Support

Black Country Core Strategy Issue and Option Report

Representation ID: 367

Received: 07/09/2017

Respondent: Clowes Developments

Agent: Harris Lamb

Representation Summary:

please see above

Full text:

We have commented previously that the new plan will need to shift the emphasis away from urban regeneration to a more balanced provision of brownfield and greenfield sites. Part of a problem with the delivery of brownfield sites in the urban area are that they are returning to an active employment use. The adopted Core Strategy sought to direct new residential development to what was, at the time of its preparation, redundant employment land. These employment sites are now developing a new lease of life. As such, the capacity for residential development on brownfield land is highly limited and these areas are self regenerating into active employment sites.

Furthermore, given the problems in bringing forward any brownfield sites for a variety of reasons, it will be necessary to ensure that greenfield opportunities can be brought forward in the early part of the plan period in order to ensure an appropriate supply of land.

We should add that our experience of working in the Black Country is that Local Authorities do need to understand the constraints of developing in the Black Country, particularly in respect of highway and urban design standards. Many of the sites are difficult to develop and the Council's will need to apply development management considerations flexibly in order to ensure that sites can come forward. Many brownfield sites present physical and topographic challenges which can influence the formation of layout and design solutions. Furthermore, some of these sites will not be in locations which are attractive to those seeking new housing. All of these factors need to be taken into account when individual planning applications are assessed and Council's should apply flexibility when discussing design solutions, including transportation solutions, with applicants.