Black Country Core Strategy Issue and Option Report

Question 9 - Do you agree that Policies CSP1 and CSP2 should be retained and updated to reflect new evidence and growth proposals outside the Growth Network? Yes/No; If not, what changes do you think

Representation ID: 2633

Received: 08/09/2017

Respondent: Wallace Land Investments

Agent: Pegasus Group

Representation Summary:

5.5 It is agreed that the policies could remain, if the development requirements and related changes are made to ensure the policies are consistent with the overall strategy. The changes relate to both the quantum of development (homes, employment and retail space), the location of development (within and beyond the existing Regeneration Corridors) and the type of development (brownfield, greenfield and on land removed from the Green Belt). It is considered that references should be made to urban extensions (on land removed from the Green Belt) in Policy CSP2 specifically, to highlight the important contribution that such sites will make to meeting the development requirements of the Plan.
5.6 As touched upon above and throughout these Representations, it is clear that given the significant amounts of housing that will need to be delivered across the Black Country, there will be a need for a switch from a sole focus on brownfield regeneration to a need for a dual approach that focuses on both brownfield and strategic greenfield/green belt release. The focus on Regeneration Corridors and Strategic Centres was very much a product of the times and housing needs of when the Core Strategy was first adopted in 2011. In light of the emerging, higher housing requirements, it is clear that there is a need for a fresh approach to the spatial distribution of growth across the Black Country. Whilst reference to strategic centres and regeneration corridors could remain, this remit needs to be expanded to reflect the evident need for urban extensions outside of the existing growth networks. Indeed, Sustainable Urban Extensions both within the Black Country administrative boundaries and within the adjacent South Staffordshire District will be required to meet emerging housing requirements. These policies should therefore be expanded to include references to urban extensions in the form of green field land outside of the defined urban area, to ensure that sufficient certainty is built into the plan that the housing needs of the area will be met. Amending these policies to make it clear that both brown field and green field land is required will ensure that a fresh approach to spatial distribution across the Black Country Area would be secured and delivered.

Comment

Black Country Core Strategy Issue and Option Report

Question 15b - Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details.

Representation ID: 2635

Received: 08/09/2017

Respondent: Wallace Land Investments

Agent: Pegasus Group

Representation Summary:

5.7 On a separate note, whilst a point mostly relating to the South Staffordshire Local Plan to which separate representations will be made, it is considered that the currently adopted approach to spatial distribution in South Staffordshire will need to be re-assessed. Given the huge housing requirements of the Black Country and the shared housing market between South Staffordshire and the Black Country, it is considered that suitable urban extension sites located within South Staffordshire District would be the logical and sensible locations to meet any remaining unmet housing need. In terms of the relevance of this point to the Black Country Review, it will be important for the Black Country authorities to collaborate with South Staffordshire on cross boundary issues, and to identify suitable extension sites to the Black Country built area which fall within the planning jurisdiction of South Staffordshire District. It is welcomed that this approach is planned to be undertaken, by virtue of the forthcoming Green Belt Review which will be a joint exercise between the Black Country Authorities and South Staffordshire District.

Support

Black Country Core Strategy Issue and Option Report

Question 10 - In continuing to promote growth within the Growth Network, is there a need to amend the boundaries of any of the Regeneration Corridors in the existing Core Strategy? Yes/No; If so, whic

Representation ID: 2636

Received: 08/09/2017

Respondent: Wallace Land Investments

Agent: Pegasus Group

Representation Summary:

5.8 As highlighted previously, the key to understanding where the most appropriate employment/ housing locations are within the Growth Network and Corridors will be determined through a qualitative assessment of allocated employment sites. It is understood an updated assessment has been undertaken and such work, complete with responses to the Call for Sites consultation, will provide the Black Country authorities with evidence to determine the urban capacity for housing, which may include transferring some employment land to housing as well as housing land to employment. This work will then outline the number of dwellings to be accommodated beyond the existing Growth Network within the Green Belt.
5.9 It is welcomed that the Issues and Options Draft recognises the need to release Green Belt in all scenarios proposed.

Support

Black Country Core Strategy Issue and Option Report

Question 11a - Do you support Strategic Option 1A? Yes/No; If yes, please explain why.

Representation ID: 2637

Received: 08/09/2017

Respondent: Wallace Land Investments

Agent: Pegasus Group

Representation Summary:

5.8 As highlighted previously, the key to understanding where the most appropriate employment/ housing locations are within the Growth Network and Corridors will be determined through a qualitative assessment of allocated employment sites. It is understood an updated assessment has been undertaken and such work, complete with responses to the Call for Sites consultation, will provide the Black Country authorities with evidence to determine the urban capacity for housing, which may include transferring some employment land to housing as well as housing land to employment. This work will then outline the number of dwellings to be accommodated beyond the existing Growth Network within the Green Belt.
5.9 It is welcomed that the Issues and Options Draft recognises the need to release Green Belt in all scenarios proposed.

