Object
Black Country Core Strategy Issue and Option Report
Representation ID: 334
Received: 07/09/2017
Respondent: Barberry Developments Ltd
Agent: Harris Lamb
The release of greenfield/Green Belt land also has significant costs associated with it. It is more likely to require new below ground infrastructure to be provided such as drains, power supply etc. Other physical and social infrastructure contributions will also be required such as education, transport etc. Therefore, greenfield sites are not necessarily more able to contribute more significantly to affordable housing than brownfield sites. We believe, therefore, that a flat rate of 25% across the BCCS area should be adopted.
The release of greenfield/Green Belt land also has significant costs associated with it. It is more likely to require new below ground infrastructure to be provided such as drains, power supply etc. Other physical and social infrastructure contributions will also be required such as education, transport etc. Therefore, greenfield sites are not necessarily more able to contribute more significantly to affordable housing than brownfield sites. We believe, therefore, that a flat rate of 25% across the BCCS area should be adopted.