Black Country Core Strategy Issue and Option Report

Search representations

Results for Bloor Homes search

New search New search

Object

Black Country Core Strategy Issue and Option Report

Question 99c - Do you think that national space standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropria

Representation ID: 2161

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Harris Lamb

Representation Summary:

Do not agree that National Space standards should be introduced.

Full text:

We are instructed by Bloor Homes to submit a response to the Black Country Core Strategy Review - Issues and Options consultation. We welcome the opportunity to comment and to input into the preparation of the Core Strategy at the outset. We have responded to the questions as per the consultation document and have submitted the comments via the online consultation website. We trust you take our comments into consideration and look forward to being notified of future stages of consultation on the Core Strategy.


Question 1 - Do you agree that the Core Strategy Review should be a partial review, retaining and stretching the existing spatial strategy and updating existing policies? Yes/No. If not, what do you think should be the scope of the review?

No, we consider that the review needs to go further than a partial review. Whilst the overall strategy of supporting further housing and employment growth with an emphas is on regeneration should be supported, it is clear that the desire to achieve major regeneration of identified areas has failed, for a var iety of reasons relating to ownership, viability, market perceptions, site suitability etc.

The approach of the BCCS is based upon the revoked West Midlands Regional Spatial Strategy and it was produced prior to the adoption of the Framework. Furthermore, there was a significant shift in the amount of housing and employment land that is required that the Black Country Core Strategy needs to respond to. The emerging Core Strategy is also being prepared in a significantly different econom ic climate to the adopted document. These factors clearly indicate that a new approach should be taken to the development through the Core Strategy review.







LONDON STOKE-ON-TRENT
0207 317 4550 01782 272555 t INVESTORS (

" 'RTPI

NOTIINGHAM WORCESTER

-t! IN PEOPLE



..,...j >'*Ot!Ol>$W(' ""'. "901¢.<*

0115 947 6236 01905 22666 RICS

A full list of Directors available on request Registration No. 4301250 Regulated by RIGS
Harris Lamb Limited, Grosvenor House, 75-76 Francis Road, Edgbaston, Birmingham 816 8SP w w w.harrislamb.com




To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




The adopted Core Strategy seeks to deliver development by focusing the majority of new housing employment land requirements through a Growth Network and a series of Regeneration Corridors. It is, however, advised in the "delivery" section of the emerging Core Strategy (paragraphs 2.5 to 2.11) that the level of concentration in the growth corridors is "less than participated". One of the reasons for this is that more windfall sites will come forward than expected outside of the Growth Network. These windfall sites have assisted in housing delivery. Appendix C - Black Country Monitoring Summary, of the emerging plan advises that there is currently a shortfall of 3,039 dwellings in the Black Country to meet the housing requirement set by the adopted Core Strategy for the plan period to date. The windfall developme nts have effectively bolstered housing delivery whilst the housing allocations within the Regeneration Corridors and Growth Network generally have under delivered.

The Growth Network and Regeneration Corridor approach in the adopted Core Strategy is based upon the delivery of a significant quantum of housing on surplus employment land. The emerging plan advises in paragraph 2.5 that it is transpired that there is "not as much surplus employment land suitable for housing as anticipated". This is partly because the economy has strengthened and local firms are more robust than expected and partly because the sites are more affected by constra ints than expected.

It is, therefore, our view that the approach of the adopted Core Strategy seeking to focus new residential development on poor quality employment land will not deliver the housing numbers required. In addition, as referred to in response to Question 4, new evidence identifies a significant requirement for additional employment land. As a consequence, the emerging Core Strategy should prepare an approach that places less reliance on the delivery of housing on employment land.

This means that the trajectory of the current plan is unlikely to be met since it now relies heavily on windfall sites, some of which are not suited to market requirements or are also subject to contribution and viability problems.

A new strategy is required which will provide a range of sites on both brownfield and greenfield (Green Belt) opportunities which are capable of being delivered in the new plan period and which will be attract ive to the market.

We consider that a portfolio of new strategic sites would be identified in the emerging plan with capacities of 150 to 500 units plus. Such sites are more likely to be deliverable in the plan period although we do see the opportunity for a major mixed use urban extension to the south west of Junction 3 of the MS.

The identification of a range of sites will ensure that there is adequacy of supply and will avoid reliance on major urban extensions which can experience diff iculties in terms of funding and timing.

We also consider that a realistic approach needs to be taken to sites coming forward and that a non implementation rate needs to be identified in respect of the windfall element of the housing requirement. This is particularly important given the considerable reliance given to windfall sites in the current supply figure and the acknowledgement with Review department that there have been problems experienced in bring forward brownfield sites.

We also believe that the strategy needs to encompass wider discuss ions with the adjoining Authorities to the Black Country, including South Staffordshire , Wyre Forest and Bromsgrove

To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




whose administrative boundaries adjoin or are close to the Black Country and where there are functional and geographical linkages.

We believe it is important that the Green Belt releases are phased for the early part of the plan period so that a mix of sites can be made available to meet the needs of the market. This will also help with early delivery and will help Local Authorities to maintain a five year housing land supply and also to boost significantly the supply of housing in accordance with the requirements of paragraph 47 of the Framework .

This approach is entirely consistent with the requirement of the Framework. The Framework requires Local Authorities to "be significantly " for supply of housing land. In accordance with the requirements of footnotes 11 and 12 of the Framework, housing sites would be "deliverable and available" in order to be allocated. The employment led regeneration approach of the emerging Core Strategy has failed this test at least to some degree.

Indeed, it is specifically advised that the higher than anticipated levels of windfall development do "conceal a delivery challenge". There is a large number of major housing sites concentrating the Growth Network. However, many of these sites have multiple constraints and financial assistance is required for them to come forward (paragraph 2.10). This includes 300 hectares of occupied employment land which has been allocated for housing. This approach brings issues of viability due to the cost of land assembly, business relocation and land remediation. Significant amounts of external funding are required to deliver this. Whilst some funding is available, it is not sufficient to cover the costs of compulsory purchase, which may be necessary on many sites. The sites are clearly not "deliverable" or "developable" in the context of the allocations test put in place by paragraph 47 of the Framework . To be considered deliverable, sites should be available for development now and be achievable for a realistic prospect that housing will be delivered on the site. To be considered developable, sites should be in a suitable location for housing development and there should be a reasonable prospect that the site is available and could be viably developed at the point envisaged. This is not the case with a significant number of the employment allocations within the adopted development plan, by the emerging Core Strategies own omission.

Finally, we consider that a more robust SHMA should be undertaken focusing on the Black Country and the adjoining Authorities. The housing market areas should not be confined to the administrative boundaries of the Black Country Authorities. ( HL to review)

Question 2 - Do you think that the key evidence set out in table 1 is sufficient to support the key stages of the Core Strategy Review? Yes/No.

If not, what further evidence is required and, if there are any partic.ular issues that should be taken into account in considering development on any particular sites or any particular areas, please provide details.

We consider that a more in depth analysis needs to be undertaken of the brownfield windfall sites which make up the housing supply and, in particular, their ability to be brought forward. It is not clear to the development industry, given the current rates of completions and the need for a significant step up in delivery rates, that the windfall sites will come forward at the rate required.

A study needs to be undertaken regarding the true capacity likely to be obtained from brownfield windfalls. This will help to identify an appropriate non completion allowance.




To: Black Country Core Strategy - Dudley MBC Date: 81h Septembe r 2017




As noted in the response to Question 1, we also believe that the SHMA needs to be reviewed so that it follows the housing market area and not simply Local Autho rity boundaries.

We further support the intention identified at paragraph 3.11 that the Council intends to explore new means of providing housing beyond the housing market area used for the BCCS review where there are clear migration or commuting links with Local Author ities. This strengthens our view that the SHLLA may have to be reviewed because of the linkages with surrounding authorities.

We also note that there appears to be no acknowledgement that the current shortfall provision, identified at some 3,000 units, has been taken into account in the housing requirement figure.

We are also of a view that the Black Country Green Belt review should prioritised. It is noted that it is suggested that the Green Belt review will not be completed until mid 2018. It is, however, anticipated that the preferred options consultation will be undertaken in September 2018. There is going to be a clear reliance on Green Belt sites in delivering the emerging housing requirement. We are concerned that there is insufficient time for the Author ities to properly digest the findings of the Green Belt review and identify strategy for new development based upon Green Belt land release in and around the Authority area in the time allowed between the completion of a Green Belt study and the publication of a consultation document.

Finally, we believe that further research should be undertaken regarding the effect of Government grant regimes in bringing sites forward. Our experience to date has been that the programmes have been time consuming, costly and unwieldly and have had limited benefit in helping to increase the supply of housing land.

Question 3 - Do you agree that the housing need identified for the Black Country over the period 2014 to 2036 in the SHMA, and the anticipated amount of supply, are appropriate and in line with national guidance? Yes/No .

If not, please explain why they are not appropriate and in line with national guidance.

National guidance requires Local Authorities to meet the full, objectively assessed needs in the market and affordable housing in their housing market area, as far is consistent with policies set out in the Framework. The objective is to boost significantly the supply of housing.

We have already commented in respect of our responses to Questions 1 and 2 that the SHMA needs to be reviewed and this could lead to an increase in the overall requirement for the Black Country Authorities.

As a starting point, we are concerned with the approach the SHMA has undertaken towards the HMA. It is advised that the SHMA does not seek to visit the HMA but build upon the work undertaken in establishing the Greater Birmingham HMA part of the preparation of the Birmingham Development Plan. HMAs overlap. The HMA for Birmingham will not be exactly the same as that for the Black Country. The emerging SHMA should have at least tested whet her the HMA boundary remains valid for the purposes of its assessment. This approach is, however, entirely missing.

It should also be noted that the SHMA does not fully address affordable housing requirements . It is confirmed in paragraphs 7.26 to 7.29 of the SHMA that the National Planning Practice Guide requires a "policy on" calculation of the housing needs for certain groups of people. Affordable housing need is not a direct component of the demographic part of the objectively assessed








To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017



needs assessment. As such, an updated calculation of this nature is not included in the SHMA. It is for the client Authorities to consider whether more new homes over and above the objectively assessed housing needs figure identified in the SHMA should be provided in the plan area to address more affordable housing need through policy adjustments .

The Framework advises that paragraph 159 that Local Authorities should develop SHMAs to inform their local plans. The SHMA should, amongst other things, "address the need for all types of housing, including affordable housing and the need for different groups in the community". This process has not been completed by the SHMA. It does not, therefore, provide a complete picture of housing need within the subject Authority areas.

The SHMA is not, therefore, in accordance with national guidance in this regard. The SHMA needs to be supplemented with additional information that factor in affordable housing requirements to establish a true objectively assessed housing needs figure.

Furthermore , there is a difference between the objectively assessed housing needs figure and the quantum of housing which should be allocated for development by the plan. Not all housing sites deliver as expected. This is clearly evidenced by the existing Core Strategy where there has been significant under delivery in the Growth Network. As referred to in our response to Question 1, there is clear uncertainty regarding for delivery of a significant number of the housing sites identified on the existing employment land by the current development plan documents. It is necessary for the emerging Core Strategy to identify housing requirement notably above the objectively assessed housing needs figure take account of non-delivery of proposed housing allocations. At the present time the Black Country Core Strategy has undelivered its housing requirement by approximately 11.6% (Appendix C - Black Country Monitoring Summary). It is, therefore, our view that the finalised objectively assessed housing needs figure should be increased by a minimum of 11.6% of flexibility to supply and to take account of the delivery in delivering the urban regeneration sites.

The current completion rates are significantly below what is required for even the current local plan figure and are significantly below the figure of 3,690 units per annum identified above. Even at 78,190 units over the plan period, this produces an annual requirement of 3,554 units per annum which is also far in excess of what has ever been achieved annually in the SCCS. We consider that this is a challenging figure in terms of the current supply , over half of which is dependent upon existing housing supply in the urban area and is largely made up of brownfield windfalls.

In this context we believe that it is going to be important to significantly change the balance of the current supply with a far greater reliance on greenfield/Green Belt sites than the 25,000 units identified.

We note that the overall supply from the urban area depends upon some 42 ,507 units from existing sites in the urban area and a further 8,335 units from the urban area, much of which appears to come from former employment sites.

Given the problems in releasing employment sites in the current strategy (see paragraph 3.16 and paragraph 2.5, the latter identifying the problems in releasing employment sites), we consider that the local plan strategy wh ich relies on some 65% of provision on urban brownfield/windfall sites (using the draft figure of 78,190) is wholly unrealistic given that, to date, the current local plan has failed to meet existing requirements.













To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017



The components of the supply in the urban area (completions plus existing housing supply plus estimated further housing supply) total some 56,520 units which equates to a requirement of 2,569 units per annum over the new plan period. However, that required completion figure is in excess of what has been achieved to date through the current local plan, which relies entirely upon brownfield windfalls in the urban area, that figure being 2,325 units per annum.

It is apparent , therefore, that the current supply of brownfield/windfall sites is unlikely to produce sufficient units to meet its share of the housing requirement and, therefo re, the contribution which this makes to the overall requirement should be reduced (this will be consistent with our argument about adopting a non completion rate) and the contribution from greenfield/Green Belt sites outside the existing urban boundary should be increased. This will require contributions to be made from greenfield/Green Belt sites within the BCCS administrative area and also from sites in sustainable locat ions which are well related to the Black Country in neighbouring authorities.

Although we reserve our position on this point, we would expect that the contribution from the existing brownfield windfalls to be reduced by some 25%, to reflect the problems of market attractiveness, viability , delivery etc and with a consequent increase in the greenfield/Green Belt allocations.

In summary, the SHMA does not properly identify the housing requirement for the HMA. In addition, the reliance upon brownfield urban sites is not supported by evidence. There is, therefore, a requirement for a fundamental shift in the plan strategy with greater reliance placed upon Green Belt/greenfield land release in and around the wider HMA area of sustainable locations in order to ensure delivery.

Question 4 - Do you consider the employment land requirement identified to the Black Country up to 2036 in the EDNA is appropr iate and in line with national guidance? Yes/No . If not, please explain why they are not appropriate and in line with national guidance.

It is not clear if the land requirement fully encompasses land to be lost to residential development and other uses. The current supply of housing identified in the emerg ing plan requires a significant contribution to be made from former employment sites. It has been noted, however, in the Issues and Options document that employment sites have failed to come forward at the rate expected, partly owing to problems in site delivery but also partly because of recovery in the demand for the stock of existing employment sites.

We expect that demand to continue for local and sub regional requirements on appropriate sites.

In addition, we believe there will be a demand for large, greenfield sites to encourage inward investment and we consider that sites should be identified to the north and south of the Black Country which are well connected to the existing motorway network.

We consider that the employment requirement should be based on a net addition in order to take account of any losses to alternative land uses.

We agree that a range of sites will need to be allocated including, as noted above, high quality sites to attract inward investment.

To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




We also question whether the figure of 394 hectares of employment land can be regarded as being realistically deliverable and we believe that further assessment about the delivery of this land should be undertaken.

Question 5 - Do you agree with the proposed approach to the Black Country Green Belt Review? Yes/No. If not, what additional work do you think is necessary?

We agree that a review of the Green Belt is an imperative element of the new strategy. This needs to be completed in time to inform the Core Strategy Review to be published in September 2018.

We consider the review will need to assess the implications of land release 1n adjoining Authorities including South Staffordshire, Wyre Forest and Bromsgrove.

Green Belt sites in both the Black Country Authority area and in these other authorities will have a vital role to play in providing the necessary housing supply to meet the housing requirement over the plan period. They will need to make an early contribution to housing supply and should not be phased for delivery in the latter part of the plan period.

We also think it is important that the Green Belt Review extends beyond the current plan period in order to provide a lasting Green Belt boundary in accordance with the advice set out in paragraphs 83 and 85 of the Framework. That advice suggests that the boundaries should be set so that they are capable of enduring beyond the plan period. If necessary, safeguarded land between the urban area and the Green Belt should be identified in order to meet long term development needs "stretching well beyond the plan period' .

We would suggest that the Green Belt Review should be conducted in order to provide for development needs up to 2051.

Question 6 - Do you agree that the key issues set out in part 3 are key issues that need to be taken into account through the Core Strategy Review? Yes/No. If not, what other key issues should be taken into account.

We believe that an extensive review needs to be undertaken in order to ensure that an appropriate strategy is arrived at. Clearly, reliance upon the existing strategy will fail to meet the housing requirement and employment land requirement identified.

We believe that elements of the evidence base require furthe r exam ination including the SHMA and also the likely delivery of housing and employment from existing brownfield windfalls and existing sites.

There appears to be some confusion in the plan as to the extent of the gap identif ied. The policy talks about 22,000 homes but then also identifies a further 3,000 units as a shortfall in the housing area. It is unclear if the current shortfall of 3,000 units has been addressed.

In this context there may be a need to identify a further 28,000 homes over and above the existing, alleged, capacity in the urban area.

There is a need to continue to plan for a growing population. However, the SHMA underestimates delivery, this is not taken into account affordable housing needs. Furthermore, the emerg ing plan housing requirement will need to take into account the fact that not all housing allocations deliver. As a consequence the housing requirement will need to be significantly











To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




above the objectively assessed housing needs figure within the SHMA. The suggested "gap" between supply and need of 22,000 dwellings is, therefore , less than that actually required.

This figure may increase further when proper account is taken of the true delivery capabilities of the land in the existing urban area. So far, the current local plan has failed to deliver development rates which would meet with the housing requirement for the new plan period and indeed do not even meet the requirement which will be needed from the current supply identified. This suggests that the contribution from greenfield/Green Belt sites from within the SCCS area and from Authorities adjoining it will need to be increased significantly.

The Green Belt release should not be seen as a matter of a last resort but needs to be part of an overall strategy with early releases needed to ensure supply of housing sites in the early part of the plan period.


Question 7 - Do you think that the Core Strategy Vision and Sustainability principles remain appropriate? Yes/No. If not, what alternative would you suggest?

We are content with four of the five Core Strategy Vision and Sustainability principles but the fourth bullet point, 'Brownfield first' is no longer relevant. As we have explained in our responses to previous questions, the reliance on Brownfield development needs to be significantly reduced. It is already acknowledged that a significant number of homes, 22,000 - 25 ,000 may have to be allocated on Greenfield I Green Belt sites (these could be still higher if the current shortfall is to be rectified) and if an update to the SHMA reveals the need to release new land to meet affordable housing needs. We have already explained that we are concerned that there is an over reliance on Brownfield sites and that this could, overall, increase the requirement for new development on Green Field I Green Belt sites to some 40,000 units which will be approximately half of the overall housing requirement, once account is taken of the shortfall from the early part of the current local plan period.

For these reasons, Greenfield I Green Belt sites will have to be released at the same time as the Brownfield supply in order to ensure an adequate supply in the early part of the planning period. This is entirely consistent with paragraph 17 of the Framework which, whilst encouraging the reuse of brownfield sites, does not seek to prioritise their use over greenfield sites.

We would also question whether or not the reference to 'comprehensive approach to development' has any real meaning in terms of delivery of individual sites. We consider that if 'comprehensive ' development is required this can still take place on a phased basis so long as new development achieves a comprehensive approach in due course.

Question 8 - Do you think that the Core Strategy Spatial objectives remain appropriate? Yes/No. If not, what alternative would you suggest and how might these changes impact on the individual Core Strategy policies?

We consider that spatial objectives two and three need to be reviewed. Whilst we would continue to support the delivery of high quality employment and with in the regeneration corridors, which will also be helpful to local business, it should be recognised that inward investme nt may require high quality Greenfield sites on the edge of the Black Country. The availability of land 6a54 was a considerable benefit in bringing JLR to the Black Country and the opportunity for similar scale developments should be seized through the local plan review process. In particular, we consider that further strategic employment development on the north side of the Black Country and also to the south east, adjoining Junction 3 of the M5, should be identified.











To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017





We also have concerns that the regeneration corridors have failed to deliver wide spread change throughout the Black Country and that they may not provide a basis for sustainable communities in the new plan. In this context, we believe that this particular objective should be replaced with the following:

'Identification of a series of deliverable housing sites on Brownfield and Greenfield within, adjoining and well connected to the Black Country which will meet the BCCS requirement over the plan period. These sites will be of differing scales and will provide different market opportunities to delivering housing over the planning period. '

Question 9 - Do you agree that Policies CSP1 and CSP2 should be retained and updated to reflect new evidence and growth proposals outside the growth network? Yes/No. If not, what changes do you think should be made to Policies CSP1 and CSP2 in response to new challenges and opportunities?

We agree that the policies should be changed. The growth network strategy will not provide for the new housing and employment requirements for the Emerging Local Plan and need to be amended to reflect the fact that a significant proportion of both housing and strategic employment sites will have to take place on Greenfield I Green Belt sites outside of the current urban boundary and indeed on sites outsides of the BCCS administrative area.

The presumption in favour of using Brownfield sites first also needs to be altered so that an appropriate portfolio of residential and employment sites can be developed over the planning period.

Question 10 - In continuing to promote growth within the growth network, is there a need to amend the boundaries of any of the regeneration corridors in the existing Core Strategy? Yes/No.

If so which boundaries and why?

We do not comment upon specific regeneration corridors but we believe that they will all need to be reviewed to see if they are fit for purpose. In particular, they should be examined to see if the employment elements are still likely to be required by the existing and new local businesses. Where it is clear that significant change in the regeneration corridor are unlikely to happen during the new planning period, alternative provision should be made.

Question 11A - Do you support Strategic Option 1A? Yes/No.

We consider that Option 1A is to be preferred to Strategic Option 1B. That said, we believe there continues to be an overre liance upon Brownfield I windfall sites in the existing supply and there is also an over reliance on Brownfield windfalls in the estimated further housing supply.

We consider, therefore, that overall the Greenfield requirement should provide some 40 ,000 units of the overall requirement which itself should be increased to 81,290 units.

Question 11A - Do you support Option 1B? Yes/No.

We do not support Option 1B. We believe that there is a considerable overreliance on Brownfield
I windfall sites and that there is no real certainty that further employment land can be released








To: Black Country Core Strategy - Dudley MBC Date: gth September 2017




over the plan period to provide housing opportunities. Indeed some of the existing housing allocations need to be reviewed as they will remain in employment use.

In this context , we consider that the Option 1B would not meet the objectives of the housing policies of the Framework particularly those which require the planning system to deliver significantly increased supply of housing land.

Paragraph 47 of the Framework requires housing opportunities to be deliverable and to meet the full, objectively assessed needs for market and affordable housing in the housing market area.

A review of the current local plan strategy has demonstrated that there is considerable uncertainty about reliance on a portfolio of Brownfield windfall sites we consider that strategic Option 1B, which is largely reliant upon such a source of housing opportunities, will not provide any certainty to the development industry regarding the provision of housing throug h the plan period.

Question 12A - Do you support spatial Option H1? Yes/No. What criteria should be used to select suitable sites? Eg. Ability to create a defensible new Green Belt boundary, size, access to existing residential services.


