Object
Draft Black Country Plan
Representation ID: 23555
Received: 11/10/2021
Respondent: St Modwen SL&R
Agent: RPS
Representation Summary:
Paragraph 9.11 - 9.20 - "The findings of the site-specific Green Belt Assessment undertaken by RPS indicate that LUC have erred in the application of their methodology through identifying the Site as part of the wider parcel B117A as a result of the stage 1 process, having not taken account of the differences in contribution to the purposes of the Green Belt between the Site and land further to the north. "