The adopted BCCS spatial strategy focussed on the Growth Network, which was identified as having the ability to meet the 'majority of long term development needs' [BCCS §4.11]. Taylor Wimpey agreed that the Growth Network no longer has the ability to meet the majority of long term development needs and the CD identifies two strategic options to meeting the housing and employment requirements.
Strategic Option 1A would seek to meet all remaining housing and employment land growth needs outside the Growth Network, whilst Strategic Option 1B would seek to re-structure the Growth Network, releasing some existing employment land for housing within regeneration corridors.
The CD makes it clear that Option 1B would be 'very challenging' [§§4.18-4.20] and acknowledges that despite the previous aim to shrink the stock of employment land, the employment land stock has proved to be more resilient than predicted and sites have proved difficult to bring forward for housing [CD §5.19]. The adopted BCCS planned for a contraction in net employment land but there is now a recognised need to increase employment land stock. If any employment land were to be redeveloped for housing within the regeneration corridors, or any amendments to any regeneration corridor boundaries were proposed, the local authorities will need to ensure that any proposed development sites were sustainable and viable.
Further work is therefore required in order to assess the feasibility of Option 1B in terms of whether it would be viable and/or sustainable and determine how much employment land would realistically be available and developable for housing.
Any employment land displaced under Option 1B would need to be made up elsewhere [CD §4.19]. Therefore, whilst Taylor Wimpey does not object to the retention of the Growth Network, there is a need to provide additional land to accommodate the housing needs of the Black Country and the unmet needs of the GBHMA. The CD identifies that further land will be required to provide 22-25,000 new homes and up to 300ha of new employment land [§4.12]. Additionally, analysis undertaken by Lichfields indicates that the BCCS proposals to accommodate 3,000 dwellings of Birmingham's unmet needs significantly underestimates the proportionate 'fair share' expected of the Black Country based on the size of its population. The requirement could be as high as 955 dpa, though it is recognised that more recent evidence is needed to determine the feasibility of distributing Birmingham's unmet need across the wider GBHMA.
There is a clear and unquestionable need to provide significant amounts of housing land outwith the Growth Network within the Green Belt. Therefore the BCCS must identify and allocate suitable sites for release from the Green Belt for housing development, whichever strategic option is pursued. Taylor Wimpey however broadly supports Option 1A.

Full text:

The Strategic Challenges and Opportunities (Questions 2-6)
2.4 Taylor Wimpey generally agrees with the key issues identified but makes specific comment regarding relevant issues below.
Key Issue 1 - Updating the Evidence Base
Taylor Wimpey considers that the Key Evidence set out in Table 1 is broadly sufficient to support the BCCS review but notes that the Government is currently proposing material changes to the Framework and Practice Guidance to make the evidence requirements for Local Plans more proportionate1. Any such changes may lead to further additional work being necessary for the BCCS to be found sound when examined. Taylor Wimpey therefore reserves the right to make further comment on evidence requirements until such time that more detail is available on the proposed changes to national policy and guidance.
Key Issue 2 - Meeting the Housing Needs of a Growing Population
2.6 The CD identifies a housing need of 78,190 for the Black Country for the period 2014 to 2036; 3,554 dwellings per annum [dpa]. Taylor Wimpey considers that this is insufficient to meet the needs of the Black Country's growing population and is not in line with national guidance. The 'Black Country Housing Needs Assessment - Headroom Report' sets out the basis for this view.
2.7 The CD is based upon the March 2017 Strategic Housing Market Assessment [SHMA] which uses the 2014 Sub-National Population Projections [SNPP], with an allowance for vacancy rates and adjustment for past housing under-delivery. Finally the CD uplifts the target by 3,000 dwellings to accommodate some of Birmingham's unmet housing need. The SHMA has a flawed methodological approach, particularly: the lack of alternative household and populations projections such as using long term migration rates and no sensitivity adjustment for historic low household formation rates in younger age cohorts as required by the Framework [§159] and 1 Housing White Paper [§1.10 and A.19] Practice Guidance2; and an underestimate of the need to increase delivery in response to market signals (as recommended by the Practice Guidance3 and in recommendations made by the Local Plan Experts Group [LPEG]4).
2.8 Taylor Wimpey commissioned Lichfields to undertake an independent assessment of the Black Country's OAHN. This involved modelling a number of demographic and economic scenarios to forecast future population and household growth, following the Framework and recommendations of the Practice Guidance and LPEG. This found that the CD significantly underestimates the level of housing required to support the needs of the Black Country's growing population.
2.9 A more appropriate and robust OAHN for the Black Country (excluding South Staffordshire) is 4,518 to 5,473 dpa. This is based upon the long term migration trends seen in the Black Country, with an adjustment to household formation rates for younger age cohorts. The OAHN also includes uplifts to each local authority to reflect negative market signals and an increased affordable housing need in Dudley. Finally the OAHN sets out an increased requirement of up to 955 dpa to reflect the Black Country's proportionate 'fair share' of Birmingham's unmet housing need. The 'Black Country Housing Needs Assessment - Headroom Report' provides further detail on the approach and assumptions used to derive this OAHN.
Key Issue 3 - Supporting a Resurgent Economy
2.10 The Framework and Practice Guidance make it clear that economic growth needs and housing must align to promote sustainable patterns of development. An imbalance between housing and employment land growth could lead to unsustainable commuting patterns or constrain growth. The Practice Guidance5 makes clear that economic forecasts must have regard to the growth of working age population within the HMA, and consider demographically derived assessments of future employment needs6. This is particularly important as the economic growth ambitions of Birmingham will need to be supported by housing provision in the wider HMA, and the Black Country local authorities have an important role to play in supporting this. The Practice Guidance7 goes on to say that a failure to agree housing provision as part of the duty to cooperate would result in unmet housing need. The Framework sets out that Local Planning Authorities [LPAs] should ensure that their assessment of strategies for housing, employment and other uses are integrated, and that they take full account of relevant market and economic signals [§158].
2.11 The BCCS sets out the Economic Development Needs Assessment's [EDNA] recommendations for up to 800 ha of additional employment land to meet the Black Country's B1, B2 and B8 needs for the period 2014 to 2036. Taylor Wimpey welcomes the Black Country's aspirations for economic growth, though further evidence is required to ensure that there is sufficient housing provision to support these ambitions. The EDNA is based solely upon economic led scenarios (past delivery rates and economic growth forecasts) and does not consider the needs arising from anticipated housing growth. Further evidence is therefore required to determine the demographically led need for employment land in the Black Country to ensure that employment land supply and housing provision align, as the CD fails to align with national guidance. This evidence would need to demonstrate the anticipated employment land required to support
2 Practice Guidance Ref: 2a-015-20140306
3 Practice Guidance Ref: 2a-019-20140306
4 LPEG (March 2016) Report to the Communities Secretary and to the Minister of Housing and Planning
5 Practice Guidance Ref: 2a-018-20140306
6 Practice Guidance Ref: 2a-032-20140306
7 Practice Guidance Ref: 2a-018-20140306
demographically led scenarios, to ensure that it would not result in an over or under supply of employment land.
2.12 Taylor Wimpey welcomes the recognition in the CD that some employment sites may be unfit for purpose and could be considered for alternative uses such as housing. This aligns with the Framework [§22] which states that allocated employment sites for which there is no reasonable prospect of development should not be protected in the long term. Proposals for alternative uses on such sites should be treated on their merits having regard to market signals and the relative need for different land uses to support sustainable local communities.
Key Issue 6 - Reviewing the Role and Extent of the Green Belt
2.13 Local planning authorities are currently required by the Framework [§14] to positively seek opportunities to meet the development needs of their area. The Framework [§17] also sets out 12 core planning principles, including how planning should:
"...proactively drive and support sustainable economic development to deliver the homes, business and industrial units, infrastructure and thriving local places that the country needs. Every effort should be made objectively to identify and then meet the housing, business and other development needs of an area, and respond positively to wider opportunities for growth. Plans should take account of market signals, such as land prices and housing affordability, and set out a clear strategy for allocating sufficient land which is suitable for development in their area, taking account of the needs of the residential and business communities."
2.14 The Practice Guidance8 states that the need for housing refers to:
"...the scale and mix of housing and the range of tenures that is likely to be needed in the housing market area over the plan period - and should cater for the housing demand of the area and identify the scale of housing supply necessary to meet that demand."
2.15 Furthermore, as set out in Housing White Paper, the Government intends to extend the requirement to accommodate housing need to also include "any needs that genuinely cannot be met within neighbouring authorities."9
2.16 The CD [§3.42] recognises the need to identify new sites outside of the urban area and currently in the Green Belt, to accommodate the housing need of the Black Country. In addition to the housing needs of the Black Country local authorities, any additional identified need from the GBHMA must be accommodated within the Black Country. Housing sites must therefore be released from the Green Belt as there is insufficient available land within the urban areas to meet the requirements.
2.17 The Framework [§§83-85] sets out the need to demonstrate 'exceptional circumstances' when amending Green Belt boundaries and this is reinforced by the Housing White Paper [§§137- 140]. Taylor Wimpey considers that the scale of the housing required and the lack of land outwith the Green Belt constitutes the necessary 'exceptional circumstances' to justify that Green Belt land should be released for housing. The local authorities therefore need to provide a sound evidence base which is robust in demonstrating the 'exceptional circumstances case' and ensure it complies with the Housing White Paper [§139].
8 Practice Guidance Ref: 2a-003-20140306
9 Housing White Paper - Page 79: Box 2
2.18 In this context, Taylor Wimpey fully supports the carrying out of a Strategic Green Belt Review as this is necessary to ensure sufficient land is provided to meet the Black Country's and GBHMA's objectively assessed housing needs over the course of the plan period.
2.19 Taylor Wimpey supports the release of Green Belt sites, including specific allocations for development by 2036 through the Core Strategy review. It is critical that the Green Belt Review process is fully informed by the GBHMA Growth Study and that developers and other stakeholders are fully engaged both in terms of the proposed methodology and any site assessment work.
2.20 Call for Sites forms and Development Statements for the sites at Chester Road, Streetly and Bosty Lane, Aldridge are being submitted on behalf of Taylor Wimpey alongside these representations. The Call for Sites submission in relation to Chester Road, Streetly clearly demonstrates that the site no longer fulfils the purposes of including the land within the Green Belt; should be removed from it; and, should be allocated for housing development in the BCCS.
2.21 Furthermore, in addition to housing allocations, the BCCS should allocate safeguarded land to provide greater certainty over the Green Belt boundaries beyond the plan period.
2.22 Where housing delivery is failing to meet plan requirements, a partial or full plan review should normally be considered to allocate safeguarded land for housing development. However, it is imperative that the BCCS includes clear triggers for such a review to ensure that the plan is transparent and effective.
2.23 In accordance with the recommendations of the LPEG Report, the Council should provide a mechanism for the release of developable reserve sites equivalent to 20% of the housing requirement. Taylor Wimpey considers that reserve sites, to be taken out of the safeguarded land supply if certain triggers are met, should be identified in the BCCS. This approach has been taken by other local authorities in adopted Local Plans and such triggers would include the lack of a five year supply or delivery below the housing trajectory. A good example of this is the West Lancashire Local Plan [Policy RS6] which includes the following mechanism for releasing reserve sites after 5 years of the plan, namely:
"If less than 80% of the pro rata housing target has been delivered after 5 years of the Plan period, then the Council will release land from that safeguarded from development..."
2.24 Similar triggers are included in the policy for low delivery after 10 years or if new evidence emerges that the housing requirement should be higher. An extract of the West Lancashire Local Plan [Policy RS6] is included at Annex 1 for reference.
Key Issue 9 - Working Effectively With Neighbours
2.25 It is acknowledgement that the Black Country authorities are committed to working in partnership with neighbouring stakeholders and meeting the requirements of the Duty to Co- Operate set out in the Framework. However, significant emphasis should be put on the Black Country's role and responsibility for meeting any unmet housing need from the Greater Birmingham Housing Market Area [GBHMA].
2.26 Any additional identified need from the GBHMA must be accommodated within the Black Country and additional sites allocated for housing.
Reviewing the Strategy to Meet New Challenges and Opportunities
Vision, Principles, Spatial Objectives and Strategic Policies (Questions 7-9)
2.27 It is considered that the BCCS vision and sustainability principles remain generally appropriate as they reflect the sustainability principles of the Framework and Practice Guidance. Taylor Wimpey however, reserves the right to make further comment on the specific wording at subsequent stages of consultation on the BCCS.
2.28 It is considered that the BCCS spatial objectives remain generally appropriate but an obvious omission is a specific objective for providing the necessary level of housing in the Black Country, including any unmet housing need from the GBHMA. Such an objective should be added and other relevant objectives (i.e. 1 and 8) also amended to reflect the need to provide sufficient high quality housing in the locations where it is needed.
2.29 Taylor Wimpey agrees that policies CSP1 and CSP2 should be retained and updated to reflect new evidence and growth proposals outside the growth network. In particular, the policies will need to reflect and provide for adequate levels of housing based on robust evidence and including any additional identified need from the GBHMA.
Reviewing the Spatial Strategy
Stage 1: Strategic Options 1A and 1B - Continuing the Role of the Growth Network (Questions 10 and 11)
2.30 The adopted BCCS spatial strategy focussed on the Growth Network, which was identified as having the ability to meet the 'majority of long term development needs' [BCCS §4.11]. Taylor Wimpey agreed that the Growth Network no longer has the ability to meet the majority of long term development needs and the CD identifies two strategic options to meeting the housing and employment requirements.
2.31 Strategic Option 1A would seek to meet all remaining housing and employment land growth needs outside the Growth Network, whilst Strategic Option 1B would seek to re-structure the Growth Network, releasing some existing employment land for housing within regeneration corridors.
2.32 The CD makes it clear that Option 1B would be 'very challenging' [§§4.18-4.20] and acknowledges that despite the previous aim to shrink the stock of employment land, the employment land stock has proved to be more resilient than predicted and sites have proved difficult to bring forward for housing [CD §5.19]. The adopted BCCS planned for a contraction in net employment land but there is now a recognised need to increase employment land stock. If any employment land were to be redeveloped for housing within the regeneration corridors, or any amendments to any regeneration corridor boundaries were proposed, the local authorities will need to ensure that any proposed development sites were sustainable and viable.
2.33 Further work is therefore required in order to assess the feasibility of Option 1B in terms of whether it would be viable and/or sustainable and determine how much employment land would realistically be available and developable for housing.
2.34 Any employment land displaced under Option 1B would need to be made up elsewhere
[CD §4.19]. Therefore, whilst Taylor Wimpey does not object to the retention of the Growth
Network, there is a need to provide additional land to accommodate the housing needs of the Black Country and the unmet needs of the GBHMA. The CD identifies that further land will be required to provide 22-25,000 new homes and up to 300ha of new employment land [§4.12]. Additionally, analysis undertaken by Lichfields indicates that the BCCS proposals to accommodate 3,000 dwellings of Birmingham's unmet needs significantly underestimates the proportionate 'fair share' expected of the Black Country based on the size of its population. The requirement could be as high as 955 dpa, though it is recognised that more recent evidence is needed to determine the feasibility of distributing Birmingham's unmet need across the wider GBHMA.
2.35 There is a clear and unquestionable need to provide significant amounts of housing land outwith the Growth Network within the Green Belt. Therefore the BCCS must identify and allocate suitable sites for release from the Green Belt for housing development, whichever strategic option is pursued. Taylor Wimpey however broadly supports Option 1A.
Stage 2: Strategic Options 2A and 2B - Housing and Employment Outside the Urban Area (Questions 12-20)
2.36 There is inadequate land within the Black Country urban area to meet emerging employment and housing needs and there is also a pressing need to assist Birmingham in meeting its acute housing shortfall. Additionally an independent assessment of the Black Country's OAHN indicates a much higher requirement than that proposed by the BCCS (further details are provided in the 'Black Country Housing Needs Assessment - Headroom Report'). This need cannot be met within the existing urban area of the Black Country and therefore exceptional circumstances exist to justify the release of enough sites from the Green Belt to boost the supply of housing to meet the identified needs.
2.37 The CD identifies two spatial housing options to achieve this, namely 'rounding off' (Spatial Option H1) and Sustainable Urban Extensions [SUEs] (Spatial Option H2).
2.38 Taylor Wimpey considers that strategic scale Sustainable Urban Extensions [SUE] would normally comprise approximately 700 or more dwellings and provide new strategic social and physical infrastructure such as major highways improvements, and community healthcare and education facilities such as GPs practices or schools. Sites of around 300-700 dwellings may also constitute SUEs where they would provide substantial elements of social and physical infrastructure but not to the same scale as strategic SUEs.

2.39 Allocating SUEs of different scales across the Black Country could contribute to a mix of uses and a wide range of house types to significantly boost the supply of housing and could provide for significant investment in new infrastructure. However, relying only on very large scale sites to deliver the housing needed would have associated risks. Strategic scale sites often have more complex issues associated with them such as multiple ownerships and/or significant infrastructure requirements, which can restrict and/or delay delivery. Releasing smaller sites would help promote choice and opportunity for those in need of housing and also for developers to ensure that sustainable developments in the right locations will be viable and actually delivered. Smaller sites would need to be largely supported by existing infrastructure but could also contribute improvements to and therefore boost the existing local infrastructure in appropriate sustainable locations.

2.40 Taylor Wimpey therefore considers that there is merit in both Spatial Options H1 (rounding off) and H2 (Sustainable Urban Extensions) and therefore the most appropriate overall spatial approach in the BCCS should be to combine the two approaches. Specifically, the local authorities should identify deliverable and viable sites of all range of sizes, in sustainable locations where the size of the site and range of house types can reflect the local need for housing and the character of the area.

2.41 The critical challenge facing the Black Country is that whichever approach is adopted, large areas of the Green Belt are required for housing. Any site released from the Green Belt for housing would need to be available, suitable, achievable and viable and well related to existing patterns of development. All sites will also need to be assessed and those which would cause the least harm to Green Belt purposes. The Black Country Green Belt Review (due to be published in 2019) is therefore a crucial piece of work to identify sustainable sites which can be allocated for housing in the BCCS.

2.42 In this context, Call for Sites submissions relating to land at Chester Road, Streetly, and Bosty Lane, Aldridge accompany these representations and set out how each site would; provide a sustainable location for residential development; no longer contribute to Green Belt purposes; and, should therefore be removed from the Green Belt and allocated for residential development.

2.43 Taylor Wimpey objects to the suggestion that the Black Country's housing growth could be exported to neighbouring authorities for a number of reasons:
1 The OAHN should be fully met within the Black Country HMA to meet the needs of its residents and its growing population. However it is recognised that HMAs do not align precisely with local authority boundaries and there are grey areas at the margins in particular. As such, there can be overlaps between HMAs and there are situations where sites fall within multiple HMAs. For example the wider Black Country & South Staffordshire HMA has some overlap between the LPAs of Wolverhampton and South Staffordshire. In such situations where sites abut the borders of HMAs and are well related and accessible to settlements in adjoining districts, they can practically help meet some of the neighbouring needs whilst also meeting the needs of their HMA.

2 The nearby areas in the GBHMA cannot accommodate additional housing growth; for example Birmingham is already looking to neighbouring authorities to accommodate its growth. It is therefore unfeasible to expect neighbouring authorities to also accommodate the needs of the Black Country HMA.

3 As detailed in the 'Black Country Housing Needs Assessment - Headroom Report' there is a significant need for housing growth in the Black Country HMA, above the target proposed by the CD. Homes need to be built in locations that meet the needs of the residents living within and moving to the Black Country HMA. Additionally the Black Country HMA has an important role to play in helping to accommodate the unmet needs of Birmingham that must be shared by neighbouring authorities. Housing growth must be physically accommodated somewhere and it is not realistic or feasible for the Black Country HMA's needs to be exported to neighbouring authorities, particularly in addition to Birmingham's needs being exported.
4 The CD does not provide sufficient evidence to demonstrate that it would not be able to accommodate its housing growth needs within the Black Country HMA.

2.44 Taylor Wimpey considers that there are sufficient sites and locations within the Black Country to accommodate housing growth and sustainable development, albeit not within the existing urban area.

2.45 Taylor Wimpey considers that exporting housing needs would not be realistic as it would primarily rely upon increased levels of commuting. This would fall on journeys by car, increasing traffic flows between authorities within and outside the Black Country HMA. This is considered to be both unsustainable and undesirable, exacerbating existing pressures on the road network. The proposed Wednesbury to Brierly Hill Metro extension is expected to be open for passenger services in 2023, providing connectivity to regional and national rail services and Dudley Town Centre10. The Metro extension would improve capacity, journey times and accessibility for residents and people working in Dudley and Sandwell.

2.46 Whilst Taylor Wimpey does not wish to comment in detail on the spatial options for accommodating employment land growth, it notes that the Practice Guidance11 requires that potential job growth is considered in the context of potential unsustainable commuting patterns and as such plan-makers should consider how the location of new housing could help address this. Ensuring a sufficient supply of homes within easy access of employment sources represents a central facet of any efficiently functioning economy and can help to minimise housing pressures and unsustainable levels of commuting (and therefore congestion and carbon emissions).
Delivering Growth - Infrastructure and Viability

2.47 The local authorities should ensure that any proposed changes to policy DEL1 accord with the Framework [§§173-177] and do not place any unnecessary additional burden on smaller development sites as a result of attempting to be applicable to SUEs. Requirements relating to infrastructure needed in association with SUEs could be detailed in a separate policy or policies specific to each SUE.

2.48 Taylor Wimpey reserves the right to provide a further response on any changes to policy DEL1 or other policies dealing with infrastructure requirements at later stages of the preparation of the BCCS.

Social Infrastructure (Questions 22-25)

2.49 Taylor Wimpey does not have any specific comments to make on social infrastructure at this time but accepts that new social infrastructure is often required in relation to housing developments in order to achieve sustainable, high quality development. However, the local authorities must ensure that the BCCS accords with the Framework [§§173-177] and does not place unnecessarily burdensome requirements on developments to the point that viability and deliverability is impacted. Taylor Wimpey reserves the right to comment on such issues at the next stage of preparing the BCCS.

Physical Infrastructure (Questions 26-28)

2.50 Taylor Wimpey does not wish to make detailed comments on physical infrastructure at this time but accepts that new physical infrastructure is often required in relation to housing developments in order to achieve sustainable, high quality development. However, the local authorities must ensure that the BCCS accords with the Framework [§§173-177] and does not place unnecessarily burdensome requirements on developments to the point that viability and deliverability is impacted. Any infrastructure requirements should be proportionate to the scale of development proposed. Taylor Wimpey notes that the requirement of new physical infrastructure to serve any needs should be based on robust evidence.

10 http://www.metroalliance.co.uk/wednesbury-brierley-hill/
11 Practice Guidance Ref: 2a-018-20140306
2.51 Taylor Wimpey reserves the right to comment on such issues at the next stage of preparing the BCCS.
Delivery and Viability (Questions 29-30)
2.52 The CD [§§5.22-5.23] states that the Black Country has a good track record of working with developers to address viability issues and deliver sites and that delivery work will be undertaken in relation to Green Belt sites to understand what is required to make them viable and deliver the necessary infrastructure. A pro-active approach to ensure that any sites released from the Green Belt are viable and deliverable is welcomed.
2.53 In terms of the possible impacts of Green Belt release on the deliverability of brownfield sites, Taylor Wimpey notes that the Housing White Paper sets out clear policy proposals which the Council needs to consider in terms of ensuring that its Local Plan evidence base is robust. This includes the Housing Delivery Test [Housing White Paper §1.10] and a need to ensure that it has examined fully all other reasonable options when considering the release of land from the Green Belt [Housing White Paper §1.39-1.40].
2.54 Taylor Wimpey reserves the right to comment on the appropriateness of infrastructure delivery mechanisms either through conditions, planning/highway obligations or CIL until the Government provides further advice following the publication of the White Paper and any amendments to CIL and S106 obligations which are anticipated in the Autumn Budget.
Funding for Site Development and Infrastructure (Question 31)
2.55 The mechanisms listed in the CD [§§5.35-5.38], for funding infrastructure associated with developments are considered appropriate.
2.56 Taylor Wimpey does not wish to comment on the specific sources of funding to make developments viable [CD §§5.26-5.32] but notes that 25% of the existing Black Country housing land supply is not viable under current market conditions [CD §5.28]. The CD states that the sources of funding identified 'should' provide enough support to ring forward a sufficient supply of land to meet short to medium term needs as set out in the existing local plan [§5.32]. However, housing needs in excess of those in the existing BCCS have now been identified including additional need from the GBHMA and the release of Green Belt land is needed to meet those needs. If the identified sources fail to deliver the anticipated level of funding, there will be extra pressure for viable and deliverable sites to provide for the increased levels of housing need.

2.57 It is essential therefore that viable, deliverable Green Belt sites are allocated through the BCCS and the local authorities should also consider identifying further safeguarded land as set out in the Framework [§85] in order to meet development needs stretching well beyond the plan period (see §§2.21- 2.24 above).
Review of Existing Core Strategy Policies and Proposals
Policy Area A - Health and Wellbeing (Questions 32-34)
2.58 Taylor Wimpey does not have any specific comments to make on health and wellbeing at this time but in terms of design features of new developments, the local authorities must ensure that the BCCS accords with the Framework [§§173-177] and does not place unnecessarily burdensome requirements on developments to the point that viability and deliverability is impacted. Taylor Wimpey reserves the right to comment on such issues at the next stage of preparing the BCCS.
Policy Area B - Creating Sustainable Communities in the Black Country (Questions 35 - 48)
HOU1 - Housing Land Supply
2.59 The Framework [§47] is clear that there is a need to boost significantly the supply of housing in order to deliver a wide choice of high quality homes and ensure that Local Plans meet the full and objectively assessed needs for market and affordable housing in the relevant housing market area.
2.60 The BCCS should plan for a level of housing growth to support the economic aspirations of the local authorities, align with their growth objectives, and accommodate the unmet need from the GBHMA. The local authorities should ensure that the relevant evidence base documents and studies have regard to each other, and that the objectively assessed need [OAN] for employment land is aligned with the OAN for housing. Demand for housing land and demand for employment land are inherently linked, and provision of both should be well planned and promote sustainable travel.
2.61 There are substantial negative economic and social implications of not providing sufficient housing to meet identified needs and demand. It is therefore crucial that enough housing land is allocated in the BCCS for residential development.
2.62 In order to ensure robustness and flexibility, the BCCS must ensure that the local authorities are able to demonstrate a deliverable 5 year supply of housing land throughout the life of the plan. It is therefore important that the spatial distribution of development allows all sites identified for development to conform with the deliverability criteria set out in the Framework [§47 and footnote 11].
2.63 Taylor Wimpey has not carried out a detailed assessment of any sources of supply or had the opportunity to review any evidence on which the housing supply in the BCCS will be based but notes that the housing target for the new plan period (2014-36) will be established through the BCCS review. Taylor Wimpey therefore reserves the right to comment on these issues at a later stage but notes that the BCCS will need to accord with the Framework [§47] and meet the full, objectively assessed needs for market and affordable housing in the housing market area. In particular:
1 Any sites identified in the BCCS land supply will need to meet the tests set out at footnotes 11 and 12 of the Framework and if a small sites windfall allowance is to be included, it must be based on robust evidence of past delivery of such sites;
2 The CD [§6.22] proposes a reduction in the levels of discount for non-delivery on sites within the Growth Network. Taylor Wimpey notes that the levels of discount should not be reduced unless robust evidence on past delivery can be presented in support of this. The housing needs of the Black Country and GBHMA can only be met by releasing sites from the Green Belt, outside of the growth network where there will be less certainty and therefore an appropriate discount is necessary; and,
3 The housing requirement in the BCCS should be treated as a minimum rather than a maximum figure and an adequate surplus should be provided to give flexibility to deal with changing circumstances as required by the Framework [§153].
2.64 In summary, the BCCS must provide the necessary land to accommodate both the housing needs of the Black Country and the additional need from the GBHMA. The BCCS must also provide flexibility to deal with changing circumstances as required by the Framework [§153] and for the longer term needs of the Black Country. The local authorities therefore need to identify significant amounts of Green Belt land and allocate sites such as those at Bosty Lane, Aldridge and Chester Road, Streetly, through the BCCS.
HOU2 - Housing Density, Type and Accessibility
2.65 Taylor Wimpey supports parts of the existing text to policy HOU2 in so much as it recognises that the density and type of new housing provided on each site will be informed by:
1 The need for a range of types and sizes of accommodation to meet identified sub regional and local needs;
2 The level of accessibility by sustainable transport to residential services, including any improvements to be secured through development; and,
3 The need to achieve high quality design and minimise amenity impacts, taking into account the characteristics and mix of uses in the area where the proposal is located.
2.66 Taylor Wimpey supports the removal of the final paragraph of policy HOU2 [CD §6.28] which currently requires local plan documents to prescribe the density and house type mix for each allocation.
2.67 The Housing White Paper signals the Government's intention to minimise the use of local standards (through the Housing Standards Review) and therefore Taylor Wimpey does not support accessibility standards applied on a 'blanket' policy basis as this can lead to viability issues on developments.
2.68 Higher density development will be more appropriate in town centres and close to public transport nodes and local services but the current policy wording was adopted in the context of a spatial strategy which did not require substantial Green Belt release, as is now required. The policy should be updated to allow for the density and house type mix of any housing development site should reflect the local context in which the site is located.
2.69 The balance of new housing types and sizes should be based on an appropriate evidence base such as the 2017 SHMA findings. It is important however to also maintain a degree of flexibility to respond to changing local circumstances and more up-to-date evidence as time goes on.
2.70 Taylor Wimpey would not support a policy requirement for serviced plots on large housing sites if it threatened the viability and/or deliverability of the site. If such a requirement was introduced, there must be a mechanism to relax the requirement if it proved to not be viable on any given site.
2.71 Taylor Wimpey reserves the right to make more detailed comments on the specific wording of policy HOU2 at future stages in the preparation of the BCCS.
Policy HOU3 - Affordable Housing
2.72 The Council is querying whether the annual affordable homes target should be increased to reflect the 2017 Black Country Strategic Housing Market Assessment. Such an increase should only occur if the SHMA is robust.
2.73 Taylor Wimpey generally supports the provision of affordable housing, particularly in light of the Housing White Paper which sets out the Government's commitment to helping to support people to buy their own homes. Taylor Wimpey is supportive of the inclusion of starter homes as defined affordable housing provision and the Council should amend any evidence within the SHMA to meet emerging National Guidance. The White Paper [§4.15] states that there is a desire to deliver starter homes as part of a mixed package of affordable housing that can respond to local needs and markets.
2.74 The threshold in Policy HOU3 of sites of 15 or more dwellings should be reduced to sites of 11 or more dwellings to reflect the Practice Guidance12 and ensure that all major housing development proposals that can contribute to the provision of affordable housing, do contribute, particularly if the overall annual affordable homes target is increased.
2.75 Taylor Wimpey strongly objects to the proposal to increase the affordable housing requirement on future Green belt release sites. The 25% affordable housing requirement on private housing sites should not be increased, nor should a higher requirement set for Green Belt release housing sites, unless robust evidence shows that his would be viable and deliverable. The local authorities must ensure that the BCCS accords with the Framework [§173-177] and does not place unnecessarily burdensome requirements on developments to the point that viability and deliverability is impacted. In any case therefore, the final paragraph of Policy HOU3 must be retained so that on sites where the policy requirement for affordable housing is proven not to be viable, the maximum proportion of affordable housing will be sought which will not undermine the development's viability.
Policy HOU5 - Education and Health Care Facilities
2.76 If Policy HOU5 were to be expanded to include any other types of built social infrastructure, they would need to be adequately evidenced and viability tested to ensure that they would not place additional burdens on housing development sites to the point that viability and/or deliverability is threatened.
2.77 Taylor Wimpey reserves the right to comment further on this matter and any specific policy wording at subsequent stages in the preparation of the BCCS.
Policy Area B - Creating Sustainable Communities in the Black Country (Question 49)
Policy DEL2 - Managing the Balance between Employment Land and Housing
2.78 Taylor Wimpey does not wish to provide detailed comments at this point on whether policy DEL2 should be retained and/or amended as this will depend largely on the overall spatial strategic and strategic option pursued. Taylor Wimpey reserves the right to comment further on this matter and any specific policy wording at subsequent stages in the preparation of the BCCS.
Policy Area F - The Black Country Environment (Questions 94-103)
Policies CSP3 and CSP4 - Environmental Infrastructure and Placemaking
2.79 The proposed changes to Policies CSP3 and CSP4 set out in the CD [§6.1.46] are supported as they will simply make the policies consistent with the local authorities' adopted Development Plan Documents.
12 Practice Guidance Ref: 23b-031-20161116
2.80 If Garden City principles were to be introduced they would need to be fully viability tested so as not to threaten the viability and/or delivery of housing sites.
2.81 Taylor Wimpey reserves the right to make further detailed comments on the specific wording of these policies at subsequent stages in the preparation of the BCCS.
Policy ENV3 Design Quality
2.82 Taylor Wimpey agrees with the proposed change to Policy ENV3 to remove the requirement to meet Code for Sustainable Homes Level 3 or above for residential development as this no longer accords with national policy and guidance.
2.83 Taylor Wimpey acknowledges the need to provide accessible accommodation but given the Government's intention to minimise the use of local standards (through the Housing Standards Review), Taylor Wimpey would not support the introduction of any additional accessibility standards introduced on a 'blanket' policy basis as this would lead to viability issues on developments. The same would be true for water consumption and space standards. The BCCS must accord with the Framework [§§173-177] and not place unnecessarily burdensome requirements on developments to the point that viability and deliverability is impacted.
2.84 Taylor Wimpey reserves the right to comment on these issues at the next stage of preparing the Local Plan.
ENV5 Flood Risk, Sustainable Drainage (SuDS) and Urban Heat Island Effects
2.85 Taylor Wimpey generally supports the proposed change to policy ENV5 to prioritise natural green space SuDS where it is "practical and viable" [CD §6.1.58]. The BCCS should also go further and define what is meant by 'practical' (i.e. where natural green space SuDS would not prevent the efficient use of land or achieving an overall high quality, well designed development).
2.86 Taylor Wimpey reserves the right to make further detailed comments on the specific wording of these policies at subsequent stages in the preparation of the BCCS.
ENV7 - Renewable Energy
2.87 Taylor Wimpey acknowledges and agrees with the recognition [CD §6.1.64] that any change to the % requirement would need to be justified with evidence. Taylor Wimpey therefore reserves the right to make further comment on any changes proposed at subsequent stages of the preparation of the BCCS.
Policy Are J - Growth Network Detailed Proposals (Question 117)
2.88 Taylor Wimpey agrees in principle with the proposed approach of updating and amending Appendix 2 and Tables 2 and 3 of the existing Core Strategy but reserves the right to make further comment on any specific changes proposed at subsequent stages of the preparation of the BCCS.
Policy Area K - Monitoring and Additional Policies (Question 118-119)
2.89 Taylor Wimpey supports the proposals to streamline and simplify the Core Strategy Monitoring Framework and focus on the key quantitative indicators, in particular 'net new homes'.
2.90 There is a clear and over-riding need to release sites from the Green Belt to meet the housing needs of the Black Country and GBHMA. Taylor Wimpey fully supports the recognition that a new section in the BCCS should allocate specific Green Belt sites for housing development [CD §6.2.6]. Taylor Wimpey reserves the right to make further detailed comments on such a section and the policies it contains at subsequent stages in the preparation of the BCCS.

Support

Black Country Core Strategy Issue and Option Report

Representation ID: 2441

Received: 08/09/2017

Respondent: Gallagher Estates

Agent: Pegasus Group

Representation Summary:

As highlighted previously, the key to understanding where the most appropriate employment/ housing locations are within the Growth Network and Corridors will be determined through a qualitative assessment of allocated employment sites. It is understood an updated assessment has been undertaken and such work, complete with responses to the Call for Sites consultation, will provide the Black Country authorities with evidence to determine the urban capacity for housing, which may include transferring some employment land to housing as well as housing land to employment. This work will then outline the number of dwellings to be accommodated beyond the existing Growth Network within the Green Belt.
It is welcomed that the Issues and Options Draft recognises the need to release Green Belt in all scenarios proposed.