We believe that spatial Option H1 - Rounding off is to be preferred to spatial Option H2 - sustainable urban extensions. We believe that the 'rounding off' approach is more likely to deliver a series of well-planned and well located developments throughout the plan period thereby maintaining a deliverable supply of housing land for the house building industry. This could include sites of approximately 150 - 750 units.

Question 13A - Do you support Spatial Option H2? Yes/No.

What should the characteristics of Sustainable Urban Areas (SUEs) B? E.g. a minimum/maximum size, mix of uses, mix of housing types, accessibility to other areas. What criteria should be used to select suitable sites? E.g. proximity to a rail station, availability of existing infrastructure, easy access to jobs, potential to support existing settlement/services, proximity to the existing growth network, potential to support urban regeneration.

In general terms we do not support Spatial Option H2 in that we believe a range of smaller strategic sites should be provided in the Green Belt in order to ensure a deliverable supply of housing land in the plan period.

We consider that some modest size sustainable urban extensions could be provided. These should have the capacity to support a primary school and local facilities.

We would not favour sustainable urban area extensions of greater size than this as we do not consider that they would be deliverable in the plan period. In this context we believe that modest scale SUEs could be provided as part of a blended Spatial Option H1.

















To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




Question 15A - If all housing need cannot be met within the Black Country, do you support the "export" of housing growth to neighbouring Authorities within the HMA? Yes/No.

What factors should be taken into account in an assessment of the opportunities in neighbouring Authorities e.g. proximity to the edge of the urban area, proximity to a rail station, availability of existing infrastructure, easy access to jobs?

We believe that it will be necessary for sites to be released outside of the Black Country administrative area in order to meet the housing requirements of the BCCS.

In particular, we believe that sites should be identified in South Staffordshire , Wyre Forest and Bromsgrove districts which could accommodate some of the overspill.

We consider that locations should be selected which could fulfil the following criteria.

A. Be situated immediately adjoining the Black Country administrative boundary and with the ability to achieve easy access to the existing urban area: or

B. Be located in settlements in close proximity to the Black Country.

By these means people from the Black Country will be able to find suitable housing in locations which still afford them the opportunity to support the economic growth of the Black Country and will remain in employment in the Black Country area.

Question 158 - Do you think that there are any potential locations that should be
considered? Yes/No

We believe that Hagley will provide an appropriate location for sites to be released which meet the needs of the Black Country . Hagley is very well related to the Black Country, lying just to the south of the edge of Stourbr idge. It is a sustainable settlement, being the second most sustainable settlement in Bromsgrove District with both primary and secondary schools, a railway station, local facilities and can access the Black Country through the primary road network.

We have ident ified two opportunities for sites to be released at Hagley through the "Call for Sites" process on behalf of Hagley Hall Estate.

The site addresses are as follows:

1. Western Road I Stourbridge Road
2. Stoney Lane I Stakenbridge Lane I Kidderminster Road

The Call for Sites response provides more information regarding the suitability of these two sites for development.

We can confirm that, subject to the release of the sites from the Green Belt through the Bromsgrove District Plan, both sites can be made available in the early part of the plan period and will provide high quality, sustainable developments which will fulf il the housing requirements of residents of the Black Country.




To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




Question 15C - Do you think there are ways to ensure that exporting housing will meet the needs of people who would otherwise live in the Black Country? (E.g. transport improvements, provision of affordable housing, creation of employment opportunities). Yes/No.

Yes, we believe that the best way to ensure that housing provided outside of the Black Country will meet the needs of people, who would otherwise live in the Black Country is to ensure that the location of new development has good functional and geographic links with the Black Country. As noted in our response to Question 15b, sites can be released which immediately adjoin the Black Country and administrative area or are in settlements with strong functional and physical/geographic links with the Black Country. Clearly, there is nothing to stop people migrating from the Black Country into the surrounding Shire Authorities, regardless of housing provision, and, therefore, the provision of additional housing outside of the BCCS, but which will meet the needs of people living in the Black Country, will ensure that the needs of Black Country residents can be met either within the Black Country itself or in settlements which are suitable to serve it.

Question 21 - Do you think that changes are required to Policy DEL1 to ensure it covers both development within the existing urban area and any within the Green Belt? Yes/No.

Policy DEL1 may need to be reviewed to ensure it is compliant with the policies of the Framework and the PPG. Otherwise, it will be important for the SCCS Authorities to work with neighbouring Authorities to ensure that sites which are released to meet the Black Country's needs outside of the SCCS area are also supported by appropriate infrastructure. Some of this may also have to be outside of the BCCS area, particularly for the larger urban expansion sites which may provide local facilities, green space, primary schools etc.

The important point here is to ensure that statutory undertakers are involved with the local plan process at an early stage in order to ensure that necessary infrastructure including highways, drainage and power are available for the development envisaged.

Question 25 - Will there be any new social infrastructure requirements necessary to serve large new housing developments? Yes/No. If yes, please explain the type and scale of any new social infrastructure required.

We suspect that, generally speaking, there will need to be incremental improvements in social infrastructure provision to meet the requirements for the occupants of new development over the plan period. This will need to be assessed in detail with social infrastructure providers and it will be necessary for the BCCS Author ities to work with landowners and developers in this regard together with the relevant strategy consultees.

We should state from the outset that the provision of doctor's surgeries should be regarded as a "private sector" matter. Doctor's surgeries are generally self-funding and do not need to be the subject of Section 106/CI L contributions.

We believe it is likely that some new infrastructure will have to be provided for individual schemes in terms of local highway improvements but this will have to be assessed on a case by case basis. This will probably be best assessed at the local level.




To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




Question 29 - Do you think there are any other tools or interventions that could be used to ensure enough infrastructure is provided by developments? Yes/No.

At this stage we have no comment to make other than to confirm that viability is an important issue which needs to be addressed when dealing with sites. We would say at this stage that the Authorities should adopt realistic expectations as to what social and environmental infrastructure can be borne by individual developments .

Question 30 - Do you have any suggestions around how the strategy can be developed in order to maintain the urban regeneration focus of the Black Country while at the same time bringing forward sites in the Green Belt? Yes/No.

We have commented previously that the new plan will need to shift the emphasis away from urban regeneration to a more balanced provision of brownfield and greenfield sites. Part of a problem with the delivery of brownfield sites in the urban area are that they are returning to an active employment use. The adopted Core Strategy sought to direct new residential development to what was, at the time of its preparation, redundant employment land. These employment sites are now developing a new lease of life. As such, the capacity for residential development on brownfield land is highly limited and these areas are self regenerating into active employment sites.

Furthermore, given the problems in bringing forward any brownfield sites for a variety of reasons, it will be necessary to ensure that greenfield opportunities can be brought forward in the early part of the plan period in order to ensure an appropriate supply of land.

We should add that our experience of working in the Black Country is that Local Authorit ies do need to understand the constraints of developing in the Black Country, particularly in respect of highway and urban design standards. Many of the sites are difficult to develop and the Council's will need to apply development management considerations flexibly in order to ensure that sites can come forwa rd. Many brownfield sites present physical and topographic challenges which can influence the formation of layout and design solutions. All of these factors need to be taken into account when individual planning applications are assessed and Council's should apply flexibility when discussing design solutions, including transportation solutions, with applicants.

Question 31 - Do you think that the right scale in the form of funding is available to support the delivery of the Core Strategy Review? Yes/No. If no, what alternative source of the funding or delivery mechanisms should be investigated?

Our concern is that it takes a considerable amount of time to make funding available for new development and this is holding back sites from being released.

Furthermore, it cannot be guaranteed that the funding which is provided now will continue to be available during the plan period.

In this context it is important to ensure that there is a balance portfolio of housing provided, some of which will be less dependent upon intervention funding. It is for this reason that we endorse a higher proportion of development on greenfield/Green Belt sites that is currently in the plan (see response to Question 3).


To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




Question 34A - Do you agree that the Health and Wellbeing impacts of large development proposals should be considered at the preferred Spatial Option stage of the Core Strategy Review through a Health Impact Assessment approach? Yes/No .

Our response is that such matters will be better addressed at the development management stage when it will be possible to assess the specific impacts on individual schemes . The locational criteria to be applied to the inspection of sites should suffice for development plan purposes. Some of this will reflect matters such as proximity to local services.

Question 348 - What design features do you think are key to ensuring new development encourages healthy living, which could be assessed through the HIA process? Yes/No.

We make no formal comment at this stage but we participate in the next stage of the plan when more details of this approach are given. We would stress, however, that given the likely constraints which will exist on many of the Black Country sites, care should be taken to ensure that overly restrictive policies are not introduced which could further reduce the attractiveness of sites for development.

Question 35 - Do you support the proposed approach to housing land supply? Yes/No.

We agree that HOU1 of the adopted Core Strategy needs to be reviewed. We agree that the proportion of housing to be built on previously developed land will need to be significant ly changed and we have indicated elsewhere that the plan should provide approximately 50% provision of the overall requirement on greenfield/Green Belt sites.

We do not favour the prioritisation of brownfield land over greenfield land. Given the considerable amount of housing required across the SCCS, it will be necessary for both greenfield and brownfield sites to be released at the same time. Indeed, the greenfield/Green Belt sites are likely to serve different areas of the housing market and so it is important that a range of sites are made available for all sectors of the housing market at the same time. Furthermore, the current strategy has failed to deliver the required level of housing from former employment sites.

In terms of a discount rate we note that there have been problems in meeting the housing requirement in the plan period. This is of particular concern given that the housing trajecto ry for the adopted Core Strategy starts at a relatively low rate. The extent of the shortfall is already 3,000 units. Given the problems of bringing forward brownfield sites, acknowledged elsewhere in the Issues and Options document and including matters such as viability , ground conditions, failure to release employment sites, we believe that a discount rate of 25% should be applied. We consider that the proportion of a greenfield land as an element of the overall supply should be increased to provide more certainty about provision across the plan period and to ensure that the housing strategy accords with paragraph 47 of the Framework. It should be noted that the requirement to boost significantly the supply of housing land became national policy after the adoption of the SCCS.

We make no comment at this stage about proposals for high density allocations within strategic centres, particularly in Walsall, until more market research has been carried out to ensure that there is both demand and an appetite from the house building industry to provide this type of product.














To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017



Question 36 - If you think that the current accessibility and density standards set out in Policy HOU2 and Table 8 should be changed, what standards should be applied instead, for example, should the minimum net density of 35 dph be increased to maximise brownfield housing delivery? Yes/No.

The calculation of density standards is a difficult subject. It is always important to start first with an understanding of what the net developable area of a site may be irrespective of whether it is brownfield or greenfield. It will be necessary to have regard to site constraints, parking requirements , offset distances, green infrastructure requirements, drainage requirements etc. All these factors can significantly limit the net developable area on a site. It is importa nt not to overestimate densities which could be achieved when identifying sites to be released for development. Once schemes provide more than 40 dwellings per net developable acre the dens ity will usually require some element of flatted development.

The insistence on 35 dph as a minimum could well be problematic on greenfield sites, particularly if these are expected to accommodate significant areas of green infrastructure .

We would suggest that the policy should be targeted to provide densities of 30 to 40 dph depending upon site specific circumstances. High densities could be achieved in more centralised locations adjoining transport hubs, again subject to achieving acceptable design standards. We have explained elsewhere the importance of ensuring that development management expectations need to be married to strategic housing requirement delivery objectives.

Question 37A - Do you think that the existing Policy HOU2 site size threshold should be kept at 15 homes or more? Yes/No.

We would keep the threshold at 15 homes or more. This will help to assist smaller house builders to provide schemes on smaller sites which tend to have more exacting development management issues such as overlooking, relationship with existing uses etc and which can limit the ability to increase densities.

Question 38 - Do you think that the current accessibility and density standards are appropriate for Green Belt release locations? Yes/No.

In our response to Question 36, we identify the fact that greenfield sites may have more exacting requirements in terms of green infrastructure and that density standards may well have to be reduced. We suggest that density standards of 35 dph net developable should be considered.

Question 39 - Do you think separate accessibility standards are needed for particular types of housing, e.g. housing for the elderly or affordable housing (as occupiers may be less mobile and more dependent on public transport)? Yes/No.

Generally speaking we believe that provision for the housing for the elderly will be demand driven. Occupiers will understand their markets and we would not welcome a restrictive policy regarding the location of either accommodation for the elderly or affordable housing.

Question 40 - Do you agree that the 2017 SHMA findings should be used to set general house type targets for the plan period? Yes/No.

No. The SHLAA does not fully assesses affordable housing requirements as referred to above; as such it should not dictate an overall mix. House builders will provide housing to meet their










To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




assessment of the localised market. Setting general standards across such a large area can be difficult and can cause problems with housing delivery. Furthermore, it is important to understand the likelihood that new housing will also generate movements from existing stock to new stock thereby freeing up smaller properties for first time buyers and younger families.

Question 41A - Do you support the introduction of a policy approach towards self and custom built housing in the Core Strategy? Yes/No.

No, we do not support this approach . This is not a significant sector of the housing market. Given the need to encourage housing on a variety of sites, many of which will have problems in terms of delivery, we would not favour a policy which could create problems for delivery and viability which would arise if self and custom built housing were introduced into any housing requirement.

Question 42 - Do you agree that the annual affordable homes target should be increased to reflect the 2017 Black Country Strategic Housing Market Assessment? Yes/No.

We believe it would be prudent to keep the affordable homes target as originally set. Otherwise this will cause problems for delivery of brownfield sites.

Question 43A - Do you think that the existing Policy HOU3 site size threshold should be kept at 15 homes or more? Yes/No .

Yes, we believe that the site size threshold should be retained at 15 homes. Again this will assist in the delivery of smaller sites by smaller house builders . It will also be more attractive to the registered providers who do wait to manage a few plots on smaller schemes.

Question 44A - Do you think that the affordable housing requirement for eligible sites in Question 43 should be kept at 25% of the total number of homes on site? Yes/No.

Yes, we agree that the figure should be retained at 25%, subject to viability.

Question 45 - Should an increase in affordable housing requirement beset for Green Belt release sites, to reflect the likely financial viability of these sites? Yes/No.

The release of greenfield/Green Belt land also has significant costs associated with it. It is more likely to require new below ground infrastructure to be provided such as drains, power supply etc. Other physical and social infrastructure contributions will also be required such as educat ion, transport etc. Therefore, greenfield sites are not necessarily more able to contribute more significantly to affordable housing than brownfield sites. We believe, therefore , that a flat rate of 25% across the BCCS area should be adopted.

Question 47 - Do you think that Policy HOU5 should be expanded to cover other types of built social infrastructure and set out standards of built social infrastructure to serve major housing developments? Yes/No.

We should first comment that the provision of medical facilities relating to new developments should be funded through the clinical commissioning groups. In most cases this will involve new or extended doctor's surgeries. Doctor's surgeries can be provided through the private sector since the surgeries generate a rental income so that there is a development/investm ent market












To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




ready to provide the product. It does not need to be funded from contributions from residential development.

Education provision will need to be carefully researched so that a capacity in schools is identified in order to avoid unnecessary contributions being sought. The funding implications of the Education Funding Agency also need to be taken into account when assessing education requirements.

In terms of new community facilities, we agree that these need to be carefully assessed in order to ensure that they will in fact be used and also maintained by the local community. In some circumstances it may be better for contributions to be made to upgrade and expand existing facilities rather than create new ones which will simply put a drain on revenue resources.

Question 49A - Is there a need for the existing Policy DEL2 in order to manage the release of poorer quality employment land for housing? Yes/No.

We believe that the policy does need to be refined in order to ensure that land which is not necessary to be retained can be released quickly and easily without the need for extensive marketing. Also we see no reason for the policy to be applied where land has been allocated in an action area plan or similar alternative plan for alternative use.

Question 50 - Do you think that the Core Strategy should continue to set a target for the total employment land stock in Policy EMP1? Yes/No.

We believe that this should be included and that a net target should be set in order to allow for losses to alternative uses.

Question 55 - Do you agree with the proposed proposal to obtain Policy EMP5? Yes/No.

Generally we do not favour contributions which seek to restrict jobs to existing residents. This can cause problems for companies who have their own training and apprenticeship programmes. Whilst it is clearly desirable for Local Authorities to work alongside employers in trying to get local residents into work opportunities, this should be on a voluntary basis and there should not be a requirement to impose what is, in effect, a restrictive trade practice.

Question 94 - Do you support the proposed changes relating to environmental infrastructure and place making? Yes/No.

We appreciate that it will be necessary to review environmental infrastructure in the light of changing circumstances and updated guidance and standards. We will comment further on this issue at the next stage of the plan.

Question 95A - Do you think Garden City principles should be applied at the Black Country? Yes/No.

We would not encourage this as a design approach in the Black Country. Garden City proposals were developed expressly for new settlements. The Black Country has a different history and heritage as do the settlements which are geographically and functionally close to the Black Country. We do not consider that the vernacular of the existing urban area and adjoining settlements is appropriate for Garden City principles.










To: Black Country Core Strategy - Dudley MBC Date: Sth September 2017




Question 96 - Do you support the proposed changes relating to nature conversation? Yes/No.

It should be noted that the inclusion of new natural green space and new development will have implications for net developable areas and consequently, the amount of land which will need to be identified for development. It will also impact upon the viability of schemes and these factors need to be taken into account when assessing overall development requirements.

Question 98 - Do you support the proposed changes relating to design quality? Yes/No.

The introduction of National Space standa rd does have implications for viability since it introduces a significant additional cost to new house building without any necessary uplift in values. It can, therefore, have a significant impact upon the delivery of schemes.

Question 99C - Do you think that National Space standards for housing development should be introduced in the Black Country. Yes/No .

In the context of our response to Question 98, we do not agree that National Space standards should be introduced.

Question 99D - Do you think that the standards should be different for brownfield and greenfield sites? Yes/No.

Given that greenfield sites have their own viability concerns, we would not agree that the standards should vary between brownfield and greenfield sites. In any event we do not support the introduction of National Space standards.

Question 101A - Do you support the proposed changes relating to flood risk, sustainable drainage and urban heat island effects? Yes/No.

Whilst we appreciate the need to have regard to new standards regarding SuDS provision, the implications upon site layout and viability do need to be considered. A f lexible approach will be required from the Local Authorities when assessing individual schemes. In particular, a j oined up approach is needed by strategy undertakers to ensure that SuDS areas will be adopted if they are part of wider open space areas.

Question 103A - Do you think that Policy ENV7 should be changed to allow increased energy efficiency standards to be accepted in lieu of renewable energy provision for non­ domestic buildings? Yes/No .

We consider that the benefits of higher energy efficiency, as opposed to renewable energy should be considered in the planning balance, particularly when this has an implication for viability. Although this may not be capable of being a policy requirement there is no reason why it should not be capable of being taken into account. The residential sector has spent a considerable amount of money investing in improved materials which improve the energy efficiency of buildings and these factors need to be taken into account of both domestic and non­ domestic schemes .

Attachments:

Object

Black Country Core Strategy Issue and Option Report

Question 99d - Do you think that the standards should be different for brownfield and greenfield sites? Yes/No; If yes, please explain how and why

Representation ID: 2162

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Harris Lamb

Representation Summary:

Do not agree that different standards should apply to brownfield and greenfield sites.

Full text:

We are instructed by Bloor Homes to submit a response to the Black Country Core Strategy Review - Issues and Options consultation. We welcome the opportunity to comment and to input into the preparation of the Core Strategy at the outset. We have responded to the questions as per the consultation document and have submitted the comments via the online consultation website. We trust you take our comments into consideration and look forward to being notified of future stages of consultation on the Core Strategy.


Question 1 - Do you agree that the Core Strategy Review should be a partial review, retaining and stretching the existing spatial strategy and updating existing policies? Yes/No. If not, what do you think should be the scope of the review?

No, we consider that the review needs to go further than a partial review. Whilst the overall strategy of supporting further housing and employment growth with an emphas is on regeneration should be supported, it is clear that the desire to achieve major regeneration of identified areas has failed, for a var iety of reasons relating to ownership, viability, market perceptions, site suitability etc.

The approach of the BCCS is based upon the revoked West Midlands Regional Spatial Strategy and it was produced prior to the adoption of the Framework. Furthermore, there was a significant shift in the amount of housing and employment land that is required that the Black Country Core Strategy needs to respond to. The emerging Core Strategy is also being prepared in a significantly different econom ic climate to the adopted document. These factors clearly indicate that a new approach should be taken to the development through the Core Strategy review.







LONDON STOKE-ON-TRENT
0207 317 4550 01782 272555 t INVESTORS (

" 'RTPI

NOTIINGHAM WORCESTER

-t! IN PEOPLE



..,...j >'*Ot!Ol>$W(' ""'. "901¢.<*

0115 947 6236 01905 22666 RICS

A full list of Directors available on request Registration No. 4301250 Regulated by RIGS
Harris Lamb Limited, Grosvenor House, 75-76 Francis Road, Edgbaston, Birmingham 816 8SP w w w.harrislamb.com




To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




The adopted Core Strategy seeks to deliver development by focusing the majority of new housing employment land requirements through a Growth Network and a series of Regeneration Corridors. It is, however, advised in the "delivery" section of the emerging Core Strategy (paragraphs 2.5 to 2.11) that the level of concentration in the growth corridors is "less than participated". One of the reasons for this is that more windfall sites will come forward than expected outside of the Growth Network. These windfall sites have assisted in housing delivery. Appendix C - Black Country Monitoring Summary, of the emerging plan advises that there is currently a shortfall of 3,039 dwellings in the Black Country to meet the housing requirement set by the adopted Core Strategy for the plan period to date. The windfall developme nts have effectively bolstered housing delivery whilst the housing allocations within the Regeneration Corridors and Growth Network generally have under delivered.

The Growth Network and Regeneration Corridor approach in the adopted Core Strategy is based upon the delivery of a significant quantum of housing on surplus employment land. The emerging plan advises in paragraph 2.5 that it is transpired that there is "not as much surplus employment land suitable for housing as anticipated". This is partly because the economy has strengthened and local firms are more robust than expected and partly because the sites are more affected by constra ints than expected.

It is, therefore, our view that the approach of the adopted Core Strategy seeking to focus new residential development on poor quality employment land will not deliver the housing numbers required. In addition, as referred to in response to Question 4, new evidence identifies a significant requirement for additional employment land. As a consequence, the emerging Core Strategy should prepare an approach that places less reliance on the delivery of housing on employment land.

This means that the trajectory of the current plan is unlikely to be met since it now relies heavily on windfall sites, some of which are not suited to market requirements or are also subject to contribution and viability problems.

A new strategy is required which will provide a range of sites on both brownfield and greenfield (Green Belt) opportunities which are capable of being delivered in the new plan period and which will be attract ive to the market.

We consider that a portfolio of new strategic sites would be identified in the emerging plan with capacities of 150 to 500 units plus. Such sites are more likely to be deliverable in the plan period although we do see the opportunity for a major mixed use urban extension to the south west of Junction 3 of the MS.

The identification of a range of sites will ensure that there is adequacy of supply and will avoid reliance on major urban extensions which can experience diff iculties in terms of funding and timing.

