Object

Black Country Core Strategy Issue and Option Report

Representation ID: 394

Received: 07/09/2017

Respondent: Bloor Homes

Agent: Harris Lamb

Representation Summary:

No, we consider that the review needs to go further than a partial review.

Full text:

No, we consider that the review needs to go further than a partial review. Whilst the overall strategy of supporting further housing and employment growth with an emphasis on regeneration should be supported, it is clear that the desire to achieve major regeneration of identified areas has failed, for a variety of reasons relating to ownership, viability, market perceptions, site suitability etc.

The approach of the BCCS is based upon the revoked West Midlands Regional Spatial Strategy and it was produced prior to the adoption of the Framework. Furthermore, there was a significant shift in the amount of housing and employment land that is required that the Black Country Core Strategy needs to respond to. The emerging Core Strategy is also being prepared in a significantly different economic climate to the adopted document. These factors clearly indicate that a new approach should be taken to the development through the Core Strategy review.

The adopted Core Strategy seeks to deliver development by focusing the majority of new housing employment land requirements through a Growth Network and a series of Regeneration Corridors. It is, however, advised in the "delivery" section of the emerging Core Strategy (paragraphs 2.5 to 2.11) that the level of concentration in the growth corridors is "less than participated". One of the reasons for this is that more windfall sites will come forward than expected outside of the Growth Network. These windfall sites have assisted in housing delivery. Appendix C - Black Country Monitoring Summary, of the emerging plan advises that there is currently a shortfall of 3,039 dwellings in the Black Country to meet the housing requirement set by the adopted Core Strategy for the plan period to date. The windfall developments have effectively bolstered housing delivery whilst the housing allocations within the Regeneration Corridors and Growth Network generally have under delivered.

The Growth Network and Regeneration Corridor approach in the adopted Core Strategy is based upon the delivery of a significant quantum of housing on surplus employment land. The emerging plan advises in paragraph 2.5 that it is transpired that there is "not as much surplus employment land suitable for housing as anticipated". This is partly because the economy has strengthened and local firms are more robust than expected and partly because the sites are more affected by constraints than expected.

It is, therefore, our view that the approach of the adopted Core Strategy seeking to focus new residential development on poor quality employment land will not deliver the housing numbers required. In addition, as referred to in response to Question 4, new evidence identifies a significant requirement for additional employment land. As a consequence, the emerging Core Strategy should prepare an approach that places less reliance on the delivery of housing on employment land.

This means that the trajectory of the current plan is unlikely to be met since it now relies heavily on windfall sites, some of which are not suited to market requirements or are also subject to contribution and viability problems.

A new strategy is required which will provide a range of sites on both brownfield and greenfield (Green Belt) opportunities which are capable of being delivered in the new plan period and which will be attractive to the market.

We consider that a portfolio of new strategic sites would be identified in the emerging plan with capacities of 150 to 500 units plus. Such sites are more likely to be deliverable in the plan period although we do see the opportunity for a major mixed use urban extension to the south west of Junction 3 of the M5.

The identification of a range of sites will ensure that there is adequacy of supply and will avoid reliance on major urban extensions which can experience difficulties in terms of funding and timing.

We also consider that a realistic approach needs to be taken to sites coming forward and that a non implementation rate needs to be identified in respect of the windfall element of the housing requirement. This is particularly important given the considerable reliance given to windfall sites in the current supply figure and the acknowledgement with Review department that there have been problems experienced in bring forward brownfield sites.

We also believe that the strategy needs to encompass wider discussions with the adjoining Authorities to the Black Country, including South Staffordshire, Wyre Forest and Bromsgrove whose administrative boundaries adjoin or are close to the Black Country and where there are functional and geographical linkages.

We believe it is important that the Green Belt releases are phased for the early part of the plan period so that a mix of sites can be made available to meet the needs of the market. This will also help with early delivery and will help Local Authorities to maintain a five year housing land supply and also to boost significantly the supply of housing in accordance with the requirements of paragraph 47 of the Framework.

This approach is entirely consistent with the requirement of the Framework. The Framework requires Local Authorities to "be significantly" for supply of housing land. In accordance with the requirements of footnotes 11 and 12 of the Framework, housing sites would be "deliverable and available" in order to be allocated. The employment led regeneration approach of the emerging Core Strategy has failed this test at least to some degree.

Indeed, it is specifically advised that the higher than anticipated levels of windfall development do "conceal a delivery challenge". There is a large number of major housing sites concentrating the Growth Network. However, many of these sites have multiple constraints and financial assistance is required for them to come forward (paragraph 2.10). This includes 300 hectares of occupied employment land which has been allocated for housing. This approach brings issues of viability due to the cost of land assembly, business relocation and land remediation. Significant amounts of external funding are required to deliver this. Whilst some funding is available, it is not sufficient to cover the costs of compulsory purchase, which may be necessary on many sites. The sites are clearly not "deliverable" or "developable" in the context of the allocations test put in place by paragraph 47 of the Framework. To be considered deliverable, sites should be available for development now and be achievable for a realistic prospect that housing will be delivered on the site. To be considered developable, sites should be in a suitable location for housing development and there should be a reasonable prospect that the site is available and could be viably developed at the point envisaged. This is not the case with a significant number of the employment allocations within the adopted development plan, by the emerging Core Strategies own omission.

Finally, we consider that a more robust SHMA should be undertaken focusing on the Black Country and the adjoining Authorities. The housing market areas should not be confined to the administrative boundaries of the Black Country Authorities.