Support

Black Country Core Strategy Issue and Option Report

Question 11b - If no, do you support Option 1B? Yes/No; If yes, please explain why. If you support the release of further employment land for housing, what should the characteristics of these employm

Representation ID: 2638

Received: 08/09/2017

Respondent: Wallace Land Investments

Agent: Pegasus Group

Representation Summary:

5.8 As highlighted previously, the key to understanding where the most appropriate employment/ housing locations are within the Growth Network and Corridors will be determined through a qualitative assessment of allocated employment sites. It is understood an updated assessment has been undertaken and such work, complete with responses to the Call for Sites consultation, will provide the Black Country authorities with evidence to determine the urban capacity for housing, which may include transferring some employment land to housing as well as housing land to employment. This work will then outline the number of dwellings to be accommodated beyond the existing Growth Network within the Green Belt.
5.9 It is welcomed that the Issues and Options Draft recognises the need to release Green Belt in all scenarios proposed.

Object

Black Country Core Strategy Issue and Option Report

Question 12a - Do you support Spatial Option H1? Yes/No; What criteria should be used to select suitable sites? e.g. ability to create a defensible new green belt boundary, size, access to existing re

Representation ID: 2640

Received: 08/09/2017

Respondent: Wallace Land Investments

Agent: Pegasus Group

Representation Summary:

5.10 Given the scale of the housing need, there is concern that the development requirements could not be met with just one of the suggested options presented and, therefore, a combination of both options will be necessary.
5.11 To be in the best possible position to significantly boost the amount of housing and meet the development requirements in the Black Country, in accordance with the NPPF, it is advised that opportunities to both round off edges of the Green Belt and Sustainable Urban Extensions are proposed in the Preferred Options Draft Core Strategy. As highlighted within the Issues and Options Draft, there are challenges and opportunities that come with both types of development, for example from a delivery perspective, smaller sites will come forward more quickly due to the nature of these being straight forward proposals (with limited infrastructure necessary and one or few land owners) and larger sites will ultimately take longer as they are more complex (with multiple land uses, infrastructure and land owners). This fact has been evidenced by Nathaniel Lichfield and Partners (now known as Lichfields) within their report 'Start to Finish' who concluded that the average planning approval period of schemes of 2,000+ dwellings is 6.1 years and the annual average build out rate is 161 dwellings per annum. These figures demonstrate the need to have a number of sites of different sizes and in different locations removed from the Green Belt. The report also identifies, with regard to housing delivery, that 50% more homes per annum are delivered on average on large greenfield sites than large brownfield sites. This is a significant benefit of including greenfield sites within the Preferred Option and will assist to secure its delivery.
5.12 In terms of the locations for removing land from the Green Belt, this should be informed by the Strategic Growth Study and a Black Country Review of the Green Belt. The more detailed study will provide an assessment of land parcels against the purposes of the Green Belt and is likely to recommend that those that compromise the purposes the least will be shortlisted for further consideration to be removed from the Green Belt. It is advised that the next stage should be a consideration of the shortlisted sites based on their suitability (i.e. are the neighbouring uses compatible, would any previous land uses prevent the development of the site), sustainability (i.e. proximity to/ ability to provide local services/ public transport/ employment opportunities) and deliverability (i.e. whether the site is available, being promoted for development, has no barriers to coming forward etc.) credentials. Clearly each site will fair differently against such criteria and the Call for Sites submission will assist the Council to come to a decision on the preferred sites. It is advised that the Black Country authorities should be mindful of the opportunities, through infrastructure and design, that development can bring that will enhance the diversity and character of a particular location.
5.13 In terms of the characteristics of a Sustainable Urban Extension, this is likely to vary depending on the location of each site. For example, some may be more urban and others suburban in their character and would, therefore, provide a different land use offer. It is important that each are considered on a site by site basis to ensure that any subsequent allocation delivers a successful development. It is important that the developer responsible for promoting the site helps to influence what is ultimately delivered. Often what is proposed on site has been informed by housing market intelligence undertaken by sales experts at development companies and, therefore, should be taken into account. Particularly given recent experience in the down turn in the apartment market, it is important that sites are allocated for the right type and mix of housing to ensure that it will be delivered, occupied and successful.
5.14 In the more suburban locations, it is suggested that Sustainable Urban Extensions should look to provide a different offer to potentially what exists in the Strategic Centres and Regeneration Corridors, such as a mix of larger and lower density homes, which will attract those households that in the past have migrated elsewhere. Given the emphasis on delivering more high density homes in the Strategic Centres, it is important that this housing mix is offset by more larger homes in appropriate locations. Otherwise, there is a concern that the Black Country will have a disproportional amount of small homes, which will further encourage more families to migrate elsewhere and not meet the aspiration to diversify the wider HMA.