We also consider that a realistic approach needs to be taken to sites coming forward and that a non implementation rate needs to be identified in respect of the windfall element of the housing requirement. This is particularly important given the considerable reliance given to windfall sites in the current supply figure and the acknowledgement with Review department that there have been problems experienced in bring forward brownfield sites.

We also believe that the strategy needs to encompass wider discuss ions with the adjoining Authorities to the Black Country, including South Staffordshire , Wyre Forest and Bromsgrove

To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




whose administrative boundaries adjoin or are close to the Black Country and where there are functional and geographical linkages.

We believe it is important that the Green Belt releases are phased for the early part of the plan period so that a mix of sites can be made available to meet the needs of the market. This will also help with early delivery and will help Local Authorities to maintain a five year housing land supply and also to boost significantly the supply of housing in accordance with the requirements of paragraph 47 of the Framework .

This approach is entirely consistent with the requirement of the Framework. The Framework requires Local Authorities to "be significantly " for supply of housing land. In accordance with the requirements of footnotes 11 and 12 of the Framework, housing sites would be "deliverable and available" in order to be allocated. The employment led regeneration approach of the emerging Core Strategy has failed this test at least to some degree.

Indeed, it is specifically advised that the higher than anticipated levels of windfall development do "conceal a delivery challenge". There is a large number of major housing sites concentrating the Growth Network. However, many of these sites have multiple constraints and financial assistance is required for them to come forward (paragraph 2.10). This includes 300 hectares of occupied employment land which has been allocated for housing. This approach brings issues of viability due to the cost of land assembly, business relocation and land remediation. Significant amounts of external funding are required to deliver this. Whilst some funding is available, it is not sufficient to cover the costs of compulsory purchase, which may be necessary on many sites. The sites are clearly not "deliverable" or "developable" in the context of the allocations test put in place by paragraph 47 of the Framework . To be considered deliverable, sites should be available for development now and be achievable for a realistic prospect that housing will be delivered on the site. To be considered developable, sites should be in a suitable location for housing development and there should be a reasonable prospect that the site is available and could be viably developed at the point envisaged. This is not the case with a significant number of the employment allocations within the adopted development plan, by the emerging Core Strategies own omission.

Finally, we consider that a more robust SHMA should be undertaken focusing on the Black Country and the adjoining Authorities. The housing market areas should not be confined to the administrative boundaries of the Black Country Authorities. ( HL to review)

Question 2 - Do you think that the key evidence set out in table 1 is sufficient to support the key stages of the Core Strategy Review? Yes/No.

If not, what further evidence is required and, if there are any partic.ular issues that should be taken into account in considering development on any particular sites or any particular areas, please provide details.

We consider that a more in depth analysis needs to be undertaken of the brownfield windfall sites which make up the housing supply and, in particular, their ability to be brought forward. It is not clear to the development industry, given the current rates of completions and the need for a significant step up in delivery rates, that the windfall sites will come forward at the rate required.

A study needs to be undertaken regarding the true capacity likely to be obtained from brownfield windfalls. This will help to identify an appropriate non completion allowance.




To: Black Country Core Strategy - Dudley MBC Date: 81h Septembe r 2017




As noted in the response to Question 1, we also believe that the SHMA needs to be reviewed so that it follows the housing market area and not simply Local Autho rity boundaries.

We further support the intention identified at paragraph 3.11 that the Council intends to explore new means of providing housing beyond the housing market area used for the BCCS review where there are clear migration or commuting links with Local Author ities. This strengthens our view that the SHLLA may have to be reviewed because of the linkages with surrounding authorities.

We also note that there appears to be no acknowledgement that the current shortfall provision, identified at some 3,000 units, has been taken into account in the housing requirement figure.

We are also of a view that the Black Country Green Belt review should prioritised. It is noted that it is suggested that the Green Belt review will not be completed until mid 2018. It is, however, anticipated that the preferred options consultation will be undertaken in September 2018. There is going to be a clear reliance on Green Belt sites in delivering the emerging housing requirement. We are concerned that there is insufficient time for the Author ities to properly digest the findings of the Green Belt review and identify strategy for new development based upon Green Belt land release in and around the Authority area in the time allowed between the completion of a Green Belt study and the publication of a consultation document.

Finally, we believe that further research should be undertaken regarding the effect of Government grant regimes in bringing sites forward. Our experience to date has been that the programmes have been time consuming, costly and unwieldly and have had limited benefit in helping to increase the supply of housing land.

Question 3 - Do you agree that the housing need identified for the Black Country over the period 2014 to 2036 in the SHMA, and the anticipated amount of supply, are appropriate and in line with national guidance? Yes/No .

If not, please explain why they are not appropriate and in line with national guidance.

National guidance requires Local Authorities to meet the full, objectively assessed needs in the market and affordable housing in their housing market area, as far is consistent with policies set out in the Framework. The objective is to boost significantly the supply of housing.

We have already commented in respect of our responses to Questions 1 and 2 that the SHMA needs to be reviewed and this could lead to an increase in the overall requirement for the Black Country Authorities.

As a starting point, we are concerned with the approach the SHMA has undertaken towards the HMA. It is advised that the SHMA does not seek to visit the HMA but build upon the work undertaken in establishing the Greater Birmingham HMA part of the preparation of the Birmingham Development Plan. HMAs overlap. The HMA for Birmingham will not be exactly the same as that for the Black Country. The emerging SHMA should have at least tested whet her the HMA boundary remains valid for the purposes of its assessment. This approach is, however, entirely missing.

It should also be noted that the SHMA does not fully address affordable housing requirements . It is confirmed in paragraphs 7.26 to 7.29 of the SHMA that the National Planning Practice Guide requires a "policy on" calculation of the housing needs for certain groups of people. Affordable housing need is not a direct component of the demographic part of the objectively assessed








To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017



needs assessment. As such, an updated calculation of this nature is not included in the SHMA. It is for the client Authorities to consider whether more new homes over and above the objectively assessed housing needs figure identified in the SHMA should be provided in the plan area to address more affordable housing need through policy adjustments .

The Framework advises that paragraph 159 that Local Authorities should develop SHMAs to inform their local plans. The SHMA should, amongst other things, "address the need for all types of housing, including affordable housing and the need for different groups in the community". This process has not been completed by the SHMA. It does not, therefore, provide a complete picture of housing need within the subject Authority areas.

The SHMA is not, therefore, in accordance with national guidance in this regard. The SHMA needs to be supplemented with additional information that factor in affordable housing requirements to establish a true objectively assessed housing needs figure.

Furthermore , there is a difference between the objectively assessed housing needs figure and the quantum of housing which should be allocated for development by the plan. Not all housing sites deliver as expected. This is clearly evidenced by the existing Core Strategy where there has been significant under delivery in the Growth Network. As referred to in our response to Question 1, there is clear uncertainty regarding for delivery of a significant number of the housing sites identified on the existing employment land by the current development plan documents. It is necessary for the emerging Core Strategy to identify housing requirement notably above the objectively assessed housing needs figure take account of non-delivery of proposed housing allocations. At the present time the Black Country Core Strategy has undelivered its housing requirement by approximately 11.6% (Appendix C - Black Country Monitoring Summary). It is, therefore, our view that the finalised objectively assessed housing needs figure should be increased by a minimum of 11.6% of flexibility to supply and to take account of the delivery in delivering the urban regeneration sites.

The current completion rates are significantly below what is required for even the current local plan figure and are significantly below the figure of 3,690 units per annum identified above. Even at 78,190 units over the plan period, this produces an annual requirement of 3,554 units per annum which is also far in excess of what has ever been achieved annually in the SCCS. We consider that this is a challenging figure in terms of the current supply , over half of which is dependent upon existing housing supply in the urban area and is largely made up of brownfield windfalls.

In this context we believe that it is going to be important to significantly change the balance of the current supply with a far greater reliance on greenfield/Green Belt sites than the 25,000 units identified.

We note that the overall supply from the urban area depends upon some 42 ,507 units from existing sites in the urban area and a further 8,335 units from the urban area, much of which appears to come from former employment sites.

Given the problems in releasing employment sites in the current strategy (see paragraph 3.16 and paragraph 2.5, the latter identifying the problems in releasing employment sites), we consider that the local plan strategy wh ich relies on some 65% of provision on urban brownfield/windfall sites (using the draft figure of 78,190) is wholly unrealistic given that, to date, the current local plan has failed to meet existing requirements.













To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017



The components of the supply in the urban area (completions plus existing housing supply plus estimated further housing supply) total some 56,520 units which equates to a requirement of 2,569 units per annum over the new plan period. However, that required completion figure is in excess of what has been achieved to date through the current local plan, which relies entirely upon brownfield windfalls in the urban area, that figure being 2,325 units per annum.

It is apparent , therefore, that the current supply of brownfield/windfall sites is unlikely to produce sufficient units to meet its share of the housing requirement and, therefo re, the contribution which this makes to the overall requirement should be reduced (this will be consistent with our argument about adopting a non completion rate) and the contribution from greenfield/Green Belt sites outside the existing urban boundary should be increased. This will require contributions to be made from greenfield/Green Belt sites within the BCCS administrative area and also from sites in sustainable locat ions which are well related to the Black Country in neighbouring authorities.

Although we reserve our position on this point, we would expect that the contribution from the existing brownfield windfalls to be reduced by some 25%, to reflect the problems of market attractiveness, viability , delivery etc and with a consequent increase in the greenfield/Green Belt allocations.

In summary, the SHMA does not properly identify the housing requirement for the HMA. In addition, the reliance upon brownfield urban sites is not supported by evidence. There is, therefore, a requirement for a fundamental shift in the plan strategy with greater reliance placed upon Green Belt/greenfield land release in and around the wider HMA area of sustainable locations in order to ensure delivery.

Question 4 - Do you consider the employment land requirement identified to the Black Country up to 2036 in the EDNA is appropr iate and in line with national guidance? Yes/No . If not, please explain why they are not appropriate and in line with national guidance.

It is not clear if the land requirement fully encompasses land to be lost to residential development and other uses. The current supply of housing identified in the emerg ing plan requires a significant contribution to be made from former employment sites. It has been noted, however, in the Issues and Options document that employment sites have failed to come forward at the rate expected, partly owing to problems in site delivery but also partly because of recovery in the demand for the stock of existing employment sites.

We expect that demand to continue for local and sub regional requirements on appropriate sites.

In addition, we believe there will be a demand for large, greenfield sites to encourage inward investment and we consider that sites should be identified to the north and south of the Black Country which are well connected to the existing motorway network.

We consider that the employment requirement should be based on a net addition in order to take account of any losses to alternative land uses.

We agree that a range of sites will need to be allocated including, as noted above, high quality sites to attract inward investment.

To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




We also question whether the figure of 394 hectares of employment land can be regarded as being realistically deliverable and we believe that further assessment about the delivery of this land should be undertaken.

Question 5 - Do you agree with the proposed approach to the Black Country Green Belt Review? Yes/No. If not, what additional work do you think is necessary?

We agree that a review of the Green Belt is an imperative element of the new strategy. This needs to be completed in time to inform the Core Strategy Review to be published in September 2018.

We consider the review will need to assess the implications of land release 1n adjoining Authorities including South Staffordshire, Wyre Forest and Bromsgrove.

Green Belt sites in both the Black Country Authority area and in these other authorities will have a vital role to play in providing the necessary housing supply to meet the housing requirement over the plan period. They will need to make an early contribution to housing supply and should not be phased for delivery in the latter part of the plan period.

We also think it is important that the Green Belt Review extends beyond the current plan period in order to provide a lasting Green Belt boundary in accordance with the advice set out in paragraphs 83 and 85 of the Framework. That advice suggests that the boundaries should be set so that they are capable of enduring beyond the plan period. If necessary, safeguarded land between the urban area and the Green Belt should be identified in order to meet long term development needs "stretching well beyond the plan period' .

We would suggest that the Green Belt Review should be conducted in order to provide for development needs up to 2051.

Question 6 - Do you agree that the key issues set out in part 3 are key issues that need to be taken into account through the Core Strategy Review? Yes/No. If not, what other key issues should be taken into account.

We believe that an extensive review needs to be undertaken in order to ensure that an appropriate strategy is arrived at. Clearly, reliance upon the existing strategy will fail to meet the housing requirement and employment land requirement identified.

We believe that elements of the evidence base require furthe r exam ination including the SHMA and also the likely delivery of housing and employment from existing brownfield windfalls and existing sites.

There appears to be some confusion in the plan as to the extent of the gap identif ied. The policy talks about 22,000 homes but then also identifies a further 3,000 units as a shortfall in the housing area. It is unclear if the current shortfall of 3,000 units has been addressed.

In this context there may be a need to identify a further 28,000 homes over and above the existing, alleged, capacity in the urban area.

There is a need to continue to plan for a growing population. However, the SHMA underestimates delivery, this is not taken into account affordable housing needs. Furthermore, the emerg ing plan housing requirement will need to take into account the fact that not all housing allocations deliver. As a consequence the housing requirement will need to be significantly











To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




above the objectively assessed housing needs figure within the SHMA. The suggested "gap" between supply and need of 22,000 dwellings is, therefore , less than that actually required.

This figure may increase further when proper account is taken of the true delivery capabilities of the land in the existing urban area. So far, the current local plan has failed to deliver development rates which would meet with the housing requirement for the new plan period and indeed do not even meet the requirement which will be needed from the current supply identified. This suggests that the contribution from greenfield/Green Belt sites from within the SCCS area and from Authorities adjoining it will need to be increased significantly.

The Green Belt release should not be seen as a matter of a last resort but needs to be part of an overall strategy with early releases needed to ensure supply of housing sites in the early part of the plan period.


Question 7 - Do you think that the Core Strategy Vision and Sustainability principles remain appropriate? Yes/No. If not, what alternative would you suggest?

We are content with four of the five Core Strategy Vision and Sustainability principles but the fourth bullet point, 'Brownfield first' is no longer relevant. As we have explained in our responses to previous questions, the reliance on Brownfield development needs to be significantly reduced. It is already acknowledged that a significant number of homes, 22,000 - 25 ,000 may have to be allocated on Greenfield I Green Belt sites (these could be still higher if the current shortfall is to be rectified) and if an update to the SHMA reveals the need to release new land to meet affordable housing needs. We have already explained that we are concerned that there is an over reliance on Brownfield sites and that this could, overall, increase the requirement for new development on Green Field I Green Belt sites to some 40,000 units which will be approximately half of the overall housing requirement, once account is taken of the shortfall from the early part of the current local plan period.

For these reasons, Greenfield I Green Belt sites will have to be released at the same time as the Brownfield supply in order to ensure an adequate supply in the early part of the planning period. This is entirely consistent with paragraph 17 of the Framework which, whilst encouraging the reuse of brownfield sites, does not seek to prioritise their use over greenfield sites.

We would also question whether or not the reference to 'comprehensive approach to development' has any real meaning in terms of delivery of individual sites. We consider that if 'comprehensive ' development is required this can still take place on a phased basis so long as new development achieves a comprehensive approach in due course.

Question 8 - Do you think that the Core Strategy Spatial objectives remain appropriate? Yes/No. If not, what alternative would you suggest and how might these changes impact on the individual Core Strategy policies?

We consider that spatial objectives two and three need to be reviewed. Whilst we would continue to support the delivery of high quality employment and with in the regeneration corridors, which will also be helpful to local business, it should be recognised that inward investme nt may require high quality Greenfield sites on the edge of the Black Country. The availability of land 6a54 was a considerable benefit in bringing JLR to the Black Country and the opportunity for similar scale developments should be seized through the local plan review process. In particular, we consider that further strategic employment development on the north side of the Black Country and also to the south east, adjoining Junction 3 of the M5, should be identified.











To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017





We also have concerns that the regeneration corridors have failed to deliver wide spread change throughout the Black Country and that they may not provide a basis for sustainable communities in the new plan. In this context, we believe that this particular objective should be replaced with the following:

'Identification of a series of deliverable housing sites on Brownfield and Greenfield within, adjoining and well connected to the Black Country which will meet the BCCS requirement over the plan period. These sites will be of differing scales and will provide different market opportunities to delivering housing over the planning period. '

Question 9 - Do you agree that Policies CSP1 and CSP2 should be retained and updated to reflect new evidence and growth proposals outside the growth network? Yes/No. If not, what changes do you think should be made to Policies CSP1 and CSP2 in response to new challenges and opportunities?

We agree that the policies should be changed. The growth network strategy will not provide for the new housing and employment requirements for the Emerging Local Plan and need to be amended to reflect the fact that a significant proportion of both housing and strategic employment sites will have to take place on Greenfield I Green Belt sites outside of the current urban boundary and indeed on sites outsides of the BCCS administrative area.

The presumption in favour of using Brownfield sites first also needs to be altered so that an appropriate portfolio of residential and employment sites can be developed over the planning period.

Question 10 - In continuing to promote growth within the growth network, is there a need to amend the boundaries of any of the regeneration corridors in the existing Core Strategy? Yes/No.

If so which boundaries and why?

We do not comment upon specific regeneration corridors but we believe that they will all need to be reviewed to see if they are fit for purpose. In particular, they should be examined to see if the employment elements are still likely to be required by the existing and new local businesses. Where it is clear that significant change in the regeneration corridor are unlikely to happen during the new planning period, alternative provision should be made.

Question 11A - Do you support Strategic Option 1A? Yes/No.

We consider that Option 1A is to be preferred to Strategic Option 1B. That said, we believe there continues to be an overre liance upon Brownfield I windfall sites in the existing supply and there is also an over reliance on Brownfield windfalls in the estimated further housing supply.

We consider, therefore, that overall the Greenfield requirement should provide some 40 ,000 units of the overall requirement which itself should be increased to 81,290 units.

Question 11A - Do you support Option 1B? Yes/No.

We do not support Option 1B. We believe that there is a considerable overreliance on Brownfield
I windfall sites and that there is no real certainty that further employment land can be released








To: Black Country Core Strategy - Dudley MBC Date: gth September 2017




over the plan period to provide housing opportunities. Indeed some of the existing housing allocations need to be reviewed as they will remain in employment use.

In this context , we consider that the Option 1B would not meet the objectives of the housing policies of the Framework particularly those which require the planning system to deliver significantly increased supply of housing land.

Paragraph 47 of the Framework requires housing opportunities to be deliverable and to meet the full, objectively assessed needs for market and affordable housing in the housing market area.

A review of the current local plan strategy has demonstrated that there is considerable uncertainty about reliance on a portfolio of Brownfield windfall sites we consider that strategic Option 1B, which is largely reliant upon such a source of housing opportunities, will not provide any certainty to the development industry regarding the provision of housing throug h the plan period.

Question 12A - Do you support spatial Option H1? Yes/No. What criteria should be used to select suitable sites? Eg. Ability to create a defensible new Green Belt boundary, size, access to existing residential services.


We believe that spatial Option H1 - Rounding off is to be preferred to spatial Option H2 - sustainable urban extensions. We believe that the 'rounding off' approach is more likely to deliver a series of well-planned and well located developments throughout the plan period thereby maintaining a deliverable supply of housing land for the house building industry. This could include sites of approximately 150 - 750 units.

Question 13A - Do you support Spatial Option H2? Yes/No.

What should the characteristics of Sustainable Urban Areas (SUEs) B? E.g. a minimum/maximum size, mix of uses, mix of housing types, accessibility to other areas. What criteria should be used to select suitable sites? E.g. proximity to a rail station, availability of existing infrastructure, easy access to jobs, potential to support existing settlement/services, proximity to the existing growth network, potential to support urban regeneration.

In general terms we do not support Spatial Option H2 in that we believe a range of smaller strategic sites should be provided in the Green Belt in order to ensure a deliverable supply of housing land in the plan period.

We consider that some modest size sustainable urban extensions could be provided. These should have the capacity to support a primary school and local facilities.

We would not favour sustainable urban area extensions of greater size than this as we do not consider that they would be deliverable in the plan period. In this context we believe that modest scale SUEs could be provided as part of a blended Spatial Option H1.

















To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




Question 15A - If all housing need cannot be met within the Black Country, do you support the "export" of housing growth to neighbouring Authorities within the HMA? Yes/No.

What factors should be taken into account in an assessment of the opportunities in neighbouring Authorities e.g. proximity to the edge of the urban area, proximity to a rail station, availability of existing infrastructure, easy access to jobs?

We believe that it will be necessary for sites to be released outside of the Black Country administrative area in order to meet the housing requirements of the BCCS.

In particular, we believe that sites should be identified in South Staffordshire , Wyre Forest and Bromsgrove districts which could accommodate some of the overspill.

We consider that locations should be selected which could fulfil the following criteria.

A. Be situated immediately adjoining the Black Country administrative boundary and with the ability to achieve easy access to the existing urban area: or

B. Be located in settlements in close proximity to the Black Country.

By these means people from the Black Country will be able to find suitable housing in locations which still afford them the opportunity to support the economic growth of the Black Country and will remain in employment in the Black Country area.

Question 158 - Do you think that there are any potential locations that should be
considered? Yes/No

We believe that Hagley will provide an appropriate location for sites to be released which meet the needs of the Black Country . Hagley is very well related to the Black Country, lying just to the south of the edge of Stourbr idge. It is a sustainable settlement, being the second most sustainable settlement in Bromsgrove District with both primary and secondary schools, a railway station, local facilities and can access the Black Country through the primary road network.

We have ident ified two opportunities for sites to be released at Hagley through the "Call for Sites" process on behalf of Hagley Hall Estate.

The site addresses are as follows:

1. Western Road I Stourbridge Road
2. Stoney Lane I Stakenbridge Lane I Kidderminster Road

The Call for Sites response provides more information regarding the suitability of these two sites for development.

We can confirm that, subject to the release of the sites from the Green Belt through the Bromsgrove District Plan, both sites can be made available in the early part of the plan period and will provide high quality, sustainable developments which will fulf il the housing requirements of residents of the Black Country.




To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




Question 15C - Do you think there are ways to ensure that exporting housing will meet the needs of people who would otherwise live in the Black Country? (E.g. transport improvements, provision of affordable housing, creation of employment opportunities). Yes/No.

Yes, we believe that the best way to ensure that housing provided outside of the Black Country will meet the needs of people, who would otherwise live in the Black Country is to ensure that the location of new development has good functional and geographic links with the Black Country. As noted in our response to Question 15b, sites can be released which immediately adjoin the Black Country and administrative area or are in settlements with strong functional and physical/geographic links with the Black Country. Clearly, there is nothing to stop people migrating from the Black Country into the surrounding Shire Authorities, regardless of housing provision, and, therefore, the provision of additional housing outside of the BCCS, but which will meet the needs of people living in the Black Country, will ensure that the needs of Black Country residents can be met either within the Black Country itself or in settlements which are suitable to serve it.

Question 21 - Do you think that changes are required to Policy DEL1 to ensure it covers both development within the existing urban area and any within the Green Belt? Yes/No.