Full text:

Question 1: Do you agree that the Core Strategy review should be a partial review, retaining and stretching the existing spatial strategy and updating existing policies? Yes/No; If not, what do you think should be the scope of the review?
2.3 In response to Question 1 and whether it should be a partial review or not, whilst the existing strategy identifies the most sustainable locations for growth in the context of delivering development requirements identified by the Regional Strategy (RS), there is now a new and much bigger challenge ahead in meeting the arising needs for homes identified by the latest evidence and there is concern that the existing spatial strategy may not facilitate the delivery of these needs. The Black Country authorities, therefore, need to be mindful of this and not attempt to put "a square peg in a round hole".
2.4 It is our view that urban regeneration can be achieved whilst pursuing development on the urban edge. Indeed, the scale of housing need is so large that both must be encouraged in order to meet current and arising housing needs within the Black Country.
2.5 It is extremely important that in reviewing the Core Strategy it fully takes account of and facilitates the delivery of strategic economic plans, as recognised in paragraph 1.15. All too often these strategies are ignored and, accordingly, development plans could effectively frustrate economic growth from being realised.
2.6 In terms of the Plan period proposed in paragraph 1.17, whilst a 15 year time period from adoption is appropriate, there is concern that the preparation of plans is often delayed (due to reasons beyond the control of the LPAs) and it may be prudent to stretch the period further to prevent such an issue from occurring.
2.7 It is welcomed that the Issues and Options document recognises that it will not be possible to accommodate all future development needs within the urban area and that an examination of the potential for development land outside the existing urban area, which is effectively land within the Green Belt, will take place as part of the Core Strategy review process.
3. THE BLACK COUNTRY TODAY - THE EXISTING STRATEGY
3.1 As set out within this section, the delivery of both employment and housing land has not come forward as originally envisaged in part due to the after effects of the recession. Surplus employment land which might have been available for housing has not come forward due to a strengthening economy and local firms being more robust than anticipated. In addition, the range of locations available has not in all cases met with market expectations as to where people want to live.
3.2 In terms of the employment land, it is important that sufficient land is provided for new employment and that there is not an overreliance on land that is currently in use. It is impressive that despite generally poor economic performance local businesses have performed well. Should the economy significantly improve within the Plan period in line with LEP aspirations (considered later in this response), there is concern that it may become difficult to transfer existing employment locations to housing allocations. It is appropriate, therefore, for the Council to ensure the evidence contained in the Strategic Housing and Employment Land Availability Assessment is reviewed and updated regularly. This will enable the land supply to be responsive to arising needs and not rigidly be wedded to delivering commitments that are unlikely to be realised.
3.3 What is further emphasised by the analysis in this section is that urban regeneration cannot be delivered quickly and that there are a number of factors beyond the control of the Black Country authorities that may have implications on the delivery of the strategy. This further emphasises the need for a mix of types of sites (brownfield, brownfield compulsory purchase, greenfield and Green Belt) of different forms of development (high density, mid and low density family homes) in a variety of locations, which will maximise the opportunities to deliver a successful Local Plan.
3.4 Finally, in respect of the proposal to maintain 300 hectares of employment land that will become vacant by way of general churn over the Plan period. Whilst the principle is considered acceptable, there should be appropriate evidence to support the assumption.
3.5 Our experience is that there are employment sites that clients are looking to secure a residential allocation on that have not been identified thus far. In light of these changing circumstances, the Black Country authorities should ensure that the policy approach is flexible to allow sites in appropriate locations to be brought forward for housing throughout the Plan period and likewise, sites that have been allocated for housing but have not come forward should be removed from the supply.
4. THE STRATEGIC CHALLENGES & OPPORTUNITIES
4.1 It is welcomed that the Black Country authorities are updating their evidence base. Indeed, the adopted Core Strategy took the development requirements from the adopted Regional Strategy (RS), which has since been revoked and is unquestionably out of date. Since the RS was published there has been a number of population and household projections published showing increasing dwelling requirements in the Black Country, which were largely ignored and, therefore, it should come as no surprise that there is a significant increase in forming households.
4.2 In terms of the list of evidence either prepared or due to be completed, it appears to be sufficiently comprehensive.
4.3 A separate review of the housing evidence based, including the Strategic Housing Market Assessment for the Black Country and South Staffordshire, is contained at Appendix A. The key conclusions arising from the report as summarised as follows:
* The OAN identified by the SHMA for the Black Country and South Staffordshire is generally supported, however, there are concerns with regard to the methodology and it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline.
* There is concern that the economic growth scenarios do not use the latest economic forecast data and that the methodology translating the job growth into dwelling growth is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances and also more aspirational job growth targets, such as those arising from the SEP.
* In terms of providing uplifts for market signals, a 25% uplift for South Staffs is appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, it should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack within the housing market and prevent house prices from increasing at an accelerated rate.
4.4 In addition, consideration of the Housing Background Report is also contained in the Housing Evidence Based Review Paper contained at Appendix A. The key findings from reviewing the evidence is set out below:
* Clearly a lot of work is yet to be done to determine what the housing land supply position is in the Black Country. Given that much of the existing evidence is based on the adopted Core Strategy, it is recognised that the SHLAAs across the four authorities will need to be updated, both in terms of revising the methodology and range of sites assessed, to reflect a potentially different approach to locating development.
* It is commendable that the Housing Background Report has examined existing sources of supply in an attempt to provide additional homes from sites within the urban area. There is concern, however, that by changing policies, for example, to increase the minimum density on sites has wider policy implications to take into account than simply increasing the number of homes.
* The Housing Background Report suggests a continued allowance for larger windfall sites. It is suggested that it is inappropriate to include an allowance for this source as there is no certainty that this land will come forward for development.
* Other sources, such as converting employment sites to residential sites, based on the evidence presented and feedback from the development industry, it is known that there are employment sites functioning well as employment sites but are to be converted to residential and other employment sites that are unoccupied and undesirable that are to be retained as employment sites. Clearly, there is a mismatch between employment land need and employment land supply. It is advised that the qualitative assessment of employment informs future land supply recommendations and allocations are revised where necessary.
4.5 As a result of the dwelling requirements generated by the SHMA and the land supply identified from the Housing Background Report, it is concluded that there in insufficient urban land to provide for the development requirements and that a Green Belt Review should be conducted. It is noted that scoping is underway and that the work is to be completed in mid 2018. It is hopeful that the development industry will be involved in defining the methodology of the work to ensure that it is conducted in a robust way.
4.6 Another very important piece of work to be taken into consideration will be the Greater Birmingham and Black Country HMA Strategic Growth Study. It is unclear at this stage what role the Black Country authorities will play in meeting the wider needs of Birmingham and, indeed, whether it can now contribute given that meeting the needs of the indigenous population will be a tall order. Further, there is uncertainty with regard to how far the study will go in identifying locations for growth and how this evidence will be taken forward in emerging Development Plans, particularly given that it is premature to the Green Belt Review for the wider Black Country area. It is our view that there are sites within the Green Belt that will provide sustainable locations for growth and that their removal will not compromise the purposes of the Green Belt and, accordingly it will remain purposeful and functional.
Question 2: Do you think that the key evidence set out in Table 1 is sufficient to support the key stages of the Core Strategy review? Yes/No; If not, what further evidence is required and, if there are any particular issues that should be taken into account in considering development on any particular sites or in any particular areas, please provide details
4.7 It is considered that the evidence contained within Table 1 is comprehensive, however, as suggested above and below, a number of concerns have been highlighted and it is therefore suggested that these are addressed in order to improve the soundness of the next iteration of the Core Strategy Review.
4.8 It is welcomed that an updated qualitative assessment of employment land has been undertaken in order to identify if the sites are fit for purpose, alongside the quantitative employment land study. It has been identified that a number of employment land sites that have been suggested for residential land allocations remain in occupation as functioning employment sites. These sites should be removed from the housing land supply. Conversely, there are vacant employment land sites that have been marketed over a period of time where no market interest has been forthcoming and, therefore, it is recommended that these sites should be considered for housing delivery.
4.9 It is noted that Viability Studies are identified as evidence base documents that are still to be prepared. Whilst not specifically identified, it is recommended that affordable housing viability is a key matter that needs to be addressed as part of this evidence base to ensure the level suggested by the SHMA Part 2 is deliverable. If this is not the case, the delivery of both market and affordable housing could be compromised and prevent the successful delivery of any new strategy.
Question 3: Do you agree that the housing need identified for the Black Country over the period 2014-36 in the SHMA, and the anticipated amount of supply, are appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.10 In terms of the extent of the sub market, which includes the Black Country and South Staffordshire, this is considered to be appropriate. It is recognised and welcomed that the Black Country authorities and South Staffordshire have jointly undertaken a SHMA for the sub area, which facilitates the preparation of an Issues and Options Core Strategy Review. There is concern, however, that the remaining constituent authorities within the wider Greater Birmingham Housing Market Area have not taken part and there is a danger that housing need for the whole HMA may not entirely be comprehensively captured due to the different time periods covered by the separate studies. It is advised that a SHMA, consistent with the guidance in the NPPF and Planning Practice Guidance, is prepared for the entire HMA over the same Plan period (as opposed to a housing needs study), which will properly consider all relevant factors in a consistent and comprehensive manner.
4.11 The OAN arrived at by the SHMA is generally appropriate in identifying the starting point for determining the dwelling requirement, however, it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline. There is concern that the economic growth scenarios contain potentially out of date employment forecasts and the methodology to determine appropriate dwelling requirements is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances. In addition, more aspirational job growth targets, such as those arising from the SEP, may not necessarily be appropriate for the Black Country (as discussed later in these representations).
4.12 In terms of providing an uplift for market signals, a 25% uplift for South Staffs is agreed to be appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, the application of such an uplift in South Staffordshire should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack or headroom within the housing market and prevent house prices from increasing at an accelerated rate, exacerbating issues of affordability.
4.13 Clearly, the evidence contained in the SHMA does not consider the potential to accommodate any of Birmingham City's housing needs and that this could result in increased dwelling requirements. We reserve our position in respect of this matter and await the publication of the HMA wide Strategic Housing Needs Study.
4.14 We shortly await a consultation publication from central Government in relation to providing a standardised methodology for generating dwelling requirements. This is anticipated in Autumn 2017. The Black Country authorities will need to take account of any proposed national policy changes identified through the consultation paper. We reserve our position on this matter, until the full details and implications for the Back Country are known. It is considered that, whilst a standard methodology will be helpful in identifying a baseline dwelling requirement, the consideration of long term trends and economic forecasts cannot be carried out in a mathematical calculation outside a demographic/ economic model. In light of this, the SHMA prepared for the sub-area could remain useful as evidence to inform the review of the Black Country Core Strategy.
4.15 In terms of meeting the dwelling requirements, it is understood that the 'Call for Sites' consultation will inform an updated SHLAA, which will assess sites both within and outside the urban area to determine the maximum number of dwellings that can be realistically delivered within the Black Country over the proposed Plan period. The Housing Background Report that has been published as part of the evidence base for the Issues and Options Core Strategy Review has considered assumptions contained within the SHLAA based on adopted policies and considers changes to the policies to boost the delivery of housing on existing sites. Whilst it is a commendable that the Black Country authorities are exploring all potential options to boost housing on urban land, there are wider implications of doing so and accordingly, caution is expressed in response to a number of the identified approaches proposed.
4.16 As confirmed in paragraph 3.15, it is extremely important that the Black Country authorities 'firm up' the housing supply in order to ensure that there is sufficient provision to meet the dwelling requirements. It is also considered appropriate to provide an additional buffer of housing land supply to provide a contingency when sites are delayed. As explained earlier in the Issues and Options Report, sites providing a total of 3,000 homes have not come forward as anticipated. It is considered that additional supply is required to provide flexibility and minimise any durations within the Plan period where the housing trajectory would otherwise dip.
4.17 In terms of the extent of a buffer for housing land, the Local Plan Expert Group suggested that additional land, equivalent to delivering 20% of the overall dwelling requirement, is added to the supply, which will provide a contingency of land to be used as and when necessary during the Plan period. It is suggested that this additional land will help ensure the dwelling delivery targets and housing needs are met in a timely manner, which will reduce the opportunity for households to become concealed or shared. Given the issues experienced in respect of delivery in the past, it could be argued that an increased buffer of circa 25% could be applied.
4.18 It is also appropriate to ensure that, as well as identifying the right amount of land, there is sufficient variety in the types of sites (brownfield, greenfield, Green Belt) are identified, reflecting different sizes, in a range of locations. This variety in provision will allow the best opportunity for multiple sites to come forward at the same time without market constraint and hence ensuring delivery targets are met. In addition, this approach will also provide market choice to existing and arising households looking to move into a new home in the Black Country, which will have wider social benefits (i.e. allow families to live nearby one another and provide an opportunity to diversify existing communities through providing alternative homes to the existing housing stock).
4.19 Indeed, as previously documented in the adopted Core Strategy, it is considered that the ambition to retain the young and professional population within the Black Country should be maintained and that suitable and attractive housing and complementary environments are encouraged.
4.20 Finally, it is welcomed that the Black Country authorities have agreed to test the dwelling requirement figures on an ongoing basis. It is hoped that the suggested changes/alternative scenarios suggested above are implemented in order to ensure the evidence base is robust and the resultant policies and proposals soundly based.
Question 4: Do you consider the employment land requirement identified for the Black Country up to 2036 in the EDNA is appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.21 The Core Strategy review intends to utilise the Economic Development Needs Assessment (EDNA) for the Black Country, published in May 2017, to inform future employment land requirements. The EDNA uses forecasts produced as part of the West Midlands Combined Authority Strategic Economic Plan (SEP) to calculate long-term growth, noting that the 'Super SEP Economy+ Scenario' is the preferred aspirational scenario. This scenario assumes average annual growth in employment of 1.3% across the Combined Authority and presents an ambitious view of future growth in the area, with 500,000 jobs created between 2013 and 2030.
4.22 The SEP Technical Appendix breaks down the job forecasts for the three Local Enterprise Partnerships that form the Combined Authority (Black Country; Coventry & Warwickshire; and Greater Birmingham & Solihull). Jobs growth in the Black Country LEP is forecast to be around 1.1% per annum, whilst it is forecast at 1.5% per annum in the other two LEP areas. This averages out at annual growth of approximately 1.3%. Using data from the Business Register & Employment Survey, published by the Office for National Statistics, it is possible to look at employment trends over the last five to six years (2009-15) and this analysis suggests that the growth rate used in the aspirational growth scenario may be too ambitious for the Back Country:
4.23 Between 2009 and 2015, total employment in the Black Country LEP increased from around 450,000 to approximately 453,000. This equates to average annual growth of 0.1%. Walsall (1.5% p.a.) and Sandwell (0.9% p.a.) experienced jobs growth, although Dudley (-1.1% p.a.) and Wolverhampton (-0.8%) both suffered a fall in employment.
4.24 By contrast, both the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs saw total job numbers increase by 1.3% p.a. from 2009-13. A number of districts in these LEPs saw particularly strong growth over the period, notably Solihull and Lichfield in Greater Birmingham & Solihull, where employment grew by at least 3.0% on an annual basis. In short, the 1.3% average across the West Midlands Combined Authority Area is substantially bolstered by Solihull and Lichfield and therefore it is very ambitious to suggest this will occur across the Black Country area.
4.25 That said, growth in the Black Country needs to be faster than in previous years and the new Core Strategy has a vital role to play in supporting this, however the analysis presented above suggests that the growth targets need to be lowered to better reflect the local economic climate. It is considered unlikely that an annual increase of 1.0% or more will happen in the area in the long-term, especially with the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs capturing new job opportunities at a faster rate in recent years. Lowering the employment growth rate means the amount of employment floorspace needed would be lower. This would not reduce the demographically based housing targets for the area but it would potentially free up previously allocated employment sites for other uses such as residential. This would help the Black Country meet its future housing targets and ensure that it has enough homes for its future workforce to live in.
4.26 As identified in the supporting report and above, it is known that employment sites that had previously been identified for housing are still operational with businesses continuing to use the land and, conversely, there are sites allocated for employment that have been vacant and subsequently market, however, remain unoccupied, which could be transferred to a residential use. It is therefore recommended that the Councils ensure that updated EDNA qualitative review conclusions are taken into account and correct uses applied where appropriate.
Question 5: Do you agree with the proposed approach to the Black Country Green Belt Review? Yes/No; If not, what additional work do you think is necessary?
4.27 In respect of the Green Belt Review, on the basis of the evidence published setting out housing need and supply, it is agreed that it will be necessary to find sites outside of the existing urban area, which will require removing land from the Green Belt where it is appropriate to do so. This will provide an opportunity to identify strategic sites that can provide a significant amount of homes to contribute to meeting identified housing needs. It is considered that there are a number of locations whereby housing sites can be identified, without the purposes of the Green Belt being compromised, ensuring the function and integrity of the Green Belt will remain.
4.28 In addition, areas on the urban fringe have the potential to ensure new homes can be delivered in an established, well landscaped environment, which could be attractive to those young families and professionals that the Black Country authorities have had difficulty in retaining, often through out-migration to neighbouring Shire districts considered to represent more aspirational locations.
4.29 In terms of the process and methodology for undertaking a Green Belt Review, it is understood that the awaited Strategic Housing Needs Study (SHNS) will be accompanied by Strategic Green Belt Review across Greater Birmingham and that the Black Country authorities have been engaged in presenting potential opportunities. It is reassuring that this engagement between consultants and local planning authorities is taking place as there is a danger that logical locations fail to be identified due to a lack of understanding of environmental conditions and/ or local circumstances that are applicable to sites.
4.30 It is agreed and makes sense for the local planning authorities to conduct a Stage 2 Green Belt Assessment following the completion of the higher level work. Any input on reviewing the draft methodology for the Stage 3 Green Belt Review would be welcomed.
Question 6: Do you agree that the key issues set out in Part 3 are the key issues that need to be taken into account through the Core Strategy Review? Yes/No; If not, what other key issues should be taken into account?
4.31 The key issues presented are considered to be relevant, however, there are a number of inconsistencies relating to matters identified above against the previous questions raised.
5. REVIEWING THE STRATEGY TO MEET NEW CHALLENGES & OPPORTUNITIES
Question 7: Do you think that the Core Strategy vision and sustainability principles remain appropriate? Yes/No; If not, what alternatives would you suggest?
5.1 In the main, the Core Strategy Vision and sustainability principles are considered to be appropriate, all except for the principle to 'put brownfield first'. It is understood that the NPPF, whilst it encourages an efficient use of land and for brown field land to be recycled, it does not suggest a sequential approach to development. The is no evidence to demonstrate that the development of greenfield land will compromise the development of brownfield land. Often the type of developers of the different land categories are different and, given the scale of the housing need, it is appropriate that the early delivery of housing is encouraged from all types of sites. In particular, the larger, potentially Green Belt, sites will have a longer lead in time due to the time it takes to plan for, determine and implement a comprehensive scheme. Indeed, a recent study entitled 'Start to Finish', prepared by NLP, supports this claim. When planning the housing trajectory for the Core Strategy, the larger sites should be planned in to come forward as soon as practically possible.
5.2 It is, therefore, suggested that the reference to 'putting brownfield first' is inappropriate and that it should be replaced by 'ensuring an efficient use of land to meet the identified housing needs', which encourages the recycling of land and recognises the contributions of greenfield/ Green Belt land to meeting housing delivery targets.
Question 8: Do you think that the Core Strategy spatial objectives remain appropriate? Yes/No; If not, what alternatives would you suggest and how might these changes impact on individual Core Strategy policies?
5.3 Whilst the objectives outlined generally remain sound, there is concern that one of the NPPF's main priorities is absent. This is in relation to significantly boosting the supply of housing. It is suggested that an additional objective is added in order to ensure that meeting housing needs remains a priority within the Black Country. Once a preferred option is arrived at, spatial references as to where the housing growth will be delivered could be included (for example, meeting housing needs on urban (brownfield and greenfield) land and at extensions to the urban area).
5.4 Further, given the increased employment land requirements, the second objective relating to employment land being within the best locations within the Regeneration Corridors may no longer be appropriate. Indeed, as highlighted earlier, there is concern that there is a mismatch in land allocations, and it is appropriate for the Core Strategy review to ensure all employment sites are fit for purpose. This may conclude that employment opportunities should be identified on new land outside of the Regeneration Corridors. Should this be the case, the objective would be inappropriately worded.
Question 9: Do you agree that Policies CSP1 and CSP2 should be retained and updated to reflect new evidence and growth proposals outside the Growth Network? Yes/No; If not, what changes do you think should be made to Policies CSP1 and CSP2 in response to new challenges and opportunities?
5.5 It is agreed that the policies could remain, if the development requirements and related changes are made to ensure the policies are consistent with the overall strategy. The changes relate to both the quantum of development (homes, employment and retail space), the location of development (within and beyond the existing Regeneration Corridors) and the type of development (brownfield, greenfield and on land removed from the Green Belt). It is considered that references should be made to urban extensions (on land removed from the Green Belt) in Policy CSP2 specifically, to highlight the important contribution that such sites will make to meeting the development requirements of the Plan.
5.6 On a separate note, whilst a point mostly relating to the South Staffordshire Local Plan to which separate representations will be made, it is considered that the currently adopted approach to spatial distribution in South Staffordshire will need to be re-assessed. Given the huge housing requirements of the Black Country and the shared housing market between South Staffordshire and the Black Country, it is considered that suitable urban extension sites located within South Staffordshire District would be the logical and sensible locations to meet any remaining unmet housing need. In terms of the relevance of this point to the Black Country Review, it will be important for the Black Country authorities to collaborate with South Staffordshire on cross-boundary issues, and to identify suitable extension sites to the Black Country built area which fall within the planning jurisdiction of South Staffordshire District. It is welcomed that this approach is planned to be undertaken, by virtue of the forthcoming Green Belt Review which will be a joint exercise between the Black Country Authorities and South Staffordshire District.
Question 10: In continuing to promote growth within the Growth Network, is there a need to amend the boundaries of any of the Regeneration Corridors in the existing Core Strategy? Yes/No; If so, which boundaries and why?
Question 11a: Do you support Strategic Option 1A? Yes/No; If yes, please explain why. If no, do you support Option 1B? Yes/No; If yes, please explain why. If you support the release of further employment land for housing, what should the characteristics of these employment areas be?
Question 11b: Are there any current employment areas that might be considered suitable for redevelopment to housing? Yes/No; Please submit specific sites through the 'call for sites' form.
5.7 As highlighted previously, the key to understanding where the most appropriate employment/ housing locations are within the Growth Network and Corridors will be determined through a qualitative assessment of allocated employment sites. It is understood an updated assessment has been undertaken and such work, complete with responses to the Call for Sites consultation, will provide the Black Country authorities with evidence to determine the urban capacity for housing, which may include transferring some employment land to housing as well as housing land to employment. This work will then outline the number of dwellings to be accommodated beyond the existing Growth Network within the Green Belt.
5.8 It is welcomed that the Issues and Options Draft recognises the need to release Green Belt in all scenarios proposed.
Question 12a: Do you support Spatial Option H1? Yes/No; What criteria should be used to select suitable sites? e.g. ability to create a defensible new green belt boundary, size, access to existing residential services.
Question 12b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details (please submit specific sites through the 'call for sites' form).
Question 13a: Do you support Spatial Option H2? Yes/No; What should the characteristics of Sustainable Urban Areas (SUEs) be? e.g. minimum/ maximum size, mix of uses, mix of housing types, accessibility to other areas. What criteria should be used to select suitable sites? e.g. proximity to a rail station, availability of existing infrastructure, easy access to jobs, potential to support existing settlements / services, proximity to the existing growth network, potential to support urban regeneration.
5.9 Given the scale of the housing need, there is concern that the development requirements could not be met with just one of the suggested options presented and, therefore, a combination of both options will be necessary.
5.10 To be in the best possible position to significantly boost the amount of housing and meet the development requirements in the Black Country, in accordance with the NPPF, it is advised that opportunities to both round off edges of the Green Belt and Sustainable Urban Extensions are proposed in the Preferred Options Draft Core Strategy. As highlighted within the Issues and Options Draft, there are challenges and opportunities that come with both types of development, for example from a delivery perspective, smaller sites will come forward more quickly due to the nature of these being straight forward proposals (with limited infrastructure necessary and one or few land owners) and larger sites will ultimately take longer as they are more complex (with multiple land uses, infrastructure and land owners). This fact has been evidenced by Nathaniel Lichfield and Partners (now known as Lichfields) within their report 'Start to Finish' who concluded that the average planning approval period of schemes of 2,000+ dwellings is 6.1 years and the annual average build out rate is 161 dwellings per annum. These figures demonstrate the need to have a number of sites of different sizes and in different locations removed from the Green Belt. The report also identifies, with regard to housing delivery, that 50% more homes per annum are delivered on average on large greenfield sites than large brownfield sites. This is a significant benefit of including greenfield sites within the Preferred Option and will assist to secure its delivery.
5.11 In terms of the locations for removing land from the Green Belt, this should be informed by the Strategic Growth Study and a Black Country Review of the Green Belt. The more detailed study will provide an assessment of land parcels against the purposes of the Green Belt and is likely to recommend that those that compromise the purposes the least will be shortlisted for further consideration to be removed from the Green Belt. It is advised that the next stage should be a consideration of the shortlisted sites based on their suitability (i.e. are the neighbouring uses compatible, would any previous land uses prevent the development of the site), sustainability (i.e. proximity to/ ability to provide local services/ public transport/ employment opportunities) and deliverability (i.e. whether the site is available, being promoted for development, has no barriers to coming forward etc.) credentials. Clearly each site will fair differently against such criteria and the Call for Sites submission will assist the Council to come to a decision on the preferred sites. It is advised that the Black Country authorities should be mindful of the opportunities, through infrastructure and design, that development can bring that will enhance the diversity and character of a particular location.
5.12 In terms of the characteristics of a Sustainable Urban Extension, this is likely to vary depending on the location of each site. For example, some may be more urban and others suburban in their character and would, therefore, provide a different land use offer. It is important that each are considered on a site by site basis to ensure that any subsequent allocation delivers a successful development. It is important that the developer responsible for promoting the site helps to influence what is ultimately delivered. Often what is proposed on site has been informed by housing market intelligence undertaken by sales experts at development companies and, therefore, should be taken into account. Particularly given recent experience in the down turn in the apartment market, it is important that sites are allocated for the right type and mix of housing to ensure that it will be delivered, occupied and successful.
5.13 In the more suburban locations, it is suggested that Sustainable Urban Extensions should look to provide a different offer to potentially what exists in the Strategic Centres and Regeneration Corridors, such as a mix of larger and lower density homes, which will attract those households that in the past have migrated elsewhere. Given the emphasis on delivering more high density homes in the Strategic Centres, it is important that this housing mix is offset by more larger homes in appropriate locations. Otherwise, there is a concern that the Black Country will have a disproportional amount of small homes, which will further encourage more families to migrate elsewhere and not meet the aspiration to diversify the wider HMA.
Question 13b: What infrastructure do you think would be needed for different sizes of SUEs?
5.14 The type of infrastructure needed will vary depending on the different location and size of each site and must be compliant with paragraph 122 of the CIL Regulations that requires planning obligations (which applies to most infrastructure) to be necessary to make the development acceptable in planning terms; directly related to the development; and fairly and reasonably related in scale and kind to the development.
5.15 With the above in mind, however, provision for open space (both formal and informal), local centre and potentially a primary school should be considered for sites in excess of 1,000 homes.
Question 13c: Are there any potential locations that should be considered for SUEs (please submit through the 'call for sites' form) and what infrastructure would be required to support these?
5.16 Land at Home Farm, Sandhills is a location on the edge of Brownhills in Walsall Borough that could accommodate in excess of 1,200 homes, complete with open space, al local centre and potentially a primary school if required. A Call for Sites form is included at Appendix B, which demonstrates the sites suitability, achievability and deliverability. In addition, a Technical Compendium is included at Appendix C, which includes evidence in relation to landscape and visual matters, cultural heritage and archaeology, transportation, agricultural circumstances, ecology, flood risk and drainage and ground conditions. All of which serves to demonstrate there are no constraints to the delivery of the site and that residential development of circa 1,200 homes can be successfully achieved.
Question 13d: Do you think that the Core Strategy should set out detailed guidance for the development of SUEs (e.g. type and tenure of housing, specific infrastructure required), rather than details being determined at a local level in light of local policies? Yes/No; Any further comments?
5.17 For the reasons outlined above, relating to considering existing local circumstances and CIL Regulation requirements in respect of any charging schedule and planning obligation requirements, it is advised that detailed guidance for the development of SUEs should not be specified within the Black Country Core Strategy as each site will vary and deserves a more detailed consideration, alongside the developer, at the local level.
Question 14: Do you think there are any other deliverable and sustainable Housing Spatial Options? Yes/No; If yes, please provide details
5.18 There are no other sustainable and deliverable options that we are aware of within the Black Country administrative boundary that are capable of delivering the housing spatial options.
Question 15a: If all housing need cannot be met within the Black Country, do you support the 'export' of housing growth to neighbouring authorities within the HMA? Yes/No; What factors should be taken into account in an assessment of the opportunities in neighbouring authorities e.g. proximity to the edge of the urban area, proximity to a rail station, availability of existing infrastructure, easy access to jobs?
5.19 If, once all realistically deliverable options have been considered, there remains an unmet need for housing it is agreed that the Black Country authorities should consider the possibility of exporting growth to neighbouring authorities within the HMA. In particular, there are options to expand existing settlements that are close to the administrative boundary (for example, in both the Black Country and South Staffordshire) across authorities and, therefore, once all options within the HMA have been explored, these could help deliver growth in a sustainable and deliverable manner. These opportunities should be explored first prior to exporting further growth to other authorities within the HMA where there is less of a spatial connection.
Question 15c: Do you think there are ways to ensure that exporting housing will meet the needs of people who would otherwise live in the Black Country? (e.g. transport improvements, provision of affordable housing, creation of employment opportunities) Yes/No; If yes, please provide details.
5.21 It is important to consider a number of factors, including migration and travel to work patterns, which have been used to identify the extent of the HMA, to determine where households relocate to when leaving the Black Country in order to understand where and why those moves are taking place. Whilst planning can attempt to influence where people relocate to, there is no mechanism to guide or restrict people moving to or from certain locations. Once knowledge of movers can be understood can the planning system can attempt to recreate those attractive characteristics (homes that are more affordable, good public transport links, employment opportunities etc.) in locations where there is capacity for the homes to be delivered. It is advised that an additional analysis of the data, where necessary, is undertaken to provide the Black Country authorities with the relevant intelligence to deliver a successful strategy for growth outside the administrative area.
Question 16: Do you support Spatial Option E1? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access) If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
Question 17: Do you support Spatial Option E2? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites e.g. quick motorway access, good sustainable transport links? If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
Question 18: Do you support Spatial Option E3? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access) If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
Question 19a: Do you support Spatial Option E4? Yes/No; Any further comments?
Question 19b: Should any factors be taken into account in an assessment of the opportunities? Yes/No; If yes, what should they be? (e.g. quick motorway access, strong transport links with the Black Country, good sustainable transport links with the Black Country) If you think there are any potential locations that should be considered, please provide details.
Question 20: Do you think there are any other deliverable and sustainable Employment Land Spatial Options? Yes/No; If yes, please provide details.
5.22 As previously outlined, there is concern that some of the employment sites currently identified are potentially not fit for purpose and others that are identified to be transferred to housing remain in employment occupation. In light of this mismatch, it is welcomed that an updated qualitative assessment has been undertaken and has informed how much employment land is has be found outside the urban area.
5.23 In terms of where the employment land should be located outside the urban area, as with housing, decisions should be based on the results of the Green Belt Review and the suitability, sustainability and deliverability of sites. For employment land sites, the suitability of a site may well include good transportation links for goods and people. The Call for Sites consultation will assist in putting forward suggestions for sites.
5.24 In terms of exporting employment land, it is considered that a proportionate amount of employment land to housing land exported should be made in an attempt to create more sustainable communities, that is unless there is good reason not to do so (i.e. due to improved public transport links between exported housing and employment sites). As evidenced in work supporting the Issues and Options Draft, whilst the Black Country is a sufficiently self-contained labour market there are strong linkages with Birmingham and South Staffordshire. This would therefore suggest that these locations should be first explored for transporting any employment land growth, however, given the land capacity issues in Birmingham it is more likely that South Staffordshire would be able to assist.
6. DELIVERING GROWTH - INFRASTRUCTURE & VIABILITY
Question 21: Do you think that changes are required to Policy DEL1 to ensure it covers both development within the existing urban area and any within the Green Belt? Yes/No; If yes, please provide details.
6.1 Policy DEL1 is considered to be sound on the basis that it is sufficiently flexible to deal with different circumstances on different sites across the Black Country, including sites that are to be removed from the Green Belt.
Question 22: Do you have evidence of a requirement for new social infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.2 We are in consultation with the relevant authorities to explore any requirements for social infrastructure to serve any need relating to the development proposals proposed at Home Farm, Sandhills.
Question 23: Do you have evidence of social infrastructure that is no longer needed and where the site could be reallocated for alternative uses? Yes/No; If yes, please provide details.
6.3 No comment.
Question 28: Do you think physical infrastructure is necessary to serve large new housing developments? Yes/No; If yes, what type and scale of physical infrastructure is necessary?
6.8 As set out above, the need for infrastructure will vary for each site. Given such different circumstances, it would be inappropriate and potentially unlawful (as it would conflict with paragraph 122 of the CIL Regulations) to incorporate a blanket policy requiring specific infrastructure on every large housing site.
Question 29: Do you think there are any other tools or interventions that could be used to ensure enough infrastructure is provided by developments? Yes/No; If yes, please provide details.
6.9 It is considered that the existing national framework (which includes the NPPF and CIL Regulations) provides a sufficient tool to ensure the relevant infrastructure is delivered. In addition, the CIL Charging Schedule allows authorities to raise funds for named infrastructure projects, which should be updated in line with the Core Strategy. Therefore, it is considered that there are existing provisions to deliver infrastructure and no additional interventions in the Black Country Core Strategy Review are needed.
Question 30: Do you have any suggestions around how the strategy can be developed in order to maintain the urban regeneration focus of the Black Country while at the same time bringing forward sites in the green belt? Yes/No; If yes, please provide details.
6.10 There is no a need for any specific interventions, such as phasing, to protect the delivery of urban regeneration in the Black Country. Indeed, it is considered that development of green field and Green Belt sites can very much compliment urban regeneration through the provision of a more varied form of development that will help diversify the housing stock and profile of residents in the wider area, which will assist to sustain and improve the vitality of existing communities. Further, as highlighted above, given the priority to significantly boost the delivery of housing green field and Green Belt sites should come forward for development as soon as practically possible. In light of the lead in and build out rates of larger sites, the land should be encouraged to be developed as soon as possible so to ensure the homes are delivered in the plan period and the needs are met.
Question 31: Do you think that the right scale and form of funding is available to support the delivery of the Core Strategy review? Yes/No; If no, what alternative sources of funding or delivery mechanisms should be investigated?
6.11 When delivering green field/ Green Belt sites, there is an opportunity to deliver infrastructure to meet the needs arising from the proposal, which may have wider benefits for the local community. In addition, it is likely that the communities created by the Sustainable Urban Extensions will potentially be more affluent and share their wealth using local shops and services within the wider Black Country, which will contribute to more successful and prosperous community.
7. REVIEW OF EXISTING CORE STRATEGY POLICIES & PROPOSALS
Housing
Question 35: Do you support the proposed approach to housing land supply? Yes/No; If no, please explain why
7.1 As identified above, it is important that a range of sites in different locations are identified to be in the best possible position of delivering the development requirements. In terms of presenting these sites in the Core Strategy, whilst it is useful to identify a housing trajectory, it is important that there is not a phasing policy as such that would prevent the delivery of housing, given the current housing crisis. As stated above, the delivery of housing on greenfield and Green Belt land will not compromise the delivery of urban regeneration as the development on the urban edge will complement and rejuvenate the environment in a different way.
7.2 In terms of the proposed level of discounting, it is considered that if the LPA adopt an approach to identify a further 20% of sites in accordance with the LPEG recommendations identified above, there would not necessarily be a need for the application of discounting in determining the overall level of supply. It is interesting to note that the level of discounting proposed by LPEG is suggested for all LPAs, not necessarily those which have experienced difficulty in delivery. It could therefore be argued that an increased buffer of 25% could be applied in order to take a cautious approach.
Question 36: Do you think that the current accessibility and density standards set out in Policy HOU2 and Table 8 should be changed? Yes/No; If yes, what standards should be applied instead, for example should the minimum net density of 35 dwellings per hectare be increased to maximise brownfield housing delivery?
7.3 It is clear that the current accessibility and density standards outlined in the adopted Core Strategy were formulated in the context of the vast majority of development taking place on brownfield sites within the defined urban area. As reiterated throughout these representations, there is now a clear need for Green Belt release as part of the Local Plan Review to meet emerging, objectively assessed housing needs. We outline in further detail below why the adopted accessibility and densities would not be applicable to Green Belt sites, however would suggest that the current standards do not allow sufficient flexibility on brownfield sites. A blanket application of prescriptive accessibility and density standards across the Black Country, be it brownfield or greenfield, does not allow sufficient flexibility which take into account site specific characteristics. The Council should allow for greater flexibility when assessing accessibility and density standards, with a more pragmatic approach which allows appropriate assessment for site-specific characteristics and also an assessment of market demand which may vary significantly across the large Black Country area.
7.4 Paragraph 47 of the NPPF outlines how local authorities should set out their own approach towards density. It is suggested that the currently adopted approach does not allow for sufficient assessment of local characteristics. It is clear that the chosen approach must be reflective of local circumstances, including the matters outlined above as well as infrastructure and services available in the locality. It is advocated that a more flexible approach to density and accessibility standards is taken as part of the emerging Local Plan Review.
Question 37a: Do you think that the existing Policy HOU2 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why
7.5 In line with the comments above, it is suggested that the Council should assess each site on a case by case basis in terms of accessibility and density standards. This approach would suggest that the numerical baseline trigger of 15 homes or more will not always be appropriate or applicable, and as advocated throughout these representations it suggested that there should be a complete re-assessment on accessibility and density standards as part of the emerging Local Plan Review.
Question 38: Do you think that the current accessibility and density standards are appropriate for green belt release locations? Yes/No; If no, what standards should be applied in these locations and why?
7.6 No, it is not considered that the current standards would be applicable to Green Belt release locations. The adopted standards are overly prescriptive, and as previously discussed were written in the context of brownfield land. Green Belt release sites have a completely different type of character, therefore consideration of accessibility and density standards in relation to these sites should be reflective of local character and site characteristics. The more suburban settings of Green Belt release land lends itself to lower densities which are more appropriate to the Green Belt setting, which typically deliver more family homes. The Council must provide robust evidence to test any forthcoming accessibility and density standards in relation to Green Belt release locations, which allows for a flexible and pragmatic approach.
Question 39: Do you think separate accessibility standards are needed for particular types of housing e.g. housing for the elderly or affordable housing (as occupiers may be less mobile and more dependent on public transport)? Yes/No; If yes, please provide details.
7.7 It is clear that separate accessibility standards will apply to particular types of housing such as affordable and for the elderly population, however in line with the sentiment expressed above, any forthcoming standards should be based on robust evidence and allow for sufficient flexibility to avoid any unnecessary constraints to development coming forward.
Question 40: Do you agree that the 2017 SHMA findings should be used to set general house type targets for the Plan period? Yes/No; If no, please explain why.
7.8 A general and blanket application for house types across the Black Country should not be advanced as part of the Local Plan Review. Paragraph 50 is clear that local planning authorities should plan for a mix of housing based on current and future demographic trends and market trends. It is therefore notable that the NPPF specifically highlights 'market trends' in this context, which acknowledges that the market must inform such decisions.
7.9 Whilst the 2017 SHMA does provide an assessment of demographic and market trends, it is notable that it looks at a wider area assessment and is focused at a higher level. This assessment therefore does not draw out sub-market trends, and cover smaller areas within the vast Black Country area. Again, a blanket policy of house type targets across the Black Country area would not allow for sufficient flexibility to assess each site on a site by site basis, taking into consideration local market trends and demand. The NPPF does not state that specific policies should be set to enforce that local demand is met. As such, it is considered that this should be left for the market to decide, as opposed to applying rigid and prescriptive house size standards.
7.10 It is suggested that the evidence presented in the SHMA should be put into the Plan as an informative and general guide, but should not feed into a specific policy requirement which outlines housing mix percentages that should be applied across the Black Country. A policy containing general house type targets could present as a significant constraint to the delivery of a site where there is no local market demand for this house type, which in turn would have a negative impact on achieving the necessary housing growth targets to be delivered in the Black Country over the Plan period.
Question 41a: Do you support the introduction of a policy approach towards self and custom build housing in the Core Strategy? Yes/No; If yes, would you support:
7.11 It is not considered that there is a policy need for the Core Strategy to address self and custom build housing in the emerging Review. Paragraph 6.32 indicates that there are only nine records on self and custom build registers in the Black Country. It is evident that that there is very limited demand in the Black Country, which is unsurprising given that self and custom build housing is often more popular in rural areas. Given the limited demand it is therefore not considered necessary to take a policy approach towards self and custom build housing within the Local Plan Review.
Question 41b: A target for each authority? Yes/No; Any further comments
7.12 Given that there is evidence of little market demand, it is not considered necessary for the Core Strategy to set targets for each of the Black Country authorities. If it was considered to be necessary as the Local Plan Review progresses, any targets being set should be formulated on the basis of robust evidence such as monitoring of the registers, to provide an indication of how many self-build homes will be needed.
Question 41c: A requirement for large housing sites to provide serviced plots? Yes/No; Any further comments?
7.13 There should not be a requirement for large housing sites to provide serviced plots. This can pose an unnecessary market constraint for large housebuilders when there may be limited or no market demand for self-build plots. Self and custom build plots are often unusual and unique in character, therefore would not be best suited to be located within a large housing development with more uniform house types. If deemed necessary, self and custom build housing should be allocated specific site allocations, as discussed below.
Question 41d: Another approach altogether? Yes/No; If yes, please specify.
7.14 If it is considered necessary for the Review to address self and custom build housing, this should be addressed by the Council's identifying and allocating specific plots for these uses. Identifying site-specific plots would ensure that the most appropriate and suitable locations for self and custom-build will be allocated, via the assessment of appropriate evidence and market demand. In addition, this might be more likely to be achieved on surplus publicly owned land.
Question 42: Do you agree that the annual affordable homes target should be increased to reflect the 2017 Black Country Strategic Housing Market Assessment? Yes/No; If no, please explain why.
7.15 As a general principle, the notion of applying different affordable housing ratios to different parts of the Black Country, based on an understanding of needs and viability, is acceptable. Given that the Black Country represents a vast area, there will not be a uniform housing market, and there will be sub-market trends within this wider area. As such, a more flexible approach which assesses local housing market evidence on a case by case basis could be justified. That said, there is an inherent simplicity and attraction to a single rate figure, which is easy for the development industry to understand.
7.16 In terms of the annual affordable housing target, it is unclear how the Issues and Options document has calculated the figure of 832 homes per year. At paragraph 7.42 of the June 2017 SHMA Part Two- affordable housing document, it is stated that the total annual affordable housing need is 677 dwellings, which represents 19.8% of the annual projected household growth. This differs to paragraph 6.36 of the Issues and Options document, which states that the affordable housing target is 23.4% of total housing need or 832 homes per year. From paragraph 7.47 of the SHMA, it appears that this figure may have been calculated by adding the overall requirement of 16.6% of housing to be affordable rented and 6.7% shared ownership. Clarity is sought on how this figure has been calculated, and we reserve the right to comment further on this matter.
Question 43a: Do you think that the existing Policy HOU3 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why.
7.17 We have not undertaken detailed analysis of the findings and assumptions of the SHMA and affordable housing delivery matters, therefore would like to reserve the right to comment on this matter further. However, on face value, it appears to be a reasonable threshold and is not dissimilar to other locations.
Question 44a: Do you think that the affordable housing requirement for eligible sites in Question 43 should be kept at 25% of the total number of homes on the site? Yes /No; Any further comments?
7.18 Based on the current evidence, a blanket rate of 25% affordable housing would appear to be sound.
7.19 However, irrespective of the final rate, any amendments to the currently adopted affordable housing policy must continue to have a clause in it which stipulates that this requirement is subject to viability tests. Any revised affordable housing requirements will also need to carefully consider the implications of adopted Community Infrastructure Levy (CIL) regimes. Both Sandwell and Dudley Councils have adopted CIL Charging Schedules. These will have implications on viability, therefore if revised affordable housing targets are to progressed then these CIL tariffs will need to re-assessed and re-visited.
Question 44b: If no, should the percentage be increased to allow for the provision of affordable home ownership? Yes/No; If yes, what should the percentage be and why?
7.20 At paragraph 6.39 of the Issues and Options Paper, it is stated that options need to be explored to increase affordable housing delivery of private sites. One option would be to increase the overall affordable housing proportion, which would require developers to provide affordable home ownership products plus an appropriate proportion of other affordable tenures. This paragraph follows on from commentary relating to the Housing White Paper.
7.21 The Housing White Paper discusses Starter Homes at Chapter 4, and explains how the government intend to amend the NPPF to introduce a clear policy expectation that housing sites deliver a minimum of 10% affordable home ownership units. It is later stated that it will be for local areas to work with developers to agree an appropriate level of delivery of starter homes, alongside other affordable home ownership and rented tenures.
7.22 The policy position on Starter Homes is not yet fully clear, and has yet to be formally established through a formal amendment and update to the NPPF. Until the national policy position on Starter Homes has been made clear, it would be premature for the Core Strategy Review to suggest an uplift in the affordable housing requirement to include affordable home ownership such as Starter Homes. Any suggestion to uplift the affordable housing requirement to include Starter
Homes should be reflective of the national policy position, as well as founded upon a robust evident base which dictates exactly what percentage this element should be of the overall affordable housing requirement.
Question 45: Should an increased affordable housing requirement be set for green belt release sites, to reflect the likely financial viability of these sites? Yes/No; If yes, what should this be.
7.23 The likely financial viability of Green Belt sites will vary across different areas of the Black Country, therefore any affordable housing requirements for Green Belt sites will need to be reflective of these circumstances. Any affordable housing targets for Green Belt sites should be based on robust evidence, and acknowledge that many sites may need to support and deliver other infrastructure requirements.
7.24 Ultimately, any affordable housing strategy will need to address the affordable housing need as well as the need for market housing. Bearing in mind that the SHMA confirms over 70% of homes required are for homes to be sold on the open market, any affordable housing policy must not dilute the delivery of these needs/requirements. A higher figure on Green Belt sites over and above a standard blanket figure would potentially do this.
Employment
Question 49a: Is there still a need for existing Policy DEL2 in order to manage the release of poorer quality employment land for housing? Yes/No; If no, please explain why.
7.25 The Black Country is to be the subject of large levels of both employment and housing growth over the Plan Period. These uses are very much inter-linked with one another, and will drive each other's need for growth. The Local Plan Review, in order to meet emerging employment and housing needs, must identify a significant number of specific sites for employment and housing uses. By planning proactively and identifying suitable sites for both employment land and housing land, this should reduce the pressures to manage the release of poorer quality employment land, which may not always be suitable for release. The Local Plan Review should also seek to undertake a further review of poorer quality employment land to make it available for other suitable uses, if it proves to no longer be viable for employment land use. This is in line with policy provisions of the NPPF, which at Paragraph 22 outlines that planning policies should avoid the long-term protection of sites allocated for employment use where there is no reasonable prospect of a site being used for that purpose.
Question 50: Do you think that the Core Strategy should continue to set a target for the total employment land stock in Policy EMP1? Yes/No; Please explain why.
7.26 The continuation of setting a target for employment land stock would be supported. Policy EMP1 should make it clear that these are not maximum figures, to encourage further flexibility for additional growth.
Retail
Question 61: In addition to para 4.33 of the current Core Strategy should the revised Core Strategy include criteria for the creation of new centres that might be needed as a result of any additional housing identified through the plan? Yes/No; Any further comments?
7.28 Criteria would be a useful policy tool to help assess the designation of new centres, and should be in line with previous methodologies used which set out clear thresholds.
Question 71: Should the Core Strategy set housing targets for the Town Centres?
7.29 Housing within Town Centres should be supported, in line with paragraph 23 of the NPPF which discusses the important role that residential development can play in ensuring the vitality of Town Centres. Any housing targets should be based on what sites are known to be readily available, suitable and viable for residential development. Market demand for housing in these areas will also need to be fully assessed. It is notable from the outcome of the 2017 SHMA that there is most demand for three bedroom properties (40%). The highest demand is therefore for family housing, and not for flats which are often the most popular within Town Centre locations. Any housing targets set for the Town Centre would therefore need to consider the findings of the SHMA, and be reflective of the fact that family housing is often more suitable for delivery on larger sites, including on sites which are currently located within the Green Belt.
Environment
Question 99a: Do you think that national standards for housing development on water consumption should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.30 When referring to water consumption paragraph 6.1.52 of the Issues and Options document states that the Black Country does not currently lie in an area of serious water stress, therefore clear need may be difficult to demonstrate. This evidence suggests that there is limited or no need to introduce such a policy, therefore it is not considered that the Core Strategy Review should seek to introduce water consumption standards for housing development.
Question 99b: Do you think that national access standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.31 The introduction of any national access standards, with the Issues and Options document referring specifically to Lifetime Homes, again must be based on a robust evidence base which can demonstrate market demand. It is noted that Paragraph 50 of the NPPF states that planning authorities must plan for a mix of housing to meet a range of needs. In the same paragraph, it is later stated that these must be based on current and future market trends. If Lifetime Home standards are to be introduced these will therefore need to be based on robust evidence, to ensure that the standards are not overly onerous and prevent the delivery of other types of housing which have higher levels of market demand.
Question 99c: Do you think that national space standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.32 As reiterated throughout these representations, it is not considered that a blanket approach of prescriptive standards across the Black Country allows sufficient flexibility to assess local market and site considerations in an appropriate manner. Whilst it is recognised that space standards can be an important tool to ensure that high quality of homes are delivered, we agree with the sentiment expressed in the recent Housing White Paper. The Paper explains that the government are concerned that a one size fits all approach may not reflect the needs and aspirations of a wider range of households. The White Paper also states that the Government will be undertaking a review of the Nationally Described Space Standards. It is suggested that the Core Strategy Review should await the outcome of this national review of national space standards, to ensure compliance with national policy and to ensure that the most appropriate approach to space standards, if required, is taken.
Question 99d: Do you think that the standards should be different for brownfield and greenfield sites? Yes/No; If yes, please explain how and why.
7.33 As discussed above, prescriptive standards do not always allow sufficient flexibility for local market needs, so we would not advocate a blanket approach of different standards to brownfield and greenfield sites.
Open Space, Sport and Recreation
Question 102a: Do you support the proposed changes relating to open space, sport and recreation? Yes/No; If no, please explain
7.34 Paragraph 6.1.60 of the Issues and Options paper outlines how adopted Policy ENV6 creates the framework for open space policies at the local level. The Issues and Options paper outlines how this is in line with national guidance, and that it is proposed to retain this policy and update some references in the supporting text to reflect changing circumstances. It is agreed that the local level remains the appropriate place to set open space policies, and that Policy ENV6 should continue to endorse this approach.

