Black Country Core Strategy Issue and Option Report

Search representations

Results for Bloor Homes search

New search New search

Object

Black Country Core Strategy Issue and Option Report

Question 99c - Do you think that national space standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropria

Representation ID: 2161

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Harris Lamb

Representation Summary:

Do not agree that National Space standards should be introduced.

Attachments:

Object

Black Country Core Strategy Issue and Option Report

Question 99d - Do you think that the standards should be different for brownfield and greenfield sites? Yes/No; If yes, please explain how and why

Representation ID: 2162

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Harris Lamb

Representation Summary:

Do not agree that different standards should apply to brownfield and greenfield sites.

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

Question 101a - Do you support the proposed changes relating to Flood Risk, Sustainable Drainage and Urban Heat Island effects? Yes/No; Further comments?

Representation ID: 2163

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Harris Lamb

Representation Summary:

A flexible approach should be considered for SuDS provision on sites as this may have implications on site layout and viability. A more joined up approach should be considered to adopt SuDS as part of wider open space area.

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

Question 103a - Do you think that Policy ENV7 should be changed to allow increased energy efficiency standards to be accepted in lieu of renewable energy provision for non-domestic buildings? Yes/No;

Representation ID: 2164

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Harris Lamb

Representation Summary:

The benefits of higher energy efficiency should be taken into account when considering renewable energy requirements.

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

Question 1 - Do you agree that the Core Strategy review should be a partial review, retaining and stretching the existing spatial strategy and updating existing policies? Yes/No; If not, what do you

Representation ID: 2558

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Pegasus Group

Representation Summary:

2.4 In response to Question 1 and whether it should be a partial review or not, whilst the existing strategy identifies the most sustainable locations for growth in the context of delivering development requirements identified by the Regional Strategy (RS), there is now a new and much bigger challenge ahead in meeting the arising needs for homes identified by the latest evidence and there is concern that the existing spatial strategy may not facilitate the delivery of these needs. The Black Country authorities, therefore, need to be mindful of this and not attempt to put "a square peg in a round hole".
2.5 It is our view that urban regeneration can be achieved whilst pursuing development on the urban edge. Indeed, the scale of housing need is so large that both must be encouraged in order to meet current and arising housing needs within the Black Country.
2.6 It is extremely important that in reviewing the Core Strategy it fully takes account of and facilitates the delivery of strategic economic plans, as recognised in paragraph 1.15. All too often these strategies are ignored and, accordingly, development plans could effectively frustrate economic growth from being realised.
2.7 In terms of the Plan period proposed in paragraph 1.17, whilst a 15-year time period from adoption is appropriate, there is concern that the preparation of plans is often delayed (due to reasons beyond the control of the LPAs) and it may be prudent to stretch the period further to prevent such an issue from occurring.
2.8 It is welcomed that the Issues and Options document recognises that it will not be possible to accommodate all future development needs within the urban area and that an examination of the potential for development land outside the existing urban area, which is effectively land within the Green Belt, will take place as part of the Core Strategy review process.

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

2. The Black Country Today - the Existing Strategy

Representation ID: 2559

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Pegasus Group

Representation Summary:

3.1 As set out within this section, the delivery of both employment and housing land has not come forward as originally envisaged in part due to the after effects of the recession. Surplus employment land which might have been available for housing has not come forward due to a strengthening economy and local firms being more robust than anticipated. In addition, the range of locations available has not in all cases met with market expectations as to where people want to live.
3.2 In terms of the employment land, it is important that sufficient land is provided for new employment and that there is not an overreliance on land that is currently in use. It is impressive that despite generally poor economic performance local businesses have performed well. Should the economy significantly improve within the Plan period in line with LEP aspirations (considered later in this response), there is concern that it may become difficult to transfer a wide range of existing employment locations to housing allocations. It is appropriate, therefore, for the Council to ensure the evidence contained within the Strategic Housing and Employment Land Availability Assessment is reviewed and updated regularly. This will enable the land supply to be responsive to arising needs and not rigidly be wedded to delivering commitments that are unlikely to be realised.
3.3 What is further emphasised by the analysis in this section is that urban regeneration cannot be delivered quickly and that there are a number of factors beyond the control of the Black Country authorities that may have implications for the delivery of the strategy. This further emphasises the need for a mix of types of sites (brownfield, brownfield compulsory purchase, greenfield and Green Belt) of different forms of development (high density, mid and low density family homes) in a variety of locations, which will maximise the opportunities to deliver a successful Local Plan.
3.4 Finally, in respect of the proposal to maintain 300 hectares of employment land that will become vacant by way of general churn over the Plan period. Whilst the principle is considered acceptable, there should be appropriate evidence to support the assumption.
3.5 Our experience is that there are employment sites that clients are looking to secure a residential allocation on that have not been identified thus far. In light of these changing circumstances, the Black Country authorities should ensure that the policy approach is flexible to allow sites in appropriate locations to be brought forward for housing throughout the Plan period and likewise, sites that have been allocated for housing but have not come forward should be removed from the supply.

