Object

Draft Black Country Plan

Representation ID: 46234

Received: 11/10/2021

Respondent: W Heritage

Representation Summary:

Summary: Draft BCP Ketley Quarry DUH 203 page 372
Holbeache BCP Site REf DUH 208 page 371 DSA1 pages 419-423
The Triangle BCP Site Ref DUH 211 page 371 DSA 2 pages 424-428
Roads will not be able to cope.
Hospitals are overloaded, waiting times etc
the whole infrastructure is overloaded
Schools will not cope
Doctors are overloaded and waiting times are very long.
It allready takes 30-40 mins to get past High Oak jut to get to Russalls Hall Hospital.
+object to Lapwood Avenue Draft BCP DUH 213 page 401