Policy DEL1 may need to be reviewed to ensure it is compliant with the policies of the Framework and the PPG. Otherwise, it will be important for the SCCS Authorities to work with neighbouring Authorities to ensure that sites which are released to meet the Black Country's needs outside of the SCCS area are also supported by appropriate infrastructure. Some of this may also have to be outside of the BCCS area, particularly for the larger urban expansion sites which may provide local facilities, green space, primary schools etc.

The important point here is to ensure that statutory undertakers are involved with the local plan process at an early stage in order to ensure that necessary infrastructure including highways, drainage and power are available for the development envisaged.

Question 25 - Will there be any new social infrastructure requirements necessary to serve large new housing developments? Yes/No. If yes, please explain the type and scale of any new social infrastructure required.

We suspect that, generally speaking, there will need to be incremental improvements in social infrastructure provision to meet the requirements for the occupants of new development over the plan period. This will need to be assessed in detail with social infrastructure providers and it will be necessary for the BCCS Author ities to work with landowners and developers in this regard together with the relevant strategy consultees.

We should state from the outset that the provision of doctor's surgeries should be regarded as a "private sector" matter. Doctor's surgeries are generally self-funding and do not need to be the subject of Section 106/CI L contributions.

We believe it is likely that some new infrastructure will have to be provided for individual schemes in terms of local highway improvements but this will have to be assessed on a case by case basis. This will probably be best assessed at the local level.




To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




Question 29 - Do you think there are any other tools or interventions that could be used to ensure enough infrastructure is provided by developments? Yes/No.

At this stage we have no comment to make other than to confirm that viability is an important issue which needs to be addressed when dealing with sites. We would say at this stage that the Authorities should adopt realistic expectations as to what social and environmental infrastructure can be borne by individual developments .

Question 30 - Do you have any suggestions around how the strategy can be developed in order to maintain the urban regeneration focus of the Black Country while at the same time bringing forward sites in the Green Belt? Yes/No.

We have commented previously that the new plan will need to shift the emphasis away from urban regeneration to a more balanced provision of brownfield and greenfield sites. Part of a problem with the delivery of brownfield sites in the urban area are that they are returning to an active employment use. The adopted Core Strategy sought to direct new residential development to what was, at the time of its preparation, redundant employment land. These employment sites are now developing a new lease of life. As such, the capacity for residential development on brownfield land is highly limited and these areas are self regenerating into active employment sites.

Furthermore, given the problems in bringing forward any brownfield sites for a variety of reasons, it will be necessary to ensure that greenfield opportunities can be brought forward in the early part of the plan period in order to ensure an appropriate supply of land.

We should add that our experience of working in the Black Country is that Local Authorit ies do need to understand the constraints of developing in the Black Country, particularly in respect of highway and urban design standards. Many of the sites are difficult to develop and the Council's will need to apply development management considerations flexibly in order to ensure that sites can come forwa rd. Many brownfield sites present physical and topographic challenges which can influence the formation of layout and design solutions. All of these factors need to be taken into account when individual planning applications are assessed and Council's should apply flexibility when discussing design solutions, including transportation solutions, with applicants.

Question 31 - Do you think that the right scale in the form of funding is available to support the delivery of the Core Strategy Review? Yes/No. If no, what alternative source of the funding or delivery mechanisms should be investigated?

Our concern is that it takes a considerable amount of time to make funding available for new development and this is holding back sites from being released.

Furthermore, it cannot be guaranteed that the funding which is provided now will continue to be available during the plan period.

In this context it is important to ensure that there is a balance portfolio of housing provided, some of which will be less dependent upon intervention funding. It is for this reason that we endorse a higher proportion of development on greenfield/Green Belt sites that is currently in the plan (see response to Question 3).


To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




Question 34A - Do you agree that the Health and Wellbeing impacts of large development proposals should be considered at the preferred Spatial Option stage of the Core Strategy Review through a Health Impact Assessment approach? Yes/No .

Our response is that such matters will be better addressed at the development management stage when it will be possible to assess the specific impacts on individual schemes . The locational criteria to be applied to the inspection of sites should suffice for development plan purposes. Some of this will reflect matters such as proximity to local services.

Question 348 - What design features do you think are key to ensuring new development encourages healthy living, which could be assessed through the HIA process? Yes/No.

We make no formal comment at this stage but we participate in the next stage of the plan when more details of this approach are given. We would stress, however, that given the likely constraints which will exist on many of the Black Country sites, care should be taken to ensure that overly restrictive policies are not introduced which could further reduce the attractiveness of sites for development.

Question 35 - Do you support the proposed approach to housing land supply? Yes/No.

We agree that HOU1 of the adopted Core Strategy needs to be reviewed. We agree that the proportion of housing to be built on previously developed land will need to be significant ly changed and we have indicated elsewhere that the plan should provide approximately 50% provision of the overall requirement on greenfield/Green Belt sites.

We do not favour the prioritisation of brownfield land over greenfield land. Given the considerable amount of housing required across the SCCS, it will be necessary for both greenfield and brownfield sites to be released at the same time. Indeed, the greenfield/Green Belt sites are likely to serve different areas of the housing market and so it is important that a range of sites are made available for all sectors of the housing market at the same time. Furthermore, the current strategy has failed to deliver the required level of housing from former employment sites.

In terms of a discount rate we note that there have been problems in meeting the housing requirement in the plan period. This is of particular concern given that the housing trajecto ry for the adopted Core Strategy starts at a relatively low rate. The extent of the shortfall is already 3,000 units. Given the problems of bringing forward brownfield sites, acknowledged elsewhere in the Issues and Options document and including matters such as viability , ground conditions, failure to release employment sites, we believe that a discount rate of 25% should be applied. We consider that the proportion of a greenfield land as an element of the overall supply should be increased to provide more certainty about provision across the plan period and to ensure that the housing strategy accords with paragraph 47 of the Framework. It should be noted that the requirement to boost significantly the supply of housing land became national policy after the adoption of the SCCS.

We make no comment at this stage about proposals for high density allocations within strategic centres, particularly in Walsall, until more market research has been carried out to ensure that there is both demand and an appetite from the house building industry to provide this type of product.














To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017



Question 36 - If you think that the current accessibility and density standards set out in Policy HOU2 and Table 8 should be changed, what standards should be applied instead, for example, should the minimum net density of 35 dph be increased to maximise brownfield housing delivery? Yes/No.

The calculation of density standards is a difficult subject. It is always important to start first with an understanding of what the net developable area of a site may be irrespective of whether it is brownfield or greenfield. It will be necessary to have regard to site constraints, parking requirements , offset distances, green infrastructure requirements, drainage requirements etc. All these factors can significantly limit the net developable area on a site. It is importa nt not to overestimate densities which could be achieved when identifying sites to be released for development. Once schemes provide more than 40 dwellings per net developable acre the dens ity will usually require some element of flatted development.

The insistence on 35 dph as a minimum could well be problematic on greenfield sites, particularly if these are expected to accommodate significant areas of green infrastructure .

We would suggest that the policy should be targeted to provide densities of 30 to 40 dph depending upon site specific circumstances. High densities could be achieved in more centralised locations adjoining transport hubs, again subject to achieving acceptable design standards. We have explained elsewhere the importance of ensuring that development management expectations need to be married to strategic housing requirement delivery objectives.

Question 37A - Do you think that the existing Policy HOU2 site size threshold should be kept at 15 homes or more? Yes/No.

We would keep the threshold at 15 homes or more. This will help to assist smaller house builders to provide schemes on smaller sites which tend to have more exacting development management issues such as overlooking, relationship with existing uses etc and which can limit the ability to increase densities.

Question 38 - Do you think that the current accessibility and density standards are appropriate for Green Belt release locations? Yes/No.

In our response to Question 36, we identify the fact that greenfield sites may have more exacting requirements in terms of green infrastructure and that density standards may well have to be reduced. We suggest that density standards of 35 dph net developable should be considered.

Question 39 - Do you think separate accessibility standards are needed for particular types of housing, e.g. housing for the elderly or affordable housing (as occupiers may be less mobile and more dependent on public transport)? Yes/No.

Generally speaking we believe that provision for the housing for the elderly will be demand driven. Occupiers will understand their markets and we would not welcome a restrictive policy regarding the location of either accommodation for the elderly or affordable housing.

Question 40 - Do you agree that the 2017 SHMA findings should be used to set general house type targets for the plan period? Yes/No.

No. The SHLAA does not fully assesses affordable housing requirements as referred to above; as such it should not dictate an overall mix. House builders will provide housing to meet their










To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




assessment of the localised market. Setting general standards across such a large area can be difficult and can cause problems with housing delivery. Furthermore, it is important to understand the likelihood that new housing will also generate movements from existing stock to new stock thereby freeing up smaller properties for first time buyers and younger families.

Question 41A - Do you support the introduction of a policy approach towards self and custom built housing in the Core Strategy? Yes/No.

No, we do not support this approach . This is not a significant sector of the housing market. Given the need to encourage housing on a variety of sites, many of which will have problems in terms of delivery, we would not favour a policy which could create problems for delivery and viability which would arise if self and custom built housing were introduced into any housing requirement.

Question 42 - Do you agree that the annual affordable homes target should be increased to reflect the 2017 Black Country Strategic Housing Market Assessment? Yes/No.

We believe it would be prudent to keep the affordable homes target as originally set. Otherwise this will cause problems for delivery of brownfield sites.

Question 43A - Do you think that the existing Policy HOU3 site size threshold should be kept at 15 homes or more? Yes/No .

Yes, we believe that the site size threshold should be retained at 15 homes. Again this will assist in the delivery of smaller sites by smaller house builders . It will also be more attractive to the registered providers who do wait to manage a few plots on smaller schemes.

Question 44A - Do you think that the affordable housing requirement for eligible sites in Question 43 should be kept at 25% of the total number of homes on site? Yes/No.

Yes, we agree that the figure should be retained at 25%, subject to viability.

Question 45 - Should an increase in affordable housing requirement beset for Green Belt release sites, to reflect the likely financial viability of these sites? Yes/No.

The release of greenfield/Green Belt land also has significant costs associated with it. It is more likely to require new below ground infrastructure to be provided such as drains, power supply etc. Other physical and social infrastructure contributions will also be required such as educat ion, transport etc. Therefore, greenfield sites are not necessarily more able to contribute more significantly to affordable housing than brownfield sites. We believe, therefore , that a flat rate of 25% across the BCCS area should be adopted.

Question 47 - Do you think that Policy HOU5 should be expanded to cover other types of built social infrastructure and set out standards of built social infrastructure to serve major housing developments? Yes/No.

We should first comment that the provision of medical facilities relating to new developments should be funded through the clinical commissioning groups. In most cases this will involve new or extended doctor's surgeries. Doctor's surgeries can be provided through the private sector since the surgeries generate a rental income so that there is a development/investm ent market












To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




ready to provide the product. It does not need to be funded from contributions from residential development.

Education provision will need to be carefully researched so that a capacity in schools is identified in order to avoid unnecessary contributions being sought. The funding implications of the Education Funding Agency also need to be taken into account when assessing education requirements.

In terms of new community facilities, we agree that these need to be carefully assessed in order to ensure that they will in fact be used and also maintained by the local community. In some circumstances it may be better for contributions to be made to upgrade and expand existing facilities rather than create new ones which will simply put a drain on revenue resources.

Question 49A - Is there a need for the existing Policy DEL2 in order to manage the release of poorer quality employment land for housing? Yes/No.

We believe that the policy does need to be refined in order to ensure that land which is not necessary to be retained can be released quickly and easily without the need for extensive marketing. Also we see no reason for the policy to be applied where land has been allocated in an action area plan or similar alternative plan for alternative use.

Question 50 - Do you think that the Core Strategy should continue to set a target for the total employment land stock in Policy EMP1? Yes/No.

We believe that this should be included and that a net target should be set in order to allow for losses to alternative uses.

Question 55 - Do you agree with the proposed proposal to obtain Policy EMP5? Yes/No.

Generally we do not favour contributions which seek to restrict jobs to existing residents. This can cause problems for companies who have their own training and apprenticeship programmes. Whilst it is clearly desirable for Local Authorities to work alongside employers in trying to get local residents into work opportunities, this should be on a voluntary basis and there should not be a requirement to impose what is, in effect, a restrictive trade practice.

Question 94 - Do you support the proposed changes relating to environmental infrastructure and place making? Yes/No.

We appreciate that it will be necessary to review environmental infrastructure in the light of changing circumstances and updated guidance and standards. We will comment further on this issue at the next stage of the plan.

Question 95A - Do you think Garden City principles should be applied at the Black Country? Yes/No.

We would not encourage this as a design approach in the Black Country. Garden City proposals were developed expressly for new settlements. The Black Country has a different history and heritage as do the settlements which are geographically and functionally close to the Black Country. We do not consider that the vernacular of the existing urban area and adjoining settlements is appropriate for Garden City principles.










To: Black Country Core Strategy - Dudley MBC Date: Sth September 2017




Question 96 - Do you support the proposed changes relating to nature conversation? Yes/No.

It should be noted that the inclusion of new natural green space and new development will have implications for net developable areas and consequently, the amount of land which will need to be identified for development. It will also impact upon the viability of schemes and these factors need to be taken into account when assessing overall development requirements.

Question 98 - Do you support the proposed changes relating to design quality? Yes/No.

The introduction of National Space standa rd does have implications for viability since it introduces a significant additional cost to new house building without any necessary uplift in values. It can, therefore, have a significant impact upon the delivery of schemes.

Question 99C - Do you think that National Space standards for housing development should be introduced in the Black Country. Yes/No .

In the context of our response to Question 98, we do not agree that National Space standards should be introduced.

Question 99D - Do you think that the standards should be different for brownfield and greenfield sites? Yes/No.

Given that greenfield sites have their own viability concerns, we would not agree that the standards should vary between brownfield and greenfield sites. In any event we do not support the introduction of National Space standards.

Question 101A - Do you support the proposed changes relating to flood risk, sustainable drainage and urban heat island effects? Yes/No.

Whilst we appreciate the need to have regard to new standards regarding SuDS provision, the implications upon site layout and viability do need to be considered. A f lexible approach will be required from the Local Authorities when assessing individual schemes. In particular, a j oined up approach is needed by strategy undertakers to ensure that SuDS areas will be adopted if they are part of wider open space areas.

Question 103A - Do you think that Policy ENV7 should be changed to allow increased energy efficiency standards to be accepted in lieu of renewable energy provision for non­ domestic buildings? Yes/No .

We consider that the benefits of higher energy efficiency, as opposed to renewable energy should be considered in the planning balance, particularly when this has an implication for viability. Although this may not be capable of being a policy requirement there is no reason why it should not be capable of being taken into account. The residential sector has spent a considerable amount of money investing in improved materials which improve the energy efficiency of buildings and these factors need to be taken into account of both domestic and non­ domestic schemes .

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

Question 101a - Do you support the proposed changes relating to Flood Risk, Sustainable Drainage and Urban Heat Island effects? Yes/No; Further comments?

Representation ID: 2163

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Harris Lamb

Representation Summary:

A flexible approach should be considered for SuDS provision on sites as this may have implications on site layout and viability. A more joined up approach should be considered to adopt SuDS as part of wider open space area.

Full text:

We are instructed by Bloor Homes to submit a response to the Black Country Core Strategy Review - Issues and Options consultation. We welcome the opportunity to comment and to input into the preparation of the Core Strategy at the outset. We have responded to the questions as per the consultation document and have submitted the comments via the online consultation website. We trust you take our comments into consideration and look forward to being notified of future stages of consultation on the Core Strategy.


Question 1 - Do you agree that the Core Strategy Review should be a partial review, retaining and stretching the existing spatial strategy and updating existing policies? Yes/No. If not, what do you think should be the scope of the review?

No, we consider that the review needs to go further than a partial review. Whilst the overall strategy of supporting further housing and employment growth with an emphas is on regeneration should be supported, it is clear that the desire to achieve major regeneration of identified areas has failed, for a var iety of reasons relating to ownership, viability, market perceptions, site suitability etc.

The approach of the BCCS is based upon the revoked West Midlands Regional Spatial Strategy and it was produced prior to the adoption of the Framework. Furthermore, there was a significant shift in the amount of housing and employment land that is required that the Black Country Core Strategy needs to respond to. The emerging Core Strategy is also being prepared in a significantly different econom ic climate to the adopted document. These factors clearly indicate that a new approach should be taken to the development through the Core Strategy review.







LONDON STOKE-ON-TRENT
0207 317 4550 01782 272555 t INVESTORS (

" 'RTPI

NOTIINGHAM WORCESTER

-t! IN PEOPLE



..,...j >'*Ot!Ol>$W(' ""'. "901¢.<*

0115 947 6236 01905 22666 RICS

A full list of Directors available on request Registration No. 4301250 Regulated by RIGS
Harris Lamb Limited, Grosvenor House, 75-76 Francis Road, Edgbaston, Birmingham 816 8SP w w w.harrislamb.com




To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




The adopted Core Strategy seeks to deliver development by focusing the majority of new housing employment land requirements through a Growth Network and a series of Regeneration Corridors. It is, however, advised in the "delivery" section of the emerging Core Strategy (paragraphs 2.5 to 2.11) that the level of concentration in the growth corridors is "less than participated". One of the reasons for this is that more windfall sites will come forward than expected outside of the Growth Network. These windfall sites have assisted in housing delivery. Appendix C - Black Country Monitoring Summary, of the emerging plan advises that there is currently a shortfall of 3,039 dwellings in the Black Country to meet the housing requirement set by the adopted Core Strategy for the plan period to date. The windfall developme nts have effectively bolstered housing delivery whilst the housing allocations within the Regeneration Corridors and Growth Network generally have under delivered.

The Growth Network and Regeneration Corridor approach in the adopted Core Strategy is based upon the delivery of a significant quantum of housing on surplus employment land. The emerging plan advises in paragraph 2.5 that it is transpired that there is "not as much surplus employment land suitable for housing as anticipated". This is partly because the economy has strengthened and local firms are more robust than expected and partly because the sites are more affected by constra ints than expected.

It is, therefore, our view that the approach of the adopted Core Strategy seeking to focus new residential development on poor quality employment land will not deliver the housing numbers required. In addition, as referred to in response to Question 4, new evidence identifies a significant requirement for additional employment land. As a consequence, the emerging Core Strategy should prepare an approach that places less reliance on the delivery of housing on employment land.

This means that the trajectory of the current plan is unlikely to be met since it now relies heavily on windfall sites, some of which are not suited to market requirements or are also subject to contribution and viability problems.

A new strategy is required which will provide a range of sites on both brownfield and greenfield (Green Belt) opportunities which are capable of being delivered in the new plan period and which will be attract ive to the market.

We consider that a portfolio of new strategic sites would be identified in the emerging plan with capacities of 150 to 500 units plus. Such sites are more likely to be deliverable in the plan period although we do see the opportunity for a major mixed use urban extension to the south west of Junction 3 of the MS.

The identification of a range of sites will ensure that there is adequacy of supply and will avoid reliance on major urban extensions which can experience diff iculties in terms of funding and timing.

We also consider that a realistic approach needs to be taken to sites coming forward and that a non implementation rate needs to be identified in respect of the windfall element of the housing requirement. This is particularly important given the considerable reliance given to windfall sites in the current supply figure and the acknowledgement with Review department that there have been problems experienced in bring forward brownfield sites.

We also believe that the strategy needs to encompass wider discuss ions with the adjoining Authorities to the Black Country, including South Staffordshire , Wyre Forest and Bromsgrove

To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




whose administrative boundaries adjoin or are close to the Black Country and where there are functional and geographical linkages.

We believe it is important that the Green Belt releases are phased for the early part of the plan period so that a mix of sites can be made available to meet the needs of the market. This will also help with early delivery and will help Local Authorities to maintain a five year housing land supply and also to boost significantly the supply of housing in accordance with the requirements of paragraph 47 of the Framework .

This approach is entirely consistent with the requirement of the Framework. The Framework requires Local Authorities to "be significantly " for supply of housing land. In accordance with the requirements of footnotes 11 and 12 of the Framework, housing sites would be "deliverable and available" in order to be allocated. The employment led regeneration approach of the emerging Core Strategy has failed this test at least to some degree.

Indeed, it is specifically advised that the higher than anticipated levels of windfall development do "conceal a delivery challenge". There is a large number of major housing sites concentrating the Growth Network. However, many of these sites have multiple constraints and financial assistance is required for them to come forward (paragraph 2.10). This includes 300 hectares of occupied employment land which has been allocated for housing. This approach brings issues of viability due to the cost of land assembly, business relocation and land remediation. Significant amounts of external funding are required to deliver this. Whilst some funding is available, it is not sufficient to cover the costs of compulsory purchase, which may be necessary on many sites. The sites are clearly not "deliverable" or "developable" in the context of the allocations test put in place by paragraph 47 of the Framework . To be considered deliverable, sites should be available for development now and be achievable for a realistic prospect that housing will be delivered on the site. To be considered developable, sites should be in a suitable location for housing development and there should be a reasonable prospect that the site is available and could be viably developed at the point envisaged. This is not the case with a significant number of the employment allocations within the adopted development plan, by the emerging Core Strategies own omission.

Finally, we consider that a more robust SHMA should be undertaken focusing on the Black Country and the adjoining Authorities. The housing market areas should not be confined to the administrative boundaries of the Black Country Authorities. ( HL to review)

Question 2 - Do you think that the key evidence set out in table 1 is sufficient to support the key stages of the Core Strategy Review? Yes/No.

If not, what further evidence is required and, if there are any partic.ular issues that should be taken into account in considering development on any particular sites or any particular areas, please provide details.

We consider that a more in depth analysis needs to be undertaken of the brownfield windfall sites which make up the housing supply and, in particular, their ability to be brought forward. It is not clear to the development industry, given the current rates of completions and the need for a significant step up in delivery rates, that the windfall sites will come forward at the rate required.

A study needs to be undertaken regarding the true capacity likely to be obtained from brownfield windfalls. This will help to identify an appropriate non completion allowance.




To: Black Country Core Strategy - Dudley MBC Date: 81h Septembe r 2017




As noted in the response to Question 1, we also believe that the SHMA needs to be reviewed so that it follows the housing market area and not simply Local Autho rity boundaries.

We further support the intention identified at paragraph 3.11 that the Council intends to explore new means of providing housing beyond the housing market area used for the BCCS review where there are clear migration or commuting links with Local Author ities. This strengthens our view that the SHLLA may have to be reviewed because of the linkages with surrounding authorities.

We also note that there appears to be no acknowledgement that the current shortfall provision, identified at some 3,000 units, has been taken into account in the housing requirement figure.

We are also of a view that the Black Country Green Belt review should prioritised. It is noted that it is suggested that the Green Belt review will not be completed until mid 2018. It is, however, anticipated that the preferred options consultation will be undertaken in September 2018. There is going to be a clear reliance on Green Belt sites in delivering the emerging housing requirement. We are concerned that there is insufficient time for the Author ities to properly digest the findings of the Green Belt review and identify strategy for new development based upon Green Belt land release in and around the Authority area in the time allowed between the completion of a Green Belt study and the publication of a consultation document.

