Object
Draft Black Country Plan
Representation ID: 44801
Received: 11/10/2021
Respondent: Consortium of Developers
Number of people: 4
Agent: Turley Associates
Existing Allocations in Wolverhampton
5.28 As with Dudley, the 2,248 homes due to deliver in the Strategic Centre in Wolverhampton (which is the City Centre) are identified in an Area Action Plan, the latest version of which was adopted in 2016. The aim was for 2,043 homes to be delivered by 2026, with 475 of these by 2021.
5.29 In this case, the AAP does not even explicitly identify all the sites it relies on to deliver these homes. The Core Strategy targets for the AAP area include 2,130 commitments and 1,100 unidentified sites in the City Centre, and 560 homes on employment land to the south of the City Centre.
5.30 At the time of AAP adoption (2016) there had been 470 homes completed in the City Centre and there were 163 homes on committed sites, according the latest SHLAA (2020) there are still 163 commitments to be delivered by 2021. The latest Wolverhampton SHLAA (2020) states that there had been 948 completions in the City Centre between 2006 and 2019. Although the documentation is not explicit, it appears that delivery has fallen behind what was expected and relied on.