Object

Black Country Core Strategy Issue and Option Report

Question 12b - Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details (please submit specific sites through the 'call for sites' form).

Representation ID: 2641

Received: 08/09/2017

Respondent: Wallace Land Investments

Agent: Pegasus Group

Representation Summary:

5.10 Given the scale of the housing need, there is concern that the development requirements could not be met with just one of the suggested options presented and, therefore, a combination of both options will be necessary.
5.11 To be in the best possible position to significantly boost the amount of housing and meet the development requirements in the Black Country, in accordance with the NPPF, it is advised that opportunities to both round off edges of the Green Belt and Sustainable Urban Extensions are proposed in the Preferred Options Draft Core Strategy. As highlighted within the Issues and Options Draft, there are challenges and opportunities that come with both types of development, for example from a delivery perspective, smaller sites will come forward more quickly due to the nature of these being straight forward proposals (with limited infrastructure necessary and one or few land owners) and larger sites will ultimately take longer as they are more complex (with multiple land uses, infrastructure and land owners). This fact has been evidenced by Nathaniel Lichfield and Partners (now known as Lichfields) within their report 'Start to Finish' who concluded that the average planning approval period of schemes of 2,000+ dwellings is 6.1 years and the annual average build out rate is 161 dwellings per annum. These figures demonstrate the need to have a number of sites of different sizes and in different locations removed from the Green Belt. The report also identifies, with regard to housing delivery, that 50% more homes per annum are delivered on average on large greenfield sites than large brownfield sites. This is a significant benefit of including greenfield sites within the Preferred Option and will assist to secure its delivery.
5.12 In terms of the locations for removing land from the Green Belt, this should be informed by the Strategic Growth Study and a Black Country Review of the Green Belt. The more detailed study will provide an assessment of land parcels against the purposes of the Green Belt and is likely to recommend that those that compromise the purposes the least will be shortlisted for further consideration to be removed from the Green Belt. It is advised that the next stage should be a consideration of the shortlisted sites based on their suitability (i.e. are the neighbouring uses compatible, would any previous land uses prevent the development of the site), sustainability (i.e. proximity to/ ability to provide local services/ public transport/ employment opportunities) and deliverability (i.e. whether the site is available, being promoted for development, has no barriers to coming forward etc.) credentials. Clearly each site will fair differently against such criteria and the Call for Sites submission will assist the Council to come to a decision on the preferred sites. It is advised that the Black Country authorities should be mindful of the opportunities, through infrastructure and design, that development can bring that will enhance the diversity and character of a particular location.
5.13 In terms of the characteristics of a Sustainable Urban Extension, this is likely to vary depending on the location of each site. For example, some may be more urban and others suburban in their character and would, therefore, provide a different land use offer. It is important that each are considered on a site by site basis to ensure that any subsequent allocation delivers a successful development. It is important that the developer responsible for promoting the site helps to influence what is ultimately delivered. Often what is proposed on site has been informed by housing market intelligence undertaken by sales experts at development companies and, therefore, should be taken into account. Particularly given recent experience in the down turn in the apartment market, it is important that sites are allocated for the right type and mix of housing to ensure that it will be delivered, occupied and successful.
5.14 In the more suburban locations, it is suggested that Sustainable Urban Extensions should look to provide a different offer to potentially what exists in the Strategic Centres and Regeneration Corridors, such as a mix of larger and lower density homes, which will attract those households that in the past have migrated elsewhere. Given the emphasis on delivering more high density homes in the Strategic Centres, it is important that this housing mix is offset by more larger homes in appropriate locations. Otherwise, there is a concern that the Black Country will have a disproportional amount of small homes, which will further encourage more families to migrate elsewhere and not meet the aspiration to diversify the wider HMA.