Finally, we believe that further research should be undertaken regarding the effect of Government grant regimes in bringing sites forward. Our experience to date has been that the programmes have been time consuming, costly and unwieldly and have had limited benefit in helping to increase the supply of housing land.

Question 3 - Do you agree that the housing need identified for the Black Country over the period 2014 to 2036 in the SHMA, and the anticipated amount of supply, are appropriate and in line with national guidance? Yes/No .

If not, please explain why they are not appropriate and in line with national guidance.

National guidance requires Local Authorities to meet the full, objectively assessed needs in the market and affordable housing in their housing market area, as far is consistent with policies set out in the Framework. The objective is to boost significantly the supply of housing.

We have already commented in respect of our responses to Questions 1 and 2 that the SHMA needs to be reviewed and this could lead to an increase in the overall requirement for the Black Country Authorities.

As a starting point, we are concerned with the approach the SHMA has undertaken towards the HMA. It is advised that the SHMA does not seek to visit the HMA but build upon the work undertaken in establishing the Greater Birmingham HMA part of the preparation of the Birmingham Development Plan. HMAs overlap. The HMA for Birmingham will not be exactly the same as that for the Black Country. The emerging SHMA should have at least tested whet her the HMA boundary remains valid for the purposes of its assessment. This approach is, however, entirely missing.

It should also be noted that the SHMA does not fully address affordable housing requirements . It is confirmed in paragraphs 7.26 to 7.29 of the SHMA that the National Planning Practice Guide requires a "policy on" calculation of the housing needs for certain groups of people. Affordable housing need is not a direct component of the demographic part of the objectively assessed








To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017



needs assessment. As such, an updated calculation of this nature is not included in the SHMA. It is for the client Authorities to consider whether more new homes over and above the objectively assessed housing needs figure identified in the SHMA should be provided in the plan area to address more affordable housing need through policy adjustments .

The Framework advises that paragraph 159 that Local Authorities should develop SHMAs to inform their local plans. The SHMA should, amongst other things, "address the need for all types of housing, including affordable housing and the need for different groups in the community". This process has not been completed by the SHMA. It does not, therefore, provide a complete picture of housing need within the subject Authority areas.

The SHMA is not, therefore, in accordance with national guidance in this regard. The SHMA needs to be supplemented with additional information that factor in affordable housing requirements to establish a true objectively assessed housing needs figure.

Furthermore , there is a difference between the objectively assessed housing needs figure and the quantum of housing which should be allocated for development by the plan. Not all housing sites deliver as expected. This is clearly evidenced by the existing Core Strategy where there has been significant under delivery in the Growth Network. As referred to in our response to Question 1, there is clear uncertainty regarding for delivery of a significant number of the housing sites identified on the existing employment land by the current development plan documents. It is necessary for the emerging Core Strategy to identify housing requirement notably above the objectively assessed housing needs figure take account of non-delivery of proposed housing allocations. At the present time the Black Country Core Strategy has undelivered its housing requirement by approximately 11.6% (Appendix C - Black Country Monitoring Summary). It is, therefore, our view that the finalised objectively assessed housing needs figure should be increased by a minimum of 11.6% of flexibility to supply and to take account of the delivery in delivering the urban regeneration sites.

The current completion rates are significantly below what is required for even the current local plan figure and are significantly below the figure of 3,690 units per annum identified above. Even at 78,190 units over the plan period, this produces an annual requirement of 3,554 units per annum which is also far in excess of what has ever been achieved annually in the SCCS. We consider that this is a challenging figure in terms of the current supply , over half of which is dependent upon existing housing supply in the urban area and is largely made up of brownfield windfalls.

In this context we believe that it is going to be important to significantly change the balance of the current supply with a far greater reliance on greenfield/Green Belt sites than the 25,000 units identified.

We note that the overall supply from the urban area depends upon some 42 ,507 units from existing sites in the urban area and a further 8,335 units from the urban area, much of which appears to come from former employment sites.

Given the problems in releasing employment sites in the current strategy (see paragraph 3.16 and paragraph 2.5, the latter identifying the problems in releasing employment sites), we consider that the local plan strategy wh ich relies on some 65% of provision on urban brownfield/windfall sites (using the draft figure of 78,190) is wholly unrealistic given that, to date, the current local plan has failed to meet existing requirements.













To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017



The components of the supply in the urban area (completions plus existing housing supply plus estimated further housing supply) total some 56,520 units which equates to a requirement of 2,569 units per annum over the new plan period. However, that required completion figure is in excess of what has been achieved to date through the current local plan, which relies entirely upon brownfield windfalls in the urban area, that figure being 2,325 units per annum.

It is apparent , therefore, that the current supply of brownfield/windfall sites is unlikely to produce sufficient units to meet its share of the housing requirement and, therefo re, the contribution which this makes to the overall requirement should be reduced (this will be consistent with our argument about adopting a non completion rate) and the contribution from greenfield/Green Belt sites outside the existing urban boundary should be increased. This will require contributions to be made from greenfield/Green Belt sites within the BCCS administrative area and also from sites in sustainable locat ions which are well related to the Black Country in neighbouring authorities.

Although we reserve our position on this point, we would expect that the contribution from the existing brownfield windfalls to be reduced by some 25%, to reflect the problems of market attractiveness, viability , delivery etc and with a consequent increase in the greenfield/Green Belt allocations.

In summary, the SHMA does not properly identify the housing requirement for the HMA. In addition, the reliance upon brownfield urban sites is not supported by evidence. There is, therefore, a requirement for a fundamental shift in the plan strategy with greater reliance placed upon Green Belt/greenfield land release in and around the wider HMA area of sustainable locations in order to ensure delivery.

Question 4 - Do you consider the employment land requirement identified to the Black Country up to 2036 in the EDNA is appropr iate and in line with national guidance? Yes/No . If not, please explain why they are not appropriate and in line with national guidance.

It is not clear if the land requirement fully encompasses land to be lost to residential development and other uses. The current supply of housing identified in the emerg ing plan requires a significant contribution to be made from former employment sites. It has been noted, however, in the Issues and Options document that employment sites have failed to come forward at the rate expected, partly owing to problems in site delivery but also partly because of recovery in the demand for the stock of existing employment sites.

We expect that demand to continue for local and sub regional requirements on appropriate sites.

In addition, we believe there will be a demand for large, greenfield sites to encourage inward investment and we consider that sites should be identified to the north and south of the Black Country which are well connected to the existing motorway network.

We consider that the employment requirement should be based on a net addition in order to take account of any losses to alternative land uses.

We agree that a range of sites will need to be allocated including, as noted above, high quality sites to attract inward investment.

To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




We also question whether the figure of 394 hectares of employment land can be regarded as being realistically deliverable and we believe that further assessment about the delivery of this land should be undertaken.

Question 5 - Do you agree with the proposed approach to the Black Country Green Belt Review? Yes/No. If not, what additional work do you think is necessary?

We agree that a review of the Green Belt is an imperative element of the new strategy. This needs to be completed in time to inform the Core Strategy Review to be published in September 2018.

We consider the review will need to assess the implications of land release 1n adjoining Authorities including South Staffordshire, Wyre Forest and Bromsgrove.

Green Belt sites in both the Black Country Authority area and in these other authorities will have a vital role to play in providing the necessary housing supply to meet the housing requirement over the plan period. They will need to make an early contribution to housing supply and should not be phased for delivery in the latter part of the plan period.

We also think it is important that the Green Belt Review extends beyond the current plan period in order to provide a lasting Green Belt boundary in accordance with the advice set out in paragraphs 83 and 85 of the Framework. That advice suggests that the boundaries should be set so that they are capable of enduring beyond the plan period. If necessary, safeguarded land between the urban area and the Green Belt should be identified in order to meet long term development needs "stretching well beyond the plan period' .

We would suggest that the Green Belt Review should be conducted in order to provide for development needs up to 2051.

Question 6 - Do you agree that the key issues set out in part 3 are key issues that need to be taken into account through the Core Strategy Review? Yes/No. If not, what other key issues should be taken into account.

We believe that an extensive review needs to be undertaken in order to ensure that an appropriate strategy is arrived at. Clearly, reliance upon the existing strategy will fail to meet the housing requirement and employment land requirement identified.

We believe that elements of the evidence base require furthe r exam ination including the SHMA and also the likely delivery of housing and employment from existing brownfield windfalls and existing sites.

There appears to be some confusion in the plan as to the extent of the gap identif ied. The policy talks about 22,000 homes but then also identifies a further 3,000 units as a shortfall in the housing area. It is unclear if the current shortfall of 3,000 units has been addressed.

In this context there may be a need to identify a further 28,000 homes over and above the existing, alleged, capacity in the urban area.

There is a need to continue to plan for a growing population. However, the SHMA underestimates delivery, this is not taken into account affordable housing needs. Furthermore, the emerg ing plan housing requirement will need to take into account the fact that not all housing allocations deliver. As a consequence the housing requirement will need to be significantly











To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




above the objectively assessed housing needs figure within the SHMA. The suggested "gap" between supply and need of 22,000 dwellings is, therefore , less than that actually required.

This figure may increase further when proper account is taken of the true delivery capabilities of the land in the existing urban area. So far, the current local plan has failed to deliver development rates which would meet with the housing requirement for the new plan period and indeed do not even meet the requirement which will be needed from the current supply identified. This suggests that the contribution from greenfield/Green Belt sites from within the SCCS area and from Authorities adjoining it will need to be increased significantly.

The Green Belt release should not be seen as a matter of a last resort but needs to be part of an overall strategy with early releases needed to ensure supply of housing sites in the early part of the plan period.


Question 7 - Do you think that the Core Strategy Vision and Sustainability principles remain appropriate? Yes/No. If not, what alternative would you suggest?

We are content with four of the five Core Strategy Vision and Sustainability principles but the fourth bullet point, 'Brownfield first' is no longer relevant. As we have explained in our responses to previous questions, the reliance on Brownfield development needs to be significantly reduced. It is already acknowledged that a significant number of homes, 22,000 - 25 ,000 may have to be allocated on Greenfield I Green Belt sites (these could be still higher if the current shortfall is to be rectified) and if an update to the SHMA reveals the need to release new land to meet affordable housing needs. We have already explained that we are concerned that there is an over reliance on Brownfield sites and that this could, overall, increase the requirement for new development on Green Field I Green Belt sites to some 40,000 units which will be approximately half of the overall housing requirement, once account is taken of the shortfall from the early part of the current local plan period.

For these reasons, Greenfield I Green Belt sites will have to be released at the same time as the Brownfield supply in order to ensure an adequate supply in the early part of the planning period. This is entirely consistent with paragraph 17 of the Framework which, whilst encouraging the reuse of brownfield sites, does not seek to prioritise their use over greenfield sites.

We would also question whether or not the reference to 'comprehensive approach to development' has any real meaning in terms of delivery of individual sites. We consider that if 'comprehensive ' development is required this can still take place on a phased basis so long as new development achieves a comprehensive approach in due course.

Question 8 - Do you think that the Core Strategy Spatial objectives remain appropriate? Yes/No. If not, what alternative would you suggest and how might these changes impact on the individual Core Strategy policies?

We consider that spatial objectives two and three need to be reviewed. Whilst we would continue to support the delivery of high quality employment and with in the regeneration corridors, which will also be helpful to local business, it should be recognised that inward investme nt may require high quality Greenfield sites on the edge of the Black Country. The availability of land 6a54 was a considerable benefit in bringing JLR to the Black Country and the opportunity for similar scale developments should be seized through the local plan review process. In particular, we consider that further strategic employment development on the north side of the Black Country and also to the south east, adjoining Junction 3 of the M5, should be identified.











To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017





We also have concerns that the regeneration corridors have failed to deliver wide spread change throughout the Black Country and that they may not provide a basis for sustainable communities in the new plan. In this context, we believe that this particular objective should be replaced with the following:

'Identification of a series of deliverable housing sites on Brownfield and Greenfield within, adjoining and well connected to the Black Country which will meet the BCCS requirement over the plan period. These sites will be of differing scales and will provide different market opportunities to delivering housing over the planning period. '

Question 9 - Do you agree that Policies CSP1 and CSP2 should be retained and updated to reflect new evidence and growth proposals outside the growth network? Yes/No. If not, what changes do you think should be made to Policies CSP1 and CSP2 in response to new challenges and opportunities?

We agree that the policies should be changed. The growth network strategy will not provide for the new housing and employment requirements for the Emerging Local Plan and need to be amended to reflect the fact that a significant proportion of both housing and strategic employment sites will have to take place on Greenfield I Green Belt sites outside of the current urban boundary and indeed on sites outsides of the BCCS administrative area.

The presumption in favour of using Brownfield sites first also needs to be altered so that an appropriate portfolio of residential and employment sites can be developed over the planning period.

Question 10 - In continuing to promote growth within the growth network, is there a need to amend the boundaries of any of the regeneration corridors in the existing Core Strategy? Yes/No.

If so which boundaries and why?

We do not comment upon specific regeneration corridors but we believe that they will all need to be reviewed to see if they are fit for purpose. In particular, they should be examined to see if the employment elements are still likely to be required by the existing and new local businesses. Where it is clear that significant change in the regeneration corridor are unlikely to happen during the new planning period, alternative provision should be made.

Question 11A - Do you support Strategic Option 1A? Yes/No.

We consider that Option 1A is to be preferred to Strategic Option 1B. That said, we believe there continues to be an overre liance upon Brownfield I windfall sites in the existing supply and there is also an over reliance on Brownfield windfalls in the estimated further housing supply.

We consider, therefore, that overall the Greenfield requirement should provide some 40 ,000 units of the overall requirement which itself should be increased to 81,290 units.

Question 11A - Do you support Option 1B? Yes/No.

We do not support Option 1B. We believe that there is a considerable overreliance on Brownfield
I windfall sites and that there is no real certainty that further employment land can be released








To: Black Country Core Strategy - Dudley MBC Date: gth September 2017




over the plan period to provide housing opportunities. Indeed some of the existing housing allocations need to be reviewed as they will remain in employment use.

In this context , we consider that the Option 1B would not meet the objectives of the housing policies of the Framework particularly those which require the planning system to deliver significantly increased supply of housing land.

Paragraph 47 of the Framework requires housing opportunities to be deliverable and to meet the full, objectively assessed needs for market and affordable housing in the housing market area.

A review of the current local plan strategy has demonstrated that there is considerable uncertainty about reliance on a portfolio of Brownfield windfall sites we consider that strategic Option 1B, which is largely reliant upon such a source of housing opportunities, will not provide any certainty to the development industry regarding the provision of housing throug h the plan period.

Question 12A - Do you support spatial Option H1? Yes/No. What criteria should be used to select suitable sites? Eg. Ability to create a defensible new Green Belt boundary, size, access to existing residential services.


We believe that spatial Option H1 - Rounding off is to be preferred to spatial Option H2 - sustainable urban extensions. We believe that the 'rounding off' approach is more likely to deliver a series of well-planned and well located developments throughout the plan period thereby maintaining a deliverable supply of housing land for the house building industry. This could include sites of approximately 150 - 750 units.

Question 13A - Do you support Spatial Option H2? Yes/No.

What should the characteristics of Sustainable Urban Areas (SUEs) B? E.g. a minimum/maximum size, mix of uses, mix of housing types, accessibility to other areas. What criteria should be used to select suitable sites? E.g. proximity to a rail station, availability of existing infrastructure, easy access to jobs, potential to support existing settlement/services, proximity to the existing growth network, potential to support urban regeneration.

In general terms we do not support Spatial Option H2 in that we believe a range of smaller strategic sites should be provided in the Green Belt in order to ensure a deliverable supply of housing land in the plan period.

We consider that some modest size sustainable urban extensions could be provided. These should have the capacity to support a primary school and local facilities.

We would not favour sustainable urban area extensions of greater size than this as we do not consider that they would be deliverable in the plan period. In this context we believe that modest scale SUEs could be provided as part of a blended Spatial Option H1.

















To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




Question 15A - If all housing need cannot be met within the Black Country, do you support the "export" of housing growth to neighbouring Authorities within the HMA? Yes/No.

What factors should be taken into account in an assessment of the opportunities in neighbouring Authorities e.g. proximity to the edge of the urban area, proximity to a rail station, availability of existing infrastructure, easy access to jobs?

We believe that it will be necessary for sites to be released outside of the Black Country administrative area in order to meet the housing requirements of the BCCS.

In particular, we believe that sites should be identified in South Staffordshire , Wyre Forest and Bromsgrove districts which could accommodate some of the overspill.

We consider that locations should be selected which could fulfil the following criteria.

A. Be situated immediately adjoining the Black Country administrative boundary and with the ability to achieve easy access to the existing urban area: or

B. Be located in settlements in close proximity to the Black Country.

By these means people from the Black Country will be able to find suitable housing in locations which still afford them the opportunity to support the economic growth of the Black Country and will remain in employment in the Black Country area.

Question 158 - Do you think that there are any potential locations that should be
considered? Yes/No

We believe that Hagley will provide an appropriate location for sites to be released which meet the needs of the Black Country . Hagley is very well related to the Black Country, lying just to the south of the edge of Stourbr idge. It is a sustainable settlement, being the second most sustainable settlement in Bromsgrove District with both primary and secondary schools, a railway station, local facilities and can access the Black Country through the primary road network.

We have ident ified two opportunities for sites to be released at Hagley through the "Call for Sites" process on behalf of Hagley Hall Estate.

The site addresses are as follows:

1. Western Road I Stourbridge Road
2. Stoney Lane I Stakenbridge Lane I Kidderminster Road

The Call for Sites response provides more information regarding the suitability of these two sites for development.

We can confirm that, subject to the release of the sites from the Green Belt through the Bromsgrove District Plan, both sites can be made available in the early part of the plan period and will provide high quality, sustainable developments which will fulf il the housing requirements of residents of the Black Country.




To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




Question 15C - Do you think there are ways to ensure that exporting housing will meet the needs of people who would otherwise live in the Black Country? (E.g. transport improvements, provision of affordable housing, creation of employment opportunities). Yes/No.

Yes, we believe that the best way to ensure that housing provided outside of the Black Country will meet the needs of people, who would otherwise live in the Black Country is to ensure that the location of new development has good functional and geographic links with the Black Country. As noted in our response to Question 15b, sites can be released which immediately adjoin the Black Country and administrative area or are in settlements with strong functional and physical/geographic links with the Black Country. Clearly, there is nothing to stop people migrating from the Black Country into the surrounding Shire Authorities, regardless of housing provision, and, therefore, the provision of additional housing outside of the BCCS, but which will meet the needs of people living in the Black Country, will ensure that the needs of Black Country residents can be met either within the Black Country itself or in settlements which are suitable to serve it.

Question 21 - Do you think that changes are required to Policy DEL1 to ensure it covers both development within the existing urban area and any within the Green Belt? Yes/No.

Policy DEL1 may need to be reviewed to ensure it is compliant with the policies of the Framework and the PPG. Otherwise, it will be important for the SCCS Authorities to work with neighbouring Authorities to ensure that sites which are released to meet the Black Country's needs outside of the SCCS area are also supported by appropriate infrastructure. Some of this may also have to be outside of the BCCS area, particularly for the larger urban expansion sites which may provide local facilities, green space, primary schools etc.

The important point here is to ensure that statutory undertakers are involved with the local plan process at an early stage in order to ensure that necessary infrastructure including highways, drainage and power are available for the development envisaged.

Question 25 - Will there be any new social infrastructure requirements necessary to serve large new housing developments? Yes/No. If yes, please explain the type and scale of any new social infrastructure required.

We suspect that, generally speaking, there will need to be incremental improvements in social infrastructure provision to meet the requirements for the occupants of new development over the plan period. This will need to be assessed in detail with social infrastructure providers and it will be necessary for the BCCS Author ities to work with landowners and developers in this regard together with the relevant strategy consultees.

We should state from the outset that the provision of doctor's surgeries should be regarded as a "private sector" matter. Doctor's surgeries are generally self-funding and do not need to be the subject of Section 106/CI L contributions.

We believe it is likely that some new infrastructure will have to be provided for individual schemes in terms of local highway improvements but this will have to be assessed on a case by case basis. This will probably be best assessed at the local level.




To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




Question 29 - Do you think there are any other tools or interventions that could be used to ensure enough infrastructure is provided by developments? Yes/No.

At this stage we have no comment to make other than to confirm that viability is an important issue which needs to be addressed when dealing with sites. We would say at this stage that the Authorities should adopt realistic expectations as to what social and environmental infrastructure can be borne by individual developments .

Question 30 - Do you have any suggestions around how the strategy can be developed in order to maintain the urban regeneration focus of the Black Country while at the same time bringing forward sites in the Green Belt? Yes/No.

We have commented previously that the new plan will need to shift the emphasis away from urban regeneration to a more balanced provision of brownfield and greenfield sites. Part of a problem with the delivery of brownfield sites in the urban area are that they are returning to an active employment use. The adopted Core Strategy sought to direct new residential development to what was, at the time of its preparation, redundant employment land. These employment sites are now developing a new lease of life. As such, the capacity for residential development on brownfield land is highly limited and these areas are self regenerating into active employment sites.

Furthermore, given the problems in bringing forward any brownfield sites for a variety of reasons, it will be necessary to ensure that greenfield opportunities can be brought forward in the early part of the plan period in order to ensure an appropriate supply of land.

We should add that our experience of working in the Black Country is that Local Authorit ies do need to understand the constraints of developing in the Black Country, particularly in respect of highway and urban design standards. Many of the sites are difficult to develop and the Council's will need to apply development management considerations flexibly in order to ensure that sites can come forwa rd. Many brownfield sites present physical and topographic challenges which can influence the formation of layout and design solutions. All of these factors need to be taken into account when individual planning applications are assessed and Council's should apply flexibility when discussing design solutions, including transportation solutions, with applicants.

Question 31 - Do you think that the right scale in the form of funding is available to support the delivery of the Core Strategy Review? Yes/No. If no, what alternative source of the funding or delivery mechanisms should be investigated?

Our concern is that it takes a considerable amount of time to make funding available for new development and this is holding back sites from being released.

Furthermore, it cannot be guaranteed that the funding which is provided now will continue to be available during the plan period.

In this context it is important to ensure that there is a balance portfolio of housing provided, some of which will be less dependent upon intervention funding. It is for this reason that we endorse a higher proportion of development on greenfield/Green Belt sites that is currently in the plan (see response to Question 3).


To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




Question 34A - Do you agree that the Health and Wellbeing impacts of large development proposals should be considered at the preferred Spatial Option stage of the Core Strategy Review through a Health Impact Assessment approach? Yes/No .

Our response is that such matters will be better addressed at the development management stage when it will be possible to assess the specific impacts on individual schemes . The locational criteria to be applied to the inspection of sites should suffice for development plan purposes. Some of this will reflect matters such as proximity to local services.

Question 348 - What design features do you think are key to ensuring new development encourages healthy living, which could be assessed through the HIA process? Yes/No.