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

3. The Strategic Challenges and Opportunities

Representation ID: 2560

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Pegasus Group

Representation Summary:

4.1 It is welcomed that the Black Country authorities are updating their evidence base. Indeed, the adopted Core Strategy took the development requirements from the adopted Regional Strategy (RS), which has since been revoked and is unquestionably out of date. Since the RS was published there has been a number of population and household projections published showing increasing dwelling requirements in the Black Country, which were largely ignored and, therefore, it should come as no surprise that there is a significant increase in forming households.
4.2 In terms of the list of evidence either prepared or due to be completed, it appears to be sufficiently comprehensive.
4.3 A separate review of the housing evidence based, including the Strategic Housing Market Assessment for the Black Country and South Staffordshire, is contained at Appendix A. The key conclusions arising from the report as summarised as follows:
* In determining the OAN, there are concerns with regard to the SHMA methodology and it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline.
* There is concern that the economic growth scenarios do not use the latest economic forecast data and that the methodology translating the job growth into dwelling growth is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances and also more aspirational job growth targets, such as those arising from the SEP.
* In terms of providing uplifts for market signals, a 25% uplift for South Staffs is appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, it should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack within the housing market and prevent house prices from increasing at an accelerated rate.
4.4 In addition, consideration of the Housing Background Report is also contained in the Housing Evidence Based Review Paper contained at Appendix A. The key findings from reviewing the evidence is set out below:
* Clearly a lot of work is yet to be done to determine what the housing land supply position is in the Black Country. Given that much of the existing evidence is based on the adopted Core Strategy, it is recognised that the SHLAAs across the four authorities will need to be updated, both in terms of revising the methodology and range of sites assessed, to reflect a potentially different approach to locating development.
* It is commendable that the Housing Background Report has examined existing sources of supply in an attempt to provide additional homes from sites within the urban area. There is concern, however, that by changing policies, for example, to increase the minimum density on sites has wider policy implications to take into account than simply increasing the number of homes.
* The Housing Background Report suggests a continued allowance for larger windfall sites. It is suggested that it is inappropriate to include an allowance for this source as there is no certainty that this land will come forward for development.
* Other sources, such as converting employment sites to residential sites, based on the evidence presented and feedback from the development industry, it is known that there are employment sites functioning well as employment sites but are to be converted to residential and other employment sites that are unoccupied and undesirable that are to be retained as employment sites. Clearly, there is a mismatch between employment land need and employment land supply. It is advised that the qualitative assessment of employment informs future land supply recommendations and allocations are revised where necessary.
4.5 As a result of the dwelling requirements generated by the SHMA and the land supply identified from the Housing Background Report, it is concluded that there in insufficient urban land to provide for the development requirements and that a Green Belt Review should be conducted. It is noted that scoping is underway and that the work is to be completed in mid-2018. It is hopeful that the development industry will be involved in defining the methodology of the work to ensure that it is conducted in a robust way.
4.6 Another very important piece of work to be taken into consideration will be the Greater Birmingham and Black Country HMA Strategic Growth Study. It is unclear at this stage what role the Black Country authorities will play in meeting the wider needs of Birmingham and, indeed, whether it can now contribute given that meeting the needs of the indigenous population will be a tall order. Further, there is uncertainty with regard to how far the study will go in identifying locations for growth and how this evidence will be taken forward in emerging Development Plans, particularly given that it is premature to the Green Belt Review for the wider Black Country area. It is our view that there are sites within the Green Belt that will provide sustainable locations for growth and that their removal will not compromise the purposes of the Green Belt and, accordingly it will remain purposeful and functional.