Object

Black Country Core Strategy Issue and Option Report

Question 13a - Do you support Spatial Option H2? Yes/No; What should the characteristics of Sustainable Urban Areas (SUEs) be? e.g. minimum/ maximum size, mix of uses, mix of housing types, accessibi

Representation ID: 2642

Received: 08/09/2017

Respondent: Wallace Land Investments

Agent: Pegasus Group

Representation Summary:

5.10 Given the scale of the housing need, there is concern that the development requirements could not be met with just one of the suggested options presented and, therefore, a combination of both options will be necessary.
5.11 To be in the best possible position to significantly boost the amount of housing and meet the development requirements in the Black Country, in accordance with the NPPF, it is advised that opportunities to both round off edges of the Green Belt and Sustainable Urban Extensions are proposed in the Preferred Options Draft Core Strategy. As highlighted within the Issues and Options Draft, there are challenges and opportunities that come with both types of development, for example from a delivery perspective, smaller sites will come forward more quickly due to the nature of these being straight forward proposals (with limited infrastructure necessary and one or few land owners) and larger sites will ultimately take longer as they are more complex (with multiple land uses, infrastructure and land owners). This fact has been evidenced by Nathaniel Lichfield and Partners (now known as Lichfields) within their report 'Start to Finish' who concluded that the average planning approval period of schemes of 2,000+ dwellings is 6.1 years and the annual average build out rate is 161 dwellings per annum. These figures demonstrate the need to have a number of sites of different sizes and in different locations removed from the Green Belt. The report also identifies, with regard to housing delivery, that 50% more homes per annum are delivered on average on large greenfield sites than large brownfield sites. This is a significant benefit of including greenfield sites within the Preferred Option and will assist to secure its delivery.
5.12 In terms of the locations for removing land from the Green Belt, this should be informed by the Strategic Growth Study and a Black Country Review of the Green Belt. The more detailed study will provide an assessment of land parcels against the purposes of the Green Belt and is likely to recommend that those that compromise the purposes the least will be shortlisted for further consideration to be removed from the Green Belt. It is advised that the next stage should be a consideration of the shortlisted sites based on their suitability (i.e. are the neighbouring uses compatible, would any previous land uses prevent the development of the site), sustainability (i.e. proximity to/ ability to provide local services/ public transport/ employment opportunities) and deliverability (i.e. whether the site is available, being promoted for development, has no barriers to coming forward etc.) credentials. Clearly each site will fair differently against such criteria and the Call for Sites submission will assist the Council to come to a decision on the preferred sites. It is advised that the Black Country authorities should be mindful of the opportunities, through infrastructure and design, that development can bring that will enhance the diversity and character of a particular location.
5.13 In terms of the characteristics of a Sustainable Urban Extension, this is likely to vary depending on the location of each site. For example, some may be more urban and others suburban in their character and would, therefore, provide a different land use offer. It is important that each are considered on a site by site basis to ensure that any subsequent allocation delivers a successful development. It is important that the developer responsible for promoting the site helps to influence what is ultimately delivered. Often what is proposed on site has been informed by housing market intelligence undertaken by sales experts at development companies and, therefore, should be taken into account. Particularly given recent experience in the down turn in the apartment market, it is important that sites are allocated for the right type and mix of housing to ensure that it will be delivered, occupied and successful.
5.14 In the more suburban locations, it is suggested that Sustainable Urban Extensions should look to provide a different offer to potentially what exists in the Strategic Centres and Regeneration Corridors, such as a mix of larger and lower density homes, which will attract those households that in the past have migrated elsewhere. Given the emphasis on delivering more high density homes in the Strategic Centres, it is important that this housing mix is offset by more larger homes in appropriate locations. Otherwise, there is a concern that the Black Country will have a disproportional amount of small homes, which will further encourage more families to migrate elsewhere and not meet the aspiration to diversify the wider HMA.

Comment

Black Country Core Strategy Issue and Option Report

Question 13b - What infrastructure do you think would be needed for different sizes of SUEs?

Representation ID: 2643

Received: 08/09/2017

Respondent: Wallace Land Investments

Agent: Pegasus Group

Representation Summary:

5.15 The type of infrastructure needed will vary depending on the different location and size of each site and must be compliant with paragraph 122 of the CIL Regulations that requires planning obligations (which applies to most infrastructure) to be necessary to make the development acceptable in planning terms; directly related to the development; and fairly and reasonably related in scale and kind to the development.
5.16 With the above in mind, however, provision for open space (both formal and informal), local centre and potentially a primary school should be considered for sites in excess of 1,000 homes.

Object

Black Country Core Strategy Issue and Option Report

Question 13d - Do you think that the Core Strategy should set out detailed guidance for the development of SUEs (e.g. type and tenure of housing, specific infrastructure required), rather than details

Representation ID: 2644

Received: 08/09/2017

Respondent: Wallace Land Investments

Agent: Pegasus Group

Representation Summary:

5.19 For the reasons outlined above, relating to considering existing local circumstances and CIL Regulation requirements in respect of any charging schedule and planning obligation requirements, it is advised that detailed guidance for the development of SUEs should not be specified within the Black Country Core Strategy as each site will vary and deserves a more detailed consideration, alongside the developer, at the local level.