We make no formal comment at this stage but we participate in the next stage of the plan when more details of this approach are given. We would stress, however, that given the likely constraints which will exist on many of the Black Country sites, care should be taken to ensure that overly restrictive policies are not introduced which could further reduce the attractiveness of sites for development.

Question 35 - Do you support the proposed approach to housing land supply? Yes/No.

We agree that HOU1 of the adopted Core Strategy needs to be reviewed. We agree that the proportion of housing to be built on previously developed land will need to be significant ly changed and we have indicated elsewhere that the plan should provide approximately 50% provision of the overall requirement on greenfield/Green Belt sites.

We do not favour the prioritisation of brownfield land over greenfield land. Given the considerable amount of housing required across the SCCS, it will be necessary for both greenfield and brownfield sites to be released at the same time. Indeed, the greenfield/Green Belt sites are likely to serve different areas of the housing market and so it is important that a range of sites are made available for all sectors of the housing market at the same time. Furthermore, the current strategy has failed to deliver the required level of housing from former employment sites.

In terms of a discount rate we note that there have been problems in meeting the housing requirement in the plan period. This is of particular concern given that the housing trajecto ry for the adopted Core Strategy starts at a relatively low rate. The extent of the shortfall is already 3,000 units. Given the problems of bringing forward brownfield sites, acknowledged elsewhere in the Issues and Options document and including matters such as viability , ground conditions, failure to release employment sites, we believe that a discount rate of 25% should be applied. We consider that the proportion of a greenfield land as an element of the overall supply should be increased to provide more certainty about provision across the plan period and to ensure that the housing strategy accords with paragraph 47 of the Framework. It should be noted that the requirement to boost significantly the supply of housing land became national policy after the adoption of the SCCS.

We make no comment at this stage about proposals for high density allocations within strategic centres, particularly in Walsall, until more market research has been carried out to ensure that there is both demand and an appetite from the house building industry to provide this type of product.














To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017



Question 36 - If you think that the current accessibility and density standards set out in Policy HOU2 and Table 8 should be changed, what standards should be applied instead, for example, should the minimum net density of 35 dph be increased to maximise brownfield housing delivery? Yes/No.

The calculation of density standards is a difficult subject. It is always important to start first with an understanding of what the net developable area of a site may be irrespective of whether it is brownfield or greenfield. It will be necessary to have regard to site constraints, parking requirements , offset distances, green infrastructure requirements, drainage requirements etc. All these factors can significantly limit the net developable area on a site. It is importa nt not to overestimate densities which could be achieved when identifying sites to be released for development. Once schemes provide more than 40 dwellings per net developable acre the dens ity will usually require some element of flatted development.

The insistence on 35 dph as a minimum could well be problematic on greenfield sites, particularly if these are expected to accommodate significant areas of green infrastructure .

We would suggest that the policy should be targeted to provide densities of 30 to 40 dph depending upon site specific circumstances. High densities could be achieved in more centralised locations adjoining transport hubs, again subject to achieving acceptable design standards. We have explained elsewhere the importance of ensuring that development management expectations need to be married to strategic housing requirement delivery objectives.

Question 37A - Do you think that the existing Policy HOU2 site size threshold should be kept at 15 homes or more? Yes/No.

We would keep the threshold at 15 homes or more. This will help to assist smaller house builders to provide schemes on smaller sites which tend to have more exacting development management issues such as overlooking, relationship with existing uses etc and which can limit the ability to increase densities.

Question 38 - Do you think that the current accessibility and density standards are appropriate for Green Belt release locations? Yes/No.

In our response to Question 36, we identify the fact that greenfield sites may have more exacting requirements in terms of green infrastructure and that density standards may well have to be reduced. We suggest that density standards of 35 dph net developable should be considered.

Question 39 - Do you think separate accessibility standards are needed for particular types of housing, e.g. housing for the elderly or affordable housing (as occupiers may be less mobile and more dependent on public transport)? Yes/No.

Generally speaking we believe that provision for the housing for the elderly will be demand driven. Occupiers will understand their markets and we would not welcome a restrictive policy regarding the location of either accommodation for the elderly or affordable housing.

Question 40 - Do you agree that the 2017 SHMA findings should be used to set general house type targets for the plan period? Yes/No.

No. The SHLAA does not fully assesses affordable housing requirements as referred to above; as such it should not dictate an overall mix. House builders will provide housing to meet their










To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




assessment of the localised market. Setting general standards across such a large area can be difficult and can cause problems with housing delivery. Furthermore, it is important to understand the likelihood that new housing will also generate movements from existing stock to new stock thereby freeing up smaller properties for first time buyers and younger families.

Question 41A - Do you support the introduction of a policy approach towards self and custom built housing in the Core Strategy? Yes/No.

No, we do not support this approach . This is not a significant sector of the housing market. Given the need to encourage housing on a variety of sites, many of which will have problems in terms of delivery, we would not favour a policy which could create problems for delivery and viability which would arise if self and custom built housing were introduced into any housing requirement.

Question 42 - Do you agree that the annual affordable homes target should be increased to reflect the 2017 Black Country Strategic Housing Market Assessment? Yes/No.

We believe it would be prudent to keep the affordable homes target as originally set. Otherwise this will cause problems for delivery of brownfield sites.

Question 43A - Do you think that the existing Policy HOU3 site size threshold should be kept at 15 homes or more? Yes/No .

Yes, we believe that the site size threshold should be retained at 15 homes. Again this will assist in the delivery of smaller sites by smaller house builders . It will also be more attractive to the registered providers who do wait to manage a few plots on smaller schemes.

Question 44A - Do you think that the affordable housing requirement for eligible sites in Question 43 should be kept at 25% of the total number of homes on site? Yes/No.

Yes, we agree that the figure should be retained at 25%, subject to viability.

Question 45 - Should an increase in affordable housing requirement beset for Green Belt release sites, to reflect the likely financial viability of these sites? Yes/No.

The release of greenfield/Green Belt land also has significant costs associated with it. It is more likely to require new below ground infrastructure to be provided such as drains, power supply etc. Other physical and social infrastructure contributions will also be required such as educat ion, transport etc. Therefore, greenfield sites are not necessarily more able to contribute more significantly to affordable housing than brownfield sites. We believe, therefore , that a flat rate of 25% across the BCCS area should be adopted.

Question 47 - Do you think that Policy HOU5 should be expanded to cover other types of built social infrastructure and set out standards of built social infrastructure to serve major housing developments? Yes/No.

We should first comment that the provision of medical facilities relating to new developments should be funded through the clinical commissioning groups. In most cases this will involve new or extended doctor's surgeries. Doctor's surgeries can be provided through the private sector since the surgeries generate a rental income so that there is a development/investm ent market












To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




ready to provide the product. It does not need to be funded from contributions from residential development.

Education provision will need to be carefully researched so that a capacity in schools is identified in order to avoid unnecessary contributions being sought. The funding implications of the Education Funding Agency also need to be taken into account when assessing education requirements.

In terms of new community facilities, we agree that these need to be carefully assessed in order to ensure that they will in fact be used and also maintained by the local community. In some circumstances it may be better for contributions to be made to upgrade and expand existing facilities rather than create new ones which will simply put a drain on revenue resources.

Question 49A - Is there a need for the existing Policy DEL2 in order to manage the release of poorer quality employment land for housing? Yes/No.

We believe that the policy does need to be refined in order to ensure that land which is not necessary to be retained can be released quickly and easily without the need for extensive marketing. Also we see no reason for the policy to be applied where land has been allocated in an action area plan or similar alternative plan for alternative use.

Question 50 - Do you think that the Core Strategy should continue to set a target for the total employment land stock in Policy EMP1? Yes/No.

We believe that this should be included and that a net target should be set in order to allow for losses to alternative uses.

Question 55 - Do you agree with the proposed proposal to obtain Policy EMP5? Yes/No.

Generally we do not favour contributions which seek to restrict jobs to existing residents. This can cause problems for companies who have their own training and apprenticeship programmes. Whilst it is clearly desirable for Local Authorities to work alongside employers in trying to get local residents into work opportunities, this should be on a voluntary basis and there should not be a requirement to impose what is, in effect, a restrictive trade practice.

Question 94 - Do you support the proposed changes relating to environmental infrastructure and place making? Yes/No.

We appreciate that it will be necessary to review environmental infrastructure in the light of changing circumstances and updated guidance and standards. We will comment further on this issue at the next stage of the plan.

Question 95A - Do you think Garden City principles should be applied at the Black Country? Yes/No.

We would not encourage this as a design approach in the Black Country. Garden City proposals were developed expressly for new settlements. The Black Country has a different history and heritage as do the settlements which are geographically and functionally close to the Black Country. We do not consider that the vernacular of the existing urban area and adjoining settlements is appropriate for Garden City principles.










To: Black Country Core Strategy - Dudley MBC Date: Sth September 2017




Question 96 - Do you support the proposed changes relating to nature conversation? Yes/No.

It should be noted that the inclusion of new natural green space and new development will have implications for net developable areas and consequently, the amount of land which will need to be identified for development. It will also impact upon the viability of schemes and these factors need to be taken into account when assessing overall development requirements.

Question 98 - Do you support the proposed changes relating to design quality? Yes/No.

The introduction of National Space standa rd does have implications for viability since it introduces a significant additional cost to new house building without any necessary uplift in values. It can, therefore, have a significant impact upon the delivery of schemes.

Question 99C - Do you think that National Space standards for housing development should be introduced in the Black Country. Yes/No .

In the context of our response to Question 98, we do not agree that National Space standards should be introduced.

Question 99D - Do you think that the standards should be different for brownfield and greenfield sites? Yes/No.

Given that greenfield sites have their own viability concerns, we would not agree that the standards should vary between brownfield and greenfield sites. In any event we do not support the introduction of National Space standards.

Question 101A - Do you support the proposed changes relating to flood risk, sustainable drainage and urban heat island effects? Yes/No.

Whilst we appreciate the need to have regard to new standards regarding SuDS provision, the implications upon site layout and viability do need to be considered. A f lexible approach will be required from the Local Authorities when assessing individual schemes. In particular, a j oined up approach is needed by strategy undertakers to ensure that SuDS areas will be adopted if they are part of wider open space areas.

Question 103A - Do you think that Policy ENV7 should be changed to allow increased energy efficiency standards to be accepted in lieu of renewable energy provision for non­ domestic buildings? Yes/No .

We consider that the benefits of higher energy efficiency, as opposed to renewable energy should be considered in the planning balance, particularly when this has an implication for viability. Although this may not be capable of being a policy requirement there is no reason why it should not be capable of being taken into account. The residential sector has spent a considerable amount of money investing in improved materials which improve the energy efficiency of buildings and these factors need to be taken into account of both domestic and non­ domestic schemes .

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

Question 103a - Do you think that Policy ENV7 should be changed to allow increased energy efficiency standards to be accepted in lieu of renewable energy provision for non-domestic buildings? Yes/No;

Representation ID: 2164

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Harris Lamb

Representation Summary:

The benefits of higher energy efficiency should be taken into account when considering renewable energy requirements.

Full text:

We are instructed by Bloor Homes to submit a response to the Black Country Core Strategy Review - Issues and Options consultation. We welcome the opportunity to comment and to input into the preparation of the Core Strategy at the outset. We have responded to the questions as per the consultation document and have submitted the comments via the online consultation website. We trust you take our comments into consideration and look forward to being notified of future stages of consultation on the Core Strategy.


Question 1 - Do you agree that the Core Strategy Review should be a partial review, retaining and stretching the existing spatial strategy and updating existing policies? Yes/No. If not, what do you think should be the scope of the review?

No, we consider that the review needs to go further than a partial review. Whilst the overall strategy of supporting further housing and employment growth with an emphas is on regeneration should be supported, it is clear that the desire to achieve major regeneration of identified areas has failed, for a var iety of reasons relating to ownership, viability, market perceptions, site suitability etc.

The approach of the BCCS is based upon the revoked West Midlands Regional Spatial Strategy and it was produced prior to the adoption of the Framework. Furthermore, there was a significant shift in the amount of housing and employment land that is required that the Black Country Core Strategy needs to respond to. The emerging Core Strategy is also being prepared in a significantly different econom ic climate to the adopted document. These factors clearly indicate that a new approach should be taken to the development through the Core Strategy review.







LONDON STOKE-ON-TRENT
0207 317 4550 01782 272555 t INVESTORS (

" 'RTPI

NOTIINGHAM WORCESTER

-t! IN PEOPLE



..,...j >'*Ot!Ol>$W(' ""'. "901¢.<*

0115 947 6236 01905 22666 RICS

A full list of Directors available on request Registration No. 4301250 Regulated by RIGS
Harris Lamb Limited, Grosvenor House, 75-76 Francis Road, Edgbaston, Birmingham 816 8SP w w w.harrislamb.com




To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




The adopted Core Strategy seeks to deliver development by focusing the majority of new housing employment land requirements through a Growth Network and a series of Regeneration Corridors. It is, however, advised in the "delivery" section of the emerging Core Strategy (paragraphs 2.5 to 2.11) that the level of concentration in the growth corridors is "less than participated". One of the reasons for this is that more windfall sites will come forward than expected outside of the Growth Network. These windfall sites have assisted in housing delivery. Appendix C - Black Country Monitoring Summary, of the emerging plan advises that there is currently a shortfall of 3,039 dwellings in the Black Country to meet the housing requirement set by the adopted Core Strategy for the plan period to date. The windfall developme nts have effectively bolstered housing delivery whilst the housing allocations within the Regeneration Corridors and Growth Network generally have under delivered.

The Growth Network and Regeneration Corridor approach in the adopted Core Strategy is based upon the delivery of a significant quantum of housing on surplus employment land. The emerging plan advises in paragraph 2.5 that it is transpired that there is "not as much surplus employment land suitable for housing as anticipated". This is partly because the economy has strengthened and local firms are more robust than expected and partly because the sites are more affected by constra ints than expected.

It is, therefore, our view that the approach of the adopted Core Strategy seeking to focus new residential development on poor quality employment land will not deliver the housing numbers required. In addition, as referred to in response to Question 4, new evidence identifies a significant requirement for additional employment land. As a consequence, the emerging Core Strategy should prepare an approach that places less reliance on the delivery of housing on employment land.

This means that the trajectory of the current plan is unlikely to be met since it now relies heavily on windfall sites, some of which are not suited to market requirements or are also subject to contribution and viability problems.

A new strategy is required which will provide a range of sites on both brownfield and greenfield (Green Belt) opportunities which are capable of being delivered in the new plan period and which will be attract ive to the market.

We consider that a portfolio of new strategic sites would be identified in the emerging plan with capacities of 150 to 500 units plus. Such sites are more likely to be deliverable in the plan period although we do see the opportunity for a major mixed use urban extension to the south west of Junction 3 of the MS.

The identification of a range of sites will ensure that there is adequacy of supply and will avoid reliance on major urban extensions which can experience diff iculties in terms of funding and timing.

We also consider that a realistic approach needs to be taken to sites coming forward and that a non implementation rate needs to be identified in respect of the windfall element of the housing requirement. This is particularly important given the considerable reliance given to windfall sites in the current supply figure and the acknowledgement with Review department that there have been problems experienced in bring forward brownfield sites.

We also believe that the strategy needs to encompass wider discuss ions with the adjoining Authorities to the Black Country, including South Staffordshire , Wyre Forest and Bromsgrove

To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




whose administrative boundaries adjoin or are close to the Black Country and where there are functional and geographical linkages.

We believe it is important that the Green Belt releases are phased for the early part of the plan period so that a mix of sites can be made available to meet the needs of the market. This will also help with early delivery and will help Local Authorities to maintain a five year housing land supply and also to boost significantly the supply of housing in accordance with the requirements of paragraph 47 of the Framework .

This approach is entirely consistent with the requirement of the Framework. The Framework requires Local Authorities to "be significantly " for supply of housing land. In accordance with the requirements of footnotes 11 and 12 of the Framework, housing sites would be "deliverable and available" in order to be allocated. The employment led regeneration approach of the emerging Core Strategy has failed this test at least to some degree.

Indeed, it is specifically advised that the higher than anticipated levels of windfall development do "conceal a delivery challenge". There is a large number of major housing sites concentrating the Growth Network. However, many of these sites have multiple constraints and financial assistance is required for them to come forward (paragraph 2.10). This includes 300 hectares of occupied employment land which has been allocated for housing. This approach brings issues of viability due to the cost of land assembly, business relocation and land remediation. Significant amounts of external funding are required to deliver this. Whilst some funding is available, it is not sufficient to cover the costs of compulsory purchase, which may be necessary on many sites. The sites are clearly not "deliverable" or "developable" in the context of the allocations test put in place by paragraph 47 of the Framework . To be considered deliverable, sites should be available for development now and be achievable for a realistic prospect that housing will be delivered on the site. To be considered developable, sites should be in a suitable location for housing development and there should be a reasonable prospect that the site is available and could be viably developed at the point envisaged. This is not the case with a significant number of the employment allocations within the adopted development plan, by the emerging Core Strategies own omission.

Finally, we consider that a more robust SHMA should be undertaken focusing on the Black Country and the adjoining Authorities. The housing market areas should not be confined to the administrative boundaries of the Black Country Authorities. ( HL to review)

Question 2 - Do you think that the key evidence set out in table 1 is sufficient to support the key stages of the Core Strategy Review? Yes/No.

If not, what further evidence is required and, if there are any partic.ular issues that should be taken into account in considering development on any particular sites or any particular areas, please provide details.

We consider that a more in depth analysis needs to be undertaken of the brownfield windfall sites which make up the housing supply and, in particular, their ability to be brought forward. It is not clear to the development industry, given the current rates of completions and the need for a significant step up in delivery rates, that the windfall sites will come forward at the rate required.

A study needs to be undertaken regarding the true capacity likely to be obtained from brownfield windfalls. This will help to identify an appropriate non completion allowance.




To: Black Country Core Strategy - Dudley MBC Date: 81h Septembe r 2017




As noted in the response to Question 1, we also believe that the SHMA needs to be reviewed so that it follows the housing market area and not simply Local Autho rity boundaries.

We further support the intention identified at paragraph 3.11 that the Council intends to explore new means of providing housing beyond the housing market area used for the BCCS review where there are clear migration or commuting links with Local Author ities. This strengthens our view that the SHLLA may have to be reviewed because of the linkages with surrounding authorities.

We also note that there appears to be no acknowledgement that the current shortfall provision, identified at some 3,000 units, has been taken into account in the housing requirement figure.

We are also of a view that the Black Country Green Belt review should prioritised. It is noted that it is suggested that the Green Belt review will not be completed until mid 2018. It is, however, anticipated that the preferred options consultation will be undertaken in September 2018. There is going to be a clear reliance on Green Belt sites in delivering the emerging housing requirement. We are concerned that there is insufficient time for the Author ities to properly digest the findings of the Green Belt review and identify strategy for new development based upon Green Belt land release in and around the Authority area in the time allowed between the completion of a Green Belt study and the publication of a consultation document.

Finally, we believe that further research should be undertaken regarding the effect of Government grant regimes in bringing sites forward. Our experience to date has been that the programmes have been time consuming, costly and unwieldly and have had limited benefit in helping to increase the supply of housing land.

Question 3 - Do you agree that the housing need identified for the Black Country over the period 2014 to 2036 in the SHMA, and the anticipated amount of supply, are appropriate and in line with national guidance? Yes/No .

If not, please explain why they are not appropriate and in line with national guidance.

National guidance requires Local Authorities to meet the full, objectively assessed needs in the market and affordable housing in their housing market area, as far is consistent with policies set out in the Framework. The objective is to boost significantly the supply of housing.

We have already commented in respect of our responses to Questions 1 and 2 that the SHMA needs to be reviewed and this could lead to an increase in the overall requirement for the Black Country Authorities.

As a starting point, we are concerned with the approach the SHMA has undertaken towards the HMA. It is advised that the SHMA does not seek to visit the HMA but build upon the work undertaken in establishing the Greater Birmingham HMA part of the preparation of the Birmingham Development Plan. HMAs overlap. The HMA for Birmingham will not be exactly the same as that for the Black Country. The emerging SHMA should have at least tested whet her the HMA boundary remains valid for the purposes of its assessment. This approach is, however, entirely missing.

It should also be noted that the SHMA does not fully address affordable housing requirements . It is confirmed in paragraphs 7.26 to 7.29 of the SHMA that the National Planning Practice Guide requires a "policy on" calculation of the housing needs for certain groups of people. Affordable housing need is not a direct component of the demographic part of the objectively assessed








To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017



needs assessment. As such, an updated calculation of this nature is not included in the SHMA. It is for the client Authorities to consider whether more new homes over and above the objectively assessed housing needs figure identified in the SHMA should be provided in the plan area to address more affordable housing need through policy adjustments .

The Framework advises that paragraph 159 that Local Authorities should develop SHMAs to inform their local plans. The SHMA should, amongst other things, "address the need for all types of housing, including affordable housing and the need for different groups in the community". This process has not been completed by the SHMA. It does not, therefore, provide a complete picture of housing need within the subject Authority areas.

The SHMA is not, therefore, in accordance with national guidance in this regard. The SHMA needs to be supplemented with additional information that factor in affordable housing requirements to establish a true objectively assessed housing needs figure.

Furthermore , there is a difference between the objectively assessed housing needs figure and the quantum of housing which should be allocated for development by the plan. Not all housing sites deliver as expected. This is clearly evidenced by the existing Core Strategy where there has been significant under delivery in the Growth Network. As referred to in our response to Question 1, there is clear uncertainty regarding for delivery of a significant number of the housing sites identified on the existing employment land by the current development plan documents. It is necessary for the emerging Core Strategy to identify housing requirement notably above the objectively assessed housing needs figure take account of non-delivery of proposed housing allocations. At the present time the Black Country Core Strategy has undelivered its housing requirement by approximately 11.6% (Appendix C - Black Country Monitoring Summary). It is, therefore, our view that the finalised objectively assessed housing needs figure should be increased by a minimum of 11.6% of flexibility to supply and to take account of the delivery in delivering the urban regeneration sites.

The current completion rates are significantly below what is required for even the current local plan figure and are significantly below the figure of 3,690 units per annum identified above. Even at 78,190 units over the plan period, this produces an annual requirement of 3,554 units per annum which is also far in excess of what has ever been achieved annually in the SCCS. We consider that this is a challenging figure in terms of the current supply , over half of which is dependent upon existing housing supply in the urban area and is largely made up of brownfield windfalls.

In this context we believe that it is going to be important to significantly change the balance of the current supply with a far greater reliance on greenfield/Green Belt sites than the 25,000 units identified.

We note that the overall supply from the urban area depends upon some 42 ,507 units from existing sites in the urban area and a further 8,335 units from the urban area, much of which appears to come from former employment sites.

Given the problems in releasing employment sites in the current strategy (see paragraph 3.16 and paragraph 2.5, the latter identifying the problems in releasing employment sites), we consider that the local plan strategy wh ich relies on some 65% of provision on urban brownfield/windfall sites (using the draft figure of 78,190) is wholly unrealistic given that, to date, the current local plan has failed to meet existing requirements.













