Support
Black Country Core Strategy Issue and Option Report
Representation ID: 3226
Received: 14/12/2017
Respondent: CJZ Design Limited
Agent: SLR Consulting
Representation Summary:
SLR supports the proposed changes relating to environmental infrastructure and how this can be incorporated within housing sites. Indeed, some consideration has already been given to this within the Promotional Document prepared in support of the site which is being sought as a Green Belt release. Such
environmental infrastructure will be key to the deliverability of the site in terms of landscaping, ecological mitigation and biodiversity gains.
Full text:
See the attached Issues and Options Report Consultation - Land at Tipton Road and Setton Drive, Woodsetton/Sedgley.