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

Representation ID: 2495

Received: 14/09/2017

Respondent: Dr Terry Powell

Representation Summary:

In many parts of the region employment demand for land has shifted. Large numbers of industrial units lie vacant, usually long term. There is a surplus of office accommodation, often in entirely unsuitable locations. Similarly retail units lie vacant long term, especially in town centres, and to disastrous effect in smaller centres. This reflects medium-long term changes in the economy e.g. internet shopping which are unlikely to reverse. Planning policy needs to accommodate them, respond to them and look forward to them accelerating. With imagination employment land could provide more housing than is currently planned. Its unpopularity with developers is because of cost, risk due to unexpected conditions and sites being located in areas less desirable for housing. The review should address these issues by focusing on release of employment land where it is unrealistic to expect it to be needed in future and having higher planning obligations on greenfield sites to reduce profit e.g. increasing affordable housing requirement, insisting that all developments are "open book" or only releasing greenfield sites for affordable housing. Green belt should only be released for affordable housing (a policy successfully used for greenfield land in places like the Lake District).

Full text:

1. Meeting Housing Need

The research on which the housing need assessment is based is problematic in a number of areas, but two stand out.

Firstly, it has only this week been revealed that the West Midlands is one of just two areas in the country in which house price growth has been exceeded by wage growth since 2007. This calls into question a key plank of the argument for housing demand projections, namely that there is a strong supply and demand signal from the market. Clearly if there is a market signal at all it is the reverse - that supply is more than meeting demand. At best this calls the projections into question.

Second, since the data behind the projections was compiled the UK has voted to leave the EU. The government has made it clear that free movement of EU nationals will cease in 2019, and has recommitted to a target to reduce net migration to below 100,000. Net migration has already responded to the vote and shown a statistically significant downward shift. The Consultation reveals that the main pressure on housing in projections arises from migration. Regardless of political opinion on the issue, it is plain that the referendum vote makes the projections unsafe as any assumption about migration levels is now unsafe.

Ideally these two seismic shifts in the evidence base would call for a complete revision of the projections. Practically however this may not be realistic, but the projections must now be treated as unsafe as a basis for long term planning, and so long term plans must be mare adaptable and able to pull back from excessive provision, especially where this would destabilise markets or lead to perverse consequences such as unnecessary loss of green space and essential wildlife habitat.

In terms of where new housing should be built there are two issues. The first is the suggestion green belt land should be used. I will address that below. The second is the issue of release of employment land. It is self evident in many parts of the region that employment demands for land have shifted. Large numbers of industrial units lie vacant, usually long term. There is a surplus of office accommodation, often in entirely unsuitable locations, built largely because of the perverse incentives created by tax breaks under the Labour administration. Similarly retail units lie vacant long term, especially town centres, and to disastrous effect in smaller centres. These vacancies reflect medium to long term changes in the economy and in the location of economic activity. These changes are highly unlikely to reverse. Nobody is going to uninvent the internet and Amazon is not going to skulk off to save small town shopping. Indeed it is already encroaching on the market for convenience stores. These changes are permanent, and planning policy needs to accommodate them, respond to them and look forward to them accelerating.

With imagination employment land could provide more housing than is currently allowed for in the forecasts provided. Its unpopularity with developers is that it is often costlier to develop (and part of that cost is in addressing risk - costs are more likely to overrun on brownfield sites because unexpected conditions are more likely to be encountered) and is often in areas that a less desirable for housing, holding retail priced down.

The plan that emerges should address these issues by focusing on release of employment land where it is unrealistic to expect it to be needed in future and having an explicit policy that planning obligations should be used to ensure no more profit is available for developing green field sites. This could be done by increasing the affordable housing (nil grant) component of any green field development, insisting that all such developments are carried out open book or in extremis in only releasing green field sites for affordable housing. No green belt land should be released under any circumstances for anything other than affordable housing (this is a policy successfully used for all land not previously developed in places like the Lake District).

3. Retail, leisure and commercial development have all changed in recent years, while planning has not caught up. Planning is trapped in an ideological nostalgia for a world that is found only in grainy old movies and early TV shows. Out of town retail is more popular that town retail - in part because it is easier to access given traffic and onerous parking restrictions. Out of town leisure offer opportunities that town centre cannot. And for many commercial activities out of town location make more sense than town centre ones. Who, for instance, would put a distribution hub in a town. The focus of such development on town centres is absurd, because the market response is simply to not develop at all, leaving dead and decaying towns and an air of quiet and desperate desolation. Planning should respond to the modern economy, not seek to change it. An excellent example of how damaging poor planning policy can be is in the policies of the 1970s to preserve factory land use by banning development of offices on it. This took place in a number of declining industrial areas. The result was perverse. Modern factories had come to require offices collocated with production, as modern equipment shrank the production footprint but required on site administration, and cost saving meant it was then more sensible to also collocate roles such as administration, sales and marketing. Planning policy forbade this, and so factories did not modernise - they closed and moved.

4. Parts of the Black Country are very poorly served by parks, and the cycling infrastructure in the region is utterly woeful. Manchester, for instance, by contrast now has an officer in charge of developing cycling routes and promoting cycling, and he is well funded. It is experimenting with measure such as slugs in the road to separate drivers from cyclists. Access to countryside and nature are also vital in improving the health of residents in a region that contains some of the most deprived communities and where public health is an issue.

5. The green belt is an essential tool in preventing urban sprawl , protecting open space and providing for wildlife. It is also key in creating leisure spaces and improving public health. The National Planning Policy Framework makes it clear that the green belt should, in essence, be considered a permanent feature of planning policy and that its boundaries should only ever be reviewed as a very last resort. The only exceptions to this are redevelopment of previously developed sites, and development for infrastructure. The latter can be key to facilitating housing provision further afield in the countryside.

It is not clear that any of the planning pressure faced by the region reach the threshold required by the NPPF for revision of green belt boundaries.

However, there is a bigger risk at stake here.

Release of green belt land creates monumental financial incentives that are all but certain to lead to perverse outcomes. Green belt classification suppresses land values. In parts of the region - for instance Hagley or Stourbridge - it is not unreasonable to expect allocation of a greenbelt site to increase its value by 1000% or more. This is a truly colossal financial incentive for landowners (particularly speculators) to seek change to policy.

It also creates a perverse incentive for the local authorities themselves. Local authorities rely on Section 106 Agreements for much of their affordable housing provision, and the government now expects such provision to be delivered now without subsidy (nil grant). Sites where there is a very large planning gain create a greater scope for such agreements - there is more money to take off the table.
In addition developers often prefer green belt sites. Green field sites always come with the benefit that there is less risk because development costs can be more reliably forecast. Green belt sites come with the bonus that they are intrinsically in desirable areas, so easier to sell. They lend themselves to higher cost housing where though densities are lower they are made up for by far higher margins.

Release of the green belt is almost certain to cause green belt sites to come forward in preference to all other sites for housing. Once the policy is changed these applications will be impossible to resist because refusals will be readily be overturned on appeal. Even if the release is in principle staged the impact will be the same - prematurity is not considered by the Planning Inspectorate a legitimate reason to refuse consent on a site brought forward.

Planning policy cannot and should not ignore these incentives, especially those that impact on the authority with the power to grant consents.

In general I would contend that there is not a case at present to review the green belt boundaries. The housing demand projections are not safe, and changes to the shape of the economy mean that less and less employment land is likely to be required in future. There are still very substantial numbers of unoccupied shops, offices and industrial units and this is extremely unlikely to change in future.

However, any review of the boundaries should be subject to protection to address the issues outlined above. Some suggestions might be:

* No green belt land should be released in the first half of the period the plan covers - it is unsafe to do so. Green belt land should not be allocated and its protection should not be removed in the first instance - it should at worst be relegated to safeguarded land. This would allow its release later should the need arise but its reclassification as green belt otherwise.
* Only affordable housing should be built on the green belt. This removes most of the perverse incentives inherent in releasing green belt land while still addressing housing need. This includes the incentive on the local authority, because it cannot release large monetary values that would take pressure of housing budgets elsewhere at the expense the longer terms interest of the region and its people. It also ensures that high densities can be maintained to ensure as little land is released as possible.
* All greenbelt land should be objectively classified in terms of its amenity for leisure, heritage, wildlife, natural beauty and economic contribution. Only the very lowest scoring land should be considered for release. This classification should be strictly objective to prevent bias, and should ignore the land value that could be released.
* Any release should focus on existing settlements, and should be restricted to a small increase around the settlement boundary. This ensure minimal infrastructure costs - an externality that is never borne in full by the developer and land owner - and is more sustainable. Releasing a 100 m strip around a settlement with a 1 km diameter creates 163 acres of developable land, enough for over 3000 homes at 20 homes per acre. This is much less objectionable than the release of a site for an entire new settlement 1 km across.

Comment

Black Country Core Strategy Issue and Option Report

Representation ID: 2523

Received: 08/09/2017

Respondent: JVH Town Planning Consultants Ltd (rep Walton Homes Ltd)

Representation Summary:

We support Strategic Option 1A with a larger level of Green Belt Land release. This option raises less challenges to delivery overall. A flexible approach is however needed that also allows underused employment land that is no longer required to come forward to support the Strategy and bolster the overall supply. The levels of housing need are likely to increase further and therefore allocating and identifying more sites and safeguarding these for the future would be the most pragmatic approach.

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

Representation ID: 2536

Received: 04/09/2017

Respondent: Hawksmoor

Representation Summary:

Our clients wholeheartedly support Strategic Option 1A. Given the unprecedented need for new housing, there can be no other option but to deliver a significant proportion of it on Green Belt sites within Black Country Authorities and their adjoining counterparts.

Attachments:

Object

Black Country Core Strategy Issue and Option Report

Representation ID: 2549

Received: 08/09/2017

Respondent: CORES PROPERTIES LTD

Agent: Pegasus Group

Representation Summary:

2.6 Point 3.16 of the Issues & Options Document acknowledges that "a key source of housing supply under the existing spatial strategy is the release of surplus employment land for housing". Given the housing need requirement for the Black Country it is considered unlikely that this approach could be wholly discarded therefore some employment land will need to be considered for release for residential development and therefore we cannot support Strategic Option 1A as it makes no recognition that some employment land will need to be released. On this basis, we consider Strategic Option B is the more appropriate to take forward; but we would suggest that other options should be explored which recognise that higher levels of employment and Green Belt land will potentially need to be brought forward to meet future needs

Full text:

REPRESENTATIONS
Question 2 - Do you think that the key evidence set out in Table 1 is sufficient to support the key stages of the Core Strategy review? If not what further evidence is required and, if there are any particular issues that should be taken into account in considering development on any particular site or in any particular areas, please provide details.
2.2 Whilst it is noted that a Black Country Economic Development Needs Assessment (EDNA) (May 2017) forms part of the Evidence Base, the assumptions on future requirement appeared to be based on growth figures for the West Midlands Combined Authority (WMCA), rather than refined to cover just the Black Country. We are concerned that using WMCA data is likely to distort growth assumptions and fail to provide an accurate economic forecast for the joint planning area, particularly as population growth and GVA peer head figures will vary across the West Midlands region. Consequently, we firmly believe further work is required to assess employment needs of the joint authority area.
2.3 Assessments on future employment needs should be based on scenarios that involve assumptions on population growth, household projections as well as subregional forecasts on GVA per head that relate to the plan area. At the very least the EDNA should have regard to the findings of the Black Country & South Staffs Strategic Housing Market Assessment (March 2017) (SHMA) which has concluded that the Objectively Assessed Housing Need (OAN) for the Black Country over the period 2014-36 is 78,190 homes. The EDNA should translate what the implications of this OAN will be on the economy, and therefore we strongly believe further work on the EDNA is required.
2.4 We support the undertaking of a Green Belt Review, as inevitably land will will be needed to meet employment and housing needs. But to support this exercise, we would suggest that further work is undertaken to assess urban capacity, particularly older employment sites, to demonstrate that options within the urban area have been fully examined.
Question 11a - Do you support Strategic Option 1A? Yes/No. If no, do you support Option 1B Yes/No. If you support the release of further employment land for housing, what should the characteristics of these employment areas be?
2.6 Point 3.16 of the Issues & Options Document acknowledges that "a key source of housing supply under the existing spatial strategy is the release of surplus employment land for housing". Given the housing need requirement for the Black Country it is considered unlikely that this approach could be wholly discarded therefore some employment land will need to be considered for release for residential development and therefore we cannot support Strategic Option 1A as it makes no recognition that some employment land will need to be released. On this basis, we consider Strategic Option B is the more appropriate to take forward; but we would suggest that other options should be explored which recognise that higher levels of employment and Green Belt land will potentially need to be brought forward to meet future needs
Question 11b - Are there any current employment areas that might be suitable for redevelopment to housing?
2.7 Low-quality employment which contributes least to the realisation of the economic development aspirations of the area should be considered first for release for housing, and should not be afforded rigid policy protection. Only the 'Best' or 'Good' quality employment land warrant protection, as these locations are the most likely to generate and support high levels of jobs. This would mean that in the Black Country only land identified as 'Strategic High Quality Employment Land' should be the only land that receives policy protection from alternative uses.
2.8 It is recognised that some areas currently defined as 'Local Quality Employment Land' play a role in the overall supply of employment land in the Black Country, but there is absolutely no justification for safeguarding these sites long term. Policy for these locations need to be flexible and responsive to changing circumstances, including the need to deliver housing.
2.9 These Representations are accompanied by a completed 'Call for Sites' form for a site known as Brownhills Business Park on Lindon Road. In the Walsall Employment Land Review (Updated April 2017) the site was allocated the reference number IN5.3. It is considered that this site is suitable for redevelopment to housing. The site is not fulfilling any meaningful economic benefits, with tenants on short-term rolling contracts with no permanence to the employment and job provision on this site. None of the uses employ significant numbers of people, and it is evident that the site is in need of investment and could be put into more productive use. The cost of redeveloping the site for commercial use is prohibitive and would make any commercial development unviable. Redevelopment of the site is needed to remediate the land, address crime issues on site and remove a site that has become an eyesore, blighting neighbouring sites. The only way to achieve this is to release the site to housing development. It is also noted that the site is located within a partial residential area and therefore redevelopment of the site for housing would not introduce incompatible uses to the area.
2.10 It is noted that the general strategy for growth in the Black Country is to focus growth around the opening of HS2 and the extension of the Midland Metro. The proposed site is not located in close proximity to either of these and would not be suitable for businesses attracted by either project. It is therefore suggested that there should be an overall review of existing employment land to evaluate consistency with this aspiration.
2.11 It is also noted that the EDNA found that over half (53%) of the Black Country's total employment land is located in Walsall. This is clearly a significant imbalance and suggests the need to review employment land allocations in Walsall. It is also noted that there are areas within Walsall, including the site, which are not located in close proximity to HS2 or the expanded Midlands Metro. It is suggested that any review should include an assessment of any employment lands proximity to these projects and potential contribution to economic growth associated with the realisation of these projects.
2.12 As previously discussed, the NPPF is clear that planning policies should not protect employment land where there is no reasonable prospect of it being used for that purpose. This site has been allocated as a Local Quality Employment Area since the adoption of the Black Country Core Strategy and has not fulfilled this allocation in the intervening years. It is considered that this demonstrates that there is no reasonable prospect of the site being used for purposes compliant with the Local Quality designation and therefore the site should not continue to be protected for employment use and should be considered for redevelopment to housing.
2.13 Question 49a - Is there still a need for existing Policy DEL2 in order to manage the release of poorer quality employment land for housing?
2.14 It is recognised that there may be a role for a policy managing the release of poorer quality employment land for housing. However, the wording of such a policy needs to comply with the requirement of the NPPF which states that planning policies should avoid the long-term protection of allocated employment sites where there is no reasonably prospect of the site coming forward for that purpose.
2.15 It is noted that point 2.5 of the Issues & Options Paper acknowledges that "there is not as much surplus employment land suitable for housing as anticipated." This suggests the need to re-evaluate the policy regarding the release of poorer quality employment land for housing to ensure that poor-quality employment land is not being blocked from release unnecessarily.
2.16 It is suggested any policy concerned with managing the release of employment land for housing should include provision to review the quality of the employment use of the site, through compliance with the uses listed as appropriate for its designation, and other indications of quality, including permanence of the employment use.
Question 50 - Do you think that the Core Strategy should continue to set a target for total employment land stock in Policy EMP1? Do you think that distinguishing between Strategic High Quality High Quality Employment Areas and Local Quality Employment Areas is still appropriate?
2.17 This Representation does not seek to offer a view on whether or not the Core Strategy should continue to set a target for total employment land stock, albeit we strongly question the levels currently identified for the reasons set out previously. We do however wish to express a particular view on the distinction between Strategic High Quality Employment Areas and Local Quality Employment Areas.
2.18 The EDNA itself noted that this distinction "does not represent a common practice of designation based on the review of approaches followed by other planning authorities. Furthermore, the range used does not reflect the same scale of 'measurement'" it goes on to recommend that "this is something that may need to be considered in the future" (point 7.14). It is considered that the review of the BCCS provides the ideal opportunity to review this distinction.
2.19 The EDNA clarifies that the most common delineation used elsewhere is to rate sites on a scale of best, good and other with specific/distinct references made to key strategic sites or enterprise zones (point 7.15). Sites are allocated to a classification by way of the quartiles within which their score falls and are ordered from the highest score (100) to the lowest (0) based on the scoring of a list of assessment criteria (point 7.15). It is considered that this offers greater flexibility than the binary approach of designating sites as either Strategic High Quality or Local Quality Employment Areas.
Question 52 - Do you think that the criteria used to define Local Quality Employment Areas are appropriate and reflect actual market requirements? Yes/No; If not how should the terminology be amended?
2.20 As discussed above, this Representation questions whether distinguishing between Strategic High Quality and Local Quality Employment Land is still appropriate. The EDNA suggests that a different classification system of Premium, Very Good and Good should be used. We strongly agree with this. Any future assessment of the joint planning areas employment land supply should use these categories, so that only the best quality employment land is protected. Question 53 - Do you think that Strategic High Quality Employment Areas should continue to be protected for manufacturing and logistics uses, with the other uses set out in Policy EMP3 discouraged? Yes/no; If not, what alternative approach do you recommend?
2.21 The National Planning Policy Framework (NPPF) is clear at paragraph 22 that planning policies should avoid the long-term protection of sites allocated for employment use where there is no reasonable prospect of a site being used for that purpose and that land allocations should be regularly reviewed. Paragraph 21 of the NPPF also makes clear that policies should be flexible to accommodate needs not anticipated in the plan and allow rapid response to economic change. It is therefore the case that a thorough review of existing employment land should be carried out to evaluate the merits of existing employment areas as site such as Brownwhills Business Park are clearly no longer worthy of policy protection.
2.22 We agree that sites assessed as being "Best Urban and "Good Urban" warrant protection, so long as there is sufficient flexibility to allow alternative use in the event that circumstances change (e.g. lengthy periods of vacancy). However, there is absolutely no justification for safeguarding or restricting the use of low quality employment sites, and an alternative approach must be taken that allows flexibility.

Attachments:

Support

Black Country Core Strategy Issue and Option Report

Representation ID: 2569

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Pegasus Group

Representation Summary:

5.7 Option 1A is considered to be appropriate for accommodating the growth needs of the Black Country over the Plan period to 2036. This option would significantly boost the supply of housing land and help to meet the significant current and future identified need.

Full text:

Question 1: Do you agree that the Core Strategy review should be a partial review, retaining and stretching the existing spatial strategy and updating existing policies? Yes/No; If not, what do you think should be the scope of the review?
2.4 In response to Question 1 and whether it should be a partial review or not, whilst the existing strategy identifies the most sustainable locations for growth in the context of delivering development requirements identified by the Regional Strategy (RS), there is now a new and much bigger challenge ahead in meeting the arising needs for homes identified by the latest evidence and there is concern that the existing spatial strategy may not facilitate the delivery of these needs. The Black Country authorities, therefore, need to be mindful of this and not attempt to put "a square peg in a round hole".
2.5 It is our view that urban regeneration can be achieved whilst pursuing development on the urban edge. Indeed, the scale of housing need is so large that both must be encouraged in order to meet current and arising housing needs within the Black Country.
2.6 It is extremely important that in reviewing the Core Strategy it fully takes account of and facilitates the delivery of strategic economic plans, as recognised in paragraph 1.15. All too often these strategies are ignored and, accordingly, development plans could effectively frustrate economic growth from being realised.
2.7 In terms of the Plan period proposed in paragraph 1.17, whilst a 15-year time period from adoption is appropriate, there is concern that the preparation of plans is often delayed (due to reasons beyond the control of the LPAs) and it may be prudent to stretch the period further to prevent such an issue from occurring.
2.8 It is welcomed that the Issues and Options document recognises that it will not be possible to accommodate all future development needs within the urban area and that an examination of the potential for development land outside the existing urban area, which is effectively land within the Green Belt, will take place as part of the Core Strategy review process.
3. THE BLACK COUNTRY TODAY - THE EXISTING STRATEGY
3.1 As set out within this section, the delivery of both employment and housing land has not come forward as originally envisaged in part due to the after effects of the recession. Surplus employment land which might have been available for housing has not come forward due to a strengthening economy and local firms being more robust than anticipated. In addition, the range of locations available has not in all cases met with market expectations as to where people want to live.
3.2 In terms of the employment land, it is important that sufficient land is provided for new employment and that there is not an overreliance on land that is currently in use. It is impressive that despite generally poor economic performance local businesses have performed well. Should the economy significantly improve within the Plan period in line with LEP aspirations (considered later in this response), there is concern that it may become difficult to transfer a wide range of existing employment locations to housing allocations. It is appropriate, therefore, for the Council to ensure the evidence contained within the Strategic Housing and Employment Land Availability Assessment is reviewed and updated regularly. This will enable the land supply to be responsive to arising needs and not rigidly be wedded to delivering commitments that are unlikely to be realised.
3.3 What is further emphasised by the analysis in this section is that urban regeneration cannot be delivered quickly and that there are a number of factors beyond the control of the Black Country authorities that may have implications for the delivery of the strategy. This further emphasises the need for a mix of types of sites (brownfield, brownfield compulsory purchase, greenfield and Green Belt) of different forms of development (high density, mid and low density family homes) in a variety of locations, which will maximise the opportunities to deliver a successful Local Plan.
3.4 Finally, in respect of the proposal to maintain 300 hectares of employment land that will become vacant by way of general churn over the Plan period. Whilst the principle is considered acceptable, there should be appropriate evidence to support the assumption.
3.5 Our experience is that there are employment sites that clients are looking to secure a residential allocation on that have not been identified thus far. In light of these changing circumstances, the Black Country authorities should ensure that the policy approach is flexible to allow sites in appropriate locations to be brought forward for housing throughout the Plan period and likewise, sites that have been allocated for housing but have not come forward should be removed from the supply.
4. THE STRATEGIC CHALLENGES & OPPORTUNITIES
4.1 It is welcomed that the Black Country authorities are updating their evidence base. Indeed, the adopted Core Strategy took the development requirements from the adopted Regional Strategy (RS), which has since been revoked and is unquestionably out of date. Since the RS was published there has been a number of population and household projections published showing increasing dwelling requirements in the Black Country, which were largely ignored and, therefore, it should come as no surprise that there is a significant increase in forming households.
4.2 In terms of the list of evidence either prepared or due to be completed, it appears to be sufficiently comprehensive.
4.3 A separate review of the housing evidence based, including the Strategic Housing Market Assessment for the Black Country and South Staffordshire, is contained at Appendix A. The key conclusions arising from the report as summarised as follows:
* In determining the OAN, there are concerns with regard to the SHMA methodology and it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline.
* There is concern that the economic growth scenarios do not use the latest economic forecast data and that the methodology translating the job growth into dwelling growth is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances and also more aspirational job growth targets, such as those arising from the SEP.
* In terms of providing uplifts for market signals, a 25% uplift for South Staffs is appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, it should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack within the housing market and prevent house prices from increasing at an accelerated rate.
4.4 In addition, consideration of the Housing Background Report is also contained in the Housing Evidence Based Review Paper contained at Appendix A. The key findings from reviewing the evidence is set out below:
* Clearly a lot of work is yet to be done to determine what the housing land supply position is in the Black Country. Given that much of the existing evidence is based on the adopted Core Strategy, it is recognised that the SHLAAs across the four authorities will need to be updated, both in terms of revising the methodology and range of sites assessed, to reflect a potentially different approach to locating development.
* It is commendable that the Housing Background Report has examined existing sources of supply in an attempt to provide additional homes from sites within the urban area. There is concern, however, that by changing policies, for example, to increase the minimum density on sites has wider policy implications to take into account than simply increasing the number of homes.
* The Housing Background Report suggests a continued allowance for larger windfall sites. It is suggested that it is inappropriate to include an allowance for this source as there is no certainty that this land will come forward for development.
* Other sources, such as converting employment sites to residential sites, based on the evidence presented and feedback from the development industry, it is known that there are employment sites functioning well as employment sites but are to be converted to residential and other employment sites that are unoccupied and undesirable that are to be retained as employment sites. Clearly, there is a mismatch between employment land need and employment land supply. It is advised that the qualitative assessment of employment informs future land supply recommendations and allocations are revised where necessary.
4.5 As a result of the dwelling requirements generated by the SHMA and the land supply identified from the Housing Background Report, it is concluded that there in insufficient urban land to provide for the development requirements and that a Green Belt Review should be conducted. It is noted that scoping is underway and that the work is to be completed in mid-2018. It is hopeful that the development industry will be involved in defining the methodology of the work to ensure that it is conducted in a robust way.
4.6 Another very important piece of work to be taken into consideration will be the Greater Birmingham and Black Country HMA Strategic Growth Study. It is unclear at this stage what role the Black Country authorities will play in meeting the wider needs of Birmingham and, indeed, whether it can now contribute given that meeting the needs of the indigenous population will be a tall order. Further, there is uncertainty with regard to how far the study will go in identifying locations for growth and how this evidence will be taken forward in emerging Development Plans, particularly given that it is premature to the Green Belt Review for the wider Black Country area. It is our view that there are sites within the Green Belt that will provide sustainable locations for growth and that their removal will not compromise the purposes of the Green Belt and, accordingly it will remain purposeful and functional.
Question 2: Do you think that the key evidence set out in Table 1 is sufficient to support the key stages of the Core Strategy review? Yes/No; If not, what further evidence is required and, if there are any particular issues that should be taken into account in considering development on any particular sites or in any particular areas, please provide details
4.7 It is considered that the evidence contained within Table 1 is comprehensive, however, as suggested above and below, a number of concerns have been highlighted and it is therefore suggested that these are addressed in order to improve the soundness of the next iteration of the Core Strategy Review.
4.8 It is welcomed that an updated qualitative assessment of employment land has been undertaken in order to identify if the sites are fit for purpose, alongside the quantitative employment land study. It has been identified that a number of employment land sites that have been suggested for residential land allocations remain in occupation as functioning employment sites. These sites should be removed from the housing land supply. Conversely, there are vacant employment land sites that have been marketed over a period of time where no market interest has been forthcoming and, therefore, it is recommended that these sites should be considered for housing delivery.
4.9 It is noted that Viability Studies are identified as evidence base documents that are still to be prepared. Whilst not specifically identified, it is recommended that affordable housing viability is a key matter that needs to be addressed as part of this evidence base to ensure the level suggested by the SHMA Part 2 is deliverable. If this is not the case, the delivery of both market and affordable housing could be compromised and prevent the successful delivery of any new strategy.
Question 3: Do you agree that the housing need identified for the Black Country over the period 2014-36 in the SHMA, and the anticipated amount of supply, are appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.10 In terms of the extent of the sub market, which includes the Black Country and South Staffordshire, this is considered to be appropriate. It is recognised and welcomed that the Black Country authorities and South Staffordshire have jointly undertaken a SHMA for the sub area, which facilitates the preparation of an Issues and Options Core Strategy Review. There is concern, however, that the remaining constituent authorities within the wider Greater Birmingham Housing Market Area have not taken part and there is a danger that housing need for the whole HMA may not entirely be comprehensively captured due to the different time periods covered by the separate studies. It is advised that a SHMA, consistent with the guidance in the NPPF and Planning Practice Guidance, is prepared for the entire HMA over the same Plan period (as opposed to a housing needs study), which will properly consider all relevant factors in a consistent and comprehensive manner.
4.11 The OAN arrived at by the SHMA is generally appropriate in identifying the starting point for determining the dwelling requirement, however, it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline. There is concern that the economic growth scenarios contain potentially out of date employment forecasts and the methodology to determine appropriate dwelling requirements is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances. In addition, more aspirational job growth targets, such as those arising from the SEP, may not necessarily be appropriate for the Black Country (as discussed later in these representations).
4.12 In terms of providing an uplift for market signals, a 25% uplift for South Staffs is agreed to be appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, the application of such an uplift in South Staffordshire should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack or headroom within the housing market and prevent house prices from increasing at an accelerated rate, exacerbating issues of affordability.
4.13 Clearly, the evidence contained in the SHMA does not consider the potential to accommodate any of Birmingham City's housing needs and that this could result in increased dwelling requirements. We reserve our position in respect of this matter and await the publication of the HMA wide Strategic Housing Needs Study.
4.14 We shortly await a consultation publication from central Government in relation to providing a standardised methodology for generating dwelling requirements. This is anticipated in Autumn 2017. The Black Country authorities will need to take account of any proposed national policy changes identified through the consultation paper. We reserve our position on this matter, until the full details and implications for the Back Country are known. It is considered that, whilst a standard methodology will be helpful in identifying a baseline dwelling requirement, the consideration of long term trends and economic forecasts cannot be carried out in a mathematical calculation outside a demographic/ economic model. In light of this, the SHMA prepared for the sub-area could remain useful as evidence to inform the review of the Black Country Core Strategy.
4.15 In terms of meeting the dwelling requirements, it is understood that the 'Call for Sites' consultation will inform an updated SHLAA, which will assess sites both within and outside the urban area to determine the maximum number of dwellings that can be realistically delivered within the Black Country over the proposed Plan period. The Housing Background Report that has been published as part of the evidence base for the Issues and Options Core Strategy Review has considered assumptions contained within the SHLAA based on adopted policies and considers changes to the policies to boost the delivery of housing on existing sites. Whilst it is a commendable that the Black Country authorities are exploring all potential options to boost housing on urban land, there are wider implications of doing so and accordingly, caution is expressed in response to a number of the identified approaches proposed.
4.16 As confirmed in paragraph 3.15, it is extremely important that the Black Country authorities 'firm up' the housing supply in order to ensure that there is sufficient provision to meet the dwelling requirements. It is also considered appropriate to provide an additional buffer of housing land supply to provide a contingency when sites are delayed. As explained earlier in the Issues and Options Report, sites providing a total of 3,000 homes have not come forward as anticipated. It is considered that additional supply is required to provide flexibility and minimise any durations within the Plan period where the housing trajectory would otherwise dip.
4.17 In terms of the extent of a buffer for housing land, the Local Plan Expert Group suggested that additional land, equivalent to delivering 20% of the overall dwelling requirement, is added to the supply, which will provide a contingency of land to be used as and when necessary during the Plan period. It is suggested that this additional land will help ensure the dwelling delivery targets and housing needs are met in a timely manner, which will reduce the opportunity for households to become concealed or shared. Given the issues experienced in respect of delivery in the past, it could be argued that an increased buffer of circa 25% could be applied.
4.18 It is also appropriate to ensure that, as well as identifying the right amount of land, there is sufficient variety in the types of sites (brownfield, greenfield, Green Belt) are identified, reflecting different sizes, in a range of locations. This variety in provision will allow the best opportunity for multiple sites to come forward at the same time without market constraint and hence ensuring delivery targets are met. In addition, this approach will also provide market choice to existing and arising households looking to move into a new home in the Black Country, which will have wider social benefits (i.e. allow families to live nearby one another and provide an opportunity to diversify existing communities through providing alternative homes to the existing housing stock).
4.19 Indeed, as previously documented in the adopted Core Strategy, it is considered that the ambition to retain the young and professional population within the Black Country should be maintained and that suitable and attractive housing and complementary environments are encouraged.
4.20 Finally, it is welcomed that the Black Country authorities have agreed to test the dwelling requirement figures on an ongoing basis. It is hoped that the suggested changes/alternative scenarios suggested above are implemented in order to ensure the evidence base is robust and the resultant policies and proposals soundly based.
Question 4: Do you consider the employment land requirement identified for the Black Country up to 2036 in the EDNA is appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.21 The Core Strategy review intends to utilise the Economic Development Needs Assessment (EDNA) for the Black Country, published in May 2017, to inform future employment land requirements. The EDNA uses forecasts produced as part of the West Midlands Combined Authority Strategic Economic Plan (SEP) to calculate long-term growth, noting that the 'Super SEP Economy+ Scenario' is the preferred aspirational scenario. This scenario assumes average annual growth in employment of 1.3% across the Combined Authority and presents an ambitious view of future growth in the area, with 500,000 jobs created between 2013 and 2030.
4.22 The SEP Technical Appendix breaks down the job forecasts for the three Local Enterprise Partnerships that form the Combined Authority (Black Country; Coventry & Warwickshire; and Greater Birmingham & Solihull). Jobs growth in the Black Country LEP is forecast to be around 1.1% per annum, whilst it is forecast at 1.5% per annum in the other two LEP areas. This averages out at annual growth of approximately 1.3%. Using data from the Business Register & Employment Survey, published by the Office for National Statistics, it is possible to look at employment trends over the last five to six years (2009-15) and this analysis suggests that the growth rate used in the aspirational growth scenario may be too ambitious for the Back Country:
4.23 Between 2009 and 2015, total employment in the Black Country LEP increased from around 450,000 to approximately 453,000. This equates to average annual growth of 0.1%. Walsall (1.5% p.a.) and Sandwell (0.9% p.a.) experienced jobs growth, although Dudley (-1.1% p.a.) and Wolverhampton (-0.8%) both suffered a fall in employment.
4.24 By contrast, both the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs saw total job numbers increase by 1.3% p.a. from 2009-13. A number of districts in these LEPs saw particularly strong growth over the period, notably Solihull and Lichfield in Greater Birmingham & Solihull, where employment grew by at least 3.0% on an annual basis. In short, the 1.3% average across the West Midlands Combined Authority Area is substantially bolstered by Solihull and Lichfield and therefore it is very ambitious to suggest this will occur across the Black Country area.
4.25 That said, growth in the Black Country needs to be faster than in previous years and the new Core Strategy has a vital role to play in supporting this, however the analysis presented above suggests that the growth targets need to be lowered to better reflect the local economic climate. It is considered unlikely that an annual increase of 1.0% or more will happen in the area in the long-term, especially with the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs capturing new job opportunities at a faster rate in recent years. Lowering the employment growth rate means the amount of employment floorspace needed would be lower. This would not reduce the demographically based housing targets for the area but it would potentially free up previously allocated employment sites for other uses such as residential. This would help the Black Country meet its future housing targets and ensure that it has enough homes for its future workforce to live in.
4.26 As identified in the supporting report and above, it is known that employment sites that had previously been identified for housing are still operational with businesses continuing to use the land and, conversely, there are sites allocated for employment that have been vacant and subsequently market, however, remain unoccupied, which could be transferred to a residential use. It is therefore recommended that the Councils ensure that updated EDNA qualitative review conclusions are taken into account and correct uses applied where appropriate.
Question 5: Do you agree with the proposed approach to the Black Country Green Belt Review? Yes/No; If not, what additional work do you think is necessary?
4.27 In respect of the Green Belt Review, on the basis of the evidence published setting out housing need and supply, it is agreed that it will be necessary to find sites outside of the existing urban area, which will require removing land from the Green Belt where it is appropriate to do so. This will provide an opportunity to identify strategic sites that can provide a significant amount of homes to contribute to meeting identified housing needs. It is considered that there are a number of locations whereby housing sites can be identified, without the purposes of the Green Belt being compromised, ensuring the function and integrity of the Green Belt will remain.
4.28 In addition, areas on the urban fringe have the potential to ensure new homes can be delivered in an established, well landscaped environment, which could be attractive to those young families and professionals that the Black Country authorities have had difficulty in retaining, often through out-migration to neighbouring Shire districts considered to represent more aspirational locations.
4.29 In terms of the process and methodology for undertaking a Green Belt Review, it is understood that the awaited Strategic Housing Needs Study (SHNS) will be accompanied by Strategic Green Belt Review across Greater Birmingham and that the Black Country authorities have been engaged in presenting potential opportunities. It is reassuring that this engagement between consultants and local planning authorities is taking place as there is a danger that logical locations fail to be identified due to a lack of understanding of environmental conditions and/ or local circumstances that are applicable to sites.
4.30 It is agreed and makes sense for the local planning authorities to conduct a Stage 2 Green Belt Assessment following the completion of the higher-level work. Any input on reviewing the draft methodology for the Stage 3 Green Belt Review would be welcomed.
Question 6: Do you agree that the key issues set out in Part 3 are the key issues that need to be taken into account through the Core Strategy Review? Yes/No; If not, what other key issues should be taken into account?
4.31 The key issues presented are considered to be relevant, however, there are a number of inconsistencies relating to matters identified above against the previous questions raised.
5. REVIEWING THE STRATEGY TO MEET NEW CHALLENGES & OPPORTUNITIES
Question 7: Do you think that the Core Strategy vision and sustainability principles remain appropriate? Yes/No; If not, what alternatives would you suggest?
5.1 In the main, the Core Strategy Vision and sustainability principles are considered to be appropriate, with exception to the principle of 'brownfield first'. It is understood that the NPPF, whilst it encourages an efficient use of land and for brown field land to be recycled, it does not suggest a sequential approach to development. There is no evidence to demonstrate that the development of greenfield land will compromise the development of brownfield land. Often the type of developers of the different land categories are different and, given the scale of the housing need, it is appropriate that the early delivery of housing is encouraged from all types of sites. In particular, the larger, potentially Green Belt, sites will have a longer lead in time due to the time it takes to plan for, determine and implement a comprehensive scheme. Indeed, a recent study entitled 'Start to Finish', prepared by NLP, supports this claim. When planning the housing trajectory for the Core Strategy, the larger sites should be planned in to come forward as soon as practically possible.
5.2 It is therefore suggested that the reference to 'putting brownfield first' is inappropriate and that it should be replaced by 'ensuring an efficient use of land to meet the identified housing needs', which encourages the recycling of land and recognises the contributions of greenfield/ Green Belt land to meeting housing delivery targets.
Question 8: Do you think that the Core Strategy spatial objectives remain appropriate? Yes/No; If not, what alternatives would you suggest and how might these changes impact on individual Core Strategy policies?
5.3 Whilst the objectives outlined generally remain sound, there is concern that one of the NPPFs main priorities is absent. This is in relation to significantly boosting the supply of housing. It is suggested that an additional objective is added in order to ensure that meeting housing needs remains a priority within the Black Country. Once a preferred option is arrived at, spatial references as to where the housing growth will be delivered could be included (for example, meeting housing needs on urban (brownfield and greenfield) land and at extensions to the urban area).
5.4 Further, given the increased employment land requirements, the second objective relating to employment land being within the best locations within the Regeneration Corridors may no longer be appropriate. Indeed, as highlighted earlier, there is concern that there is a mismatch in land allocations, and it is appropriate for the Core Strategy review to ensure all employment sites are fit for purpose. This may conclude that employment opportunities should be identified on new land outside of the Regeneration Corridors. Should this be the case, the objective would be inappropriately worded.
Question 9: Do you agree that Policies CSP1 and CSP2 should be retained and updated to reflect new evidence and growth proposals outside the Growth Network? Yes/No; If not, what changes do you think should be made to Policies CSP1 and CSP2 in response to new challenges and opportunities?
5.5 It is agreed that the policies could remain, if the development requirements and related changes are made to ensure the policies are consistent with the overall strategy. The changes relate to both the quantum of development (homes, employment and retail space), the location of development (within and beyond the existing Regeneration Corridors) and the type of development (brownfield, greenfield and on land removed from the Green Belt). It is considered that references should be made to urban extensions (on land removed from the Green Belt) in Policy CSP2 specifically, to highlight the important contribution that such sites will make to meeting the development requirements of the Plan.
Question 10: In continuing to promote growth within the Growth Network, is there a need to amend the boundaries of any of the Regeneration Corridors in the existing Core Strategy? Yes/No; If so, which boundaries and why?
5.6 No comment.
Question 11a: Do you support Strategic Option 1A? Yes/No; If yes, please explain why. If no, do you support Option 1B? Yes/No; If yes, please explain why. If you support the release of further employment land for housing, what should the characteristics of these employment areas be?
5.7 Option 1A is considered to be appropriate for accommodating the growth needs of the Black Country over the Plan period to 2036. This option would significantly boost the supply of housing land and help to meet the significant current and future identified need.
Question 11b: Are there any current employment areas that might be considered suitable for redevelopment to housing? Yes/No; Please submit specific sites through the 'call for sites' form.
5.8 As highlighted previously, the key to understanding where the most appropriate employment/ housing locations are within the Growth Network and Corridors will be determined through a qualitative assessment of allocated employment sites. It is understood an updated assessment has been undertaken and such work, complete with responses to the Call for Sites consultation, will provide the Black Country authorities with evidence to determine the urban capacity for housing, which may include transferring some employment land to housing as well as housing land to employment. This work will then outline the number of dwellings to be accommodated beyond the existing Growth Network within the Green Belt.
5.9 It is welcomed that the Issues and Options Draft recognises the need to release Green Belt in all scenarios proposed.
Question 12a: Do you support Spatial Option H1? Yes/No; What criteria should be used to select suitable sites? e.g. ability to create a defensible new green belt boundary, size, access to existing residential services.
5.10 No comment.
Question 12b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details (please submit specific sites through the 'call for sites' form).
5.11 No comment.
Question 13a: Do you support Spatial Option H2? Yes/No; What should the characteristics of Sustainable Urban Areas (SUEs) be? e.g. minimum/ maximum size, mix of uses, mix of housing types, accessibility to other areas. What criteria should be used to select suitable sites? e.g. proximity to a rail station, availability of existing infrastructure, easy access to jobs, potential to support existing settlements / services, proximity to the existing growth network, potential to support urban regeneration.
5.12 Given the scale of the housing need, there is concern that the development requirements could not be met with just one of the suggested options presented and, therefore, a combination of both options will be necessary.
5.13 To be in the best possible position to significantly boost the amount of housing and meet the development requirements in the Black Country, in accordance with the NPPF, it is advised that opportunities to both round off edges of the Green Belt and Sustainable Urban Extensions are proposed in the Preferred Options Draft Core Strategy. As highlighted within the Issues and Options Draft, there are challenges and opportunities that come with both types of development, for example from a delivery perspective, smaller sites will come forward more quickly due to the nature of these being straight forward proposals (with limited infrastructure necessary and one or few land owners) and larger sites will ultimately take longer as they are more complex (with multiple land uses, infrastructure and land owners). This fact has been evidenced by Nathaniel Lichfield and Partners (now known as Lichfields) within their report 'Start to Finish' who concluded that the average planning approval period of schemes of 2,000+ dwellings is 6.1 years and the annual average build out rate is 161 dwellings per annum. These figures demonstrate the need to have a number of sites of different sizes and in different locations removed from the Green Belt. The report also identifies, with regard to housing delivery, that 50% more homes per annum are delivered on average on large greenfield sites than large brownfield sites. This is a significant benefit of including greenfield sites within the Preferred Option and will assist to secure its delivery.
5.14 In terms of the locations for removing land from the Green Belt, this should be informed by the Strategic Growth Study and a Black Country Review of the Green Belt. The more detailed study will provide an assessment of land parcels against the purposes of the Green Belt and is likely to recommend that those that compromise the purposes the least will be shortlisted for further consideration to be removed from the Green Belt. It is advised that the next stage should be a consideration of the shortlisted sites based on their suitability (i.e. are the neighbouring uses compatible, would any previous land uses prevent the development of the site), sustainability (i.e. proximity to/ ability to provide local services/ public transport/ employment opportunities) and deliverability (i.e. whether the site is available, being promoted for development, has no barriers to coming forward etc.) credentials. Clearly each site will fair differently against such criteria and the Call for Sites submission will assist the Council to come to a decision on the preferred sites. It is advised that the Black Country authorities should be mindful of the opportunities, through infrastructure and design, that development can bring that will enhance the diversity and character of a particular location.
5.15 In terms of the characteristics of a Sustainable Urban Extension, this is likely to vary depending on the location of each site. For example, some may be more urban and others suburban in their character and would, therefore, provide a different land use offer. It is important that each are considered on a site by site basis to ensure that any subsequent allocation delivers a successful development. It is important that the developer responsible for promoting the site helps to influence what is ultimately delivered. Often what is proposed on site has been informed by housing market intelligence undertaken by sales experts at development companies and, therefore, should be taken into account. Particularly given recent experience in the down turn in the apartment market, it is important that sites are allocated for the right type and mix of housing to ensure that it will be delivered, occupied and successful.
5.16 In the more suburban locations, it is suggested that Sustainable Urban Extensions should look to provide a different offer to potentially what exists in the Strategic Centres and Regeneration Corridors, such as a mix of larger and lower density homes, which will attract those households that in the past have migrated elsewhere. Given the emphasis on delivering more high density homes in the Strategic Centres, it is important that this housing mix is offset by more larger homes in appropriate locations. Otherwise, there is a concern that the Black Country will have a disproportional amount of small homes, which will further encourage more families to migrate elsewhere and not meet the aspiration to diversify the wider HMA.
Question 13b: What infrastructure do you think would be needed for different sizes of SUEs?
5.17 The type of infrastructure needed will vary depending on the different location and size of each site and must be compliant with paragraph 122 of the CIL Regulations that requires planning obligations (which applies to most infrastructure) to be necessary to make the development acceptable in planning terms; directly related to the development; and fairly and reasonably related in scale and kind to the development. With the above in mind, however, provision for open space (both formal and informal), local centre and potentially a primary school should be considered for sites in excess of 1,000 homes.
Question 13c: Are there any potential locations that should be considered for SUEs (please submit through the 'call for sites' form) and what infrastructure would be required to support these?
5.18 No comment.
Question 13d: Do you think that the Core Strategy should set out detailed guidance for the development of SUEs (e.g. type and tenure of housing, specific infrastructure required), rather than details being determined at a local level in light of local policies? Yes/No; Any further comments?
5.19 For the reasons outlined above, relating to considering existing local circumstances and CIL Regulation requirements in respect of any charging schedule and planning obligation requirements, it is advised that detailed guidance for the development of SUEs should not be specified within the Black Country Core Strategy as each site will vary and deserves a more detailed consideration, alongside the developer, at the local level.
Question 14: Do you think there are any other deliverable and sustainable Housing Spatial Options? Yes/No; If yes, please provide details
5.20 There are no other sustainable and deliverable options that we are aware of within the Black Country administrative boundary that are capable of delivering the housing spatial options.
Question 15a: If all housing need cannot be met within the Black Country, do you support the 'export' of housing growth to neighbouring authorities within the HMA? Yes/No; What factors should be taken into account in an assessment of the opportunities in neighbouring authorities e.g. proximity to the edge of the urban area, proximity to a rail station, availability of existing infrastructure, easy access to jobs?
5.21 Even if all realistically deliverable options have been considered within the Black Country, there will remain an unmet need for housing. Therefore, it is necessary for the Black Country authorities to consider the possibility of exporting growth to neighbouring authorities within the HMA. In particular, there are options to expand existing settlements that are close to the administrative boundary (for example, in South Staffordshire) across authorities and could help deliver the necessary growth in a sustainable and deliverable manner. These opportunities should be explored first prior to exporting further growth to other authorities within the HMA where there is less of a spatial connection.
Question 15b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details.
5.22 No comment.
Question 15c: Do you think there are ways to ensure that exporting housing will meet the needs of people who would otherwise live in the Black Country? (e.g. transport improvements, provision of affordable housing, creation of employment opportunities) Yes/No; If yes, please provide details.
5.23 It is important to consider a number of factors, including migration and travel to work patterns, which have been used to identify the extent of the HMA, to determine where households relocate to when leaving the Black Country in order to understand where and why those moves are taking place. Whilst planning can attempt to influence where people relocate to, there is no mechanism to guide or restrict people moving to or from certain locations. Once knowledge of movers can be understood can the planning system can attempt to recreate those attractive characteristics (homes that are more affordable, good public transport links, employment opportunities etc.) in locations where there is capacity for the homes to be delivered. It is advised that an additional analysis of the data, where necessary, is undertaken to provide the Black Country authorities with the relevant intelligence to deliver a successful strategy for growth outside the administrative area.
Question 16: Do you support Spatial Option E1? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access) If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.24 No comment.
Question 17: Do you support Spatial Option E2? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites e.g. quick motorway access, good sustainable transport links? If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.25 No comment.
Question 18: Do you support Spatial Option E3? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access) If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.26 No comment.
Question 19a: Do you support Spatial Option E4? Yes/No; Any further comments?
5.27 No comment.
Question 19b: Should any factors be taken into account in an assessment of the opportunities? Yes/No; If yes, what should they be? (e.g. quick motorway access, strong transport links with the Black Country, good sustainable transport links with the Black Country) If you think there are any potential locations that should be considered, please provide details.
5.28 No comment.
Question 20: Do you think there are any other deliverable and sustainable Employment Land Spatial Options? Yes/No; If yes, please provide details.
5.29 As previously outlined, there is concern that some of the employment sites currently identified are potentially not fit for purpose and others that are identified to be transferred to housing remain in employment occupation. In light of this mismatch, it is welcomed that an updated qualitative assessment has been undertaken and has informed how much employment land is has be found outside the urban area.
5.30 In terms of where the employment land should be located outside the urban area, as with housing, decisions should be based on the results of the Green Belt Review and the suitability, sustainability and deliverability of sites. For employment land sites, the suitability of a site may well include good transportation links for goods and people. The Call for Sites consultation will assist in putting forward suggestions for sites.
6. DELIVERING GROWTH - INFRASTRUCTURE & VIABILITY
Question 21: Do you think that changes are required to Policy DEL1 to ensure it covers both development within the existing urban area and any within the Green Belt? Yes/No; If yes, please provide details.
6.1 Policy DEL1 is considered to be sound on the basis that it is sufficiently flexible to deal with different circumstances on different sites across the Black Country, including sites that are to be removed from the Green Belt.
Question 22: Do you have evidence of a requirement for new social infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.2 No comment.
Question 23: Do you have evidence of social infrastructure that is no longer needed and where the site could be reallocated for alternative uses? Yes/No; If yes, please provide details.
6.3 No comment.
Question 24: Do you have evidence of pressure being placed on the capacity of current social infrastructure which could be exacerbated by new housing? Yes/No; If yes, please provide details.
6.4 No comment.
Question 25: Will there be any new social infrastructure requirements necessary to serve large new housing developments? Yes/No; If yes, please explain the type and scale of any new social infrastructure required.
6.5 It is recognised that delivery of new housing developments may give rise to the need to deliver supporting infrastructure. Committed to working with the relevant authorities and service providers to determine the capacity of existing infrastructure and determine the level of mitigatory provision necessary to support an increase in the population in this location. It is however important that each potential large new housing development is given independent consideration in respect of any infrastructure obligations, recognising that pressures will be dependent on location and existing infrastructure capacity.
Question 26: Do you have any evidence of a requirement for new physical infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.6 No comment.
Question 27: Do you have evidence of pressure being placed on the capacity of current physical infrastructure which could be exacerbated by new developments? Yes/No; If yes, please provide details.
6.7 No comment.
Question 28: Do you think physical infrastructure is necessary to serve large new housing developments? Yes/No; If yes, what type and scale of physical infrastructure is necessary?
6.8 As set out above, the need for infrastructure will vary for each site. Given such different circumstances, it would be inappropriate and potentially unlawful (as it would conflict with paragraph 122 of the CIL Regulations) to incorporate a blanket policy requiring specific infrastructure on every large housing site.
Question 29: Do you think there are any other tools or interventions that could be used to ensure enough infrastructure is provided by developments? Yes/No; If yes, please provide details.
6.9 It is considered that the existing national framework (which includes the NPPF and CIL Regulations) provides a sufficient tool to ensure the relevant infrastructure is delivered. In addition, the CIL Charging Schedule allows authorities to raise funds for named infrastructure projects, which should be updated in line with any Core Strategy advanced. Therefore, it is considered that there are existing provisions to deliver infrastructure and no additional interventions through the Black Country Core Strategy Review are needed.
Question 30: Do you have any suggestions around how the strategy can be developed in order to maintain the urban regeneration focus of the Black Country while at the same time bringing forward sites in the green belt? Yes/No; If yes, please provide details.
6.10 There is no a need for any specific interventions, such as phasing, to protect the delivery of urban regeneration in the Black Country. Indeed, it is considered that development of greenfield and Green Belt sites can very much compliment urban regeneration through the provision of a more varied form of development that will help diversify the housing stock and profile of residents in the wider area, which will assist to sustain and improve the vitality of existing communities. Further, as highlighted above, given the priority to significantly boost the delivery of housing greenfield and Green Belt sites should come forward for development as soon as practically possible. Given lead in and build out rates of larger sites, the land should be encouraged to be developed as soon as possible so to ensure the homes are delivered in the Plan period and the needs are met.
Question 31: Do you think that the right scale and form of funding is available to support the delivery of the Core Strategy review? Yes/No; If no, what alternative sources of funding or delivery mechanisms should be investigated?
6.11 When delivering greenfield/ Green Belt sites, there is an opportunity to deliver infrastructure to meet the needs arising from the proposal, which may have wider benefits for the local community. In addition, it is likely that the communities created by the Sustainable Urban Extensions will potentially be more affluent and share their wealth using local shops and services within the wider Black Country, which will contribute to more successful and prosperous communities.
7. REVIEW OF EXISTING CORE STRATEGY POLICIES & PROPOSALS Housing
Question 35: Do you support the proposed approach to housing land supply? Yes/No; If no, please explain why
7.1 As identified above, it is important that a range of sites in different locations are identified to be in the best possible position of delivering the development requirements. In terms of presenting these sites in the Core Strategy, whilst it is useful to identify a housing trajectory, it is important that there is not a phasing policy as such that would prevent the delivery of housing, given the current housing crisis. As stated above, the delivery of housing on greenfield and Green Belt land will not compromise the delivery of urban regeneration as the development on the urban edge will complement and rejuvenate the environment in a different way.
7.2 In terms of the proposed level of discounting, it is considered that if the LPA adopt an approach to identify a further 20% of sites in accordance with the LPEG recommendations identified above, there would not necessarily be a need for the application of discounting in determining the overall level of supply. It is interesting to note that the level of discounting proposed by LPEG is suggested for all LPAs, not necessarily those which have experienced difficulty in delivery. It could therefore be argued that an increased buffer of 25% could be applied in order to take a cautious approach.
Question 36: Do you think that the current accessibility and density standards set out in Policy HOU2 and Table 8 should be changed? Yes/No; If yes, what standards should be applied instead, for example should the minimum net density of 35 dwellings per hectare be increased to maximise brownfield housing delivery?
7.3 It is clear that the current accessibility and density standards outlined in the adopted Core Strategy were formulated in the context of the vast majority of development taking place on brownfield sites within the defined urban area. As reiterated throughout these representations, there is now a clear need for Green Belt release as part of the Local Plan Review to meet emerging, objectively assessed housing needs. We outline in further detail below why the adopted accessibility and densities would not be applicable to Green Belt sites, however would suggest that the current standards do not allow sufficient flexibility on brownfield sites. A blanket application of prescriptive accessibility and density standards across the Black Country, be it brownfield or greenfield, does not allow sufficient flexibility which take into account site specific characteristics. The Council should allow for greater flexibility when assessing accessibility and density standards, with a more pragmatic approach which allows appropriate assessment for site-specific characteristics and also an assessment of market demand which may vary significantly across the large Black Country area.
7.4 Paragraph 47 of the NPPF outlines how local authorities should set out their own approach towards density. It is suggested that the currently adopted approach does not allow for sufficient assessment of local characteristics. It is clear that the chosen approach must be reflective of local circumstances, including the matters outlined above as well as infrastructure and services available in the locality. It is advocated that a more flexible approach to density and accessibility standards is taken as part of the emerging Local Plan Review.
Question 37a: Do you think that the existing Policy HOU2 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why
7.5 In line with the comments above, it is suggested that the Council should assess each site on a case by case basis in terms of accessibility and density standards. This approach would suggest that the numerical baseline trigger of 15 homes or more will not always be appropriate or applicable, and as advocated throughout these representations it suggested that there should be a complete reassessment on accessibility and density standards as part of the emerging Local Plan Review.
Question 38: Do you think that the current accessibility and density standards are appropriate for green belt release locations? Yes/No; If no, what standards should be applied in these locations and why?
7.6 No, it is not considered that the current standards would be applicable to Green Belt release locations. The adopted standards are overly prescriptive, and as previously discussed were written in the context of brownfield land. Green Belt release sites have a completely different type of character, therefore consideration of accessibility and density standards in relation to these sites should be reflective of local character and site characteristics. The more suburban settings of Green Belt release land lends itself to lower densities which are more appropriate to the Green Belt setting, which typically deliver more family homes. The Council must provide robust evidence to test any forthcoming accessibility and density standards in relation to Green Belt release locations, which allows for a flexible and pragmatic approach.
Question 39: Do you think separate accessibility standards are needed for particular types of housing e.g. housing for the elderly or affordable housing (as occupiers may be less mobile and more dependent on public transport)? Yes/No; If yes, please provide details.
7.7 It is clear that separate accessibility standards will apply to particular types of housing such as affordable and for the elderly population, however in line with the sentiment expressed above, any forthcoming standards should be based on robust evidence and allow for sufficient flexibility to avoid any unnecessary constraints to development coming forward.
Question 40: Do you agree that the 2017 SHMA findings should be used to set general house type targets for the Plan period? Yes/No; If no, please explain why.
7.8 A general and blanket application for house types across the Black Country should not be advanced as part of the Local Plan Review. Paragraph 50 is clear that local planning authorities should plan for a mix of housing based on current and future demographic trends and market trends. It is therefore notable that the NPPF specifically highlights 'market trends' in this context, which acknowledges that the market must inform such decisions.
7.9 Whilst the 2017 SHMA does provide an assessment of demographic and market trends, it is notable that it looks at a wider area assessment and is focused at a higher level. This assessment therefore does not draw out sub-market trends, and cover smaller areas within the vast Black Country area. Again, a blanket policy of house type targets across the Black Country area would not allow for sufficient flexibility to assess each site on a site by site basis, taking into consideration local market trends and demand. The NPPF does not state that specific policies should be set to enforce that local demand is met. As such, it is considered that this should be left for the market to decide, as opposed to applying rigid and prescriptive house size standards.
7.10 It is suggested that the evidence presented in the SHMA should be put into the Plan as an informative and general guide, but should not feed into a specific policy requirement which outlines housing mix percentages that should be applied across the Black Country. A policy containing general house type targets could present as a significant constraint to the delivery of a site where there is no local market demand for this house type, which in turn would have a negative impact on achieving the necessary housing growth targets to be delivered in the Black Country over the Plan period.
Question 41a: Do you support the introduction of a policy approach towards self and custom build housing in the Core Strategy? Yes/No; If yes, would you support:
7.11 It is not considered that there is a policy need for the Core Strategy to address self and custom build housing in the emerging Review. Paragraph 6.32 indicates that there are only nine records on self and custom build registers in the Black Country. It is evident that that there is very limited demand in the Black Country, which is unsurprising given that self and custom build housing is often more popular in rural areas. Given the limited demand it is therefore not considered necessary to take a policy approach towards self and custom build housing within the Local Plan Review.
Question 41b: A target for each authority? Yes/No; Any further comments
7.12 Given that there is evidence of little market demand, it is not considered necessary for the Core Strategy to set targets for each of the Black Country authorities. If it was considered to be necessary as the Local Plan Review progresses, any targets being set should be formulated on the basis of robust evidence such as monitoring of the registers, to provide an indication of how many self-build homes will be needed.
Question 41c: A requirement for large housing sites to provide serviced plots? Yes/No; Any further comments?
7.13 There should not be a requirement for large housing sites to provide serviced plots. This can pose an unnecessary market constraint for large housebuilders when there may be limited or no market demand for self-build plots. Self and custom build plots are often unusual and unique in character, therefore would not be best suited to be located within a large housing development with more uniform house types. If deemed necessary, self and custom build housing should be allocated specific site allocations, as discussed below.
Question 41d: Another approach altogether? Yes/No; If yes, please specify.
7.14 If it is considered necessary for the Review to address self and custom build housing, this should be addressed by the Council's identifying and allocating specific plots for these uses. Identifying site-specific plots would ensure that the most appropriate and suitable locations for self and custom-build will be allocated, via the assessment of appropriate evidence and market demand. In addition, this might be more likely to be achieved on surplus publicly owned land.
Question 42: Do you agree that the annual affordable homes target should be increased to reflect the 2017 Black Country Strategic Housing Market Assessment? Yes/No; If no, please explain why.
7.15 As a general principle, the notion of applying different affordable housing ratios to different parts of the Black Country, based on an understanding of needs and viability, is acceptable. Given that the Black Country represents a vast area, there will not be a uniform housing market, and there will be sub-market trends within this wider area. As such, a more flexible approach which assesses local housing market evidence on a case by case basis could be justified. That said, there is an inherent simplicity and attraction to a single rate figure, which is easy for the development industry to understand.
7.16 In terms of the annual affordable housing target, it is unclear how the Issues and Options document has calculated the figure of 832 homes per year. At paragraph 7.42 of the June 2017 SHMA Part Two- affordable housing document, it is stated that the total annual affordable housing need is 677 dwellings, which represents 19.8% of the annual projected household growth. This differs to paragraph 6.36 of the Issues and Options document, which states that the affordable housing target is 23.4% of total housing need or 832 homes per year. From paragraph 7.47 of the SHMA, it appears that this figure may have been calculated by adding the overall requirement of 16.6% of housing to be affordable rented and 6.7% shared ownership. Clarity is sought on how this figure has been calculated, and we reserve the right to comment further on this matter.
Question 43a: Do you think that the existing Policy HOU3 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why.
7.17 We have not undertaken detailed analysis of the findings and assumptions of the SHMA and affordable housing delivery matters, therefore would like to reserve the right to comment on this matter further. However, on face value, it appears to be a reasonable threshold and is not dissimilar to other locations.
Question 44a: Do you think that the affordable housing requirement for eligible sites in Question 43 should be kept at 25% of the total number of homes on the site? Yes /No; Any further comments?
7.18 Based on the current evidence, a blanket rate of 25% affordable housing would appear to be sound.
7.19 However, irrespective of the final rate, any amendments to the currently adopted affordable housing policy must continue to have a clause in it which stipulates that this requirement is subject to viability tests. Any revised affordable housing requirements will also need to carefully consider the implications of adopted Community Infrastructure Levy (CIL) regimes. Both Sandwell and Dudley Councils have adopted CIL Charging Schedules. These will have implications on viability, therefore if revised affordable housing targets are to progressed then these CIL tariffs will need to re-assessed and re-visited.
Question 44b: If no, should the percentage be increased to allow for the provision of affordable home ownership? Yes/No; If yes, what should the percentage be and why?
7.20 At paragraph 6.39 of the Issues and Options Paper, it is stated that options need to be explored to increase affordable housing delivery of private sites. One option would be to increase the overall affordable housing proportion, which would require developers to provide affordable home ownership products plus an appropriate proportion of other affordable tenures. This paragraph follows on from commentary relating to the Housing White Paper.
7.21 The Housing White Paper discusses Starter Homes at Chapter 4, and explains how the government intend to amend the NPPF to introduce a clear policy expectation that housing sites deliver a minimum of 10% affordable home ownership units. It is later stated that it will be for local areas to work with developers to agree an appropriate level of delivery of starter homes, alongside other affordable home ownership and rented tenures.
7.22 The policy position on Starter Homes is not yet fully clear, and has yet to be formally established through a formal amendment and update to the NPPF. Until the national policy position on Starter Homes has been made clear, it would be premature for the Core Strategy Review to suggest an uplift in the affordable housing requirement to include affordable home ownership such as Starter Homes. Any suggestion to uplift the affordable housing requirement to include Starter Homes should be reflective of the national policy position, as well as founded upon a robust evident base which dictates exactly what percentage this element should be of the overall affordable housing requirement.
Question 45: Should an increased affordable housing requirement be set for green belt release sites, to reflect the likely financial viability of these sites? Yes/No; If yes, what should this be.
7.23 The likely financial viability of Green Belt sites will vary across different areas of the Black Country, therefore any affordable housing requirements for Green Belt sites will need to be reflective of these circumstances. Any affordable housing targets for Green Belt sites should be based on robust evidence, and acknowledge that many sites may need to support and deliver other infrastructure requirements.
7.24 Ultimately, any affordable housing strategy will need to address the affordable housing need as well as the need for market housing. Bearing in mind that the SHMA confirms over 70% of homes required are for homes to be sold on the open market, any affordable housing policy must not dilute the delivery of these needs/requirements. A higher figure on Green Belt sites over and above a standard blanket figure would potentially do this.
Employment Question 49a: Is there still a need for existing Policy DEL2 in order to manage the release of poorer quality employment land for housing? Yes/No; If no, please explain why.
7.25 The Black Country is to be the subject of large levels of both employment and housing growth over the Plan period. These uses are very much inter-linked with one another, and will drive each other's need for growth. The Local Plan Review, in order to meet emerging employment and housing needs, must identify a significant number of specific sites for employment and housing uses. By planning proactively and identifying suitable sites for both employment land and housing land, this should reduce the pressures to manage the release of poorer quality employment land, which may not always be suitable for release. The Local Plan Review should also seek to undertake a further review of poorer quality employment land to make it available for other suitable uses, if it proves to no longer be viable for employment land use. This is in line with policy provisions of the NPPF, which at Paragraph 22 outlines that planning policies should avoid the long-term protection of sites allocated for employment use where there is no reasonable prospect of a site being used for that purpose.
Question 50: Do you think that the Core Strategy should continue to set a target for the total employment land stock in Policy EMP1? Yes/No; Please explain why.
7.26 The continuation of setting a target for employment land stock would be supported. Policy EMP1 should make it clear that these are not maximum figures, to encourage further flexibility for additional growth.
Retail Question 59: Have all the appropriate centres within the Black Country been identified? Yes/No; If not, please specify additional centres
7.27 No comment.
Question 61: In addition to para 4.33 of the current Core Strategy should the revised Core Strategy include criteria for the creation of new centres that might be needed as a result of any additional housing identified through the plan? Yes/No; Any further comments?
7.28 Criteria would be a useful policy tool to help assess the designation of new centres, and should be in line with previous methodologies used which set out clear thresholds.
Question 71: Should the Core Strategy set housing targets for the Town Centres?
7.29 Housing within Town Centres should be supported, in line with paragraph 23 of the NPPF which discusses the important role that residential development can play in ensuring the vitality of Town Centres. Any housing targets should be based on what sites are known to be readily available, suitable and viable for residential development. Market demand for housing in these areas will also need to be fully assessed. It is notable from the outcome of the 2017 SHMA that there is most demand for three bedroom properties (40%). The highest demand is therefore for family housing, and not for flats which are often the most popular within Town Centre locations. Any housing targets set for the Town Centre would therefore need to consider the findings of the SHMA, and be reflective of the fact that family housing is often more suitable for delivery on larger sites, including on sites which are currently located within the Green Belt.
Environment Question 99a: Do you think that national standards for housing development on water consumption should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.30 When referring to water consumption paragraph 6.1.52 of the Issues and Options document states that the Black Country does not currently lie in an area of serious water stress, therefore clear need may be difficult to demonstrate. This evidence suggests that there is limited or no need to introduce such a policy, therefore it is not considered that the Core Strategy Review should seek to introduce water consumption standards for housing development.
Question 99b: Do you think that national access standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.31 The introduction of any national access standards, with the Issues and Options document referring specifically to Lifetime Homes, again must be based on a robust evidence base which can demonstrate market demand. It is noted that Paragraph 50 of the NPPF states that planning authorities must plan for a mix of housing to meet a range of needs. In the same paragraph, it is later stated that these must be based on current and future market trends. If Lifetime Home standards are to be introduced these will therefore need to be based on robust evidence, to ensure that the standards are not overly onerous and prevent the delivery of other types of housing which have higher levels of market demand.
Question 99c: Do you think that national space standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.32 As reiterated throughout these representations, it is not considered that a blanket approach of prescriptive standards across the Black Country allows sufficient flexibility to assess local market and site considerations in an appropriate manner. Whilst it is recognised that space standards can be an important tool to ensure that high quality of homes are delivered, we agree with the sentiment expressed in the recent Housing White Paper. The Paper explains that the government are concerned that a one size fits all approach may not reflect the needs and aspirations of a wider range of households. The White Paper also states that the Government will be undertaking a review of the Nationally Described Space Standards. It is suggested that the Core Strategy Review should await the outcome of this national review of national space standards, to ensure compliance with national policy and to ensure that the most appropriate approach to space standards, if required, is taken.
Question 99d: Do you think that the standards should be different for brownfield and greenfield sites? Yes/No; If yes, please explain how and why.
7.33 As discussed above, prescriptive standards do not always allow sufficient flexibility for local market needs, so we would not advocate a blanket approach of different standards to brownfield and greenfield sites.
Open Space, Sport and Recreation Question 102a: Do you support the proposed changes relating to open space, sport and recreation? Yes/No; If no, please explain
7.34 Paragraph 6.1.60 of the Issues and Options paper outlines how adopted Policy ENV6 creates the framework for open space policies at the local level. The Issues and Options paper outlines how this is in line with national guidance, and that it is proposed to retain this policy and update some references in the supporting text to reflect changing circumstances. It is agreed that the local level remains the appropriate place to set open space policies, and that Policy ENV6 should continue to endorse this approach.