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

Question 2 - Do you think that the key evidence set out in Table 1 is sufficient to support the key stages of the Core Strategy review? Yes/No; If not, what further evidence is required and, if there

Representation ID: 2561

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Pegasus Group

Representation Summary:

4.7 It is considered that the evidence contained within Table 1 is comprehensive, however, as suggested above and below, a number of concerns have been highlighted and it is therefore suggested that these are addressed in order to improve the soundness of the next iteration of the Core Strategy Review.
4.8 It is welcomed that an updated qualitative assessment of employment land has been undertaken in order to identify if the sites are fit for purpose, alongside the quantitative employment land study. It has been identified that a number of employment land sites that have been suggested for residential land allocations remain in occupation as functioning employment sites. These sites should be removed from the housing land supply. Conversely, there are vacant employment land sites that have been marketed over a period of time where no market interest has been forthcoming and, therefore, it is recommended that these sites should be considered for housing delivery.
4.9 It is noted that Viability Studies are identified as evidence base documents that are still to be prepared. Whilst not specifically identified, it is recommended that affordable housing viability is a key matter that needs to be addressed as part of this evidence base to ensure the level suggested by the SHMA Part 2 is deliverable. If this is not the case, the delivery of both market and affordable housing could be compromised and prevent the successful delivery of any new strategy.

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

Question 3 - Do you agree that the housing need identified for the Black Country over the period 2014-36 in the SHMA, and the anticipated amount of supply, are appropriate and in line with national gu

Representation ID: 2562

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Pegasus Group

Representation Summary:

4.10 In terms of the extent of the sub market, which includes the Black Country and South Staffordshire, this is considered to be appropriate. It is recognised and welcomed that the Black Country authorities and South Staffordshire have jointly undertaken a SHMA for the sub area, which facilitates the preparation of an Issues and Options Core Strategy Review. There is concern, however, that the remaining constituent authorities within the wider Greater Birmingham Housing Market Area have not taken part and there is a danger that housing need for the whole HMA may not entirely be comprehensively captured due to the different time periods covered by the separate studies. It is advised that a SHMA, consistent with the guidance in the NPPF and Planning Practice Guidance, is prepared for the entire HMA over the same Plan period (as opposed to a housing needs study), which will properly consider all relevant factors in a consistent and comprehensive manner.
4.11 The OAN arrived at by the SHMA is generally appropriate in identifying the starting point for determining the dwelling requirement, however, it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline. There is concern that the economic growth scenarios contain potentially out of date employment forecasts and the methodology to determine appropriate dwelling requirements is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances. In addition, more aspirational job growth targets, such as those arising from the SEP, may not necessarily be appropriate for the Black Country (as discussed later in these representations).
4.12 In terms of providing an uplift for market signals, a 25% uplift for South Staffs is agreed to be appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, the application of such an uplift in South Staffordshire should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack or headroom within the housing market and prevent house prices from increasing at an accelerated rate, exacerbating issues of affordability.
4.13 Clearly, the evidence contained in the SHMA does not consider the potential to accommodate any of Birmingham City's housing needs and that this could result in increased dwelling requirements. We reserve our position in respect of this matter and await the publication of the HMA wide Strategic Housing Needs Study.
4.14 We shortly await a consultation publication from central Government in relation to providing a standardised methodology for generating dwelling requirements. This is anticipated in Autumn 2017. The Black Country authorities will need to take account of any proposed national policy changes identified through the consultation paper. We reserve our position on this matter, until the full details and implications for the Back Country are known. It is considered that, whilst a standard methodology will be helpful in identifying a baseline dwelling requirement, the consideration of long term trends and economic forecasts cannot be carried out in a mathematical calculation outside a demographic/ economic model. In light of this, the SHMA prepared for the sub-area could remain useful as evidence to inform the review of the Black Country Core Strategy.
4.15 In terms of meeting the dwelling requirements, it is understood that the 'Call for Sites' consultation will inform an updated SHLAA, which will assess sites both within and outside the urban area to determine the maximum number of dwellings that can be realistically delivered within the Black Country over the proposed Plan period. The Housing Background Report that has been published as part of the evidence base for the Issues and Options Core Strategy Review has considered assumptions contained within the SHLAA based on adopted policies and considers changes to the policies to boost the delivery of housing on existing sites. Whilst it is a commendable that the Black Country authorities are exploring all potential options to boost housing on urban land, there are wider implications of doing so and accordingly, caution is expressed in response to a number of the identified approaches proposed.
4.16 As confirmed in paragraph 3.15, it is extremely important that the Black Country authorities 'firm up' the housing supply in order to ensure that there is sufficient provision to meet the dwelling requirements. It is also considered appropriate to provide an additional buffer of housing land supply to provide a contingency when sites are delayed. As explained earlier in the Issues and Options Report, sites providing a total of 3,000 homes have not come forward as anticipated. It is considered that additional supply is required to provide flexibility and minimise any durations within the Plan period where the housing trajectory would otherwise dip.
4.17 In terms of the extent of a buffer for housing land, the Local Plan Expert Group suggested that additional land, equivalent to delivering 20% of the overall dwelling requirement, is added to the supply, which will provide a contingency of land to be used as and when necessary during the Plan period. It is suggested that this additional land will help ensure the dwelling delivery targets and housing needs are met in a timely manner, which will reduce the opportunity for households to become concealed or shared. Given the issues experienced in respect of delivery in the past, it could be argued that an increased buffer of circa 25% could be applied.
4.18 It is also appropriate to ensure that, as well as identifying the right amount of land, there is sufficient variety in the types of sites (brownfield, greenfield, Green Belt) are identified, reflecting different sizes, in a range of locations. This variety in provision will allow the best opportunity for multiple sites to come forward at the same time without market constraint and hence ensuring delivery targets are met. In addition, this approach will also provide market choice to existing and arising households looking to move into a new home in the Black Country, which will have wider social benefits (i.e. allow families to live nearby one another and provide an opportunity to diversify existing communities through providing alternative homes to the existing housing stock).
4.19 Indeed, as previously documented in the adopted Core Strategy, it is considered that the ambition to retain the young and professional population within the Black Country should be maintained and that suitable and attractive housing and complementary environments are encouraged.
4.20 Finally, it is welcomed that the Black Country authorities have agreed to test the dwelling requirement figures on an ongoing basis. It is hoped that the suggested changes/alternative scenarios suggested above are implemented in order to ensure the evidence base is robust and the resultant policies and proposals soundly based.

