Object
Black Country Core Strategy Issue and Option Report
Representation ID: 3192
Received: 14/12/2017
Respondent: CJZ Design Limited
Agent: SLR Consulting
Representation Summary:
SLR considers that Policy DEL1 should be updated to accommodate the necessary infrastructure requirements to allow for the release of sites within the Green Belt. Much of these requirements can be assessed during the completion of the Green Belt Review and subsequent review of housing sites within the Call for Sites and any SHLAA.
Full text:
See the attached Issues and Options Report Consultation - Land at Tipton Road and Setton Drive, Woodsetton/Sedgley.