To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017



The components of the supply in the urban area (completions plus existing housing supply plus estimated further housing supply) total some 56,520 units which equates to a requirement of 2,569 units per annum over the new plan period. However, that required completion figure is in excess of what has been achieved to date through the current local plan, which relies entirely upon brownfield windfalls in the urban area, that figure being 2,325 units per annum.

It is apparent , therefore, that the current supply of brownfield/windfall sites is unlikely to produce sufficient units to meet its share of the housing requirement and, therefo re, the contribution which this makes to the overall requirement should be reduced (this will be consistent with our argument about adopting a non completion rate) and the contribution from greenfield/Green Belt sites outside the existing urban boundary should be increased. This will require contributions to be made from greenfield/Green Belt sites within the BCCS administrative area and also from sites in sustainable locat ions which are well related to the Black Country in neighbouring authorities.

Although we reserve our position on this point, we would expect that the contribution from the existing brownfield windfalls to be reduced by some 25%, to reflect the problems of market attractiveness, viability , delivery etc and with a consequent increase in the greenfield/Green Belt allocations.

In summary, the SHMA does not properly identify the housing requirement for the HMA. In addition, the reliance upon brownfield urban sites is not supported by evidence. There is, therefore, a requirement for a fundamental shift in the plan strategy with greater reliance placed upon Green Belt/greenfield land release in and around the wider HMA area of sustainable locations in order to ensure delivery.

Question 4 - Do you consider the employment land requirement identified to the Black Country up to 2036 in the EDNA is appropr iate and in line with national guidance? Yes/No . If not, please explain why they are not appropriate and in line with national guidance.

It is not clear if the land requirement fully encompasses land to be lost to residential development and other uses. The current supply of housing identified in the emerg ing plan requires a significant contribution to be made from former employment sites. It has been noted, however, in the Issues and Options document that employment sites have failed to come forward at the rate expected, partly owing to problems in site delivery but also partly because of recovery in the demand for the stock of existing employment sites.

We expect that demand to continue for local and sub regional requirements on appropriate sites.

In addition, we believe there will be a demand for large, greenfield sites to encourage inward investment and we consider that sites should be identified to the north and south of the Black Country which are well connected to the existing motorway network.

We consider that the employment requirement should be based on a net addition in order to take account of any losses to alternative land uses.

We agree that a range of sites will need to be allocated including, as noted above, high quality sites to attract inward investment.

To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




We also question whether the figure of 394 hectares of employment land can be regarded as being realistically deliverable and we believe that further assessment about the delivery of this land should be undertaken.

Question 5 - Do you agree with the proposed approach to the Black Country Green Belt Review? Yes/No. If not, what additional work do you think is necessary?

We agree that a review of the Green Belt is an imperative element of the new strategy. This needs to be completed in time to inform the Core Strategy Review to be published in September 2018.

We consider the review will need to assess the implications of land release 1n adjoining Authorities including South Staffordshire, Wyre Forest and Bromsgrove.

Green Belt sites in both the Black Country Authority area and in these other authorities will have a vital role to play in providing the necessary housing supply to meet the housing requirement over the plan period. They will need to make an early contribution to housing supply and should not be phased for delivery in the latter part of the plan period.

We also think it is important that the Green Belt Review extends beyond the current plan period in order to provide a lasting Green Belt boundary in accordance with the advice set out in paragraphs 83 and 85 of the Framework. That advice suggests that the boundaries should be set so that they are capable of enduring beyond the plan period. If necessary, safeguarded land between the urban area and the Green Belt should be identified in order to meet long term development needs "stretching well beyond the plan period' .

We would suggest that the Green Belt Review should be conducted in order to provide for development needs up to 2051.

Question 6 - Do you agree that the key issues set out in part 3 are key issues that need to be taken into account through the Core Strategy Review? Yes/No. If not, what other key issues should be taken into account.

We believe that an extensive review needs to be undertaken in order to ensure that an appropriate strategy is arrived at. Clearly, reliance upon the existing strategy will fail to meet the housing requirement and employment land requirement identified.

We believe that elements of the evidence base require furthe r exam ination including the SHMA and also the likely delivery of housing and employment from existing brownfield windfalls and existing sites.

There appears to be some confusion in the plan as to the extent of the gap identif ied. The policy talks about 22,000 homes but then also identifies a further 3,000 units as a shortfall in the housing area. It is unclear if the current shortfall of 3,000 units has been addressed.

In this context there may be a need to identify a further 28,000 homes over and above the existing, alleged, capacity in the urban area.

There is a need to continue to plan for a growing population. However, the SHMA underestimates delivery, this is not taken into account affordable housing needs. Furthermore, the emerg ing plan housing requirement will need to take into account the fact that not all housing allocations deliver. As a consequence the housing requirement will need to be significantly











To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




above the objectively assessed housing needs figure within the SHMA. The suggested "gap" between supply and need of 22,000 dwellings is, therefore , less than that actually required.

This figure may increase further when proper account is taken of the true delivery capabilities of the land in the existing urban area. So far, the current local plan has failed to deliver development rates which would meet with the housing requirement for the new plan period and indeed do not even meet the requirement which will be needed from the current supply identified. This suggests that the contribution from greenfield/Green Belt sites from within the SCCS area and from Authorities adjoining it will need to be increased significantly.

The Green Belt release should not be seen as a matter of a last resort but needs to be part of an overall strategy with early releases needed to ensure supply of housing sites in the early part of the plan period.


Question 7 - Do you think that the Core Strategy Vision and Sustainability principles remain appropriate? Yes/No. If not, what alternative would you suggest?

We are content with four of the five Core Strategy Vision and Sustainability principles but the fourth bullet point, 'Brownfield first' is no longer relevant. As we have explained in our responses to previous questions, the reliance on Brownfield development needs to be significantly reduced. It is already acknowledged that a significant number of homes, 22,000 - 25 ,000 may have to be allocated on Greenfield I Green Belt sites (these could be still higher if the current shortfall is to be rectified) and if an update to the SHMA reveals the need to release new land to meet affordable housing needs. We have already explained that we are concerned that there is an over reliance on Brownfield sites and that this could, overall, increase the requirement for new development on Green Field I Green Belt sites to some 40,000 units which will be approximately half of the overall housing requirement, once account is taken of the shortfall from the early part of the current local plan period.

For these reasons, Greenfield I Green Belt sites will have to be released at the same time as the Brownfield supply in order to ensure an adequate supply in the early part of the planning period. This is entirely consistent with paragraph 17 of the Framework which, whilst encouraging the reuse of brownfield sites, does not seek to prioritise their use over greenfield sites.

We would also question whether or not the reference to 'comprehensive approach to development' has any real meaning in terms of delivery of individual sites. We consider that if 'comprehensive ' development is required this can still take place on a phased basis so long as new development achieves a comprehensive approach in due course.

Question 8 - Do you think that the Core Strategy Spatial objectives remain appropriate? Yes/No. If not, what alternative would you suggest and how might these changes impact on the individual Core Strategy policies?

We consider that spatial objectives two and three need to be reviewed. Whilst we would continue to support the delivery of high quality employment and with in the regeneration corridors, which will also be helpful to local business, it should be recognised that inward investme nt may require high quality Greenfield sites on the edge of the Black Country. The availability of land 6a54 was a considerable benefit in bringing JLR to the Black Country and the opportunity for similar scale developments should be seized through the local plan review process. In particular, we consider that further strategic employment development on the north side of the Black Country and also to the south east, adjoining Junction 3 of the M5, should be identified.











To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017





We also have concerns that the regeneration corridors have failed to deliver wide spread change throughout the Black Country and that they may not provide a basis for sustainable communities in the new plan. In this context, we believe that this particular objective should be replaced with the following:

'Identification of a series of deliverable housing sites on Brownfield and Greenfield within, adjoining and well connected to the Black Country which will meet the BCCS requirement over the plan period. These sites will be of differing scales and will provide different market opportunities to delivering housing over the planning period. '

Question 9 - Do you agree that Policies CSP1 and CSP2 should be retained and updated to reflect new evidence and growth proposals outside the growth network? Yes/No. If not, what changes do you think should be made to Policies CSP1 and CSP2 in response to new challenges and opportunities?

We agree that the policies should be changed. The growth network strategy will not provide for the new housing and employment requirements for the Emerging Local Plan and need to be amended to reflect the fact that a significant proportion of both housing and strategic employment sites will have to take place on Greenfield I Green Belt sites outside of the current urban boundary and indeed on sites outsides of the BCCS administrative area.

The presumption in favour of using Brownfield sites first also needs to be altered so that an appropriate portfolio of residential and employment sites can be developed over the planning period.

Question 10 - In continuing to promote growth within the growth network, is there a need to amend the boundaries of any of the regeneration corridors in the existing Core Strategy? Yes/No.

If so which boundaries and why?

We do not comment upon specific regeneration corridors but we believe that they will all need to be reviewed to see if they are fit for purpose. In particular, they should be examined to see if the employment elements are still likely to be required by the existing and new local businesses. Where it is clear that significant change in the regeneration corridor are unlikely to happen during the new planning period, alternative provision should be made.

Question 11A - Do you support Strategic Option 1A? Yes/No.

We consider that Option 1A is to be preferred to Strategic Option 1B. That said, we believe there continues to be an overre liance upon Brownfield I windfall sites in the existing supply and there is also an over reliance on Brownfield windfalls in the estimated further housing supply.

We consider, therefore, that overall the Greenfield requirement should provide some 40 ,000 units of the overall requirement which itself should be increased to 81,290 units.

Question 11A - Do you support Option 1B? Yes/No.

We do not support Option 1B. We believe that there is a considerable overreliance on Brownfield
I windfall sites and that there is no real certainty that further employment land can be released








To: Black Country Core Strategy - Dudley MBC Date: gth September 2017




over the plan period to provide housing opportunities. Indeed some of the existing housing allocations need to be reviewed as they will remain in employment use.

In this context , we consider that the Option 1B would not meet the objectives of the housing policies of the Framework particularly those which require the planning system to deliver significantly increased supply of housing land.

Paragraph 47 of the Framework requires housing opportunities to be deliverable and to meet the full, objectively assessed needs for market and affordable housing in the housing market area.

A review of the current local plan strategy has demonstrated that there is considerable uncertainty about reliance on a portfolio of Brownfield windfall sites we consider that strategic Option 1B, which is largely reliant upon such a source of housing opportunities, will not provide any certainty to the development industry regarding the provision of housing throug h the plan period.

Question 12A - Do you support spatial Option H1? Yes/No. What criteria should be used to select suitable sites? Eg. Ability to create a defensible new Green Belt boundary, size, access to existing residential services.


We believe that spatial Option H1 - Rounding off is to be preferred to spatial Option H2 - sustainable urban extensions. We believe that the 'rounding off' approach is more likely to deliver a series of well-planned and well located developments throughout the plan period thereby maintaining a deliverable supply of housing land for the house building industry. This could include sites of approximately 150 - 750 units.

Question 13A - Do you support Spatial Option H2? Yes/No.

What should the characteristics of Sustainable Urban Areas (SUEs) B? E.g. a minimum/maximum size, mix of uses, mix of housing types, accessibility to other areas. What criteria should be used to select suitable sites? E.g. proximity to a rail station, availability of existing infrastructure, easy access to jobs, potential to support existing settlement/services, proximity to the existing growth network, potential to support urban regeneration.

In general terms we do not support Spatial Option H2 in that we believe a range of smaller strategic sites should be provided in the Green Belt in order to ensure a deliverable supply of housing land in the plan period.

We consider that some modest size sustainable urban extensions could be provided. These should have the capacity to support a primary school and local facilities.

We would not favour sustainable urban area extensions of greater size than this as we do not consider that they would be deliverable in the plan period. In this context we believe that modest scale SUEs could be provided as part of a blended Spatial Option H1.

















To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




Question 15A - If all housing need cannot be met within the Black Country, do you support the "export" of housing growth to neighbouring Authorities within the HMA? Yes/No.

What factors should be taken into account in an assessment of the opportunities in neighbouring Authorities e.g. proximity to the edge of the urban area, proximity to a rail station, availability of existing infrastructure, easy access to jobs?

We believe that it will be necessary for sites to be released outside of the Black Country administrative area in order to meet the housing requirements of the BCCS.

In particular, we believe that sites should be identified in South Staffordshire , Wyre Forest and Bromsgrove districts which could accommodate some of the overspill.

We consider that locations should be selected which could fulfil the following criteria.

A. Be situated immediately adjoining the Black Country administrative boundary and with the ability to achieve easy access to the existing urban area: or

B. Be located in settlements in close proximity to the Black Country.

By these means people from the Black Country will be able to find suitable housing in locations which still afford them the opportunity to support the economic growth of the Black Country and will remain in employment in the Black Country area.

Question 158 - Do you think that there are any potential locations that should be
considered? Yes/No

We believe that Hagley will provide an appropriate location for sites to be released which meet the needs of the Black Country . Hagley is very well related to the Black Country, lying just to the south of the edge of Stourbr idge. It is a sustainable settlement, being the second most sustainable settlement in Bromsgrove District with both primary and secondary schools, a railway station, local facilities and can access the Black Country through the primary road network.

We have ident ified two opportunities for sites to be released at Hagley through the "Call for Sites" process on behalf of Hagley Hall Estate.

The site addresses are as follows:

1. Western Road I Stourbridge Road
2. Stoney Lane I Stakenbridge Lane I Kidderminster Road

The Call for Sites response provides more information regarding the suitability of these two sites for development.

We can confirm that, subject to the release of the sites from the Green Belt through the Bromsgrove District Plan, both sites can be made available in the early part of the plan period and will provide high quality, sustainable developments which will fulf il the housing requirements of residents of the Black Country.




To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




Question 15C - Do you think there are ways to ensure that exporting housing will meet the needs of people who would otherwise live in the Black Country? (E.g. transport improvements, provision of affordable housing, creation of employment opportunities). Yes/No.

Yes, we believe that the best way to ensure that housing provided outside of the Black Country will meet the needs of people, who would otherwise live in the Black Country is to ensure that the location of new development has good functional and geographic links with the Black Country. As noted in our response to Question 15b, sites can be released which immediately adjoin the Black Country and administrative area or are in settlements with strong functional and physical/geographic links with the Black Country. Clearly, there is nothing to stop people migrating from the Black Country into the surrounding Shire Authorities, regardless of housing provision, and, therefore, the provision of additional housing outside of the BCCS, but which will meet the needs of people living in the Black Country, will ensure that the needs of Black Country residents can be met either within the Black Country itself or in settlements which are suitable to serve it.

Question 21 - Do you think that changes are required to Policy DEL1 to ensure it covers both development within the existing urban area and any within the Green Belt? Yes/No.

Policy DEL1 may need to be reviewed to ensure it is compliant with the policies of the Framework and the PPG. Otherwise, it will be important for the SCCS Authorities to work with neighbouring Authorities to ensure that sites which are released to meet the Black Country's needs outside of the SCCS area are also supported by appropriate infrastructure. Some of this may also have to be outside of the BCCS area, particularly for the larger urban expansion sites which may provide local facilities, green space, primary schools etc.

The important point here is to ensure that statutory undertakers are involved with the local plan process at an early stage in order to ensure that necessary infrastructure including highways, drainage and power are available for the development envisaged.

Question 25 - Will there be any new social infrastructure requirements necessary to serve large new housing developments? Yes/No. If yes, please explain the type and scale of any new social infrastructure required.

We suspect that, generally speaking, there will need to be incremental improvements in social infrastructure provision to meet the requirements for the occupants of new development over the plan period. This will need to be assessed in detail with social infrastructure providers and it will be necessary for the BCCS Author ities to work with landowners and developers in this regard together with the relevant strategy consultees.

We should state from the outset that the provision of doctor's surgeries should be regarded as a "private sector" matter. Doctor's surgeries are generally self-funding and do not need to be the subject of Section 106/CI L contributions.

We believe it is likely that some new infrastructure will have to be provided for individual schemes in terms of local highway improvements but this will have to be assessed on a case by case basis. This will probably be best assessed at the local level.




To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




Question 29 - Do you think there are any other tools or interventions that could be used to ensure enough infrastructure is provided by developments? Yes/No.

At this stage we have no comment to make other than to confirm that viability is an important issue which needs to be addressed when dealing with sites. We would say at this stage that the Authorities should adopt realistic expectations as to what social and environmental infrastructure can be borne by individual developments .

Question 30 - Do you have any suggestions around how the strategy can be developed in order to maintain the urban regeneration focus of the Black Country while at the same time bringing forward sites in the Green Belt? Yes/No.

We have commented previously that the new plan will need to shift the emphasis away from urban regeneration to a more balanced provision of brownfield and greenfield sites. Part of a problem with the delivery of brownfield sites in the urban area are that they are returning to an active employment use. The adopted Core Strategy sought to direct new residential development to what was, at the time of its preparation, redundant employment land. These employment sites are now developing a new lease of life. As such, the capacity for residential development on brownfield land is highly limited and these areas are self regenerating into active employment sites.

Furthermore, given the problems in bringing forward any brownfield sites for a variety of reasons, it will be necessary to ensure that greenfield opportunities can be brought forward in the early part of the plan period in order to ensure an appropriate supply of land.

We should add that our experience of working in the Black Country is that Local Authorit ies do need to understand the constraints of developing in the Black Country, particularly in respect of highway and urban design standards. Many of the sites are difficult to develop and the Council's will need to apply development management considerations flexibly in order to ensure that sites can come forwa rd. Many brownfield sites present physical and topographic challenges which can influence the formation of layout and design solutions. All of these factors need to be taken into account when individual planning applications are assessed and Council's should apply flexibility when discussing design solutions, including transportation solutions, with applicants.

Question 31 - Do you think that the right scale in the form of funding is available to support the delivery of the Core Strategy Review? Yes/No. If no, what alternative source of the funding or delivery mechanisms should be investigated?

Our concern is that it takes a considerable amount of time to make funding available for new development and this is holding back sites from being released.

Furthermore, it cannot be guaranteed that the funding which is provided now will continue to be available during the plan period.

In this context it is important to ensure that there is a balance portfolio of housing provided, some of which will be less dependent upon intervention funding. It is for this reason that we endorse a higher proportion of development on greenfield/Green Belt sites that is currently in the plan (see response to Question 3).


To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




Question 34A - Do you agree that the Health and Wellbeing impacts of large development proposals should be considered at the preferred Spatial Option stage of the Core Strategy Review through a Health Impact Assessment approach? Yes/No .

Our response is that such matters will be better addressed at the development management stage when it will be possible to assess the specific impacts on individual schemes . The locational criteria to be applied to the inspection of sites should suffice for development plan purposes. Some of this will reflect matters such as proximity to local services.

Question 348 - What design features do you think are key to ensuring new development encourages healthy living, which could be assessed through the HIA process? Yes/No.

We make no formal comment at this stage but we participate in the next stage of the plan when more details of this approach are given. We would stress, however, that given the likely constraints which will exist on many of the Black Country sites, care should be taken to ensure that overly restrictive policies are not introduced which could further reduce the attractiveness of sites for development.

Question 35 - Do you support the proposed approach to housing land supply? Yes/No.

We agree that HOU1 of the adopted Core Strategy needs to be reviewed. We agree that the proportion of housing to be built on previously developed land will need to be significant ly changed and we have indicated elsewhere that the plan should provide approximately 50% provision of the overall requirement on greenfield/Green Belt sites.

We do not favour the prioritisation of brownfield land over greenfield land. Given the considerable amount of housing required across the SCCS, it will be necessary for both greenfield and brownfield sites to be released at the same time. Indeed, the greenfield/Green Belt sites are likely to serve different areas of the housing market and so it is important that a range of sites are made available for all sectors of the housing market at the same time. Furthermore, the current strategy has failed to deliver the required level of housing from former employment sites.

In terms of a discount rate we note that there have been problems in meeting the housing requirement in the plan period. This is of particular concern given that the housing trajecto ry for the adopted Core Strategy starts at a relatively low rate. The extent of the shortfall is already 3,000 units. Given the problems of bringing forward brownfield sites, acknowledged elsewhere in the Issues and Options document and including matters such as viability , ground conditions, failure to release employment sites, we believe that a discount rate of 25% should be applied. We consider that the proportion of a greenfield land as an element of the overall supply should be increased to provide more certainty about provision across the plan period and to ensure that the housing strategy accords with paragraph 47 of the Framework. It should be noted that the requirement to boost significantly the supply of housing land became national policy after the adoption of the SCCS.

We make no comment at this stage about proposals for high density allocations within strategic centres, particularly in Walsall, until more market research has been carried out to ensure that there is both demand and an appetite from the house building industry to provide this type of product.














To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017



Question 36 - If you think that the current accessibility and density standards set out in Policy HOU2 and Table 8 should be changed, what standards should be applied instead, for example, should the minimum net density of 35 dph be increased to maximise brownfield housing delivery? Yes/No.

The calculation of density standards is a difficult subject. It is always important to start first with an understanding of what the net developable area of a site may be irrespective of whether it is brownfield or greenfield. It will be necessary to have regard to site constraints, parking requirements , offset distances, green infrastructure requirements, drainage requirements etc. All these factors can significantly limit the net developable area on a site. It is importa nt not to overestimate densities which could be achieved when identifying sites to be released for development. Once schemes provide more than 40 dwellings per net developable acre the dens ity will usually require some element of flatted development.

The insistence on 35 dph as a minimum could well be problematic on greenfield sites, particularly if these are expected to accommodate significant areas of green infrastructure .

We would suggest that the policy should be targeted to provide densities of 30 to 40 dph depending upon site specific circumstances. High densities could be achieved in more centralised locations adjoining transport hubs, again subject to achieving acceptable design standards. We have explained elsewhere the importance of ensuring that development management expectations need to be married to strategic housing requirement delivery objectives.

Question 37A - Do you think that the existing Policy HOU2 site size threshold should be kept at 15 homes or more? Yes/No.

We would keep the threshold at 15 homes or more. This will help to assist smaller house builders to provide schemes on smaller sites which tend to have more exacting development management issues such as overlooking, relationship with existing uses etc and which can limit the ability to increase densities.

Question 38 - Do you think that the current accessibility and density standards are appropriate for Green Belt release locations? Yes/No.

In our response to Question 36, we identify the fact that greenfield sites may have more exacting requirements in terms of green infrastructure and that density standards may well have to be reduced. We suggest that density standards of 35 dph net developable should be considered.

Question 39 - Do you think separate accessibility standards are needed for particular types of housing, e.g. housing for the elderly or affordable housing (as occupiers may be less mobile and more dependent on public transport)? Yes/No.

Generally speaking we believe that provision for the housing for the elderly will be demand driven. Occupiers will understand their markets and we would not welcome a restrictive policy regarding the location of either accommodation for the elderly or affordable housing.

Question 40 - Do you agree that the 2017 SHMA findings should be used to set general house type targets for the plan period? Yes/No.

