Black Country Core Strategy Issue and Option Report
Representation ID: 179
Received: 08/09/2017
Respondent: Blackmoor Group
Agent: Blackmoor Group
Support is given to Spatial Option H1.
Support is given to Spatial Option H1. These sites often require less infrastructure than larger sites and have shorter delivery timescales. They also provides sites suitable for a broader range of housebuilders and allow smaller villages to thrive by providing a wider choice of housing. This is all endorsed in the Housing White Paper.
To avoid piecemeal release of Green Belt sites, a threshold should be set of approximately 1 hectare. These should be located adjacent to villages and close to the urban edge, where there is access to facilities and/or include brownfield sites which are presently washed with the Green Belt designation.