Attachments:

Support

Black Country Core Strategy Issue and Option Report

Representation ID: 2637

Received: 08/09/2017

Respondent: Wallace Land Investments

Agent: Pegasus Group

Representation Summary:

5.8 As highlighted previously, the key to understanding where the most appropriate employment/ housing locations are within the Growth Network and Corridors will be determined through a qualitative assessment of allocated employment sites. It is understood an updated assessment has been undertaken and such work, complete with responses to the Call for Sites consultation, will provide the Black Country authorities with evidence to determine the urban capacity for housing, which may include transferring some employment land to housing as well as housing land to employment. This work will then outline the number of dwellings to be accommodated beyond the existing Growth Network within the Green Belt.
5.9 It is welcomed that the Issues and Options Draft recognises the need to release Green Belt in all scenarios proposed.

Full text:

Question 1: Do you agree that the Core Strategy review should be a partial review, retaining and stretching the existing spatial strategy and updating existing policies? Yes/No; If not, what do you think should be the scope of the review?
2.4 In response to Question 1 and whether it should be a partial review or not, whilst the existing strategy identifies the most sustainable locations for growth in the context of delivering development requirements identified by the Regional Strategy (RS), there is now a new and much bigger challenge ahead in meeting the arising needs for homes identified by the latest evidence and there is concern that the existing spatial strategy may not facilitate the delivery of these needs. The Black Country authorities, therefore, need to be mindful of this and not attempt to put "a square peg in a round hole".
2.5 It is our view that urban regeneration can be achieved whilst pursuing development on the urban edge. Indeed, the scale of housing need is so large that both must be encouraged in order to meet current and arising housing needs within the Black Country.
2.6 It is extremely important that in reviewing the Core Strategy it fully takes account of and facilitates the delivery of strategic economic plans, as recognised in paragraph 1.15. All too often these strategies are ignored and, accordingly, development plans could effectively frustrate economic growth from being realised.
2.7 In terms of the Plan period proposed in paragraph 1.17, whilst a 15-year time period from adoption is appropriate, there is concern that the preparation of plans is often delayed (due to reasons beyond the control of the LPAs) and it may be prudent to stretch the period further to prevent such an issue from occurring.
2.8 It is welcomed that the Issues and Options document recognises that it will not be possible to accommodate all future development needs within the urban area and that an examination of the potential for development land outside the existing urban area, which is effectively land within the Green Belt, will take place as part of the Core Strategy review process.
3. THE BLACK COUNTRY TODAY - THE EXISTING STRATEGY
3.1 As set out within this section, the delivery of both employment and housing land has not come forward as originally envisaged in part due to the after effects of the recession. Surplus employment land which might have been available for housing has not come forward due to a strengthening economy and local firms being more robust than anticipated. In addition, the range of locations available has not in all cases met with market expectations as to where people want to live.
3.2 In terms of the employment land, it is important that sufficient land is provided for new employment and that there is not an overreliance on land that is currently in use. It is impressive that despite generally poor economic performance local businesses have performed well. Should the economy significantly improve within the Plan period in line with LEP aspirations (considered later in this response), there is concern that it may become difficult to transfer a wide range of existing employment locations to housing allocations. It is appropriate, therefore, for the Council to ensure the evidence contained within the Strategic Housing and Employment Land Availability Assessment is reviewed and updated regularly. This will enable the land supply to be responsive to arising needs and not rigidly be wedded to delivering commitments that are unlikely to be realised.
3.3 What is further emphasised by the analysis in this section is that urban regeneration cannot be delivered quickly and that there are a number of factors beyond the control of the Black Country authorities that may have implications for the delivery of the strategy. This further emphasises the need for a mix of types of sites (brownfield, brownfield compulsory purchase, greenfield and Green Belt) of different forms of development (high density, mid and low density family homes) in a variety of locations, which will maximise the opportunities to deliver a successful Local Plan.
3.4 Finally, in respect of the proposal to maintain 300 hectares of employment land that will become vacant by way of general churn over the Plan period. Whilst the principle is considered acceptable, there should be appropriate evidence to support the assumption.
3.5 Our experience is that there are employment sites that clients are looking to secure a residential allocation on that have not been identified thus far. In light of these changing circumstances, the Black Country authorities should ensure that the policy approach is flexible to allow sites in appropriate locations to be brought forward for housing throughout the Plan period and likewise, sites that have been allocated for housing but have not come forward should be removed from the supply.
4. THE STRATEGIC CHALLENGES & OPPORTUNITIES
4.1 It is welcomed that the Black Country authorities are updating their evidence base. Indeed, the adopted Core Strategy took the development requirements from the adopted Regional Strategy (RS), which has since been revoked and is unquestionably out of date. Since the RS was published there has been a number of population and household projections published showing increasing dwelling requirements in the Black Country, which were largely ignored and, therefore, it should come as no surprise that there is a significant increase in forming households.
4.2 In terms of the list of evidence either prepared or due to be completed, it appears to be sufficiently comprehensive.
4.3 A separate review of the housing evidence based, including the Strategic Housing Market Assessment for the Black Country and South Staffordshire, is contained at Appendix A. The key conclusions arising from the report as summarised as follows:
* In determining the OAN, there are concerns with regard to the SHMA methodology and it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline.
* There is concern that the economic growth scenarios do not use the latest economic forecast data and that the methodology translating the job growth into dwelling growth is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances and also more aspirational job growth targets, such as those arising from the SEP.
* In terms of providing uplifts for market signals, a 25% uplift for South Staffs is appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, it should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack within the housing market and prevent house prices from increasing at an accelerated rate.
4.4 In addition, consideration of the Housing Background Report is also contained in the Housing Evidence Based Review Paper contained at Appendix A. The key findings from reviewing the evidence is set out below:
* Clearly a lot of work is yet to be done to determine what the housing land supply position is in the Black Country. Given that much of the existing evidence is based on the adopted Core Strategy, it is recognised that the SHLAAs across the four authorities will need to be updated, both in terms of revising the methodology and range of sites assessed, to reflect a potentially different approach to locating development.
* It is commendable that the Housing Background Report has examined existing sources of supply in an attempt to provide additional homes from sites within the urban area. There is concern, however, that by changing policies, for example, to increase the minimum density on sites has wider policy implications to take into account than simply increasing the number of homes.
* The Housing Background Report suggests a continued allowance for larger windfall sites. It is suggested that it is inappropriate to include an allowance for this source as there is no certainty that this land will come forward for development.
* Other sources, such as converting employment sites to residential sites, based on the evidence presented and feedback from the development industry, it is known that there are employment sites functioning well as employment sites but are to be converted to residential and other employment sites that are unoccupied and undesirable that are to be retained as employment sites. Clearly, there is a mismatch between employment land need and employment land supply. It is advised that the qualitative assessment of employment informs future land supply recommendations and allocations are revised where necessary.
4.5 As a result of the dwelling requirements generated by the SHMA and the land supply identified from the Housing Background Report, it is concluded that there in insufficient urban land to provide for the development requirements and that a Green Belt Review should be conducted. It is noted that scoping is underway and that the work is to be completed in mid-2018. It is hopeful that the development industry will be involved in defining the methodology of the work to ensure that it is conducted in a robust way.
4.6 Another very important piece of work to be taken into consideration will be the Greater Birmingham and Black Country HMA Strategic Growth Study. It is unclear at this stage what role the Black Country authorities will play in meeting the wider needs of Birmingham and, indeed, whether it can now contribute given that meeting the needs of the indigenous population will be a tall order. Further, there is uncertainty with regard to how far the study will go in identifying locations for growth and how this evidence will be taken forward in emerging Development Plans, particularly given that it is premature to the Green Belt Review for the wider Black Country area. It is our view that there are sites within the Green Belt that will provide sustainable locations for growth and that their removal will not compromise the purposes of the Green Belt and, accordingly it will remain purposeful and functional.
Question 2: Do you think that the key evidence set out in Table 1 is sufficient to support the key stages of the Core Strategy review? Yes/No; If not, what further evidence is required and, if there are any particular issues that should be taken into account in considering development on any particular sites or in any particular areas, please provide details
4.7 It is considered that the evidence contained within Table 1 is comprehensive, however, as suggested above and below, a number of concerns have been highlighted and it is therefore suggested that these are addressed in order to improve the soundness of the next iteration of the Core Strategy Review.
4.8 It is welcomed that an updated qualitative assessment of employment land has been undertaken in order to identify if the sites are fit for purpose, alongside the quantitative employment land study. It has been identified that a number of employment land sites that have been suggested for residential land allocations remain in occupation as functioning employment sites. These sites should be removed from the housing land supply. Conversely, there are vacant employment land sites that have been marketed over a period of time where no market interest has been forthcoming and, therefore, it is recommended that these sites should be considered for housing delivery.
4.9 It is noted that Viability Studies are identified as evidence base documents that are still to be prepared. Whilst not specifically identified, it is recommended that affordable housing viability is a key matter that needs to be addressed as part of this evidence base to ensure the level suggested by the SHMA Part 2 is deliverable. If this is not the case, the delivery of both market and affordable housing could be compromised and prevent the successful delivery of any new strategy.
Question 3: Do you agree that the housing need identified for the Black Country over the period 2014-36 in the SHMA, and the anticipated amount of supply, are appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.10 In terms of the extent of the sub market, which includes the Black Country and South Staffordshire, this is considered to be appropriate. It is recognised and welcomed that the Black Country authorities and South Staffordshire have jointly undertaken a SHMA for the sub area, which facilitates the preparation of an Issues and Options Core Strategy Review. There is concern, however, that the remaining constituent authorities within the wider Greater Birmingham Housing Market Area have not taken part and there is a danger that housing need for the whole HMA may not entirely be comprehensively captured due to the different time periods covered by the separate studies. It is advised that a SHMA, consistent with the guidance in the NPPF and Planning Practice Guidance, is prepared for the entire HMA over the same Plan period (as opposed to a housing needs study), which will properly consider all relevant factors in a consistent and comprehensive manner.
4.11 The OAN arrived at by the SHMA is generally appropriate in identifying the starting point for determining the dwelling requirement, however, it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline. There is concern that the economic growth scenarios contain potentially out of date employment forecasts and the methodology to determine appropriate dwelling requirements is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances. In addition, more aspirational job growth targets, such as those arising from the SEP, may not necessarily be appropriate for the Black Country (as discussed later in these representations).
4.12 In terms of providing an uplift for market signals, a 25% uplift for South Staffs is agreed to be appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, the application of such an uplift in South Staffordshire should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack or headroom within the housing market and prevent house prices from increasing at an accelerated rate, exacerbating issues of affordability.
4.13 Clearly, the evidence contained in the SHMA does not consider the potential to accommodate any of Birmingham City's housing needs and that this could result in increased dwelling requirements. We reserve our position in respect of this matter and await the publication of the HMA wide Strategic Housing Needs Study.
4.14 We shortly await a consultation publication from central Government in relation to providing a standardised methodology for generating dwelling requirements. This is anticipated in Autumn 2017. The Black Country authorities will need to take account of any proposed national policy changes identified through the consultation paper. We reserve our position on this matter, until the full details and implications for the Back Country are known. It is considered that, whilst a standard methodology will be helpful in identifying a baseline dwelling requirement, the consideration of long term trends and economic forecasts cannot be carried out in a mathematical calculation outside a demographic/ economic model. In light of this, the SHMA prepared for the sub-area could remain useful as evidence to inform the review of the Black Country Core Strategy.
4.15 In terms of meeting the dwelling requirements, it is understood that the 'Call for Sites' consultation will inform an updated SHLAA, which will assess sites both within and outside the urban area to determine the maximum number of dwellings that can be realistically delivered within the Black Country over the proposed Plan period. The Housing Background Report that has been published as part of the evidence base for the Issues and Options Core Strategy Review has considered assumptions contained within the SHLAA based on adopted policies and considers changes to the policies to boost the delivery of housing on existing sites. Whilst it is a commendable that the Black Country authorities are exploring all potential options to boost housing on urban land, there are wider implications of doing so and accordingly, caution is expressed in response to a number of the identified approaches proposed.
4.16 As confirmed in paragraph 3.15, it is extremely important that the Black Country authorities 'firm up' the housing supply in order to ensure that there is sufficient provision to meet the dwelling requirements. It is also considered appropriate to provide an additional buffer of housing land supply to provide a contingency when sites are delayed. As explained earlier in the Issues and Options Report, sites providing a total of 3,000 homes have not come forward as anticipated. It is considered that additional supply is required to provide flexibility and minimise any durations within the Plan period where the housing trajectory would otherwise dip.
4.17 In terms of the extent of a buffer for housing land, the Local Plan Expert Group suggested that additional land, equivalent to delivering 20% of the overall dwelling requirement, is added to the supply, which will provide a contingency of land to be used as and when necessary during the Plan period. It is suggested that this additional land will help ensure the dwelling delivery targets and housing needs are met in a timely manner, which will reduce the opportunity for households to become concealed or shared. Given the issues experienced in respect of delivery in the past, it could be argued that an increased buffer of circa 25% could be applied.
4.18 It is also appropriate to ensure that, as well as identifying the right amount of land, there is sufficient variety in the types of sites (brownfield, greenfield, Green Belt) are identified, reflecting different sizes, in a range of locations. This variety in provision will allow the best opportunity for multiple sites to come forward at the same time without market constraint and hence ensuring delivery targets are met. In addition, this approach will also provide market choice to existing and arising households looking to move into a new home in the Black Country, which will have wider social benefits (i.e. allow families to live nearby one another and provide an opportunity to diversify existing communities through providing alternative homes to the existing housing stock).
4.19 Indeed, as previously documented in the adopted Core Strategy, it is considered that the ambition to retain the young and professional population within the Black Country should be maintained and that suitable and attractive housing and complementary environments are encouraged.
4.20 Finally, it is welcomed that the Black Country authorities have agreed to test the dwelling requirement figures on an ongoing basis. It is hoped that the suggested changes/alternative scenarios suggested above are implemented in order to ensure the evidence base is robust and the resultant policies and proposals soundly based.
Question 4: Do you consider the employment land requirement identified for the Black Country up to 2036 in the EDNA is appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.21 The Core Strategy review intends to utilise the Economic Development Needs Assessment (EDNA) for the Black Country, published in May 2017, to inform future employment land requirements. The EDNA uses forecasts produced as part of the West Midlands Combined Authority Strategic Economic Plan (SEP) to calculate long-term growth, noting that the 'Super SEP Economy+ Scenario' is the preferred aspirational scenario. This scenario assumes average annual growth in employment of 1.3% across the Combined Authority and presents an ambitious view of future growth in the area, with 500,000 jobs created between 2013 and 2030.
4.22 The SEP Technical Appendix breaks down the job forecasts for the three Local Enterprise Partnerships that form the Combined Authority (Black Country; Coventry & Warwickshire; and Greater Birmingham & Solihull). Jobs growth in the Black Country LEP is forecast to be around 1.1% per annum, whilst it is forecast at 1.5% per annum in the other two LEP areas. This averages out at annual growth of approximately 1.3%. Using data from the Business Register & Employment Survey, published by the Office for National Statistics, it is possible to look at employment trends over the last five to six years (2009-15) and this analysis suggests that the growth rate used in the aspirational growth scenario may be too ambitious for the Back Country:
4.23 Between 2009 and 2015, total employment in the Black Country LEP increased from around 450,000 to approximately 453,000. This equates to average annual growth of 0.1%. Walsall (1.5% p.a.) and Sandwell (0.9% p.a.) experienced jobs growth, although Dudley (-1.1% p.a.) and Wolverhampton (-0.8%) both suffered a fall in employment.
4.24 By contrast, both the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs saw total job numbers increase by 1.3% p.a. from 2009-13. A number of districts in these LEPs saw particularly strong growth over the period, notably Solihull and Lichfield in Greater Birmingham & Solihull, where employment grew by at least 3.0% on an annual basis. In short, the 1.3% average across the West Midlands Combined Authority Area is substantially bolstered by Solihull and Lichfield and therefore it is very ambitious to suggest this will occur across the Black Country area.
4.25 That said, growth in the Black Country needs to be faster than in previous years and the new Core Strategy has a vital role to play in supporting this, however the analysis presented above suggests that the growth targets need to be lowered to better reflect the local economic climate. It is considered unlikely that an annual increase of 1.0% or more will happen in the area in the long-term, especially with the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs capturing new job opportunities at a faster rate in recent years. Lowering the employment growth rate means the amount of employment floorspace needed would be lower. This would not reduce the demographically based housing targets for the area but it would potentially free up previously allocated employment sites for other uses such as residential. This would help the Black Country meet its future housing targets and ensure that it has enough homes for its future workforce to live in.
4.26 As identified in the supporting report and above, it is known that employment sites that had previously been identified for housing are still operational with businesses continuing to use the land and, conversely, there are sites allocated for employment that have been vacant and subsequently market, however, remain unoccupied, which could be transferred to a residential use. It is therefore recommended that the Councils ensure that updated EDNA qualitative review conclusions are taken into account and correct uses applied where appropriate.
Question 5: Do you agree with the proposed approach to the Black Country Green Belt Review? Yes/No; If not, what additional work do you think is necessary?
4.27 In respect of the Green Belt Review, on the basis of the evidence published setting out housing need and supply, it is agreed that it will be necessary to find sites outside of the existing urban area, which will require removing land from the Green Belt where it is appropriate to do so. This will provide an opportunity to identify strategic sites that can provide a significant amount of homes to contribute to meeting identified housing needs. It is considered that there are a number of locations whereby housing sites can be identified, without the purposes of the Green Belt being compromised, ensuring the function and integrity of the Green Belt will remain.
4.28 In addition, areas on the urban fringe have the potential to ensure new homes can be delivered in an established, well landscaped environment, which could be attractive to those young families and professionals that the Black Country authorities have had difficulty in retaining, often through out-migration to neighbouring Shire districts considered to represent more aspirational locations.
4.29 In terms of the process and methodology for undertaking a Green Belt Review, it is understood that the awaited Strategic Housing Needs Study (SHNS) will be accompanied by Strategic Green Belt Review across Greater Birmingham and that the Black Country authorities have been engaged in presenting potential opportunities. It is reassuring that this engagement between consultants and local planning authorities is taking place as there is a danger that logical locations fail to be identified due to a lack of understanding of environmental conditions and/ or local circumstances that are applicable to sites.
4.30 It is agreed and makes sense for the local planning authorities to conduct a Stage 2 Green Belt Assessment following the completion of the higher-level work. Any input on reviewing the draft methodology for the Stage 3 Green Belt Review would be welcomed.
Question 6: Do you agree that the key issues set out in Part 3 are the key issues that need to be taken into account through the Core Strategy Review? Yes/No; If not, what other key issues should be taken into account?
4.31 The key issues presented are considered to be relevant, however, there are a number of inconsistencies relating to matters identified above against the previous questions raised.
5. REVIEWING THE STRATEGY TO MEET NEW CHALLENGES & OPPORTUNITIES
Question 7: Do you think that the Core Strategy vision and sustainability principles remain appropriate? Yes/No; If not, what alternatives would you suggest?
5.1 In the main, the Core Strategy Vision and sustainability principles are considered to be appropriate, with exception to the principle of 'brownfield first'. It is understood that the NPPF, whilst it encourages an efficient use of land and for brown field land to be recycled, it does not suggest a sequential approach to development. There is no evidence to demonstrate that the development of greenfield land will compromise the development of brownfield land. Often the type of developers of the different land categories are different and, given the scale of the housing need, it is appropriate that the early delivery of housing is encouraged from all types of sites. In particular, the larger, potentially Green Belt, sites will have a longer lead in time due to the time it takes to plan for, determine and implement a comprehensive scheme. Indeed, a recent study entitled 'Start to Finish', prepared by NLP, supports this claim. When planning the housing trajectory for the Core Strategy, the larger sites should be planned in to come forward as soon as practically possible.
5.2 It is therefore suggested that the reference to 'putting brownfield first' is inappropriate and that it should be replaced by 'ensuring an efficient use of land to meet the identified housing needs', which encourages the recycling of land and recognises the contributions of greenfield/ Green Belt land to meeting housing delivery targets.
Question 8: Do you think that the Core Strategy spatial objectives remain appropriate? Yes/No; If not, what alternatives would you suggest and how might these changes impact on individual Core Strategy policies?
5.3 Whilst the objectives outlined generally remain sound, there is concern that one of the NPPFs main priorities is absent. This is in relation to significantly boosting the supply of housing. It is suggested that an additional objective is added in order to ensure that meeting housing needs remains a priority within the Black Country. Once a preferred option is arrived at, spatial references as to where the housing growth will be delivered could be included (for example, meeting housing needs on urban (brownfield and greenfield) land and at extensions to the urban area).
5.4 Further, given the increased employment land requirements, the second objective relating to employment land being within the best locations within the Regeneration Corridors may no longer be appropriate. Indeed, as highlighted earlier, there is concern that there is a mismatch in land allocations, and it is appropriate for the Core Strategy review to ensure all employment sites are fit for purpose. This may conclude that employment opportunities should be identified on new land outside of the Regeneration Corridors. Should this be the case, the objective would be inappropriately worded.
Question 9: Do you agree that Policies CSP1 and CSP2 should be retained and updated to reflect new evidence and growth proposals outside the Growth Network? Yes/No; If not, what changes do you think should be made to Policies CSP1 and CSP2 in response to new challenges and opportunities?
5.5 It is agreed that the policies could remain, if the development requirements and related changes are made to ensure the policies are consistent with the overall strategy. The changes relate to both the quantum of development (homes, employment and retail space), the location of development (within and beyond the existing Regeneration Corridors) and the type of development (brownfield, greenfield and on land removed from the Green Belt). It is considered that references should be made to urban extensions (on land removed from the Green Belt) in Policy CSP2 specifically, to highlight the important contribution that such sites will make to meeting the development requirements of the Plan.
5.6 As touched upon above and throughout these Representations, it is clear that given the significant amounts of housing that will need to be delivered across the Black Country, there will be a need for a switch from a sole focus on brownfield regeneration to a need for a dual approach that focuses on both brownfield and strategic greenfield/green belt release. The focus on Regeneration Corridors and Strategic Centres was very much a product of the times and housing needs of when the Core Strategy was first adopted in 2011. In light of the emerging, higher housing requirements, it is clear that there is a need for a fresh approach to the spatial distribution of growth across the Black Country. Whilst reference to strategic centres and regeneration corridors could remain, this remit needs to be expanded to reflect the evident need for urban extensions outside of the existing growth networks. Indeed, Sustainable Urban Extensions both within the Black Country administrative boundaries and within the adjacent South Staffordshire District will be required to meet emerging housing requirements. These policies should therefore be expanded to include references to urban extensions in the form of green field land outside of the defined urban area, to ensure that sufficient certainty is built into the plan that the housing needs of the area will be met. Amending these policies to make it clear that both brown field and green field land is required will ensure that a fresh approach to spatial distribution across the Black Country Area would be secured and delivered.
5.7 On a separate note, whilst a point mostly relating to the South Staffordshire Local Plan to which separate representations will be made, it is considered that the currently adopted approach to spatial distribution in South Staffordshire will need to be re-assessed. Given the huge housing requirements of the Black Country and the shared housing market between South Staffordshire and the Black Country, it is considered that suitable urban extension sites located within South Staffordshire District would be the logical and sensible locations to meet any remaining unmet housing need. In terms of the relevance of this point to the Black Country Review, it will be important for the Black Country authorities to collaborate with South Staffordshire on cross boundary issues, and to identify suitable extension sites to the Black Country built area which fall within the planning jurisdiction of South Staffordshire District. It is welcomed that this approach is planned to be undertaken, by virtue of the forthcoming Green Belt Review which will be a joint exercise between the Black Country Authorities and South Staffordshire District.