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

Question 4 - Do you consider the employment land requirement identified for the Black Country up to 2036 in the EDNA is appropriate and in line with national guidance? Yes/No; If not, please explain w

Representation ID: 2563

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Pegasus Group

Representation Summary:

4.21 The Core Strategy review intends to utilise the Economic Development Needs Assessment (EDNA) for the Black Country, published in May 2017, to inform future employment land requirements. The EDNA uses forecasts produced as part of the West Midlands Combined Authority Strategic Economic Plan (SEP) to calculate long-term growth, noting that the 'Super SEP Economy+ Scenario' is the preferred aspirational scenario. This scenario assumes average annual growth in employment of 1.3% across the Combined Authority and presents an ambitious view of future growth in the area, with 500,000 jobs created between 2013 and 2030.
4.22 The SEP Technical Appendix breaks down the job forecasts for the three Local Enterprise Partnerships that form the Combined Authority (Black Country; Coventry & Warwickshire; and Greater Birmingham & Solihull). Jobs growth in the Black Country LEP is forecast to be around 1.1% per annum, whilst it is forecast at 1.5% per annum in the other two LEP areas. This averages out at annual growth of approximately 1.3%. Using data from the Business Register & Employment Survey, published by the Office for National Statistics, it is possible to look at employment trends over the last five to six years (2009-15) and this analysis suggests that the growth rate used in the aspirational growth scenario may be too ambitious for the Back Country:
4.23 Between 2009 and 2015, total employment in the Black Country LEP increased from around 450,000 to approximately 453,000. This equates to average annual growth of 0.1%. Walsall (1.5% p.a.) and Sandwell (0.9% p.a.) experienced jobs growth, although Dudley (-1.1% p.a.) and Wolverhampton (-0.8%) both suffered a fall in employment.
4.24 By contrast, both the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs saw total job numbers increase by 1.3% p.a. from 2009-13. A number of districts in these LEPs saw particularly strong growth over the period, notably Solihull and Lichfield in Greater Birmingham & Solihull, where employment grew by at least 3.0% on an annual basis. In short, the 1.3% average across the West Midlands Combined Authority Area is substantially bolstered by Solihull and Lichfield and therefore it is very ambitious to suggest this will occur across the Black Country area.
4.25 That said, growth in the Black Country needs to be faster than in previous years and the new Core Strategy has a vital role to play in supporting this, however the analysis presented above suggests that the growth targets need to be lowered to better reflect the local economic climate. It is considered unlikely that an annual increase of 1.0% or more will happen in the area in the long-term, especially with the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs capturing new job opportunities at a faster rate in recent years. Lowering the employment growth rate means the amount of employment floorspace needed would be lower. This would not reduce the demographically based housing targets for the area but it would potentially free up previously allocated employment sites for other uses such as residential. This would help the Black Country meet its future housing targets and ensure that it has enough homes for its future workforce to live in.
4.26 As identified in the supporting report and above, it is known that employment sites that had previously been identified for housing are still operational with businesses continuing to use the land and, conversely, there are sites allocated for employment that have been vacant and subsequently market, however, remain unoccupied, which could be transferred to a residential use. It is therefore recommended that the Councils ensure that updated EDNA qualitative review conclusions are taken into account and correct uses applied where appropriate.

Attachments:

Need help completing this? Click here for our simple user guide.