Question 10: In continuing to promote growth within the Growth Network, is there a need to amend the boundaries of any of the Regeneration Corridors in the existing Core Strategy? Yes/No; If so, which boundaries and why?
Question 11a: Do you support Strategic Option 1A? Yes/No; If yes, please explain why. If no, do you support Option 1B? Yes/No; If yes, please explain why. If you support the release of further employment land for housing, what should the characteristics of these employment areas be?
Question 11b: Are there any current employment areas that might be considered suitable for redevelopment to housing? Yes/No;
5.8 As highlighted previously, the key to understanding where the most appropriate employment/ housing locations are within the Growth Network and Corridors will be determined through a qualitative assessment of allocated employment sites. It is understood an updated assessment has been undertaken and such work, complete with responses to the Call for Sites consultation, will provide the Black Country authorities with evidence to determine the urban capacity for housing, which may include transferring some employment land to housing as well as housing land to employment. This work will then outline the number of dwellings to be accommodated beyond the existing Growth Network within the Green Belt.
5.9 It is welcomed that the Issues and Options Draft recognises the need to release Green Belt in all scenarios proposed.
Question 12a: Do you support Spatial Option H1? Yes/No; What criteria should be used to select suitable sites? e.g. ability to create a defensible new green belt boundary, size, access to existing residential services.
Question 12b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details (please submit specific sites through the 'call for sites' form).
Question 13a: Do you support Spatial Option H2? Yes/No; What should the characteristics of Sustainable Urban Areas (SUEs) be? e.g. minimum/ maximum size, mix of uses, mix of housing types, accessibility to other areas. What criteria should be used to select suitable sites? e.g. proximity to a rail station, availability of existing infrastructure, easy access to jobs, potential to support existing settlements / services, proximity to the existing growth network, potential to support urban regeneration.
5.10 Given the scale of the housing need, there is concern that the development requirements could not be met with just one of the suggested options presented and, therefore, a combination of both options will be necessary.
5.11 To be in the best possible position to significantly boost the amount of housing and meet the development requirements in the Black Country, in accordance with the NPPF, it is advised that opportunities to both round off edges of the Green Belt and Sustainable Urban Extensions are proposed in the Preferred Options Draft Core Strategy. As highlighted within the Issues and Options Draft, there are challenges and opportunities that come with both types of development, for example from a delivery perspective, smaller sites will come forward more quickly due to the nature of these being straight forward proposals (with limited infrastructure necessary and one or few land owners) and larger sites will ultimately take longer as they are more complex (with multiple land uses, infrastructure and land owners). This fact has been evidenced by Nathaniel Lichfield and Partners (now known as Lichfields) within their report 'Start to Finish' who concluded that the average planning approval period of schemes of 2,000+ dwellings is 6.1 years and the annual average build out rate is 161 dwellings per annum. These figures demonstrate the need to have a number of sites of different sizes and in different locations removed from the Green Belt. The report also identifies, with regard to housing delivery, that 50% more homes per annum are delivered on average on large greenfield sites than large brownfield sites. This is a significant benefit of including greenfield sites within the Preferred Option and will assist to secure its delivery.
5.12 In terms of the locations for removing land from the Green Belt, this should be informed by the Strategic Growth Study and a Black Country Review of the Green Belt. The more detailed study will provide an assessment of land parcels against the purposes of the Green Belt and is likely to recommend that those that compromise the purposes the least will be shortlisted for further consideration to be removed from the Green Belt. It is advised that the next stage should be a consideration of the shortlisted sites based on their suitability (i.e. are the neighbouring uses compatible, would any previous land uses prevent the development of the site), sustainability (i.e. proximity to/ ability to provide local services/ public transport/ employment opportunities) and deliverability (i.e. whether the site is available, being promoted for development, has no barriers to coming forward etc.) credentials. Clearly each site will fair differently against such criteria and the Call for Sites submission will assist the Council to come to a decision on the preferred sites. It is advised that the Black Country authorities should be mindful of the opportunities, through infrastructure and design, that development can bring that will enhance the diversity and character of a particular location.
5.13 In terms of the characteristics of a Sustainable Urban Extension, this is likely to vary depending on the location of each site. For example, some may be more urban and others suburban in their character and would, therefore, provide a different land use offer. It is important that each are considered on a site by site basis to ensure that any subsequent allocation delivers a successful development. It is important that the developer responsible for promoting the site helps to influence what is ultimately delivered. Often what is proposed on site has been informed by housing market intelligence undertaken by sales experts at development companies and, therefore, should be taken into account. Particularly given recent experience in the down turn in the apartment market, it is important that sites are allocated for the right type and mix of housing to ensure that it will be delivered, occupied and successful.
5.14 In the more suburban locations, it is suggested that Sustainable Urban Extensions should look to provide a different offer to potentially what exists in the Strategic Centres and Regeneration Corridors, such as a mix of larger and lower density homes, which will attract those households that in the past have migrated elsewhere. Given the emphasis on delivering more high density homes in the Strategic Centres, it is important that this housing mix is offset by more larger homes in appropriate locations. Otherwise, there is a concern that the Black Country will have a disproportional amount of small homes, which will further encourage more families to migrate elsewhere and not meet the aspiration to diversify the wider HMA.
Question 13b: What infrastructure do you think would be needed for different sizes of SUEs?
5.15 The type of infrastructure needed will vary depending on the different location and size of each site and must be compliant with paragraph 122 of the CIL Regulations that requires planning obligations (which applies to most infrastructure) to be necessary to make the development acceptable in planning terms; directly related to the development; and fairly and reasonably related in scale and kind to the development.
5.16 With the above in mind, however, provision for open space (both formal and informal), local centre and potentially a primary school should be considered for sites in excess of 1,000 homes.
Question 13d: Do you think that the Core Strategy should set out detailed guidance for the development of SUEs (e.g. type and tenure of housing, specific infrastructure required), rather than details being determined at a local level in light of local policies? Yes/No; Any further comments?
5.19 For the reasons outlined above, relating to considering existing local circumstances and CIL Regulation requirements in respect of any charging schedule and planning obligation requirements, it is advised that detailed guidance for the development of SUEs should not be specified within the Black Country Core Strategy as each site will vary and deserves a more detailed consideration, alongside the developer, at the local level.
Question 14: Do you think there are any other deliverable and sustainable Housing Spatial Options? Yes/No; If yes, please provide details
5.18 There are no other sustainable and deliverable options that we are aware of within the Black Country administrative boundary that are capable of delivering the housing spatial options.
Question 15a: If all housing need cannot be met within the Black Country, do you support the 'export' of housing growth to neighbouring authorities within the HMA? Yes/No; What factors should be taken into account in an assessment of the opportunities in neighbouring authorities e.g. proximity to the edge of the urban area, proximity to a rail station, availability of existing infrastructure, easy access to jobs?
5.19 If, once all realistically deliverable options have been considered, there remains an unmet need for housing it is agreed that the Black Country authorities should consider the possibility of exporting growth to neighbouring authorities within the HMA. In particular, there are options to expand existing settlements that are close to the administrative boundary (for example, in South Staffordshire) across authorities and could help deliver the necessary growth in a sustainable and deliverable manner. These opportunities should be explored first prior to exporting further growth to other authorities within the HMA where there is less of a spatial connection.
Question 15c: Do you think there are ways to ensure that exporting housing will meet the needs of people who would otherwise live in the Black Country? (e.g. transport improvements, provision of affordable housing, creation of employment opportunities) Yes/No; If yes, please provide details.
5.20 It is important to consider a number of factors, including migration and travel to work patterns, which have been used to identify the extent of the HMA, to determine where households relocate to when leaving the Black Country in order to understand where and why those moves are taking place. Whilst planning can attempt to influence where people relocate to, there is no mechanism to guide or restrict people moving to or from certain locations. Once knowledge of movers can be understood can the planning system can attempt to recreate those attractive characteristics (homes that are more affordable, good public transport links, employment opportunities etc.) in locations where there is capacity for the homes to be delivered. It is advised that an additional analysis of the data, where necessary, is undertaken to provide the Black Country authorities with the relevant intelligence to deliver a successful strategy for growth outside the administrative area.
Question 16: Do you support Spatial Option E1? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access). If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
Question 17: Do you support Spatial Option E2? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites e.g. quick motorway access, good sustainable transport links? If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
Question 18: Do you support Spatial Option E3? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access). If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
Question 19a: Do you support Spatial Option E4? Yes/No; Any further comments?
Question 19b: Should any factors be taken into account in an assessment of the opportunities? Yes/No; If yes, what should they be? (e.g. quick motorway access, strong transport links with the Black Country, good sustainable transport links with the Black Country) If you think there are any potential locations that should be considered, please provide details.
Question 20: Do you think there are any other deliverable and sustainable Employment Land Spatial Options? Yes/No; If yes, please provide details.
5.21 As previously outlined, there is concern that some of the employment sites currently identified are potentially not fit for purpose and others that are identified to be transferred to housing remain in employment occupation. In light of this mismatch, it is welcomed that an updated qualitative assessment has been undertaken and has informed how much employment land is has be found outside the urban area.
5.22 In terms of where the employment land should be located outside the urban area, as with housing, decisions should be based on the results of the Green Belt Review and the suitability, sustainability and deliverability of sites. For employment land sites, the suitability of a site may well include good transportation links for goods and people. Indeed, there is likely to be a significant growth in the need for logistics floorspace to accommodate rapid increases in the dot.com purchasing of goods and demand for next day delivery. Efficient access to motorway junctions and the strategic road network and the availability of large sites will therefore take priority, as well as other considerations such as the ability to operate 24 hours. Placing such sites directly next to the existing urban area may therefore be impractical. The Call for Sites consultation will assist in putting forward suggestions for sites.
5.23 In terms of exporting employment land, it is considered that a proportionate amount of employment land to housing land exported should be made in an attempt to create more sustainable communities, that is unless there is good reason not to do so (i.e. due to improved public transport links between exported housing and employment sites). As evidenced in work supporting the Issues and Options Draft, whilst the Black Country is a sufficiently self-contained labour market there are strong linkages with Birmingham and South Staffordshire. This would therefore suggest that these locations should be first explored for transporting any employment land growth, however, given the land capacity issues in Birmingham it is more likely that South Staffordshire would be able to assist.
6. DELIVERING GROWTH - INFRASTRUCTURE & VIABILITY
Question 21: Do you think that changes are required to Policy DEL1 to ensure it covers both development within the existing urban area and any within the Green Belt? Yes/No; If yes, please provide details.
6.1 Policy DEL1 is considered to be sound on the basis that it is sufficiently flexible to deal with different circumstances on different sites across the Black Country, including sites that are to be removed from the Green Belt.
Question 23: Do you have evidence of social infrastructure that is no longer needed and where the site could be reallocated for alternative uses? Yes/No; If yes, please provide details.
6.2 No comment.
Question 24: Do you have evidence of pressure being placed on the capacity of current social infrastructure which could be exacerbated by new housing? Yes/No; If yes, please provide details.
6.3 No comment.
Question 25: Will there be any new social infrastructure requirements necessary to serve large new housing developments? Yes/No; If yes, please explain the type and scale of any new social infrastructure required.
6.4 No comment.
Question 26: Do you have any evidence of a requirement for new physical infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.5 No comment.
Question 27: Do you have evidence of pressure being placed on the capacity of current physical infrastructure which could be exacerbated by new developments? Yes/No; If yes, please provide details.
6.6 No comment.
Question 28: Do you think physical infrastructure is necessary to serve large new housing developments? Yes/No; If yes, what type and scale of physical infrastructure is necessary?
6.7 As set out above, the need for infrastructure will vary for each site. Given such different circumstances, it would be inappropriate and potentially unlawful (as it would conflict with paragraph 122 of the CIL Regulations) to incorporate a blanket policy requiring specific infrastructure on every large housing site.
Question 29: Do you think there are any other tools or interventions that could be used to ensure enough infrastructure is provided by developments? Yes/No; If yes, please provide details.
6.8 It is considered that the existing national framework (which includes the NPPF and CIL Regulations) provides a sufficient tool to ensure the relevant infrastructure is delivered. In addition, the CIL Charging Schedule allows authorities to raise funds for named infrastructure projects, which should be updated in line with any Core Strategy advanced. Therefore, it is considered that there are existing provisions to deliver infrastructure and no additional interventions through the Black Country Core Strategy Review are needed.
Question 30: Do you have any suggestions around how the strategy can be developed in order to maintain the urban regeneration focus of the Black Country while at the same time bringing forward sites in the green belt? Yes/No; If yes, please provide details.
6.9 There is no a need for any specific interventions, such as phasing, to protect the delivery of urban regeneration in the Black Country. Indeed, it is considered that development of greenfield and Green Belt sites can very much compliment urban regeneration through the provision of a more varied form of development that will help diversify the housing stock and profile of residents in the wider area, which will assist to sustain and improve the vitality of existing communities. Further, as highlighted above, given the priority to significantly boost the delivery of housing greenfield and Green Belt sites should come forward for development as soon as practically possible. Given lead in and build out rates of larger sites, the land should be encouraged to be developed as soon as possible so to ensure the homes are delivered in the Plan period and the needs are met.
Question 31: Do you think that the right scale and form of funding is available to support the delivery of the Core Strategy review? Yes/No; If no, what alternative sources of funding or delivery mechanisms should be investigated?
6.10 When delivering greenfield/ Green Belt sites, there is an opportunity to deliver infrastructure to meet the needs arising from the proposal, which may have wider benefits for the local community. In addition, it is likely that the communities created by the Sustainable Urban Extensions will potentially be more affluent and share their wealth using local shops and services within the wider Black Country, which will contribute to more successful and prosperous communities.
7. REVIEW OF EXISTING CORE STRATEGY POLICIES & PROPOSALS
Housing Question 35: Do you support the proposed approach to housing land supply? Yes/No; If no, please explain why
7.1 As identified above, it is important that a range of sites in different locations are identified to be in the best possible position of delivering the development requirements. In terms of presenting these sites in the Core Strategy, whilst it is useful to identify a housing trajectory, it is important that there is not a phasing policy as such that would prevent the delivery of housing, given the current housing crisis. As stated above, the delivery of housing on greenfield and Green Belt land will not compromise the delivery of urban regeneration as the development on the urban edge will complement and rejuvenate the environment in a different way.
7.2 In terms of the proposed level of discounting, it is considered that if the LPA adopt an approach to identify a further 20% of sites in accordance with the LPEG recommendations identified above, there would not necessarily be a need for the application of discounting in determining the overall level of supply. It is interesting to note that the level of discounting proposed by LPEG is suggested for all LPAs, not necessarily those which have experienced difficulty in delivery. It could therefore be argued that an increased buffer of 25% could be applied in order to take a cautious approach.
Question 36: Do you think that the current accessibility and density standards set out in Policy HOU2 and Table 8 should be changed? Yes/No; If yes, what standards should be applied instead, for example should the minimum net density of 35 dwellings per hectare be increased to maximise brownfield housing delivery?
7.3 It is clear that the current accessibility and density standards outlined in the adopted Core Strategy were formulated in the context of the vast majority of development taking place on brownfield sites within the defined urban area. As reiterated throughout these representations, there is now a clear need for Green Belt release as part of the Local Plan Review to meet emerging, objectively assessed housing needs. We outline in further detail below why the adopted accessibility and densities would not be applicable to Green Belt sites, however would suggest that the current standards do not allow sufficient flexibility on brownfield sites. A blanket application of prescriptive accessibility and density standards across the Black Country, be it brownfield or greenfield, does not allow sufficient flexibility which take into account site specific characteristics. The Council should allow for greater flexibility when assessing accessibility and density standards, with a more pragmatic approach which allows appropriate assessment for site-specific characteristics and also an assessment of market demand which may vary significantly across the large Black Country area.
7.4 Paragraph 47 of the NPPF outlines how local authorities should set out their own approach towards density. It is suggested that the currently adopted approach does not allow for sufficient assessment of local characteristics. It is clear that the chosen approach must be reflective of local circumstances, including the matters outlined above as well as infrastructure and services available in the locality. It is advocated that a more flexible approach to density and accessibility standards is taken as part of the emerging Local Plan Review.
Question 37a: Do you think that the existing Policy HOU2 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why
7.5 In line with the comments above, it is suggested that the Council should assess each site on a case by case basis in terms of accessibility and density standards. This approach would suggest that the numerical baseline trigger of 15 homes or more will not always be appropriate or applicable, and as advocated throughout these representations it suggested that there should be a complete reassessment on accessibility and density standards as part of the emerging Local Plan Review.
Question 38: Do you think that the current accessibility and density standards are appropriate for green belt release locations? Yes/No; If no, what standards should be applied in these locations and why?
7.6 No, it is not considered that the current standards would be applicable to Green Belt release locations. The adopted standards are overly prescriptive, and as previously discussed were written in the context of brownfield land. Green Belt release sites have a completely different type of character, therefore consideration of accessibility and density standards in relation to these sites should be reflective of local character and site characteristics. The more suburban settings of Green Belt release land lends itself to lower densities which are more appropriate to the Green Belt setting, which typically deliver more family homes. The Council must provide robust evidence to test any forthcoming accessibility and density standards in relation to Green Belt release locations, which allows for a flexible and pragmatic approach.
Question 39: Do you think separate accessibility standards are needed for particular types of housing e.g. housing for the elderly or affordable housing (as occupiers may be less mobile and more dependent on public transport)? Yes/No; If yes, please provide details.
7.7 It is clear that separate accessibility standards will apply to particular types of housing such as affordable and for the elderly population, however in line with the sentiment expressed above, any forthcoming standards should be based on robust evidence and allow for sufficient flexibility to avoid any unnecessary constraints to development coming forward.
Question 40: Do you agree that the 2017 SHMA findings should be used to set general house type targets for the Plan period? Yes/No; If no, please explain why.
7.8 A general and blanket application for house types across the Black Country should not be advanced as part of the Local Plan Review. Paragraph 50 is clear that local planning authorities should plan for a mix of housing based on current and future demographic trends and market trends. It is therefore notable that the NPPF specifically highlights 'market trends' in this context, which acknowledges that the market must inform such decisions.
7.9 Whilst the 2017 SHMA does provide an assessment of demographic and market trends, it is notable that it looks at a wider area assessment and is focused at a higher level. This assessment therefore does not draw out sub-market trends, and cover smaller areas within the vast Black Country area. Again, a blanket policy of house type targets across the Black Country area would not allow for sufficient flexibility to assess each site on a site by site basis, taking into consideration local market trends and demand. The NPPF does not state that specific policies should be set to enforce that local demand is met. As such, it is considered that this should be left for the market to decide, as opposed to applying rigid and prescriptive house size standards.
7.10 It is suggested that the evidence presented in the SHMA should be put into the Plan as an informative and general guide, but should not feed into a specific policy requirement which outlines housing mix percentages that should be applied across the Black Country. A policy containing general house type targets could present as a significant constraint to the delivery of a site where there is no local market demand for this house type, which in turn would have a negative impact on achieving the necessary housing growth targets to be delivered in the Black Country over the Plan period.
Question 41a: Do you support the introduction of a policy approach towards self and custom build housing in the Core Strategy? Yes/No; If yes, would you support:
7.11 It is not considered that there is a policy need for the Core Strategy to address self and custom build housing in the emerging Review. Paragraph 6.32 indicates that there are only nine records on self and custom build registers in the Black Country. It is evident that that there is very limited demand in the Black Country, which is unsurprising given that self and custom build housing is often more popular in rural areas. Given the limited demand it is therefore not considered necessary to take a policy approach towards self and custom build housing within the Local Plan Review.
Question 41b: A target for each authority? Yes/No; Any further comments
7.12 Given that there is evidence of little market demand, it is not considered necessary for the Core Strategy to set targets for each of the Black Country authorities. If it was considered to be necessary as the Local Plan Review progresses, any targets being set should be formulated on the basis of robust evidence such as monitoring of the registers, to provide an indication of how many self-build homes will be needed.
Question 41c: A requirement for large housing sites to provide serviced plots? Yes/No; Any further comments?
7.13 There should not be a requirement for large housing sites to provide serviced plots. This can pose an unnecessary market constraint for large housebuilders when there may be limited or no market demand for self-build plots. Self and custom build plots are often unusual and unique in character, therefore would not be best suited to be located within a large housing development with more uniform house types. If deemed necessary, self and custom build housing should be allocated specific site allocations, as discussed below.
Question 41d: Another approach altogether? Yes/No; If yes, please specify.
7.14 If it is considered necessary for the Review to address self and custom build housing, this should be addressed by the Council's identifying and allocating specific plots for these uses. Identifying site-specific plots would ensure that the most appropriate and suitable locations for self and custom-build will be allocated, via the assessment of appropriate evidence and market demand. In addition, this might be more likely to be achieved on surplus publicly owned land.
Question 42: Do you agree that the annual affordable homes target should be increased to reflect the 2017 Black Country Strategic Housing Market Assessment? Yes/No; If no, please explain why.
7.15 As a general principle, the notion of applying different affordable housing ratios to different parts of the Black Country, based on an understanding of needs and viability, is acceptable. Given that the Black Country represents a vast area, there will not be a uniform housing market, and there will be sub-market trends within this wider area. As such, a more flexible approach which assesses local housing market evidence on a case by case basis could be justified. That said, there is an inherent simplicity and attraction to a single rate figure, which is easy for the development industry to understand.
7.16 In terms of the annual affordable housing target, it is unclear how the Issues and Options document has calculated the figure of 832 homes per year. At paragraph 7.42 of the June 2017 SHMA Part Two- affordable housing document, it is stated that the total annual affordable housing need is 677 dwellings, which represents 19.8% of the annual projected household growth. This differs to paragraph 6.36 of the Issues and Options document, which states that the affordable housing target is 23.4% of total housing need or 832 homes per year. From paragraph 7.47 of the SHMA, it appears that this figure may have been calculated by adding the overall requirement of 16.6% of housing to be affordable rented and 6.7% shared ownership. Clarity is sought on how this figure has been calculated, and we reserve the right to comment further on this matter.
Question 43a: Do you think that the existing Policy HOU3 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why.
7.17 We have not undertaken detailed analysis of the findings and assumptions of the SHMA and affordable housing delivery matters, therefore would like to reserve the right to comment on this matter further. However, on face value, it appears to be a reasonable threshold and is not dissimilar to other locations.
Question 44a: Do you think that the affordable housing requirement for eligible sites in Question 43 should be kept at 25% of the total number of homes on the site? Yes /No; Any further comments?
7.18 Based on the current evidence, a blanket rate of 25% affordable housing would appear to be sound.
7.19 However, irrespective of the final rate, any amendments to the currently adopted affordable housing policy must continue to have a clause in it which stipulates that this requirement is subject to viability tests. Any revised affordable housing requirements will also need to carefully consider the implications of adopted Community Infrastructure Levy (CIL) regimes. Both Sandwell and Dudley Councils have adopted CIL Charging Schedules. These will have implications on viability, therefore if revised affordable housing targets are to progressed then these CIL tariffs will need to re-assessed and re-visited.
Question 44b: If no, should the percentage be increased to allow for the provision of affordable home ownership? Yes/No; If yes, what should the percentage be and why?
7.20 At paragraph 6.39 of the Issues and Options Paper, it is stated that options need to be explored to increase affordable housing delivery of private sites. One option would be to increase the overall affordable housing proportion, which would require developers to provide affordable home ownership products plus an appropriate proportion of other affordable tenures. This paragraph follows on from commentary relating to the Housing White Paper.
7.21 The Housing White Paper discusses Starter Homes at Chapter 4, and explains how the government intend to amend the NPPF to introduce a clear policy expectation that housing sites deliver a minimum of 10% affordable home ownership units. It is later stated that it will be for local areas to work with developers to agree an appropriate level of delivery of starter homes, alongside other affordable home ownership and rented tenures.
7.22 The policy position on Starter Homes is not yet fully clear, and has yet to be formally established through a formal amendment and update to the NPPF. Until the national policy position on Starter Homes has been made clear, it would be premature for the Core Strategy Review to suggest an uplift in the affordable housing requirement to include affordable home ownership such as Starter Homes. Any suggestion to uplift the affordable housing requirement to include Starter Homes should be reflective of the national policy position, as well as founded upon a robust evident base which dictates exactly what percentage this element should be of the overall affordable housing requirement.
Question 45: Should an increased affordable housing requirement be set for green belt release sites, to reflect the likely financial viability of these sites? Yes/No; If yes, what should this be.
7.23 The likely financial viability of Green Belt sites will vary across different areas of the Black Country, therefore any affordable housing requirements for Green Belt sites will need to be reflective of these circumstances. Any affordable housing targets for Green Belt sites should be based on robust evidence, and acknowledge that many sites may need to support and deliver other infrastructure requirements.
7.24 Ultimately, any affordable housing strategy will need to address the affordable housing need as well as the need for market housing. Bearing in mind that the SHMA confirms over 70% of homes required are for homes to be sold on the open market, any affordable housing policy must not dilute the delivery of these needs/requirements. A higher figure on Green Belt sites over and above a standard blanket figure would potentially do this.
Employment Question 49a: Is there still a need for existing Policy DEL2 in order to manage the release of poorer quality employment land for housing? Yes/No; If no, please explain why.
7.25 The Black Country is to be the subject of large levels of both employment and housing growth over the Plan period. These uses are very much inter-linked with one another, and will drive each other's need for growth. The Local Plan Review, in order to meet emerging employment and housing needs, must identify a significant number of specific sites for employment and housing uses. By planning proactively and identifying suitable sites for both employment land and housing land, this should reduce the pressures to manage the release of poorer quality employment land, which may not always be suitable for release. The Local Plan Review should also seek to undertake a further review of poorer quality employment land to make it available for other suitable uses, if it proves to no longer be viable for employment land use. This is in line with policy provisions of the NPPF, which at Paragraph 22 outlines that planning policies should avoid the long-term protection of sites allocated for employment use where there is no reasonable prospect of a site being used for that purpose.
Question 50: Do you think that the Core Strategy should continue to set a target for the total employment land stock in Policy EMP1? Yes/No; Please explain why.
7.26 The continuation of setting a target for employment land stock would be supported. Policy EMP1 should make it clear that these are not maximum figures, to encourage further flexibility for additional growth.
Retail Question 59: Have all the appropriate centres within the Black Country been identified? Yes/No; If not, please specify additional centres
7.27 Figure 11 and Table 6 of the Issues and Options Paper make no reference to Hardwick. We have replicated Figure 11 on the following page [SEE ATTACHED DOCUMENT FOR IMAGE], and labelled Hardwick which we consider should be identified as a Local Centre within the retail hierarchy. There are a number of local facilities in Hardwick, including a cluster of shops, public houses and restaurants centred around the Chester Road/Hardwick Road junction. There are 9 facilities located at this junction, which comprise of 2 no. restaurants, 1 no. public house, 5 no retail units and 1 no. A5 unit. Hardwick is therefore well served by a number of local facilities, and should therefore be a designated centre within the Core Strategy Review. This is particularly the case given that Hardwick is well-suited to accommodate future housing growth as explained in other sections of these Representations, therefore Hardwick should be designated as a centre to reflect future growth in the area.
Question 61: In addition to para 4.33 of the current Core Strategy should the revised Core Strategy include criteria for the creation of new centres that might be needed as a result of any additional housing identified through the plan? Yes/No; Any further comments?
7.28 As discussed above, it is suggested that through the Local Plan Review, there will be a need to designate new centres (such as Hardwick) as a result of additional housing growth. Criteria would be a useful policy tool to help assess the designation of new centres, and should be in line with previous methodologies used which set out clear thresholds.
Question 71: Should the Core Strategy set housing targets for the Town Centres?
7.29 Housing within Town Centres should be supported, in line with paragraph 23 of the NPPF which discusses the important role that residential development can play in ensuring the vitality of Town Centres. Any housing targets should be based on what sites are known to be readily available, suitable and viable for residential development. Market demand for housing in these areas will also need to be fully assessed. It is notable from the outcome of the 2017 SHMA that there is most demand for three bedroom properties (40%). The highest demand is therefore for family housing, and not for flats which are often the most popular within Town Centre locations. Any housing targets set for the Town Centre would therefore need to consider the findings of the SHMA, and be reflective of the fact that family housing is often more suitable for delivery on larger sites, including on sites which are currently located within the Green Belt.
Environment Question 99a: Do you think that national standards for housing development on water consumption should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.30 When referring to water consumption paragraph 6.1.52 of the Issues and Options document states that the Black Country does not currently lie in an area of serious water stress, therefore clear need may be difficult to demonstrate. This evidence suggests that there is limited or no need to introduce such a policy, therefore it is not considered that the Core Strategy Review should seek to introduce water consumption standards for housing development.
Question 99b: Do you think that national access standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.31 The introduction of any national access standards, with the Issues and Options document referring specifically to Lifetime Homes, again must be based on a robust evidence base which can demonstrate market demand. It is noted that Paragraph 50 of the NPPF states that planning authorities must plan for a mix of housing to meet a range of needs. In the same paragraph, it is later stated that these must be based on current and future market trends. If Lifetime Home standards are to be introduced these will therefore need to be based on robust evidence, to ensure that the standards are not overly onerous and prevent the delivery of other types of housing which have higher levels of market demand.
Question 99c: Do you think that national space standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.32 As reiterated throughout these representations, it is not considered that a blanket approach of prescriptive standards across the Black Country allows sufficient flexibility to assess local market and site considerations in an appropriate manner. Whilst it is recognised that space standards can be an important tool to ensure that high quality of homes are delivered, we agree with the sentiment expressed in the recent Housing White Paper. The Paper explains that the government are concerned that a one size fits all approach may not reflect the needs and aspirations of a wider range of households. The White Paper also states that the Government will be undertaking a review of the Nationally Described Space Standards. It is suggested that the Core Strategy Review should await the outcome of this national review of national space standards, to ensure compliance with national policy and to ensure that the most appropriate approach to space standards, if required, is taken.
Question 99d: Do you think that the standards should be different for brownfield and greenfield sites? Yes/No; If yes, please explain how and why.
7.33 As discussed above, prescriptive standards do not always allow sufficient flexibility for local market needs, so we would not advocate a blanket approach of different standards to brownfield and greenfield sites.
Open Space, Sport and Recreation Question 102a: Do you support the proposed changes relating to open space, sport and recreation? Yes/No; If no, please explain
7.34 Paragraph 6.1.60 of the Issues and Options paper outlines how adopted Policy ENV6 creates the framework for open space policies at the local level. The Issues and Options paper outlines how this is in line with national guidance, and that it is proposed to retain this policy and update some references in the supporting text to reflect changing circumstances. It is agreed that the local level remains the appropriate place to set open space policies, and that Policy ENV6 should continue to endorse this approach.

8. CONCLUSION
8.1 Wallace Land Investments are actively pursuing land promotion opportunities across the Black
Country. Wallace fully support the Black Country Authorities' decision to review the currently adopted Core Strategy.
8.2 It is clear that there will be a need for Green Belt release to accommodate the housing needs of both the Black Country and indeed the overspill needs of Birmingham. There will therefore be a clear switch from the adopted Core Strategy focusing on development within the urban area, to exploring sustainable opportunities outside of the existing urban area.
8.3 Wallace are of the view that the evidently large housing needs of the Black Country can and should be partly delivered on sites suitable for Green Belt release.
8.4 Wallace look forward to future opportunities to engage with the Black Country Authorities to identify suitable sites for allocation in the emerging Core Strategy Review, in order to ensure that future housing needs will be met.

Comment

Black Country Core Strategy Issue and Option Report

Representation ID: 2720

Received: 08/09/2017

Respondent: WYG

Representation Summary:

Peveril supports the conclusions made in the Issues and Options report in respect of the need to release Green Belt land to meet the housing requirement because there is insufficient brownfield land available. Peveril supports the acknowledgement within the Issues and Options report that South Staffordshire would have a key role in enabling the Black Country authorities to meet the emerging development requirements.
1.16 In this regard South Staffordshire is in the latter stages of its Part 2 Local Plan process. Peveril is participating in this process and it is understood the Examination into the Part 2 Plan will take place in November 2017. South Staffordshire wishes to conclude its Local Plan process and then for the new development requirements identified through the Black Country Core Strategy to 2036 to immediately be taken into account in a review of its policies. Whilst this is not ideal - and Peveril has suggested the potential to identify safeguarded areas of land to be removed from the Green Belt pending the adoption of the Black Country Core Strategy - it is probably in practical terms the best way forward. The alternative would be to suspend the current Local Plan which would not be in the interests of providing certainty (albeit for a short period) in South Staffordshire about future development requirements.
1.17 As far as Issue 1 in the Core Strategy is concerned - whether the provision for housing should be carried out on the basis of looking at sustainable open extensions rather than piecemeal releases - Peveril would strongly contend that priority should be given to identifying sustainable urban extensions. The land which Peveril controls to the north of Wolverhampton and to the south of the M54 (see representations below) would allow a sustainable mixed development to be planned in a more comprehensive way and for new facilities to be brought forward as part of a sustainable urban extension. The alternative for providing numerous piecemeal extensions would be a less comprehensive strategy to facilities - education; local centres; open space and transportation. With impact of development more widely dispersed

rather than concentrating in a specific allocation where it may be more possible to achieve acceptable mitigation.
1.18 Peveril would agree with the Council that it is difficult to define the scale of what represents a sustainable urban extension. In terms of transport and to achieve a new station (for example), the potential extension of up to 10,000 dwellings would not be unreasonable; however, there can be sustainable urban extensions that would take place with many fewer dwellings than that. From experience elsewhere, an extension of 1,000 dwellings of more could be regarded as sustainable as that level of development can provide a reasonable local centre; school and strategic open space.
1.19 It is also possible in a sustainable urban extension to provide employment facilities. In the case of Peveril's proposals, those employment facilities could be both local but also related to existing strategic employment sites. The presence of Hilton Cross - and potential extension to it - along with the Royal Ordnance Factory would make the area to the east of Wolverhampton a good location for a housing based urban extension because existing and proposed strategic employment sites already exist in that area. The employment land shortfall identified of 300 hectares should firsts and foremost be considered in the context of the ability to extend the existing strategic employment sites which were identified because of their good proximity to strategic transport networks.

Full text:

These representations are made to the Black Country Issues and Options report by Peveril Securities. Peveril is a commercial and residential developer based in the Midlands with a long track record of delivering employment and housing sites. Amongst Peveril's current projects are a large site where planning permission has recently been received (formerly Green Belt) for housing and commercial uses adjacent to the proposed HS2 station at Toton, Nottingham. The company also has a joint venture with another developer which is seeking to bring forward the Royal Ordnance Factory site at Featherstone to the north of the M54. The company also brought forward the Wolverhampton Business Park on the eastern edge of Wolverhampton.
1.2 The company controls land located to the south of the M54 between junctions 1 and 2, and owns land broadly speaking between the outskirts of Wolverhampton and Cannock Road further to the east and the M54 to the north. The area of land controlled is shown on Land Inclusion plan.
1.3 Peveril welcomes the opportunity to participate in the Core Strategy process in the Black Country including South Staffordshire. The company has made representations to South Staffordshire's emerging Sites Allocations Document in the context of the current Core Strategy. These seek to bring forward an extension to the Royal Ordnance Factory site (as SSBC propose) and also to request South Staffordshire Council safeguard land for the further expansion of Hilton Cross as a strategic employment site within South Staffordshire.
1.4 The representations made by Peveril seek to cover the following areas and issues raised within the Black Country Issues and Options report:
1. The overall scale of housing being proposed.
2. The overall scale of employment land being proposed.
3. The strategy for the release of strategic sites (including Green belt) for both housing and employment.
4. The use of regeneration corridors to promote growth.
5. Other factors and timing.
1.5 Peveril welcome the progress that is now being made within the Black Country authorities with a view to proposing a strategy for defining of the appropriate scale of housing and employment land regarded as appropriate (mainly as an overspill for Birmingham) up to 2036. The strategy of accepting at the outset that in order to meet such needs there will be a
requirement for significant release of Green Belt is supported. In addition Peveril supports the inclusion of South Staffordshire as a location to meet housing needs given it is a sub market of the HMA. Peveril welcomes the need to comprehensively review the Green Belt as part of the growth strategy and agrees that the authorities should take a realistic view of the scale of land likely to be required to meet future needs.
Comments on Overall Housing Land Requirement (Key Issues 1 and 2)
1.6 Peveril notes that the conclusions of the Issues and Options report about the likely levels of housing need required are strongly related to the results of the Examination into Birmingham's housing requirements as part of its Development Plan and the 'overspill' that is needed to be provided for outside the City in the Black Country. The overall figure arrived at for the housing requirements to be provided in the Core Strategy Plan period is based on the 2016/17 SHMA and then the completion figures and SHLAA assumptions. This results in a residential requirement of 21,670 dwellings with a further 3,000 dwellings added to meet the wider HMA shortfall hence an overall requirement of some 24,670 dwellings up to 2036.
1.7 Peveril agrees with the Black Country authorities that the requirement to meet needs emanating from Birmingham has been established and needs to be met. Failure to do so would be a failure under the duty to co-operate in terms of the soundness tests for Local Plans in the NPPF. The quantity of the unmet need from Birmingham is in itself an up to date objectively assessed need (OAN). We understand there is a methodology paper being prepared that sets out how future housing needs may be met in the Black Country, notwithstanding the fact that much work has already been done in terms of the quantification of unmet need from Birmingham, the 2016/17 SHMA etc. What needs to be certain is that the overall quantification of housing needed in the Black Country does not miss out any important considerations that might be specific to the Black Country rather than taken as read as Birmingham's unmet needs. Thus it is important that any OAN figure for the Black Country takes into account key issues such as housing market signals and economic considerations in the Black Country as well as taking as a given those calculations that affected the housing needs in Birmingham.
1.8 Peveril would therefore wish to see as part of the process the calculations that may follow from the methodology so that the Black Country authorities can be satisfied that all relevant considerations affecting housing land provision (and related employment land provision) in the Black Country have been taken account of in addition to the unmet need from Birmingham. It is also important to test the deliverability of the SHLAA sites which are claimed to deliver over 48,000 homes in the Plan period as well as windfall sites.

1.9 Notwithstanding those concerns, it is clear that overall requirement of 24,670 houses in the period to 2036 represents a significant amount of new land to be found. An up to date calculation of OAN in accordance with the emerging Government methodology (and current in relation to the methodology accepted by LPAC) would be advisable. This may result in additional dwellings to 24,670 overspill figure being generated.
1.10 Peveril would therefore reserve its position in terms of whether the 24,670 dwelling requirement figure to 2036 represents an appropriate OAN until the results of an up to date methodology being applied to the relevant statistics affecting the Black Country and Birmingham overspill has been undertaken and checks made of deliverability assumptions on SHLAA and windfall sites.
Employment Needs (Key Issue 3)
1.11 The Issues and Options report makes a conclusion that some 300 hectares of new employment land is required up to the period 2036. It is very important in Peveril's view that both the quantity of employment land and the quality of land available is comprehensively dealt with in the Issues and Options report and emerging Core Strategy. It is essential that high quality sites are identified and the most use is made of the Black Country's assets - mainly good quality highway links in order for employment land to be delivered rather than simply identified. The calculations that have been made to arrive at the 300 hectare figure - while accepted to be not as precise as required for housing - in Peveril's view understate the true need for good quality employment land.
1.12 Peveril is concerned that having identified a qualitative need over the Plan period of 800 hectares of land for employment (via the EDMA report), this figure is then reduced by 394 hectares of land which is either "currently available or is likely to come forward within the Black Country, including opportunities to intensity existing employment areas". The assumptions about the ability of the 394 hectares to deliver quality land - rather than be poor quality sites which will not be delivered - do not appear robust.
1.13 In this regard (paragraph 3.27 of the Issues and Options report), Peveril strongly supports the idea of building upon successful and high quality locations for new investment such as the M54 corridor.
1.14 In this regard, Peveril's view is that the existing regeneration corridors as set out in current Local Plan (see Figure 8 of the Issues and Options report) needs reviewing and widening with the potential to allocate good quality employment land within enlarged regeneration corridors (see below). The 300 hectare figure also seems somewhat low given the potential for large

employment sites to be allocated within quality locations and/or regeneration corridors. Strategic sites such as ROF Featherstone and Hilton Cross in the M54 corridor in the Wolverhampton/South Staffs area are in themselves quite large sites. The 300 hectare requirement would soon be taken up by four or five large sites if suitably high quality locations were found for employment leaving little residue left for smaller scale allocations. In Peveril's view, therefore, the Core Strategy should seek to identify key strategic employment locations first without necessarily seeking to restrict overall development for employment purposes to 300 hectares. This is in addition to reviewing the 300 hectare figure.
Strategy for Allocation of Land for Housing (Strategic Option 1A)
1.15 Peveril supports the conclusions made in the Issues and Options report in respect of the need to release Green Belt land to meet the housing requirement because there is insufficient brownfield land available. Peveril supports the acknowledgement within the Issues and Options report that South Staffordshire would have a key role in enabling the Black Country authorities to meet the emerging development requirements.
1.16 In this regard South Staffordshire is in the latter stages of its Part 2 Local Plan process. Peveril is participating in this process and it is understood the Examination into the Part 2 Plan will take place in November 2017. South Staffordshire wishes to conclude its Local Plan process and then for the new development requirements identified through the Black Country Core Strategy to 2036 to immediately be taken into account in a review of its policies. Whilst this is not ideal - and Peveril has suggested the potential to identify safeguarded areas of land to be removed from the Green Belt pending the adoption of the Black Country Core Strategy - it is probably in practical terms the best way forward. The alternative would be to suspend the current Local Plan which would not be in the interests of providing certainty (albeit for a short period) in South Staffordshire about future development requirements.
1.17 As far as Issue 1 in the Core Strategy is concerned - whether the provision for housing should be carried out on the basis of looking at sustainable open extensions rather than piecemeal releases - Peveril would strongly contend that priority should be given to identifying sustainable urban extensions. The land which Peveril controls to the north of Wolverhampton and to the south of the M54 (see representations below) would allow a sustainable mixed development to be planned in a more comprehensive way and for new facilities to be brought forward as part of a sustainable urban extension. The alternative for providing numerous piecemeal extensions would be a less comprehensive strategy to facilities - education; local centres; open space and transportation. With impact of development more widely dispersed

rather than concentrating in a specific allocation where it may be more possible to achieve acceptable mitigation.
1.18 Peveril would agree with the Council that it is difficult to define the scale of what represents a sustainable urban extension. In terms of transport and to achieve a new station (for example), the potential extension of up to 10,000 dwellings would not be unreasonable; however, there can be sustainable urban extensions that would take place with many fewer dwellings than that. From experience elsewhere, an extension of 1,000 dwellings of more could be regarded as sustainable as that level of development can provide a reasonable local centre; school and strategic open space.
1.19 It is also possible in a sustainable urban extension to provide employment facilities. In the case of Peveril's proposals, those employment facilities could be both local but also related to existing strategic employment sites. The presence of Hilton Cross - and potential extension to it - along with the Royal Ordnance Factory would make the area to the east of Wolverhampton a good location for a housing based urban extension because existing and proposed strategic employment sites already exist in that area. The employment land shortfall identified of 300 hectares should firsts and foremost be considered in the context of the ability to extend the existing strategic employment sites which were identified because of their good proximity to strategic transport networks.
Regeneration Corridors (Key Issue 3 and Question 10)
1.20 Peveril will support the concept of regeneration corridors set out in Figure 8 of the Issues and Options report, i.e. current Local Plan allocations. A review should be carried out of those corridors to see whether they can be extended or added to in a way that first and foremost allows high quality employment land to come forward. Peveril would also suggest either the extension of the existing Stafford Road regeneration corridor to the north of Wolverhampton for the creation of a new regeneration corridor along the M54. This would take within the corridor the existing strategic sites at Hilton Cross and the ROF and I54 as well as giving the ability for such sites to come forward with new housing - as Peveril suggests (see below). The regeneration corridors can be used as a basis for extension of existing good quality employment land and potential allocation of land as a sustainable urban extension.
A Potential Urban Extension to the East of Wolverhampton (Spatial Option H2)
1.21 Peveril's land control extends over an area of land of some 84.74 hectares lying in between the M54 to the north (including Hilton Cross); Cannock Road to the east; Underhill Lane/Bushbury Lane to the south and the northern outskirts of Wolverhampton to the west.

It is understood Wolverhampton City Council owns land (currently abandoned playing fields) in the south-western part of the site. There is woodland and Northcote Country Park at the centre of the site as well as heritage assets. The area can be put forward as a sustainable urban extension because of its location and because it is well-defined by roads that could be used as the outer edge of a new Green Belt boundary as well as being in close proximity to existing largescale employment proposals - at Hilton Cross; the Royal Ordnance Factory and I54.
1.22 It is not the purpose of these representations to carry out a full assessment of the landscape impact; transport or other site specific considerations. However, an initial masterplan has been prepared to identify the potential capacity of the site when taking a reasonable view of the existing on-site constraints. This masterplan is attached. It shows that the site under the control of Peveril (including the Wolverhampton City Council land) can accommodate some 38 hectares of land for housing together with a local centre; primary school; access routes and the protection of existing woodland, the country park and listed buildings. Access arrangements can be provided for in the context of a new road running east-west through the northern part of the site. This road is different to the route option 9 which the County Council is currently considering as a means of providing appropriate access for the Royal Ordnance Factory site to the north of the M54. Whatever route option is taken to serve the Royal Ordnance Factory this will not prejudice the release of the sustainable urban extension proposed by Peveril.
1.23 In addition to the housing areas, there is benefit in extending the Hilton Cross employment site sitting in the north-eastern corner of the area Peveril controls. This could be extended by a further 7 hectares. This area could be part of the sustainable urban extension to provide jobs for new residents alongside those being created at the Royal Ordnance Factory. In these terms the site could:
1. Provide up to 1,350 dwellings in a sustainable location.
2. Be well related to existing and proposed strategic employment sites.
3. Provide local facilities to support the scale of development proposed.
4. Establish new but long term Green Belt boundaries.
5. Be deliverable due to Peveril's land control.
1.24 It is considered that the potential to release this land and provide well-established Green Belt boundaries in accordance with the advice in paragraph 85 of the NPPF provides a realistic and

deliverable means of allowing the expansion of Wolverhampton - the site crosses the border between Wolverhampton City and South Staffordshire - in a way that allows the benefits of a mixed sustainable extension to the urban area to come forward. Peveril would be willing to discuss these matters further but in terms of how the policies are evolving for the Black Country Core Strategy suggests this site be identified as a sustainable urban extension. Peveril considers that the Core Strategy should identify key sites that would comprise sustainable urban extensions in a specific policy rather than necessarily make general statements about overall strategy to accommodate the 24,670 dwellings (if that is the figure eventually regarded as the OAN for the area).

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

Representation ID: 2817

Received: 07/09/2017

Respondent: SBP Property Ventures Ltd

Agent: Harris Lamb

Representation Summary:

see attachment

Full text:

see attachment

Comment

Black Country Core Strategy Issue and Option Report

Representation ID: 2822

Received: 13/09/2017

Respondent: ROSCONN STRATEGIC LAND

Representation Summary:

Agree (support Option 1A)
As very broad, high level strategic options, Option 1A appears to be the more appropriate and deliverable option. Option 1B raises significant challenges, not least the ability to deliver the area's housing and employment needs when it is needed. The key advantage of Option 1A identified in the table at paragraph 4.20 is that it can significantly boost the supply of housing and employment land. This has to be given significant weight in deciding which option is preferable, when assessing options against the objectives of the NPPF. Both options are identified as requiring significant adjustments to Green Belt boundaries, but in the context of there being exceptional circumstances to do so, this is not considered to be a determinative factor.

Comment

Black Country Core Strategy Issue and Option Report

Representation ID: 2867

Received: 08/09/2017

Respondent: St Philips

Representation Summary:

Both Strategic Option 1A and Strategic Option 1B recognise the need for housing in the Green Belt which St Philips supports.
There are opportunities and challenges presented by both Strategic Options, but Strategic Option 1A appears to be more suitable for accommodating the growth needs of the Black Country over the BCCS Review plan period There are various opportunities provided by Strategic Option 1A, especially the provision of a sustainable pattern of development, close to the urban edge of existing settlements where need arises in the Black Country. Importantly Strategic Option 1A would significantly boost the supply of housing land and help to meet full, objectively assessed need identified in the SHMA.

Comment

Black Country Core Strategy Issue and Option Report

Representation ID: 2909

Received: 07/09/2017

Respondent: IM Land

Agent: Harris Lamb

Representation Summary:

see attachment

Full text:

see attachment

Comment

Black Country Core Strategy Issue and Option Report

Representation ID: 2955

Received: 08/09/2017

Respondent: Barratt Homes and David Wilson Homes

Agent: Turley Associates

Representation Summary:

At the current time there is an established need for the Black Country Authorities to accommodate 81,190 new homes and up to 300 ha of new employment land between 2014 and 2036. It is clear that both are pressing needs which will require significant land. 2.48 There is currently a deficit of 57 ha of gross employment space across the Black Country. The monitoring data at Appendix C of the I&O Report identifies that there is a surplus in low quality employment land (146 ha), but a deficit of 218 ha in high quality employment land. This does not distinguish between different types of employment, including different use classes and size. 2.49 The Black Country's employment land is characterised by its supply of smaller industrial units which are typically adjacent to residential areas. Whilst some of the businesses may not be 'friendly' to neighbouring uses, these types of units form the back bone of the Black Country economy and their loss would negatively impact business in the area. The loss would also remove local, sustainable job opportunities. 2.50 As set out in our response to Q2 further employment land supply evidence is required. Through this there may be opportunities to replace derelict employment land with housing, however new employment sites tend to be of higher quality, reflecting more modern industries (such as large logistic sites). They are unlikely to replace the smaller industrial unit stock, which have numerous benefits including lower rents, being suited for 'start up' and smaller businesses which reflect of the Black Country's employment profile. New large, greenfield strategic employment sites are unlikely to be affordable for the types of businesses which currently occupy the smaller industrial unit stock. 2.51 With the Black Country facing an overall employment land deficit of 300 ha, the authorities should be seeking to protect the smaller industrial stock where possible and not maximising it for residential uses. 2.52 The Councils should also be mindful of the viability of regenerating employment land for residential use, and whether the market could sustain development on these sites. This is demonstrated by the number of previously developed sites in the Black Country allocated for housing but are yet to be delivered, and show no sign of doing so in the near future.

Full text:

2.33 We discuss the strategy to meeting housing needs in the Green Belt in response to Q12a and Q13a.
2.34 The Green Belt Review should be a robust assessment, undertaken in accordance with national planning practice guidance and the NPPF, specifically taking account of the need to promote sustainable patterns of development and not including land that does not serve the five purposes of the Green Belt.
2.35 As part of this the methodology for the Green Belt Review should be published for consultation prior to work commencing. This will be important to ensure the Review is robust and has the support of the development industry.
2.36 The I&O Report indicates the GBHMA Strategic Growth Study (renamed the 'Strategic Locations Study') will "inform and provide the basis" for the Black Country Green Belt Review.

Comment

Black Country Core Strategy Issue and Option Report

Representation ID: 2989

Received: 08/09/2017

Respondent: Hallam Land Management

Agent: Turley Associates

Representation Summary:

We do not have any general preference for either Strategic Option 1A or 1B; however the comments below should be noted. At the current time there is an established need for the Black Country Authorities to accommodate 81,190 new homes and up to 300 ha of new employment land between 2014 and 2036. It is clear that both are pressing needs which will require significant land. There is currently a deficit of 57 ha of gross employment space across the Black Country. The monitoring data at Appendix C of the I&O Report identifies that there is a surplus in local quality employment land (146 ha), but a deficit of 218 ha in high quality employment land. This does not distinguish between different types of employment, including different use classes and size. The Black Country's employment land is characterised by its supply of smaller industrial units which are typically adjacent to residential areas. Whilst some of the businesses may not be 'friendly' to neighbouring uses, these types of units form the back bone of the Black Country economy and their loss would negatively impact business in the area. The loss would also remove local, sustainable job opportunities. As set out in our response to Q2 further employment land supply evidence is required. Through this there may be opportunities to replace derelict employment land with housing, however new employment sites tend to be of higher quality, reflecting more modern industries (such as large logistic sites). They are unlikely to replace the smaller industrial unit stock, which have numerous benefits including lower rents, being suited for 'start up' and smaller businesses which reflect of the Black Country's employment profile. New large, greenfield strategic employment sites are unlikely to be affordable for the types of businesses which currently occupy the smaller industrial unit stock. With the Black Country facing an overall employment land deficit of 300 ha, the authorities should be seeking to protect the smaller industrial stock where possible and not maximising it for residential uses. The Councils should also be mindful of the viability of regenerating employment land for residential use, and whether the market could sustain development on these sites. This is demonstrated by the number of previously developed sites in the Black Country allocated for housing but are yet to be delivered, and show no sign of coming forward for development in the near future.

Full text:

The Green Belt Review should be a robust assessment, undertaken in accordance with national planning practice guidance and the NPPF, specifically taking account of the need to promote sustainable patterns of development and not including land which it is unnecessary to be kept permanently open.
As part of this the methodology for the Green Belt Review should be published for consultation prior to work commencing. This will be important to ensure the Review is robust and has the support of the development industry.
The I&O Report indicates the GBHMA Strategic Growth Study (renamed the 'Strategic Locations Study') will "inform and provide the basis" for the Black Country Green Belt Review.
The methodology for the Strategic Locations Study, made available in July 2017, is very broad; referring to the Green Belt will be assessed in 'five sections'. If the study is too broad, and the strategic areas identified too general, it will not form a sound basis for the Black Country Green Belt Review to conclude which land is suitable for Green Belt release.
The Green Belt Review should be carried out in conjunction with assessing sustainable locations for residential development in neighbouring authorities such as SSDC, which falls within the same strategic housing market area and maintains strong economic links.

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

Representation ID: 3007

Received: 07/09/2017

Respondent: Dr Baljit Bhandal

Agent: Harris Lamb

Representation Summary:

We consider that Option 1A is to be preferred to strategic Option 1B. That said, we believe there continues to be an over reliance upon brownfield sites in the existing housing supply and there is also an over reliance on brownfield windfalls in estimating future housing supply. We consider that overall the greenfield requirement should be increased to ensure delivery. Greenfield sites are typically less constrained than their brownfield alternative and, unlike a significant number of its active occupied employment sites allocated for housing by the adopted Core Strategy; they are available for development now.

Full text:

We agree that the evidence clearly demonstrates that a Green Belt review is needed to meet the development needs identified and that this is an essential component of the new Core Strategy.
However, it is also our view that the Green Belt review should extend beyond the current plan period in accordance with the Framework, which explains that when undertaking Green Belt reviews local authorities should consider revised Green Belt boundaries having regard to their intended permanence in the long term so they are capable of enduring beyond the plan period. In this context, it is highly likely that the need for housing and employment land will continue to grow and that capacity in the urban area will not exist to meet these needs. Consequently, safeguarded sites will also need to be identified. It is our view that the period up to 2051 should be considered. This is 15 years beyond the end of the existing plan period and links to the time period that local authorities are required to identified a supply of sites for (Paragraph 47).
Whilst the Green Belt review might be undertaken by the BCAs and South Staffordshire, it is important that the review is not just confined to their administrative area. Other authorities also directly adjoining the BCAs and an understanding of the function of the green belt along these boundaries is also important so that all the options available to deliver the housing need are considered.

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

Representation ID: 3036

Received: 15/09/2017

Respondent: Halls Holdings Ltd

Representation Summary:

I support option 1a

Full text:

I wish to make the following comments on the issues and options;

Question 1; I agree it should be a partial review
Q3; I agree - yes
Q5; I agree with the proposed green belt review approach
Q11a; I support option 1a
Q12; I support H1 - a new defined boundary needs to be clear.

Attachments:

Support

Black Country Core Strategy Issue and Option Report

Representation ID: 3116

Received: 08/09/2017

Respondent: Taylor Wimpey

Agent: Pegasus Group

Representation Summary:

5.9 Taylor Wimpey wishes to emphasise the importance of selecting the most appropriate approach, given this will be the basis for the site allocations which emerge through the Core Strategy review.
5.10 Whilst there are opportunities and challenges presented by both Option 1A and 1B, Taylor Wimpey supports Option 1A as the appropriate approach for meeting housing needs.
5.11 Option 1A is considered to be more appropriate for accommodating the growth needs of the Black Country over the Plan period to 2036. There are many opportunities provided by this option, particularly that it can provide for a sustainable pattern of development, close to the urban edge of existing settlements, and close to where needs arises in the Black Country. This option would significantly boost the supply of housing land and help to meet the significant current and future identified need.
5.12 Option 1B is rejected by Taylor Wimpey. In accordance with previous comments and concerns raised in these representations, there are sufficient not opportunities to meet housing needs on brownfield land. As Option 1B would not have sufficient capacity to accommodate all future growth needs, it is entirely inappropriate for this to be the sole basis for a new Development Plan.
5.13 Other key challenges posed by Option 1B include the difficulty of delivering housing on brownfield land given the costs associated with site assembly and land remediation and that delivery on larger sites may be towards the latter years of the Plan period.
5.14 Option 1A would provide a more immediate response to the housing growth crisis within the Black Country and would cater for more rapid delivery of suitable sites.

Full text:

Question 1: Do you agree that the Core Strategy review should be a partial review, retaining and stretching the existing spatial strategy and updating existing policies? Yes/No; If not, what do you think should be the scope of the review?
2.4 In response to Question 1 and whether it should be a partial review or not, whilst the existing strategy identifies the most sustainable locations for growth in the context of delivering development requirements identified by the Regional Strategy (RS), there is now a new and much bigger challenge ahead in meeting the arising needs for homes identified by the latest evidence and there is concern that the existing spatial strategy may not facilitate the delivery of these needs. The Black Country authorities, therefore, need to be mindful of this and not attempt to put "a square peg in a round hole".
2.5 It is our view that urban regeneration can be achieved whilst pursuing development on the urban edge. Indeed, the scale of housing need is so large that both must be encouraged in order to meet current and arising housing needs within the Black Country.
2.6 It is extremely important that in reviewing the Core Strategy it fully takes account of and facilitates the delivery of strategic economic plans, as recognised in paragraph 1.15. All too often these strategies are ignored and, accordingly, development plans could effectively frustrate economic growth from being realised.
2.7 In terms of the Plan period proposed in paragraph 1.17, whilst a 15-year time period from adoption is appropriate, there is concern that the preparation of plans is often delayed (due to reasons beyond the control of the LPAs) and it may be prudent to stretch the period further to prevent such an issue from occurring.
2.8 It is welcomed that the Issues and Options document recognises that it will not be possible to accommodate all future development needs within the urban area and that an examination of the potential for development land outside the existing urban area, which is effectively land within the Green Belt, will take place as part of the Core Strategy review process.
3. THE BLACK COUNTRY TODAY - THE EXISTING STRATEGY
3.1 As set out within this section, the delivery of both employment and housing land has not come forward as originally envisaged in part due to the after effects of the recession. Surplus employment land which might have been available for housing has not come forward due to a strengthening economy and local firms being more robust than anticipated. In addition, the range of locations available has not in all cases met with market expectations as to where people want to live.
3.2 In terms of the employment land, it is important that sufficient land is provided for new employment and that there is not an overreliance on land that is currently in use. It is impressive that despite generally poor economic performance local businesses have performed well. Should the economy significantly improve within the Plan period in line with LEP aspirations (considered later in this response), there is concern that it may become difficult to transfer a wide range of existing employment locations to housing allocations. It is appropriate, therefore, for the Council to ensure the evidence contained within the Strategic Housing and Employment Land Availability Assessment is reviewed and updated regularly. This will enable the land supply to be responsive to arising needs and not rigidly be wedded to delivering commitments that are unlikely to be realised.
3.3 What is further emphasised by the analysis in this section is that urban regeneration cannot be delivered quickly and that there are a number of factors beyond the control of the Black Country authorities that may have implications for the delivery of the strategy. This further emphasises the need for a mix of types of sites (brownfield, brownfield compulsory purchase, greenfield and Green Belt) of different forms of development (high density, mid and low density family homes) in a variety of locations, which will maximise the opportunities to deliver a successful Local Plan.
3.4 Finally, in respect of the proposal to maintain 300 hectares of employment land that will become vacant by way of general churn over the Plan period. Whilst the principle is considered acceptable, there should be appropriate evidence to support the assumption.
3.5 Our experience is that there are employment sites that clients are looking to secure a residential allocation on that have not been identified thus far. In light of these changing circumstances, the Black Country authorities should ensure that the policy approach is flexible to allow sites in appropriate locations to be brought forward for housing throughout the Plan period and likewise, sites that have been allocated for housing but have not come forward should be removed from the supply.
4. THE STRATEGIC CHALLENGES & OPPORTUNITIES
4.1 It is welcomed that the Black Country authorities are updating their evidence base. Indeed, the adopted Core Strategy took the development requirements from the adopted Regional Strategy (RS), which has since been revoked and is unquestionably out of date. Since the RS was published there has been a number of population and household projections published showing increasing dwelling requirements in the Black Country, which were largely ignored and, therefore, it should come as no surprise that there is a significant increase in forming households.
4.2 In terms of the list of evidence either prepared or due to be completed, it appears to be sufficiently comprehensive.
4.3 A separate review of the Objectively Assessed Housing Need (OAHN) has been undertaken by Lichfields on behalf of Taylor Wimpey (Appendix 2) which identifies the following conclusions:
* 3,545 dpa equates to the 2014-based SNHP. With suitable adjustments to include an allowance for second/vacant homes; the latest 2016 MYE; and necessary adjustments being made to headship rates in the younger age categories, this would generate a need for 4,077 dpa. Factoring in long term migration rates would increase this further to 4,201 dpa (4,057 dpa without South Staffordshire). It is considered that this represents the suitable demographic starting point for the Black Country HMA.
* A modest worsening of some market signals and consistent under-delivery of housing in the Black Country HMA suggests the need to improve affordability to stabilise increasing house prices and high affordability ratios. This would justify an uplift to the figures over and above the level suggested by the demographic projections. The Practice Guidance23 states that this should be set at a level which could be reasonably expected to improve affordability. A modest 10% uplift is considered appropriate in this instance. Applying this level of uplift to the demographic starting point would indicate a minimum demographic OAHN of 4,622 dpa (4,462 dpa without South Staffordshire).
* The scale of affordable housing needs, when considered as a proportion of market housing delivery, implies higher levels of need over and above the OAHN figure for Dudley and South Staffordshire. It is considered that to make a meaningful contribution to addressing the level of affordable housing need identified by the SHMA (770 dpa), a further 10% uplift should be applied. This would increase the OAHN to 4,692 dpa (4,518 dpa without South Staffordshire); significantly above the SHMA's proposed OAHN of 3,824 dpa and the CD proposed target of 3,554 dpa.
* In addition to the Black Country HMA's OAHN there is a need to accommodate Birmingham's unmet housing need. The CD proposes to accommodate 3,000 dwellings of Birmingham's needs up to 2031. However, a proportionate 'fair share' approach based on the population distribution across the wider HMA, and accounting for fixed commitments made by Solihull, North Warwickshire and Stratford on Avon, suggests that the Black Country HMA should accommodate up to 20,931 dwellings for the period to 2031 (19,107 without South Staffordshire). This equates to an additional 1,047 dpa above the OAHN, giving a revised OAHN of 4,692 dpa to 5,473 dpa (4,518 dpa to 5,473 dpa without South Staffordshire).
4.4 In addition, consideration of the Housing Background Report is also contained in set out below. Taylor Wimpey's comments are as follows:
* Clearly a lot of work is yet to be done to determine what the housing land supply position is in the Black Country. Given that much of the existing evidence is based on the adopted Core Strategy, it is recognised that the SHLAAs across the four authorities will need to be updated, both in terms of revising the methodology and range of sites assessed, to reflect a potentially different approach to locating development.
* It is commendable that the Housing Background Report has examined existing sources of supply in an attempt to provide additional homes from sites within the urban area. There is concern, however, that by changing policies, for example, to increase the minimum density on sites has wider policy implications to take into account than simply increasing the number of homes.
* The Housing Background Report suggests a continued allowance for larger windfall sites. It is suggested that it is inappropriate to include an allowance for this source as there is no certainty that this land will come forward for development.
* Other sources, such as converting employment sites to residential sites, based on the evidence presented and feedback from the development industry, it is known that there are employment sites functioning well as employment sites but are to be converted to residential and other employment sites that are unoccupied and undesirable that are to be retained as employment sites. Clearly, there is a mismatch between employment land need and employment land supply. It is advised that the qualitative assessment of employment informs future land supply recommendations and allocations are revised where necessary.
4.5 As a result of the dwelling requirements generated by the SHMA and the land supply identified from the Housing Background Report, it is concluded that there in insufficient urban land to provide for the development requirements and that a Green Belt Review should be conducted. It is noted that scoping is underway and that the work is to be completed in mid-2018. It is hopeful that the development industry will be involved in defining the methodology of the work to ensure that it is conducted in a robust way.
4.6 Another very important piece of work to be taken into consideration will be the Greater Birmingham and Black Country HMA Strategic Growth Study. It is unclear at this stage what role the Black Country authorities will play in meeting the wider needs of Birmingham and, indeed, whether it can now contribute given that meeting the needs of the indigenous population will be a tall order. Further, there is uncertainty with regard to how far the study will go in identifying locations for growth and how this evidence will be taken forward in emerging Development Plans, particularly given that it is premature to the Green Belt Review for the wider Black Country area. It is our view that there are sites within the Green Belt that will provide sustainable locations for growth and that their removal will not compromise the purposes of the Green Belt and, accordingly it will remain purposeful and functional.
Question 2: Do you think that the key evidence set out in Table 1 is sufficient to support the key stages of the Core Strategy review? Yes/No; If not, what further evidence is required and, if there are any particular issues that should be taken into account in considering development on any particular sites or in any particular areas, please provide details
4.7 It is considered that the evidence contained within Table 1 is comprehensive, however, as suggested above and below, a number of concerns have been highlighted and it is therefore suggested that these are addressed in order to improve the soundness of the next iteration of the Core Strategy Review.
4.8 It is welcomed that an updated qualitative assessment of employment land has been undertaken in order to identify if the sites are fit for purpose, alongside the quantitative employment land study. It has been identified that a number of employment land sites that have been suggested for residential land allocations remain in occupation as functioning employment sites. These sites should be removed from the housing land supply. Conversely, there are vacant employment land sites that have been marketed over a period of time where no market interest has been forthcoming and, therefore, it is recommended that these sites should be considered for housing delivery.
4.9 It is noted that Viability Studies are identified as evidence base documents that are still to be prepared. Whilst not specifically identified, it is recommended that affordable housing viability is a key matter that needs to be addressed as part of this evidence base to ensure the level suggested by the SHMA Part 2 is deliverable. If this is not the case, the delivery of both market and affordable housing could be compromised and prevent the successful delivery of any new strategy.
4.10 In respect of Green Belt, the two-stage approach of considering Green Belt, both locally and as part of the Greater Birmingham and Black Country HMA Strategic Growth Study, is supported by Taylor Wimpey.
4.11 Consideration of the Green Belt should identify Green Belt 'parcels' around the Black Country which do not fulfil Green Belt purposes as strongly as others. As part of this two-stage exercise, it will be important to have regard to proposals submitted through the call for sites process to ensure the parcels identified as fit for purpose.
Question 3: Do you agree that the housing need identified for the Black Country over the period 2014-36 in the SHMA, and the anticipated amount of supply, are appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.12 In terms of the extent of the sub market, which includes the Black Country and South Staffordshire, this is considered to be appropriate. It is recognised and welcomed that the Black Country authorities and South Staffordshire have jointly undertaken a SHMA for the sub area, which facilitates the preparation of an Issues and Options Core Strategy Review. There is concern, however, that the remaining constituent authorities within the wider Greater Birmingham Housing Market Area have not taken part and there is a danger that housing need for the whole HMA may not entirely be comprehensively captured due to the different time periods covered by the separate studies. It is advised that a SHMA, consistent with the guidance in the NPPF and Planning Practice Guidance, is prepared for the entire HMA over the same Plan period (as opposed to a housing needs study), which will properly consider all relevant factors in a consistent and comprehensive manner.
4.13 The dwelling requirements arrived at by the SHMA is generally appropriate in identifying the starting point for determining the dwelling requirement, however, it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline. There is concern that the economic growth scenarios contain potentially out of date employment forecasts and the methodology to determine appropriate dwelling requirements is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances. In addition, more aspirational job growth targets, such as those arising from the SEP, may not necessarily be appropriate for the Black Country (as discussed later in these representations).
4.14 In terms of providing an uplift for market signals, a 25% uplift for South Staffs is agreed to be appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, the application of such an uplift in South Staffordshire should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack or headroom within the housing market and prevent house prices from increasing at an accelerated rate, exacerbating issues of affordability.
4.15 We shortly await a consultation publication from central Government in relation to providing a standardised methodology for generating dwelling requirements. This is anticipated in Autumn 2017. The Black Country authorities will need to take account of any proposed national policy changes identified through the consultation paper. We reserve our position on this matter, until the full details and implications for the Back Country are known. It is considered that, whilst a standard methodology will be helpful in identifying a baseline dwelling requirement, the consideration of long term trends and economic forecasts cannot be carried out in a mathematical calculation outside a demographic/ economic model. In light of this, the SHMA prepared for the sub-area could remain useful as evidence to inform the review of the Black Country Core Strategy.
4.16 In terms of meeting the dwelling requirements, it is understood that the 'Call for Sites' consultation will inform an updated SHLAA, which will assess sites both within and outside the urban area to determine the maximum number of dwellings that can be realistically delivered within the Black Country over the proposed Plan period. The Housing Background Report that has been published as part of the evidence base for the Issues and Options Core Strategy Review has considered assumptions contained within the SHLAA based on adopted policies and considers changes to the policies to boost the delivery of housing on existing sites. Whilst it is a commendable that the Black Country authorities are exploring all potential options to boost housing on urban land, there are wider implications of doing so and accordingly, caution is expressed in response to a number of the identified approaches proposed.
4.17 As confirmed in paragraph 3.15, it is extremely important that the Black Country authorities 'firm up' the housing supply in order to ensure that there is sufficient provision to meet the dwelling requirements. It is also considered appropriate to provide an additional buffer of housing land supply to provide a contingency when sites are delayed. As explained earlier in the Issues and Options Report, sites providing a total of 3,000 homes have not come forward as anticipated. It is considered that additional supply is required to provide flexibility and minimise any durations within the Plan period where the housing trajectory would otherwise dip.
4.18 In terms of the extent of a buffer for housing land, the Local Plan Expert Group suggested that additional land, equivalent to delivering 20% of the overall dwelling requirement, is added to the supply, which will provide a contingency of land to be used as and when necessary during the Plan period. It is suggested that this additional land will help ensure the dwelling delivery targets and housing needs are met in a timely manner, which will reduce the opportunity for households to become concealed or shared.
4.19 It is also appropriate to ensure that, as well as identifying the right amount of land, there is sufficient variety in the types of sites (brownfield, greenfield, Green Belt) are identified, reflecting different sizes, in a range of locations. This variety in provision will allow the best opportunity for multiple sites to come forward at the same time without market constraint and hence ensuring delivery targets are met. In addition, this approach will also provide market choice to existing and arising households looking to move into a new home in the Black Country, which will have wider social benefits (i.e. allow families to live nearby one another and provide an opportunity to diversify existing communities through providing alternative homes to the existing housing stock).
4.20 Indeed, as previously documented in the adopted Core Strategy, it is considered that the ambition to retain the young and professional population within the Black Country should be maintained and that suitable and attractive housing and complementary environments are encouraged.
4.21 Finally, it is welcomed that the Black Country authorities have agreed to test the dwelling requirement figures on an ongoing basis. It is hoped that the suggested changes/alternative scenarios suggested above are implemented in order to ensure the evidence base is robust and the resultant policies and proposals soundly based.
Question 4: Do you consider the employment land requirement identified for the Black Country up to 2036 in the EDNA is appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.22 The Core Strategy review intends to utilise the Economic Development Needs Assessment (EDNA) for the Black Country, published in May 2017, to inform future employment land requirements. The EDNA uses forecasts produced as part of the West Midlands Combined Authority Strategic Economic Plan (SEP) to calculate long-term growth, noting that the 'Super SEP Economy+ Scenario' is the preferred aspirational scenario. This scenario assumes average annual growth in employment of 1.3% across the Combined Authority and presents an ambitious view of future growth in the area, with 500,000 jobs created between 2013 and 2030. The SEP Technical Appendix breaks down the job forecasts for the three Local Enterprise Partnerships that form the Combined Authority (Black Country; Coventry & Warwickshire; and Greater Birmingham & Solihull). Jobs growth in the Black Country LEP is forecast to be around 1.1% per annum, whilst it is forecast at 1.5% per annum in the other two LEP areas. This averages out at annual growth of approximately 1.3%. Using data from the Business Register & Employment Survey, published by the Office for National Statistics, it is possible to look at employment trends over the last five to six years (2009-15) and this analysis suggests that the growth rate used in the aspirational growth scenario may be too ambitious for the Back Country:
4.23 Between 2009 and 2015, total employment in the Black Country LEP increased from around 450,000 to approximately 453,000. This equates to average annual growth of 0.1%. Walsall (1.5% p.a.) and Sandwell (0.9% p.a.) experienced jobs growth, although Dudley (-1.1% p.a.) and Wolverhampton (-0.8%) both suffered a fall in employment.
4.24 By contrast, both the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs saw total job numbers increase by 1.3% p.a. from 2009-13. A number of districts in these LEPs saw particularly strong growth over the period, notably Solihull and Lichfield in Greater Birmingham & Solihull, where employment grew by at least 3.0% on an annual basis.
4.25 Growth in the Black Country needs to be faster than in previous years and the new Core Strategy has a vital role to play in supporting this, however the analysis presented above suggests that the growth targets need to be lowered to better reflect the local economic climate. It is considered unlikely that an annual increase of 1.0% or more will happen in the area in the long-term, especially with the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs capturing new job opportunities at a faster rate in recent years. Lowering the employment growth rate means the amount of employment floorspace needed would be lower. This would not reduce the demographically based housing targets for the area but it would potentially free up previously allocated employment sites for other uses such as residential. This would help the Black Country meet its future housing targets and ensure that it has enough homes for its future workforce to live in.
4.26 As identified in the supporting report and above, it is known that employment sites that had previously been identified for housing are still operational with businesses continuing to use the land and, conversely, there are sites allocated for employment that have been vacant and subsequently market, however, remain unoccupied, which could be transferred to a residential use. It is therefore recommended that the Councils ensure that updated EDNA qualitative review conclusions are taken into account and correct uses applied where appropriate.
Question 5: Do you agree with the proposed approach to the Black Country Green Belt Review? Yes/No; If not, what additional work do you think is necessary?
4.27 In respect of the Green Belt Review, on the basis of the evidence published setting out housing need and supply, it is agreed that it will be necessary to find sites outside of the existing urban area, which will require removing land from the Green Belt where it is appropriate to do so. This will provide an opportunity to identify strategic sites that can provide a significant amount of homes to contribute to meeting identified housing needs. It is considered that there are a number of locations whereby housing sites can be identified, without the purposes of the Green Belt being compromised, ensuring the function and integrity of the Green Belt will remain.
4.28 In addition, areas on the urban fringe have the potential to ensure new homes can be delivered in an established, well landscaped environment, which could be attractive to those young families and professionals that the Black Country authorities have had difficulty in retaining, often through out-migration to neighbouring Shire districts considered to represent more aspirational locations.
4.29 In terms of the process and methodology for undertaking a Green Belt Review, it is understood that the awaited Strategic Housing Needs Study (SHNS) will be accompanied by Strategic Green Belt Review across Greater Birmingham and that the Black Country authorities have been engaged in presenting potential opportunities. It is reassuring that this engagement between consultants and local planning authorities is taking place as there is a danger that logical locations fail to be identified due to a lack of understanding of environmental conditions and/ or local circumstances that are applicable to sites.
4.30 It is agreed and makes sense for the local planning authorities to conduct a Stage 2 Green Belt Assessment following the completion of the higher-level work. Any input on reviewing the draft methodology for the Stage 3 Green Belt Review would be welcomed.
Question 6: Do you agree that the key issues set out in Part 3 are the key issues that need to be taken into account through the Core Strategy Review? Yes/No; If not, what other key issues should be taken into account?
4.31 The key issues presented are considered to be relevant, however, there are a number of inconsistencies relating to matters identified above against the previous questions raised. These include:
* The need for the Core Strategy to continue to plan for a growing population
* The need to address the significant housing shortfall identified within the Black Country and the wider Housing Market Area, which will need to be considered through the Duty to Cooperate; and
* The urgency to look beyond the Growth Network in the short term in accommodating housing growth, which will inevitably require the release of land from the Green Belt to meet needs in the longer term.
5. REVIEWING THE STRATEGY TO MEET NEW CHALLENGES & OPPORTUNITIES
5.1 Question 7: Do you think that the Core Strategy vision and sustainability principles remain appropriate? Yes/No; If not, what alternatives would you suggest?
5.2 In the main, the Core Strategy Vision and sustainability principles are considered to be appropriate, with exception to the principle of 'brownfield first'. It is understood that the NPPF, whilst it encourages an efficient use of land and for brown field land to be recycled, it does not suggest a sequential approach to development. There is no evidence to demonstrate that the development of greenfield land will compromise the development of brownfield land. Often the type of developers of the different land categories are different and, given the scale of the housing need, it is appropriate that the early delivery of housing is encouraged from all types of sites. In particular, the larger, potentially Green Belt, sites will have a longer lead in time due to the time it takes to plan for, determine and implement a comprehensive scheme. Indeed, a recent study entitled 'Start to Finish', prepared by NLP, supports this claim. When planning the housing trajectory for the Core Strategy, the larger sites should be planned in to come forward as soon as practically possible.
5.3 It is therefore suggested that the reference to 'putting brownfield first' is inappropriate and that it should be replaced by 'ensuring an efficient use of land to meet the identified housing needs', which encourages the recycling of land and recognises the contributions of greenfield/ Green Belt land to meeting housing delivery targets.
Question 8: Do you think that the Core Strategy spatial objectives remain appropriate? Yes/No; If not, what alternatives would you suggest and how might these changes impact on individual Core Strategy policies?
5.4 Whilst the objectives outlined generally remain sound, there is concern that one of the NPPFs main priorities is absent. This is in relation to significantly boosting the supply of housing. It is suggested that an additional objective is added in order to ensure that meeting housing needs remains a priority within the Black Country. Once a preferred option is arrived at, spatial references as to where the housing growth will be delivered could be included (for example, meeting housing needs on urban (brownfield and greenfield) land and at extensions to the urban area).
5.5 Further, given the increased employment land requirements, the second objective relating to employment land being within the best locations within the Regeneration Corridors may no longer be appropriate. Indeed, as highlighted earlier, there is concern that there is a mismatch in land allocations, and it is appropriate for the Core Strategy review to ensure all employment sites are fit for purpose. This may conclude that employment opportunities should be identified on new land outside of the Regeneration Corridors. Should this be the case, the objective would be inappropriately worded.
Question 9: Do you agree that Policies CSP1 and CSP2 should be retained and updated to reflect new evidence and growth proposals outside the Growth Network? Yes/No; If not, what changes do you think should be made to Policies CSP1 and CSP2 in response to new challenges and opportunities?
5.6 It is agreed that the policies could remain, if the development requirements and related changes are made to ensure the policies are consistent with the overall strategy. The changes relate to both the quantum of development (homes, employment and retail space), the location of development (within and beyond the existing Regeneration Corridors) and the type of development (brownfield, greenfield and on land removed from the Green Belt). It is considered that references should be made to urban extensions (on land removed from the Green Belt) in Policy CSP2 specifically, to highlight the important contribution that such sites will make to meeting the development requirements of the Plan.
5.7 On a separate note, whilst a point mostly relating to the South Staffordshire Local Plan to which separate representations will be made, it is considered that the currently adopted approach to spatial distribution in South Staffordshire will need to be re-assessed. Given the huge housing requirements of the Black Country and the shared housing market between South Staffordshire and the Black Country, it is considered that suitable urban extension sites located within South Staffordshire District would be the logical and sensible locations to meet any remaining unmet housing need. In terms of the relevance of this point to the Black Country Review, it will be important for the Black Country authorities to collaborate with South Staffordshire on cross-boundary issues, and to identify suitable extension sites to the Black Country built area which fall within the planning jurisdiction of South Staffordshire District. It is welcomed that this approach is planned to be undertaken, by virtue of the forthcoming Green Belt Review which will be a joint exercise between the Black Country Authorities and South Staffordshire District.
Question 10: In continuing to promote growth within the Growth Network, is there a need to amend the boundaries of any of the Regeneration Corridors in the existing Core Strategy? Yes/No; If so, which boundaries and why?
5.8 No comment

Question 11a: Do you support Strategic Option 1A? Yes/No; If yes, please explain why. If no, do you support Option 1B? Yes/No; If yes, please explain why. If you support the release of further employment land for housing, what should the characteristics of these employment areas be?
5.9 Taylor Wimpey wishes to emphasise the importance of selecting the most appropriate approach, given this will be the basis for the site allocations which emerge through the Core Strategy review.
5.10 Whilst there are opportunities and challenges presented by both Option 1A and 1B, Taylor Wimpey supports Option 1A as the appropriate approach for meeting housing needs.
5.11 Option 1A is considered to be more appropriate for accommodating the growth needs of the Black Country over the Plan period to 2036. There are many opportunities provided by this option, particularly that it can provide for a sustainable pattern of development, close to the urban edge of existing settlements, and close to where needs arises in the Black Country. This option would significantly boost the supply of housing land and help to meet the significant current and future identified need.
5.12 Option 1B is rejected by Taylor Wimpey. In accordance with previous comments and concerns raised in these representations, there are sufficient not opportunities to meet housing needs on brownfield land. As Option 1B would not have sufficient capacity to accommodate all future growth needs, it is entirely inappropriate for this to be the sole basis for a new Development Plan.
5.13 Other key challenges posed by Option 1B include the difficulty of delivering housing on brownfield land given the costs associated with site assembly and land remediation and that delivery on larger sites may be towards the latter years of the Plan period.
5.14 Option 1A would provide a more immediate response to the housing growth crisis within the Black Country and would cater for more rapid delivery of suitable sites.
Question 11b: Are there any current employment areas that might be considered suitable for redevelopment to housing? Yes/No;
5.15 As highlighted previously, the key to understanding where the most appropriate employment/ housing locations are within the Growth Network and Corridors will be determined through a qualitative assessment of allocated employment sites. It is understood an updated assessment has been undertaken and such work, complete with responses to the Call for Sites consultation, will provide the Black Country authorities with evidence to determine the urban capacity for housing, which may include transferring some employment land to housing as well as housing land to employment. This work will then outline the number of dwellings to be accommodated beyond the existing Growth Network within the Green Belt.
5.16 It is welcomed that the Issues and Options Draft recognises the need to release Green Belt in all scenarios proposed.
Question 12a: Do you support Spatial Option H1? Yes/No; What criteria should be used to select suitable sites? e.g. ability to create a defensible new green belt boundary, size, access to existing residential services.
5.17 Please see response to Question 13a below.
Question 12b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details (please submit specific sites through the 'call for sites' form).
5.18 Please see response to Question 13a below.
Question 13a: Do you support Spatial Option H2? Yes/No; What should the characteristics of Sustainable Urban Areas (SUEs) be? e.g. minimum/ maximum size, mix of uses, mix of housing types, accessibility to other areas. What criteria should be used to select suitable sites? e.g. proximity to a rail station, availability of existing infrastructure, easy access to jobs, potential to support existing settlements / services, proximity to the existing growth network, potential to support urban regeneration.
5.19 Given the scale of the housing need, there is concern that the development requirements could not be met with just one of the suggested options presented and, therefore, a combination of both options will be necessary.
5.20 To be in the best possible position to significantly boost the amount of housing and meet the development requirements in the Black Country, in accordance with the NPPF, it is advised that opportunities to both round off edges of the Green Belt and Sustainable Urban Extensions are proposed in the Preferred Options Draft Core Strategy. As highlighted within the Issues and Options Draft, there are challenges and opportunities that come with both types of development, for example from a delivery perspective, smaller sites will come forward more quickly due to the nature of these being straight forward proposals (with limited infrastructure necessary and one or few land owners) and larger sites will ultimately take longer as they are more complex (with multiple land uses, infrastructure and land owners). This fact has been evidenced by Nathaniel Lichfield and Partners (now known as Lichfields) within their report 'Start to Finish' who concluded that the average planning approval period of schemes of 2,000+ dwellings is 6.1 years and the annual average build out rate is 161 dwellings per annum. These figures demonstrate the need to have a number of sites of different sizes and in different locations removed from the Green Belt. The report also identifies, with regard to housing delivery, that 50% more homes per annum are delivered on average on large greenfield sites than large brownfield sites. This is a significant benefit of including greenfield sites within the Preferred Option and will assist to secure its delivery.
5.21 In terms of the locations for removing land from the Green Belt, this should be informed by the Strategic Growth Study and a Black Country Review of the Green Belt. The more detailed study will provide an assessment of land parcels against the purposes of the Green Belt and is likely to recommend that those that compromise the purposes the least will be shortlisted for further consideration to be removed from the Green Belt. It is advised that the next stage should be a consideration of the shortlisted sites based on their suitability (i.e. are the neighbouring uses compatible, would any previous land uses prevent the development of the site), sustainability (i.e. proximity to/ ability to provide local services/ public transport/ employment opportunities) and deliverability (i.e. whether the site is available, being promoted for development, has no barriers to coming forward etc.) credentials. Clearly each site will fair differently against such criteria and the Call for Sites submission will assist the Council to come to a decision on the preferred sites. It is advised that the Black Country authorities should be mindful of the opportunities, through infrastructure and design, that development can bring that will enhance the diversity and character of a particular location.
5.22 In terms of the characteristics of a Sustainable Urban Extension, this is likely to vary depending on the location of each site. For example, some may be more urban and others suburban in their character and would, therefore, provide a different land use offer. It is important that each are considered on a site by site basis to ensure that any subsequent allocation delivers a successful development. It is important that the developer responsible for promoting the site helps to influence what is ultimately delivered. Often what is proposed on site has been informed by housing market intelligence undertaken by sales experts at development companies and, therefore, should be taken into account. Particularly given recent experience in the down turn in the apartment market, it is important that sites are allocated for the right type and mix of housing to ensure that it will be delivered, occupied and successful.
5.23 In the more suburban locations, it is suggested that Sustainable Urban Extensions should look to provide a different offer to potentially what exists in the Strategic Centres and Regeneration Corridors, such as a mix of larger and lower density homes, which will attract those households that in the past have migrated elsewhere. Given the emphasis on delivering more high density homes in the Strategic Centres, it is important that this housing mix is offset by more larger homes in appropriate locations. Otherwise, there is a concern that the Black Country will have a disproportional amount of small homes, which will further encourage more families to migrate elsewhere and not meet the aspiration to diversify the wider HMA.
Question 13b: What infrastructure do you think would be needed for different sizes of SUEs?
5.24 The type of infrastructure needed will vary depending on the different location and size of each site and must be compliant with paragraph 122 of the CIL Regulations that requires planning obligations (which applies to most infrastructure) to be necessary to make the development acceptable in planning terms; directly related to the development; and fairly and reasonably related in scale and kind to the development.
5.25 With the above in mind, however, provision for open space (both formal and informal), local centre and potentially a primary school should be considered for sites in excess of 1,000 homes.
Question 13c: Are there any potential locations that should be considered for SUEs (please submit through the 'call for sites' form) and what infrastructure would be required to support these?
5.26 Land off Linthouse Lane, Wolverhampton, should be considered as an available, suitable and deliverable location for growth, that would represent a logical Sustainable Urban Extension to the Major Urban Area. Further information is set out at Chapter 8 to these representations to evidence the site as a 'sound' locations to meet current and future housing needs arising within the Black Country and wider Greater Birmingham Housing Market Area.
5.27 It should be noted that an emerging proposal makes an allowance for the provision of infrastructure and Taylor Wimpey is committed to further dialogue with the relevant authorities and infrastructure providers to determine the infrastructure required to support the delivery of this proposed SUE..
Question 13d: Do you think that the Core Strategy should set out detailed guidance for the development of SUEs (e.g. type and tenure of housing, specific infrastructure required), rather than details being determined at a local level in light of local policies? Yes/No; Any further comments?
5.28 For the reasons outlined above, relating to considering existing local circumstances and CIL Regulation requirements in respect of any charging schedule and planning obligation requirements, it is advised that detailed guidance for the development of SUEs should not be specified within the Black Country Core Strategy as each site will vary and deserves a more detailed consideration, alongside the developer, at the local level.
Question 14: Do you think there are any other deliverable and sustainable Housing Spatial Options? Yes/No; If yes, please provide details
5.29 There are no other sustainable and deliverable options that we are aware of within the Black Country administrative boundary that are capable of delivering the housing spatial options.
Question 15a: If all housing need cannot be met within the Black Country, do you support the 'export' of housing growth to neighbouring authorities within the HMA? Yes/No; What factors should be taken into account in an assessment of the opportunities in neighbouring authorities e.g. proximity to the edge of the urban area, proximity to a rail station, availability of existing infrastructure, easy access to jobs?
5.30 If, once all realistically deliverable options have been considered, there remains an unmet need for housing it is agreed that the Black Country authorities should consider the possibility of exporting growth to neighbouring authorities within the HMA. In particular, there are options to expand existing settlements that are close to the administrative boundary (for example, in both the Black Country and South Staffordshire) across authorities and, therefore, once all options within the HMA have been explored, these could help deliver growth in a sustainable and deliverable manner. These opportunities should be explored first prior to exporting further growth to other authorities within the HMA where there is less of a spatial connection.
Question 15b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details.
5.1 Land off Linthouse Lane, Wolverhampton, should be considered as an available, suitable and deliverable location for growth, that would represent a logical Sustainable Urban Extension to the Major Urban Area. Further information is set out at Chapter 8 to these representations to evidence the site as a 'sound' locations to meet current and future housing needs arising within the Black Country and wider Greater Birmingham Housing Market Area.
Question 15c: Do you think there are ways to ensure that exporting housing will meet the needs of people who would otherwise live in the Black Country? (e.g. transport improvements, provision of affordable housing, creation of employment opportunities) Yes/No; If yes, please provide details.
5.2 It is important to consider a number of factors, including migration and travel to work patterns, which have been used to identify the extent of the HMA, to determine where households relocate to when leaving the Black Country in order to understand where and why those moves are taking place. Whilst planning can attempt to influence where people relocate to, there is no mechanism to guide or restrict people moving to or from certain locations. Once knowledge of movers can be understood can the planning system can attempt to recreate those attractive characteristics (homes that are more affordable, good public transport links, employment opportunities etc.) in locations where there is capacity for the homes to be delivered. It is advised that an additional analysis of the data, where necessary, is undertaken to provide the Black Country authorities with the relevant intelligence to deliver a successful strategy for growth outside the administrative area.
Question 16: Do you support Spatial Option E1? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access). If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.3 No comment.
Question 17: Do you support Spatial Option E2? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites e.g. quick motorway access, good sustainable transport links? If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.4 No comment
Question 18: Do you support Spatial Option E3? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access). If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.5 No comment.
Question 19a: Do you support Spatial Option E4? Yes/No; Any further comments?
5.6 No comment
Question 19b: Should any factors be taken into account in an assessment of the opportunities? Yes/No; If yes, what should they be? (e.g. quick motorway access, strong transport links with the Black Country, good sustainable transport links with the Black Country) If you think there are any potential locations that should be considered, please provide details.
5.7 No comment.
Question 20: Do you think there are any other deliverable and sustainable Employment Land Spatial Options? Yes/No; If yes, please provide details.
5.8 As previously outlined, there is concern that some of the employment sites currently identified are potentially not fit for purpose and others that are identified to be transferred to housing remain in employment occupation. In light of this mismatch, it is welcomed that an updated qualitative assessment has been undertaken and has informed how much employment land is has be found outside the urban area.
5.9 In terms of where the employment land should be located outside the urban area, as with housing, decisions should be based on the results of the Green Belt Review and the suitability, sustainability and deliverability of sites. For employment land sites, the suitability of a site may well include good transportation links for goods and people. The Call for Sites consultation will assist in putting forward suggestions for sites.
5.10 In terms of exporting employment land, it is considered that a proportionate amount of employment land to housing land exported should be made in an attempt to create more sustainable communities, that is unless there is good reason not to do so (i.e. due to improved public transport links between exported housing and employment sites). As evidenced in work supporting the Issues and Options Draft, whilst the Black Country is a sufficiently self-contained labour market there are strong linkages with Birmingham and South Staffordshire. This would therefore suggest that these locations should be first explored for transporting any employment land growth, however, given the land capacity issues in Birmingham it is more likely that South Staffordshire would be able to assist.
6. DELIVERING GROWTH - INFRASTRUCTURE & VIABILITY
Question 21: Do you think that changes are required to Policy DEL1 to ensure it covers both development within the existing urban area and any within the Green Belt? Yes/No; If yes, please provide details.
6.1 Policy DEL1 is considered to be sound on the basis that it is sufficiently flexible to deal with different circumstances on different sites across the Black Country, including sites that are to be removed from the Green Belt.
Question 22: Do you have evidence of a requirement for new social infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.2 Taylor Wimpey is in consultation with the relevant authorities to explore any requirements for social infrastructure to serve any need relating to the development proposals.
Question 23: Do you have evidence of social infrastructure that is no longer needed and where the site could be reallocated for alternative uses? Yes/No; If yes, please provide details.
6.3 No comment.
Question 24: Do you have evidence of pressure being placed on the capacity of current social infrastructure which could be exacerbated by new housing? Yes/No; If yes, please provide details.
6.4 No comment.
Question 25: Will there be any new social infrastructure requirements necessary to serve large new housing developments? Yes/No; If yes, please explain the type and scale of any new social infrastructure required.
6.5 It is recognised that development of approximately 2,500 homes on land off Linthouse Lane will give rise to the need to deliver supporting infrastructure. Taylor Wimpey is committed to working with the relevant authorities and service providers to determine the capacity of existing infrastructure and determine the level of mitigatory provision necessary to support an increase in the population in this location. It is however important that each potential large new housing development is given independent consideration in respect of any infrastructure obligations, recognising that pressures will be dependent on location and existing infrastructure capacity.
Question 26: Do you have any evidence of a requirement for new physical infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.6 No comment.
Question 27: Do you have evidence of pressure being placed on the capacity of current physical infrastructure which could be exacerbated by new developments? Yes/No; If yes, please provide details.
6.7 No comment.
Question 28: Do you think physical infrastructure is necessary to serve large new housing developments? Yes/No; If yes, what type and scale of physical infrastructure is necessary?
6.8 As set out above, the need for infrastructure will vary for each site. Given such different circumstances, it would be inappropriate and potentially unlawful (as it would conflict with paragraph 122 of the CIL Regulations) to incorporate a blanket policy requiring specific infrastructure on every large housing site.
Question 29: Do you think there are any other tools or interventions that could be used to ensure enough infrastructure is provided by developments? Yes/No; If yes, please provide details.
6.9 It is considered that the existing national framework (which includes the NPPF and CIL Regulations) provides a sufficient tool to ensure the relevant infrastructure is delivered. In addition, the CIL Charging Schedule allows authorities to raise funds for named infrastructure projects, which should be updated in line with any Core Strategy advanced. Therefore, it is considered that there are existing provisions to deliver infrastructure and no additional interventions through the Black Country Core Strategy Review are needed.
Question 30: Do you have any suggestions around how the strategy can be developed in order to maintain the urban regeneration focus of the Black Country while at the same time bringing forward sites in the green belt? Yes/No; If yes, please provide details.
6.10 There is no a need for any specific interventions, such as phasing, to protect the delivery of urban regeneration in the Black Country. Indeed, it is considered that development of greenfield and Green Belt sites can very much compliment urban regeneration through the provision of a more varied form of development that will help diversify the housing stock and profile of residents in the wider area, which will assist to sustain and improve the vitality of existing communities. Further, as highlighted above, given the priority to significantly boost the delivery of housing greenfield and Green Belt sites should come forward for development as soon as practically possible. Given lead in and build out rates of larger sites, the land should be encouraged to be developed as soon as possible so to ensure the homes are delivered in the Plan period and the needs are met.
Question 31: Do you think that the right scale and form of funding is available to support the delivery of the Core Strategy review? Yes/No; If no, what alternative sources of funding or delivery mechanisms should be investigated?
6.11 When delivering greenfield/ Green Belt sites, there is an opportunity to deliver infrastructure to meet the needs arising from the proposal, which may have wider benefits for the local community. In addition, it is likely that the communities created by the Sustainable Urban Extensions will potentially be more affluent and share their wealth using local shops and services within the wider Black Country, which will contribute to more successful and prosperous communities.
7. REVIEW OF EXISTING CORE STRATEGY POLICIES & PROPOSALS
Housing Question 35: Do you support the proposed approach to housing land supply? Yes/No; If no, please explain why
7.1 As identified above, it is important that a range of sites in different locations are identified to be in the best possible position of delivering the development requirements. In terms of presenting these sites in the Core Strategy, whilst it is useful to identify a housing trajectory, it is important that there is not a phasing policy as such that would prevent the delivery of housing, given the current housing crisis. As stated above, the delivery of housing on greenfield and Green Belt land will not compromise the delivery of urban regeneration as the development on the urban edge will complement and rejuvenate the environment in a different way.
7.2 In terms of the proposed level of discounting, it is considered that if the LPA adopt an approach to identify a further 20% of sites in accordance with the LPEG recommendations identified above, there would not necessarily be a need for the application of discounting in determining the overall level of supply. It is interesting to note that the level of discounting proposed by LPEG is suggested for all LPAs, not necessarily those which have experienced difficulty in delivery. It could therefore be argued that an increased buffer of 25% could be applied in order to take a cautious approach.
Question 36: Do you think that the current accessibility and density standards set out in Policy HOU2 and Table 8 should be changed? Yes/No; If yes, what standards should be applied instead, for example should the minimum net density of 35 dwellings per hectare be increased to maximise brownfield housing delivery?
7.3 It is clear that the current accessibility and density standards outlined in the adopted Core Strategy were formulated in the context of the vast majority of development taking place on brownfield sites within the defined urban area. As reiterated throughout these representations, there is now a clear need for Green Belt release as part of the Local Plan Review to meet emerging, objectively assessed housing needs. We outline in further detail below why the adopted accessibility and densities would not be applicable to Green Belt sites, however would suggest that the current standards do not allow sufficient flexibility on brownfield sites. A blanket application of prescriptive accessibility and density standards across the Black Country, be it brownfield or greenfield, does not allow sufficient flexibility which take into account site specific characteristics. The Council should allow for greater flexibility when assessing accessibility and density standards, with a more pragmatic approach which allows appropriate assessment for site-specific characteristics and also an assessment of market demand which may vary significantly across the large Black Country area.
7.4 Paragraph 47 of the NPPF outlines how local authorities should set out their own approach towards density. It is suggested that the currently adopted approach does not allow for sufficient assessment of local characteristics. It is clear that the chosen approach must be reflective of local circumstances, including the matters outlined above as well as infrastructure and services available in the locality. It is advocated that a more flexible approach to density and accessibility standards is taken as part of the emerging Local Plan Review.
Question 37a: Do you think that the existing Policy HOU2 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why
7.5 In line with the comments above, it is suggested that the Council should assess each site on a case by case basis in terms of accessibility and density standards. This approach would suggest that the numerical baseline trigger of 15 homes or more will not always be appropriate or applicable, and as advocated throughout these representations it suggested that there should be a complete reassessment on accessibility and density standards as part of the emerging Local Plan Review.
Question 38: Do you think that the current accessibility and density standards are appropriate for green belt release locations? Yes/No; If no, what standards should be applied in these locations and why?
7.6 No, it is not considered that the current standards would be applicable to Green Belt release locations. The adopted standards are overly prescriptive, and as previously discussed were written in the context of brownfield land. Green Belt release sites have a completely different type of character, therefore consideration of accessibility and density standards in relation to these sites should be reflective of local character and site characteristics. The more suburban settings of Green Belt release land lends itself to lower densities which are more appropriate to the Green Belt setting, which typically deliver more family homes. The Council must provide robust evidence to test any forthcoming accessibility and density standards in relation to Green Belt release locations, which allows for a flexible and pragmatic approach.
Question 39: Do you think separate accessibility standards are needed for particular types of housing e.g. housing for the elderly or affordable housing (as occupiers may be less mobile and more dependent on public transport)? Yes/No; If yes, please provide details.
7.7 It is clear that separate accessibility standards will apply to particular types of housing such as affordable and for the elderly population, however in line with the sentiment expressed above, any forthcoming standards should be based on robust evidence and allow for sufficient flexibility to avoid any unnecessary constraints to development coming forward.
Question 40: Do you agree that the 2017 SHMA findings should be used to set general house type targets for the Plan period? Yes/No; If no, please explain why.
7.8 A general and blanket application for house types across the Black Country should not be advanced as part of the Local Plan Review. Paragraph 50 is clear that local planning authorities should plan for a mix of housing based on current and future demographic trends and market trends. It is therefore notable that the NPPF specifically highlights 'market trends' in this context, which acknowledges that the market must inform such decisions.
7.9 Whilst the 2017 SHMA does provide an assessment of demographic and market trends, it is notable that it looks at a wider area assessment and is focused at a higher level. This assessment therefore does not draw out sub-market trends, and cover smaller areas within the vast Black Country area. Again, a blanket policy of house type targets across the Black Country area would not allow for sufficient flexibility to assess each site on a site by site basis, taking into consideration local market trends and demand. The NPPF does not state that specific policies should be set to enforce that local demand is met. As such, it is considered that this should be left for the market to decide, as opposed to applying rigid and prescriptive house size standards.
7.10 It is suggested that the evidence presented in the SHMA should be put into the Plan as an informative and general guide, but should not feed into a specific policy requirement which outlines housing mix percentages that should be applied across the Black Country. A policy containing general house type targets could present as a significant constraint to the delivery of a site where there is no local market demand for this house type, which in turn would have a negative impact on achieving the necessary housing growth targets to be delivered in the Black Country over the Plan period.
Question 41a: Do you support the introduction of a policy approach towards self and custom build housing in the Core Strategy? Yes/No; If yes, would you support:
7.11 It is not considered that there is a policy need for the Core Strategy to address self and custom build housing in the emerging Review. Paragraph 6.32 indicates that there are only nine records on self and custom build registers in the Black Country. It is evident that that there is very limited demand in the Black Country, which is unsurprising given that self and custom build housing is often more popular in rural areas. Given the limited demand it is therefore not considered necessary to take a policy approach towards self and custom build housing within the Local Plan Review.
Question 41b: A target for each authority? Yes/No; Any further comments
7.12 Given that there is evidence of little market demand, it is not considered necessary for the Core Strategy to set targets for each of the Black Country authorities. If it was considered to be necessary as the Local Plan Review progresses, any targets being set should be formulated on the basis of robust evidence such as monitoring of the registers, to provide an indication of how many self-build homes will be needed.
Question 41c: A requirement for large housing sites to provide serviced plots? Yes/No; Any further comments?
7.13 There should not be a requirement for large housing sites to provide serviced plots. This can pose an unnecessary market constraint for large housebuilders when there may be limited or no market demand for self-build plots. Self and custom build plots are often unusual and unique in character, therefore would not be best suited to be located within a large housing development with more uniform house types. If deemed necessary, self and custom build housing should be allocated specific site allocations, as discussed below.
Question 41d: Another approach altogether? Yes/No; If yes, please specify.
7.14 If it is considered necessary for the Review to address self and custom build housing, this should be addressed by the Council's identifying and allocating specific plots for these uses. Identifying site-specific plots would ensure that the most appropriate and suitable locations for self and custom-build will be allocated, via the assessment of appropriate evidence and market demand. In addition, this might be more likely to be achieved on surplus publicly owned land.
Question 42: Do you agree that the annual affordable homes target should be increased to reflect the 2017 Black Country Strategic Housing Market Assessment? Yes/No; If no, please explain why.
7.15 As a general principle, the notion of applying different affordable housing ratios to different parts of the Black Country, based on an understanding of needs and viability, is acceptable. Given that the Black Country represents a vast area, there will not be a uniform housing market, and there will be sub-market trends within this wider area. As such, a more flexible approach which assesses local housing market evidence on a case by case basis could be justified. That said, there is an inherent simplicity and attraction to a single rate figure, which is easy for the development industry to understand.
7.16 In terms of the annual affordable housing target, it is unclear how the Issues and Options document has calculated the figure of 832 homes per year. At paragraph 7.42 of the June 2017 SHMA Part Two- affordable housing document, it is stated that the total annual affordable housing need is 677 dwellings, which represents 19.8% of the annual projected household growth. This differs to paragraph 6.36 of the Issues and Options document, which states that the affordable housing target is 23.4% of total housing need or 832 homes per year. From paragraph 7.47 of the SHMA, it appears that this figure may have been calculated by adding the overall requirement of 16.6% of housing to be affordable rented and 6.7% shared ownership. Clarity is sought on how this figure has been calculated, and we reserve the right to comment further on this matter.
Question 43a: Do you think that the existing Policy HOU3 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why.
7.17 We have not undertaken detailed analysis of the findings and assumptions of the SHMA and affordable housing delivery matters, therefore would like to reserve the right to comment on this matter further. However, on face value, it appears to be a reasonable threshold and is not dissimilar to other locations.
Question 44a: Do you think that the affordable housing requirement for eligible sites in Question 43 should be kept at 25% of the total number of homes on the site? Yes /No; Any further comments?
7.18 Based on the current evidence, a blanket rate of 25% affordable housing would appear to be sound.
7.19 However, irrespective of the final rate, any amendments to the currently adopted affordable housing policy must continue to have a clause in it which stipulates that this requirement is subject to viability tests. Any revised affordable housing requirements will also need to carefully consider the implications of adopted Community Infrastructure Levy (CIL) regimes. Both Sandwell and Dudley Councils have adopted CIL Charging Schedules. These will have implications on viability, therefore if revised affordable housing targets are to progressed then these CIL tariffs will need to re-assessed and re-visited.
Question 44b: If no, should the percentage be increased to allow for the provision of affordable home ownership? Yes/No; If yes, what should the percentage be and why?
7.20 At paragraph 6.39 of the Issues and Options Paper, it is stated that options need to be explored to increase affordable housing delivery of private sites. One option would be to increase the overall affordable housing proportion, which would require developers to provide affordable home ownership products plus an appropriate proportion of other affordable tenures. This paragraph follows on from commentary relating to the Housing White Paper.
7.21 The Housing White Paper discusses Starter Homes at Chapter 4, and explains how the government intend to amend the NPPF to introduce a clear policy expectation that housing sites deliver a minimum of 10% affordable home ownership units. It is later stated that it will be for local areas to work with developers to agree an appropriate level of delivery of starter homes, alongside other affordable home ownership and rented tenures.
7.22 The policy position on Starter Homes is not yet fully clear, and has yet to be formally established through a formal amendment and update to the NPPF. Until the national policy position on Starter Homes has been made clear, it would be premature for the Core Strategy Review to suggest an uplift in the affordable housing requirement to include affordable home ownership such as Starter Homes. Any suggestion to uplift the affordable housing requirement to include Starter Homes should be reflective of the national policy position, as well as founded upon a robust evident base which dictates exactly what percentage this element should be of the overall affordable housing requirement.
Question 45: Should an increased affordable housing requirement be set for green belt release sites, to reflect the likely financial viability of these sites? Yes/No; If yes, what should this be.
7.23 The likely financial viability of Green Belt sites will vary across different areas of the Black Country, therefore any affordable housing requirements for Green Belt sites will need to be reflective of these circumstances. Any affordable housing targets for Green Belt sites should be based on robust evidence, and acknowledge that many sites may need to support and deliver other infrastructure requirements.
7.24 Ultimately, any affordable housing strategy will need to address the affordable housing need as well as the need for market housing. Bearing in mind that the SHMA confirms over 70% of homes required are for homes to be sold on the open market, any affordable housing policy must not dilute the delivery of these needs/requirements. A higher figure on Green Belt sites over and above a standard blanket figure would potentially do this.
Employment Question 49a: Is there still a need for existing Policy DEL2 in order to manage the release of poorer quality employment land for housing? Yes/No; If no, please explain why.
7.25 The Black Country is to be the subject of large levels of both employment and housing growth over the Plan period. These uses are very much inter-linked with one another, and will drive each other's need for growth. The Local Plan Review, in order to meet emerging employment and housing needs, must identify a significant number of specific sites for employment and housing uses. By planning proactively and identifying suitable sites for both employment land and housing land, this should reduce the pressures to manage the release of poorer quality employment land, which may not always be suitable for release. The Local Plan Review should also seek to undertake a further review of poorer quality employment land to make it available for other suitable uses, if it proves to no longer be viable for employment land use. This is in line with policy provisions of the NPPF, which at Paragraph 22 outlines that planning policies should avoid the long-term protection of sites allocated for employment use where there is no reasonable prospect of a site being used for that purpose.
Question 50: Do you think that the Core Strategy should continue to set a target for the total employment land stock in Policy EMP1? Yes/No; Please explain why.
7.26 The continuation of setting a target for employment land stock would be supported. Policy EMP1 should make it clear that these are not maximum figures, to encourage further flexibility for additional growth.
Retail Question 59: Have all the appropriate centres within the Black Country been identified? Yes/No; If not, please specify additional centres
7.27 No comment
Question 61: In addition to para 4.33 of the current Core Strategy should the revised Core Strategy include criteria for the creation of new centres that might be needed as a result of any additional housing identified through the plan? Yes/No; Any further comments?
7.28 Criteria would be a useful policy tool to help assess the designation of new centres, and should be in line with previous methodologies used which set out clear thresholds.
Question 71: Should the Core Strategy set housing targets for the Town Centres?
7.29 Housing within Town Centres should be supported, in line with paragraph 23 of the NPPF which discusses the important role that residential development can play in ensuring the vitality of Town Centres. Any housing targets should be based on what sites are known to be readily available, suitable and viable for residential development. Market demand for housing in these areas will also need to be fully assessed. It is notable from the outcome of the 2017 SHMA that there is most demand for three bedroom properties (40%). The highest demand is therefore for family housing, and not for flats which are often the most popular within Town Centre locations. Any housing targets set for the Town Centre would therefore need to consider the findings of the SHMA, and be reflective of the fact that family housing is often more suitable for delivery on larger sites, including on sites which are currently located within the Green Belt.
Environment Question 99a: Do you think that national standards for housing development on water consumption should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.30 When referring to water consumption paragraph 6.1.52 of the Issues and Options document states that the Black Country does not currently lie in an area of serious water stress, therefore clear need may be difficult to demonstrate. This evidence suggests that there is limited or no need to introduce such a policy, therefore it is not considered that the Core Strategy Review should seek to introduce water consumption standards for housing development.
Question 99b: Do you think that national access standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.31 The introduction of any national access standards, with the Issues and Options document referring specifically to Lifetime Homes, again must be based on a robust evidence base which can demonstrate market demand. It is noted that Paragraph 50 of the NPPF states that planning authorities must plan for a mix of housing to meet a range of needs. In the same paragraph, it is later stated that these must be based on current and future market trends. If Lifetime Home standards are to be introduced these will therefore need to be based on robust evidence, to ensure that the standards are not overly onerous and prevent the delivery of other types of housing which have higher levels of market demand.
Question 99c: Do you think that national space standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.32 As reiterated throughout these representations, it is not considered that a blanket approach of prescriptive standards across the Black Country allows sufficient flexibility to assess local market and site considerations in an appropriate manner. Whilst it is recognised that space standards can be an important tool to ensure that high quality of homes are delivered, we agree with the sentiment expressed in the recent Housing White Paper. The Paper explains that the government are concerned that a one size fits all approach may not reflect the needs and aspirations of a wider range of households. The White Paper also states that the Government will be undertaking a review of the Nationally Described Space Standards. It is suggested that the Core Strategy Review should await the outcome of this national review of national space standards, to ensure compliance with national policy and to ensure that the most appropriate approach to space standards, if required, is taken.
Question 99d: Do you think that the standards should be different for brownfield and greenfield sites? Yes/No; If yes, please explain how and why.
7.33 As discussed above, prescriptive standards do not always allow sufficient flexibility for local market needs, so we would not advocate a blanket approach of different standards to brownfield and greenfield sites.
Open Space, Sport and Recreation Question 102a: Do you support the proposed changes relating to open space, sport and recreation? Yes/No; If no, please explain
7.34 Paragraph 6.1.60 of the Issues and Options paper outlines how adopted Policy ENV6 creates the framework for open space policies at the local level. The Issues and Options paper outlines how this is in line with national guidance, and that it is proposed to retain this policy and update some references in the supporting text to reflect changing circumstances. It is agreed that the local level remains the appropriate place to set open space policies, and that Policy ENV6 should continue to endorse this approach.
8. LAND OFF LINTHOUSE LANE, WOLVERHAMPTON
8.1 Taylor Wimpey is currently in control of the land to the north of Linthouse Lane and to the south of the dismantled railway line as shown on the Site Location Plan appended to this representation (Appendix 1).
8.2 This land represents a logical and sustainable extension to the existing Major Urban Area that provides an opportunity for delivering approximately 2,500 new homes with associated supporting infrastructure.
8.3 As demonstrated on the attached Site and Contextual Analysis Plan (Appendix 3) there are no significant physical barriers to development. There are, however, a number of physical features which serve to shape the development shown on the illustrative masterplan. These include the power lines which traverse the site in a north-west to south-east direction as well as the localised topography of the site, existing vegetation and public rights of way.
8.4 An illustrative masterplan (Appendix 4) has been prepared to introduce an initial proposal, providing an indication of how the site could be delivered and function as a natural sustainable, urban extension to Wolverhampton. This includes a 20m offset to the existing power lines, retention of the existing public rights of way and vegetation.
8.5 The Illustrative Masterplan identifies the following key features for land to the north of Linthouse Lane on land where Taylor Wimpey has secured an interest:
* Circa. 2,500 dwellings;
* Provision of land for the delivery of a number of potential community uses, including the provision of a new Primary School;
* Significant provision of Green Infrastructure to include a landscape mitigation strategy;
* Provision of SuDS through the delivery of new attenuation features; and
* A new enduring Green Belt boundary defined by the route of the dismantled railway line.
8.6 Further consideration of the site is set out below having regard to the Council's evidence base and the technical information prepared on behalf of Taylor Wimpey to date. This analysis concludes that land to the north of Linthouse Lane, within the control of Taylor Wimpey, is both suitable and deliverable and would represent a 'sound' location for meeting housing needs within the Black Country to 2036.
Landscape Sensitivity
8.7 Pegasus Environment has undertaken a Preliminary Landscape and Visual Appraisal (LVA) to the determine the various landscape and visual constraints and opportunities of the wider site area and its context. This includes how these factors might serve to influence the potential for development in respect of an illustrative masterplan, and to influence an inherent landscape strategy as part of that masterplan.
8.8 The local landscape context comprises the wider pattern of agricultural land to the north, the topography of which is generally falling to the south towards the site, from a localised ridgeline between Essington and Westcroft. The site is located on gently sloping land between ca. +170m AOD and ca. +145m AOD. To the south, the existing settlement edge of Wolverhampton provides a townscape setting to the site and there are some near distance views into the site from this edge. Longer distance views towards the site are available from the southern edge of Essington and from higher ground to the north. The site is currently included as part of the West Midlands Green Belt. There are no landscape specific designations which cover the site or the immediate area.
8.9 The LVA identifies the key constraints and opportunities present in the site and surrounding landscape, and also the nature of the likely impacts that may arise from the proposed development. The LVA has analysed the baseline information in the context of the proposed development and has informed the proposals for landscape mitigation.
8.10 The development consequently incorporates a landscape mitigation strategy which will avoid, reduce or remedy adverse impacts. The development of the illustrative masterplan has been informed by an initial appraisal of the local landscape and visual constraints and opportunities. As such, the illustrative masterplan:
* Addresses near distance views from the edge of Essington across the Green Belt 'gap' between Essington and the edge of Wolverhampton, to maintain separation and deal with potential 'coalescence' issues;
* Includes a set-back of the development envelope away from the more elevated area of the site to the north-east;
* Utilises the well-vegetated dismantled railway line as a new Green Belt boundary;
* Provides a central linear open space in response to the offsets required to existing powerlines;
* Ensures an appropriate offset to the public right of way passing through the site along the existing hedgerow running north-south between Linthouse Lane and Blackhalve Lane; and
* Addresses longer distance views from the more elevated ground to the north by providing space for additional planting to strengthen the new Green Belt boundary in this location.
8.11 These over-arching principles set the framework for the areas which are proposed for development. Each of these can be subject to a greater level of detail regards masterplanning to identify constraints and opportunities at a more detailed level.
Ecology
8.12 Technical work has been undertaken by the Environmental Development Partnership Ltd to guide initial proposals on land off Linthouse Lane having regard to ecological sensitivities pertaining to the site, and identifying opportunities and constraints which may influence development.
8.13 The study confirmed that there are no statutorily designated nature conservation sites within the red line boundary shown at Appendix 1, however, there is a Special Area of Conservation (SAC) of European importance within 10km and two Local Nature Reserves (LNRs) of local importance within 2km.
8.14 Cannock Extension Canal SAC lies 6.3km northeast of the site and contains good water quality supporting floating water plantain and a diverse dragonfly and damselfly assemblage. Identified threats to the quality of this SAC that could occur are: pollution to groundwater, air pollution, air-borne pollutants and invasive non-native species.
8.15 Due to the spatial separation of the SAC from land off Linthouse Lane, it is unlikely that the proposed development would result in any of the identified threats to the SAC arising.
8.16 Rough Wood Chase LNR lies 2km east of the site. There is no ecological connectivity to this woodland and wetland area, being separated from land off Linthouse Lane by the M6. In addition, there is no hydrological connectivity. The proposal is not considered to have a potential impact on this LNR.
8.17 Waddens Brook LNR lies 2km south of land off Linthouse Lane and is regionally important for its great crested newt population and populations of other amphibians. As there is no hydrological or ecological connection netween the LNR and the site and the 2km of separation contains residential development and and Wyrley and Essington Canal, the proposal is not considered to have a potential impact on this LNR.
8.18 Land off Linthouse Lane is not covered by any non-statutory designations, however there are a number of non-statutory sites within 2km of the boundary. With the exception of Ashmore Lodge Biodiversity Alert Site (BAS) and Oakley Farm Potential Site of Importance (PSI), the nature of the designation of each site and the intervening distance means that a potential impact on them from the proposed development is unlikely.
8.19 Oakley Farm is designated due to the presence of field margins on historic maps. During the Extended Phase 2 Survey, no habitats of importance were noted, with the grassland and hedgerows being species poor. Therefore, in ecological terms, development in this area would not result in a significant loss in biodiversity either within the proposal site or within the PSI at Oakley Farm.
8.20 Ashmore Lodge is the dismantled railway which runs through the proposed site. A majority of this dismantled line is lined with trees with some parts covered in semi-improved grassland, providing a linear feature of local ecological value. The proposal offers the opportunity to include:
* Additional planting of native tree species;
* Creation of diverse wildflower meadows in open areas on the line and in the buffer to this line; and
* Removal of the giant hogweed by an experienced and qualified contractor.
8.21 If these opportunities were delivered, this would ensure no significant impacts would occur on any of the non-statutory designations within the p0otential zone of influence of the site and may result in an overall enhancement in line with local and national policy.
8.22 The remaining habitats within the site are predominantly of low intrinsic ecological value and present good opportunities for enhancement. They are not a constraint to development capacity in their own right, but have the potential to support protected species.
8.23 The possible presence of breeding birds, bats and great crested newts will need to be determined through further surveys, however, it is considered that, even if these protected species were found to be present, the populations could easily be safeguarded through sensitive scheme design and appropriate mitigation measures, and would not represent an 'in principle' constraint to development.
8.24 The initial technical work considers the site provides sufficient flexibility to ensure compliance with planning policy at all levels and to avoid 'significant harm' to biodiversity. Furthermore, a sensitively designed development incorporating appropriate mitigation and enhancement has the potential to deliver a significant net gain in biodiversity.
Heritage & Archaeology
8.25 An archaeological and heritage assessment has been prepared by Environmental Dimension Partnership Ltd to inform the proposal and to assess the potential effects arising from development within the site.
8.26 The report confirms that the site does not contain any designated heritage assets such as world heritage sites, scheduled monuments, registered parks and gardens, registered battlefields or listed buildings, where there would be a presumption in favour of their physical preservation in situ and against development.
8.27 Only one potentially sensitive designated heritage asset has been identified outside of the site. This is the scheduled ancient monument of Moat Farm moated site, which lies some 160m north of the site, to the north of Blackhalve Lane. The assessment concluded that whilst there is some potential for a low level of harm to the heritage significance of the monument through the change to its setting, this would need to be weighed against the public benefit of the proposed development, with harm being further mitigated through the detailed design of any proposal.
8.28 There are no listed buildings or other designated heritage assets in close proximity to the site, although there are a number of listed and locally listed buildings in the wider area. The assessment concludes that no opportunity for harm to these or any other heritage assets outside of the site is predicted as a result of development at land off Linthouse Lane.
8.29 The archaeological potential of the site is assessed as being low. Should any below ground archaeological remains survive, there is no reason to believe or expect that the site will contain archaeology of such significance that it would require preservation in situ and therefore constrain development of the site. The site has been intensively farmed and if any below ground deposits are found, they are likely to be poorly preserved due to this agricultural activity, thereby reducing their significance.
Highways and Transportation
8.30 The site is well placed in terms of accessibility to existing pedestrian and public transport networks. The site is also located in close proximity to local facilities including shopping, medical services and education facilities.
8.31 There are good public transport links in the area, with 7 two way buses per hour operating along Linthouse Lane and Cannock Road on a weekday and Saturday and, 4 two way buses per hour operating on a Sunday.
8.32 Travel by rail is achievable as part of a multi-modal trip i.e. park and ride and cycle and ride. There are hourly services to local destinations including Birmingham New Street which provides onward travel opportunity to destinations across the country.
8.33 Access to the site can be achieved from the surrounding highway network, including Linthouse Lane, Blackhalve Lane, Cannock Road and Kitchen Lane. towards the south-western end of the site. There are a number of options and significant potential in terms of achieving safe, controlled and appropriate vehicular access to the site.
8.34 The Illustrative Masterplan identifies the following access points, but it should be noted that these are not necessarily exclusive locations:
* Proposed vehicular access via Linthouse Lane;
* Proposed vehicular access via Kitchen Lane;
* Proposed vehicular access via Blackhalve Lane;
* Proposed vehicular access via Cannock Road; and
* Proposed change of priority along Wood Hayes Road through the introduction of a new junction providing east west vehicular connectivity.
8.35 The illustrative masterplan also identifies the incorporation of existing Public Rights of Way (PRoW) within green corridors and proposes a network of new primary pedestrian routes maximising opportunities to create sustainable transport links (walking and cycling) to existing and potential new amenities and facilities.
8.36 In the longer term, to support a planning application, a Transport Assessment will be completed to assess impacts across the wider network, this will include speed survey work. The Transport Assessment will take account of any local committed development sites and any committed highway improvements. Suitable mitigation will be provided as part of the development proposals including any identified off site highway works and contributions.
Flood Risk and Drainage
8.37 The site lies in Flood Zone 1, the area at least risk from flooding.
8.38 Surface water drainage is proposed to be accommodated through the provision of a series of balancing ponds located around the site. The Illustrative Masterplan, included at Appendix 4, identifies the provision of balancing ponds through a network of green infrastructure.
Noise & Air Quality
8.39 Noise is unlikely to be a significant issue for the proposed development, however it is likely to have some impact on the form of any proposal. The northern boundary of the site lies adjacent to Blackhalve Lane (B4156), which also passes through part of the site. The eastern boundary is adjacent to Essington Rugby Club and Kitchen Lane. The southern boundary is adjacent to Linthouse Lane and the western boundary is bounded by properties off Woodent Road and Cannock Road.
8.40 It should be noted that landscaping would be included throughout the development in conjunction with carefully orientated and sited dwellings and associated gardens to minimise noise impact and preserve residential amenity.
8.41 Consequently, it is unlikely noise will have a significant adverse impact on the development of this site.
Ground Conditions
8.42 A full Phase 1 Environmental Risk Assessment has been completed for the site. The British Geological Map for the area indicates the site is underlain by superficial deposits of Glacial Till (variable but predominantly cohesive strata), which overlay solid strata that vary across the site.
8.43 The Phase I Environmental Risk Assessment for the site has been undertaken which identifies that it is unlikely that the site would be classified as contaminated land.
Utilities
8.44 Sewers are present in the vicinity of the site, including within the southern verge of Kitchen Lane, residential streets to the west of the site, within the eastern verge of Wood Hayes Road and along Blackhalve Lane. Accordingly, diversions are likely to be required in order to connect the site to the network. Whilst no sewers are located within the site, surface water outfalls into the watercourse along the western boundary are noted and a foul sewer is located to the west of the watercourse.
8.45 It is envisaged that foul flows from the land to the north of Blackhalve Lane could drain via gravity to an existing foul sewer located within Wood Hayes Road or to that which exists within Blackhalve Lane. Land to the south of Blackhalve Lane has the potential to drain via gravity to a number of the public foul sewers located within Linthouse Lane.
8.46 Similarly, water mains are present in the vicinity of the site, including the northern verge of Kitchen Lane, the northern verge of Linthouse Lane, the western verge of Wood Hayes Road and Blackhalve Lane and therefore diversions are likely to be required. No water mains are located within the development area.
8.47 Further discussion with Severn Trent Water will determine suitable connection points and capacity within the network.
8.48 Regarding electricity cables, gas mains and phone lines, no apparatus is present within the development area. As a result, diversions will again be required.
8.49 The capacity of all of these utilities need to be determined but are unlikely to present any issues of deliverability in respect of the site.
Agricultural Land Classification
8.50 Natural England's Land Classification Map for the West Midlands Region (ALC004) shows that the majority of the site comprises undefined Grade 3 'Good to Moderate' quality agricultural land. It is noted that the majority of land around Wolverhampton and the wider Black Country urban area also comprises Grade 2 and 3 agricultural land.
8.70 Whilst it is acknowledged that the loss of any best and most versatile land is undesirable, the majority of the site comprises Grade 3 land, and that the scale of development required to support needs arising within the Black Country will necessitate the loss of an amount of Grade 3 land or better under any reasonable option.
Suitability
8.71 The information set out above, read in conjunction with the appended illustrative masterplan, demonstrates that land off Linthouse Lane is a suitable site.
Deliverability
8.72 There is an agreement in place between the landowner and Taylor Wimpey to facilitate the development of the site.
8.73 A considerable amount of technical work has been undertaken to demonstrate the deliverability of land off Linthouse Lane. Taylor Wimpey can confirm that this work concludes that there are no physical or other constraints likely to render the site undeliverable within the proposed Plan period to 2036. The site is available now.
8.74 There are no existing uses that would require relocation and no issues of contamination that would require remediation. Many of the potential impacts of the development of the site can be mitigated through design and in many cases a positive outcome can be achieved, such as the strengthening of Wolverhampton's north eastern boundary through landscaping and utilisation of the dismantled railway line as an enduring new Green Belt boundary.
8.75 The site is deliverable and immediately available and, subject to allocation and removal of the land from the Green Belt, could start to deliver homes and associated community benefits within the next 5 years.
9. CONCLUSION
9.1 Taylor Wimpey is in control of land at Linthouse Lane, Wolverhampton. The land is sustainably located adjacent to the existing urban area of Wolverhampton.
9.2 Land off Linthouse Lane is promoted as a suitable, deliverable and available site, subject to its release from the Green Belt. The development of the site would constitute sustainable development.
9.3 Taylor Wimpey fully support the Black Country Authorities decision to review the currently adopted Core Strategy, however wish to raise the following concerns:
* The Black Country Core Strategy Review consultation document significantly underestimate the level of housing needed to support future population growth within the Black Country. An independent assessment of OAHN undertaken by Lichfields indicates that the actual need is 4,692 to 5,473 dpa. This is based upon the high levels of migration seen in the Black Country over the long term, the need to adjust household formation rates for younger age cohorts, and an uplift to reflect market signals on house prices, affordability and concealed families. Additionally, the OAHN range includes an allowance of up to 955 dpa to accommodate Birmingham's unmet need, based on the Black Country's proportionate 'fair share'.
* The scale of the housing required in the Black Country and GBHMA, along with the lack of sufficient land outwith the Green Belt constitutes the necessary 'exceptional circumstances' to justify that Green Belt land should be released for housing. The Council therefore needs to provide a sound evidence base which is robust in demonstrating the 'exceptional circumstances case'.
* Taylor Wimpey fully supports the carrying out of a Strategic Green Belt Review as this is necessary to ensure sufficient land is provided to meet the Black Country's objectively assessed housing needs over the course of the Plan period. This should include consideration of land within South Staffordshire District.
* Informed by this process, sufficient Green Belt land should be released and allocated for housing development to meet the needs of the Black Country and GBHMA.
* Given the huge housing requirements of the Black Country and the shared housing market between South Staffordshire and the Black Country, it is considered that suitable urban extension sites located within South Staffordshire District would be the logical and sensible locations to meet any remaining unmet housing need. In terms of the relevance of this point to the Black Country Review, it will be important for the Black Country authorities to collaborate with South Staffordshire on cross-boundary issues, and to identify suitable extension sites to the Black Country built area which fall within the planning jurisdiction of South Staffordshire District..
9.4 Taylor Wimpey look forward to engaging with the Black Country Authorities and providing additional information, as required, to assist the Council in progressing the preparation of an up to date Local Plan.

Support

Black Country Core Strategy Issue and Option Report

Representation ID: 3176

Received: 14/12/2017

Respondent: CJZ Design Limited

Agent: SLR Consulting

Representation Summary:

SLR supports the premise of the of Option 1A provided that the strategy is updated to reflect the findings of the Greater Birmingham and Black Country Housing Market Area (HMA) Strategic Growth Study and any findings it may have that influence both housing needs within the HMA and the potential release of Green Belt land. SLR does, however, view that it would be more sustainable to accommodate housing allocations within the Green Belt rather than larger employment land sites.

Finally, consideration must be given to the deliverability of larger housing sites within the Growth Networks and Regeneration Corridors, especially given the constrained nature of these sites and their longer term timescales for release. The Core Strategy has already identified that there have been significant delays to bringing forward such sites given the costs of land assembly and remediation. As such, there will need to be an interim solution to meet short term housing need whilst the larger strategic brownfield sites are being released for development.

Full text:

See the attached Issues and Options Report Consultation - Land at Tipton Road and Setton Drive, Woodsetton/Sedgley.