No. The SHLAA does not fully assesses affordable housing requirements as referred to above; as such it should not dictate an overall mix. House builders will provide housing to meet their










To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




assessment of the localised market. Setting general standards across such a large area can be difficult and can cause problems with housing delivery. Furthermore, it is important to understand the likelihood that new housing will also generate movements from existing stock to new stock thereby freeing up smaller properties for first time buyers and younger families.

Question 41A - Do you support the introduction of a policy approach towards self and custom built housing in the Core Strategy? Yes/No.

No, we do not support this approach . This is not a significant sector of the housing market. Given the need to encourage housing on a variety of sites, many of which will have problems in terms of delivery, we would not favour a policy which could create problems for delivery and viability which would arise if self and custom built housing were introduced into any housing requirement.

Question 42 - Do you agree that the annual affordable homes target should be increased to reflect the 2017 Black Country Strategic Housing Market Assessment? Yes/No.

We believe it would be prudent to keep the affordable homes target as originally set. Otherwise this will cause problems for delivery of brownfield sites.

Question 43A - Do you think that the existing Policy HOU3 site size threshold should be kept at 15 homes or more? Yes/No .

Yes, we believe that the site size threshold should be retained at 15 homes. Again this will assist in the delivery of smaller sites by smaller house builders . It will also be more attractive to the registered providers who do wait to manage a few plots on smaller schemes.

Question 44A - Do you think that the affordable housing requirement for eligible sites in Question 43 should be kept at 25% of the total number of homes on site? Yes/No.

Yes, we agree that the figure should be retained at 25%, subject to viability.

Question 45 - Should an increase in affordable housing requirement beset for Green Belt release sites, to reflect the likely financial viability of these sites? Yes/No.

The release of greenfield/Green Belt land also has significant costs associated with it. It is more likely to require new below ground infrastructure to be provided such as drains, power supply etc. Other physical and social infrastructure contributions will also be required such as educat ion, transport etc. Therefore, greenfield sites are not necessarily more able to contribute more significantly to affordable housing than brownfield sites. We believe, therefore , that a flat rate of 25% across the BCCS area should be adopted.

Question 47 - Do you think that Policy HOU5 should be expanded to cover other types of built social infrastructure and set out standards of built social infrastructure to serve major housing developments? Yes/No.

We should first comment that the provision of medical facilities relating to new developments should be funded through the clinical commissioning groups. In most cases this will involve new or extended doctor's surgeries. Doctor's surgeries can be provided through the private sector since the surgeries generate a rental income so that there is a development/investm ent market












To: Black Country Core Strategy - Dudley MBC Date: 81h September 2017




ready to provide the product. It does not need to be funded from contributions from residential development.

Education provision will need to be carefully researched so that a capacity in schools is identified in order to avoid unnecessary contributions being sought. The funding implications of the Education Funding Agency also need to be taken into account when assessing education requirements.

In terms of new community facilities, we agree that these need to be carefully assessed in order to ensure that they will in fact be used and also maintained by the local community. In some circumstances it may be better for contributions to be made to upgrade and expand existing facilities rather than create new ones which will simply put a drain on revenue resources.

Question 49A - Is there a need for the existing Policy DEL2 in order to manage the release of poorer quality employment land for housing? Yes/No.

We believe that the policy does need to be refined in order to ensure that land which is not necessary to be retained can be released quickly and easily without the need for extensive marketing. Also we see no reason for the policy to be applied where land has been allocated in an action area plan or similar alternative plan for alternative use.

Question 50 - Do you think that the Core Strategy should continue to set a target for the total employment land stock in Policy EMP1? Yes/No.

We believe that this should be included and that a net target should be set in order to allow for losses to alternative uses.

Question 55 - Do you agree with the proposed proposal to obtain Policy EMP5? Yes/No.

Generally we do not favour contributions which seek to restrict jobs to existing residents. This can cause problems for companies who have their own training and apprenticeship programmes. Whilst it is clearly desirable for Local Authorities to work alongside employers in trying to get local residents into work opportunities, this should be on a voluntary basis and there should not be a requirement to impose what is, in effect, a restrictive trade practice.

Question 94 - Do you support the proposed changes relating to environmental infrastructure and place making? Yes/No.

We appreciate that it will be necessary to review environmental infrastructure in the light of changing circumstances and updated guidance and standards. We will comment further on this issue at the next stage of the plan.

Question 95A - Do you think Garden City principles should be applied at the Black Country? Yes/No.

We would not encourage this as a design approach in the Black Country. Garden City proposals were developed expressly for new settlements. The Black Country has a different history and heritage as do the settlements which are geographically and functionally close to the Black Country. We do not consider that the vernacular of the existing urban area and adjoining settlements is appropriate for Garden City principles.










To: Black Country Core Strategy - Dudley MBC Date: Sth September 2017




Question 96 - Do you support the proposed changes relating to nature conversation? Yes/No.

It should be noted that the inclusion of new natural green space and new development will have implications for net developable areas and consequently, the amount of land which will need to be identified for development. It will also impact upon the viability of schemes and these factors need to be taken into account when assessing overall development requirements.

Question 98 - Do you support the proposed changes relating to design quality? Yes/No.

The introduction of National Space standa rd does have implications for viability since it introduces a significant additional cost to new house building without any necessary uplift in values. It can, therefore, have a significant impact upon the delivery of schemes.

Question 99C - Do you think that National Space standards for housing development should be introduced in the Black Country. Yes/No .

In the context of our response to Question 98, we do not agree that National Space standards should be introduced.

Question 99D - Do you think that the standards should be different for brownfield and greenfield sites? Yes/No.

Given that greenfield sites have their own viability concerns, we would not agree that the standards should vary between brownfield and greenfield sites. In any event we do not support the introduction of National Space standards.

Question 101A - Do you support the proposed changes relating to flood risk, sustainable drainage and urban heat island effects? Yes/No.

Whilst we appreciate the need to have regard to new standards regarding SuDS provision, the implications upon site layout and viability do need to be considered. A f lexible approach will be required from the Local Authorities when assessing individual schemes. In particular, a j oined up approach is needed by strategy undertakers to ensure that SuDS areas will be adopted if they are part of wider open space areas.

Question 103A - Do you think that Policy ENV7 should be changed to allow increased energy efficiency standards to be accepted in lieu of renewable energy provision for non­ domestic buildings? Yes/No .

We consider that the benefits of higher energy efficiency, as opposed to renewable energy should be considered in the planning balance, particularly when this has an implication for viability. Although this may not be capable of being a policy requirement there is no reason why it should not be capable of being taken into account. The residential sector has spent a considerable amount of money investing in improved materials which improve the energy efficiency of buildings and these factors need to be taken into account of both domestic and non­ domestic schemes .

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

Question 1 - Do you agree that the Core Strategy review should be a partial review, retaining and stretching the existing spatial strategy and updating existing policies? Yes/No; If not, what do you

Representation ID: 2558

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Pegasus Group

Representation Summary:

2.4 In response to Question 1 and whether it should be a partial review or not, whilst the existing strategy identifies the most sustainable locations for growth in the context of delivering development requirements identified by the Regional Strategy (RS), there is now a new and much bigger challenge ahead in meeting the arising needs for homes identified by the latest evidence and there is concern that the existing spatial strategy may not facilitate the delivery of these needs. The Black Country authorities, therefore, need to be mindful of this and not attempt to put "a square peg in a round hole".
2.5 It is our view that urban regeneration can be achieved whilst pursuing development on the urban edge. Indeed, the scale of housing need is so large that both must be encouraged in order to meet current and arising housing needs within the Black Country.
2.6 It is extremely important that in reviewing the Core Strategy it fully takes account of and facilitates the delivery of strategic economic plans, as recognised in paragraph 1.15. All too often these strategies are ignored and, accordingly, development plans could effectively frustrate economic growth from being realised.
2.7 In terms of the Plan period proposed in paragraph 1.17, whilst a 15-year time period from adoption is appropriate, there is concern that the preparation of plans is often delayed (due to reasons beyond the control of the LPAs) and it may be prudent to stretch the period further to prevent such an issue from occurring.
2.8 It is welcomed that the Issues and Options document recognises that it will not be possible to accommodate all future development needs within the urban area and that an examination of the potential for development land outside the existing urban area, which is effectively land within the Green Belt, will take place as part of the Core Strategy review process.

Full text:

Question 1: Do you agree that the Core Strategy review should be a partial review, retaining and stretching the existing spatial strategy and updating existing policies? Yes/No; If not, what do you think should be the scope of the review?
2.4 In response to Question 1 and whether it should be a partial review or not, whilst the existing strategy identifies the most sustainable locations for growth in the context of delivering development requirements identified by the Regional Strategy (RS), there is now a new and much bigger challenge ahead in meeting the arising needs for homes identified by the latest evidence and there is concern that the existing spatial strategy may not facilitate the delivery of these needs. The Black Country authorities, therefore, need to be mindful of this and not attempt to put "a square peg in a round hole".
2.5 It is our view that urban regeneration can be achieved whilst pursuing development on the urban edge. Indeed, the scale of housing need is so large that both must be encouraged in order to meet current and arising housing needs within the Black Country.
2.6 It is extremely important that in reviewing the Core Strategy it fully takes account of and facilitates the delivery of strategic economic plans, as recognised in paragraph 1.15. All too often these strategies are ignored and, accordingly, development plans could effectively frustrate economic growth from being realised.
2.7 In terms of the Plan period proposed in paragraph 1.17, whilst a 15-year time period from adoption is appropriate, there is concern that the preparation of plans is often delayed (due to reasons beyond the control of the LPAs) and it may be prudent to stretch the period further to prevent such an issue from occurring.
2.8 It is welcomed that the Issues and Options document recognises that it will not be possible to accommodate all future development needs within the urban area and that an examination of the potential for development land outside the existing urban area, which is effectively land within the Green Belt, will take place as part of the Core Strategy review process.
3. THE BLACK COUNTRY TODAY - THE EXISTING STRATEGY
3.1 As set out within this section, the delivery of both employment and housing land has not come forward as originally envisaged in part due to the after effects of the recession. Surplus employment land which might have been available for housing has not come forward due to a strengthening economy and local firms being more robust than anticipated. In addition, the range of locations available has not in all cases met with market expectations as to where people want to live.
3.2 In terms of the employment land, it is important that sufficient land is provided for new employment and that there is not an overreliance on land that is currently in use. It is impressive that despite generally poor economic performance local businesses have performed well. Should the economy significantly improve within the Plan period in line with LEP aspirations (considered later in this response), there is concern that it may become difficult to transfer a wide range of existing employment locations to housing allocations. It is appropriate, therefore, for the Council to ensure the evidence contained within the Strategic Housing and Employment Land Availability Assessment is reviewed and updated regularly. This will enable the land supply to be responsive to arising needs and not rigidly be wedded to delivering commitments that are unlikely to be realised.
3.3 What is further emphasised by the analysis in this section is that urban regeneration cannot be delivered quickly and that there are a number of factors beyond the control of the Black Country authorities that may have implications for the delivery of the strategy. This further emphasises the need for a mix of types of sites (brownfield, brownfield compulsory purchase, greenfield and Green Belt) of different forms of development (high density, mid and low density family homes) in a variety of locations, which will maximise the opportunities to deliver a successful Local Plan.
3.4 Finally, in respect of the proposal to maintain 300 hectares of employment land that will become vacant by way of general churn over the Plan period. Whilst the principle is considered acceptable, there should be appropriate evidence to support the assumption.
3.5 Our experience is that there are employment sites that clients are looking to secure a residential allocation on that have not been identified thus far. In light of these changing circumstances, the Black Country authorities should ensure that the policy approach is flexible to allow sites in appropriate locations to be brought forward for housing throughout the Plan period and likewise, sites that have been allocated for housing but have not come forward should be removed from the supply.
4. THE STRATEGIC CHALLENGES & OPPORTUNITIES
4.1 It is welcomed that the Black Country authorities are updating their evidence base. Indeed, the adopted Core Strategy took the development requirements from the adopted Regional Strategy (RS), which has since been revoked and is unquestionably out of date. Since the RS was published there has been a number of population and household projections published showing increasing dwelling requirements in the Black Country, which were largely ignored and, therefore, it should come as no surprise that there is a significant increase in forming households.
4.2 In terms of the list of evidence either prepared or due to be completed, it appears to be sufficiently comprehensive.
4.3 A separate review of the housing evidence based, including the Strategic Housing Market Assessment for the Black Country and South Staffordshire, is contained at Appendix A. The key conclusions arising from the report as summarised as follows:
* In determining the OAN, there are concerns with regard to the SHMA methodology and it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline.
* There is concern that the economic growth scenarios do not use the latest economic forecast data and that the methodology translating the job growth into dwelling growth is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances and also more aspirational job growth targets, such as those arising from the SEP.
* In terms of providing uplifts for market signals, a 25% uplift for South Staffs is appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, it should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack within the housing market and prevent house prices from increasing at an accelerated rate.
4.4 In addition, consideration of the Housing Background Report is also contained in the Housing Evidence Based Review Paper contained at Appendix A. The key findings from reviewing the evidence is set out below:
* Clearly a lot of work is yet to be done to determine what the housing land supply position is in the Black Country. Given that much of the existing evidence is based on the adopted Core Strategy, it is recognised that the SHLAAs across the four authorities will need to be updated, both in terms of revising the methodology and range of sites assessed, to reflect a potentially different approach to locating development.
* It is commendable that the Housing Background Report has examined existing sources of supply in an attempt to provide additional homes from sites within the urban area. There is concern, however, that by changing policies, for example, to increase the minimum density on sites has wider policy implications to take into account than simply increasing the number of homes.
* The Housing Background Report suggests a continued allowance for larger windfall sites. It is suggested that it is inappropriate to include an allowance for this source as there is no certainty that this land will come forward for development.
* Other sources, such as converting employment sites to residential sites, based on the evidence presented and feedback from the development industry, it is known that there are employment sites functioning well as employment sites but are to be converted to residential and other employment sites that are unoccupied and undesirable that are to be retained as employment sites. Clearly, there is a mismatch between employment land need and employment land supply. It is advised that the qualitative assessment of employment informs future land supply recommendations and allocations are revised where necessary.
4.5 As a result of the dwelling requirements generated by the SHMA and the land supply identified from the Housing Background Report, it is concluded that there in insufficient urban land to provide for the development requirements and that a Green Belt Review should be conducted. It is noted that scoping is underway and that the work is to be completed in mid-2018. It is hopeful that the development industry will be involved in defining the methodology of the work to ensure that it is conducted in a robust way.
4.6 Another very important piece of work to be taken into consideration will be the Greater Birmingham and Black Country HMA Strategic Growth Study. It is unclear at this stage what role the Black Country authorities will play in meeting the wider needs of Birmingham and, indeed, whether it can now contribute given that meeting the needs of the indigenous population will be a tall order. Further, there is uncertainty with regard to how far the study will go in identifying locations for growth and how this evidence will be taken forward in emerging Development Plans, particularly given that it is premature to the Green Belt Review for the wider Black Country area. It is our view that there are sites within the Green Belt that will provide sustainable locations for growth and that their removal will not compromise the purposes of the Green Belt and, accordingly it will remain purposeful and functional.
Question 2: Do you think that the key evidence set out in Table 1 is sufficient to support the key stages of the Core Strategy review? Yes/No; If not, what further evidence is required and, if there are any particular issues that should be taken into account in considering development on any particular sites or in any particular areas, please provide details
4.7 It is considered that the evidence contained within Table 1 is comprehensive, however, as suggested above and below, a number of concerns have been highlighted and it is therefore suggested that these are addressed in order to improve the soundness of the next iteration of the Core Strategy Review.
4.8 It is welcomed that an updated qualitative assessment of employment land has been undertaken in order to identify if the sites are fit for purpose, alongside the quantitative employment land study. It has been identified that a number of employment land sites that have been suggested for residential land allocations remain in occupation as functioning employment sites. These sites should be removed from the housing land supply. Conversely, there are vacant employment land sites that have been marketed over a period of time where no market interest has been forthcoming and, therefore, it is recommended that these sites should be considered for housing delivery.
4.9 It is noted that Viability Studies are identified as evidence base documents that are still to be prepared. Whilst not specifically identified, it is recommended that affordable housing viability is a key matter that needs to be addressed as part of this evidence base to ensure the level suggested by the SHMA Part 2 is deliverable. If this is not the case, the delivery of both market and affordable housing could be compromised and prevent the successful delivery of any new strategy.
Question 3: Do you agree that the housing need identified for the Black Country over the period 2014-36 in the SHMA, and the anticipated amount of supply, are appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.10 In terms of the extent of the sub market, which includes the Black Country and South Staffordshire, this is considered to be appropriate. It is recognised and welcomed that the Black Country authorities and South Staffordshire have jointly undertaken a SHMA for the sub area, which facilitates the preparation of an Issues and Options Core Strategy Review. There is concern, however, that the remaining constituent authorities within the wider Greater Birmingham Housing Market Area have not taken part and there is a danger that housing need for the whole HMA may not entirely be comprehensively captured due to the different time periods covered by the separate studies. It is advised that a SHMA, consistent with the guidance in the NPPF and Planning Practice Guidance, is prepared for the entire HMA over the same Plan period (as opposed to a housing needs study), which will properly consider all relevant factors in a consistent and comprehensive manner.
4.11 The OAN arrived at by the SHMA is generally appropriate in identifying the starting point for determining the dwelling requirement, however, it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline. There is concern that the economic growth scenarios contain potentially out of date employment forecasts and the methodology to determine appropriate dwelling requirements is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances. In addition, more aspirational job growth targets, such as those arising from the SEP, may not necessarily be appropriate for the Black Country (as discussed later in these representations).
4.12 In terms of providing an uplift for market signals, a 25% uplift for South Staffs is agreed to be appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, the application of such an uplift in South Staffordshire should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack or headroom within the housing market and prevent house prices from increasing at an accelerated rate, exacerbating issues of affordability.
4.13 Clearly, the evidence contained in the SHMA does not consider the potential to accommodate any of Birmingham City's housing needs and that this could result in increased dwelling requirements. We reserve our position in respect of this matter and await the publication of the HMA wide Strategic Housing Needs Study.
4.14 We shortly await a consultation publication from central Government in relation to providing a standardised methodology for generating dwelling requirements. This is anticipated in Autumn 2017. The Black Country authorities will need to take account of any proposed national policy changes identified through the consultation paper. We reserve our position on this matter, until the full details and implications for the Back Country are known. It is considered that, whilst a standard methodology will be helpful in identifying a baseline dwelling requirement, the consideration of long term trends and economic forecasts cannot be carried out in a mathematical calculation outside a demographic/ economic model. In light of this, the SHMA prepared for the sub-area could remain useful as evidence to inform the review of the Black Country Core Strategy.
4.15 In terms of meeting the dwelling requirements, it is understood that the 'Call for Sites' consultation will inform an updated SHLAA, which will assess sites both within and outside the urban area to determine the maximum number of dwellings that can be realistically delivered within the Black Country over the proposed Plan period. The Housing Background Report that has been published as part of the evidence base for the Issues and Options Core Strategy Review has considered assumptions contained within the SHLAA based on adopted policies and considers changes to the policies to boost the delivery of housing on existing sites. Whilst it is a commendable that the Black Country authorities are exploring all potential options to boost housing on urban land, there are wider implications of doing so and accordingly, caution is expressed in response to a number of the identified approaches proposed.
4.16 As confirmed in paragraph 3.15, it is extremely important that the Black Country authorities 'firm up' the housing supply in order to ensure that there is sufficient provision to meet the dwelling requirements. It is also considered appropriate to provide an additional buffer of housing land supply to provide a contingency when sites are delayed. As explained earlier in the Issues and Options Report, sites providing a total of 3,000 homes have not come forward as anticipated. It is considered that additional supply is required to provide flexibility and minimise any durations within the Plan period where the housing trajectory would otherwise dip.
4.17 In terms of the extent of a buffer for housing land, the Local Plan Expert Group suggested that additional land, equivalent to delivering 20% of the overall dwelling requirement, is added to the supply, which will provide a contingency of land to be used as and when necessary during the Plan period. It is suggested that this additional land will help ensure the dwelling delivery targets and housing needs are met in a timely manner, which will reduce the opportunity for households to become concealed or shared. Given the issues experienced in respect of delivery in the past, it could be argued that an increased buffer of circa 25% could be applied.
4.18 It is also appropriate to ensure that, as well as identifying the right amount of land, there is sufficient variety in the types of sites (brownfield, greenfield, Green Belt) are identified, reflecting different sizes, in a range of locations. This variety in provision will allow the best opportunity for multiple sites to come forward at the same time without market constraint and hence ensuring delivery targets are met. In addition, this approach will also provide market choice to existing and arising households looking to move into a new home in the Black Country, which will have wider social benefits (i.e. allow families to live nearby one another and provide an opportunity to diversify existing communities through providing alternative homes to the existing housing stock).
4.19 Indeed, as previously documented in the adopted Core Strategy, it is considered that the ambition to retain the young and professional population within the Black Country should be maintained and that suitable and attractive housing and complementary environments are encouraged.
4.20 Finally, it is welcomed that the Black Country authorities have agreed to test the dwelling requirement figures on an ongoing basis. It is hoped that the suggested changes/alternative scenarios suggested above are implemented in order to ensure the evidence base is robust and the resultant policies and proposals soundly based.
Question 4: Do you consider the employment land requirement identified for the Black Country up to 2036 in the EDNA is appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.21 The Core Strategy review intends to utilise the Economic Development Needs Assessment (EDNA) for the Black Country, published in May 2017, to inform future employment land requirements. The EDNA uses forecasts produced as part of the West Midlands Combined Authority Strategic Economic Plan (SEP) to calculate long-term growth, noting that the 'Super SEP Economy+ Scenario' is the preferred aspirational scenario. This scenario assumes average annual growth in employment of 1.3% across the Combined Authority and presents an ambitious view of future growth in the area, with 500,000 jobs created between 2013 and 2030.
4.22 The SEP Technical Appendix breaks down the job forecasts for the three Local Enterprise Partnerships that form the Combined Authority (Black Country; Coventry & Warwickshire; and Greater Birmingham & Solihull). Jobs growth in the Black Country LEP is forecast to be around 1.1% per annum, whilst it is forecast at 1.5% per annum in the other two LEP areas. This averages out at annual growth of approximately 1.3%. Using data from the Business Register & Employment Survey, published by the Office for National Statistics, it is possible to look at employment trends over the last five to six years (2009-15) and this analysis suggests that the growth rate used in the aspirational growth scenario may be too ambitious for the Back Country:
4.23 Between 2009 and 2015, total employment in the Black Country LEP increased from around 450,000 to approximately 453,000. This equates to average annual growth of 0.1%. Walsall (1.5% p.a.) and Sandwell (0.9% p.a.) experienced jobs growth, although Dudley (-1.1% p.a.) and Wolverhampton (-0.8%) both suffered a fall in employment.
4.24 By contrast, both the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs saw total job numbers increase by 1.3% p.a. from 2009-13. A number of districts in these LEPs saw particularly strong growth over the period, notably Solihull and Lichfield in Greater Birmingham & Solihull, where employment grew by at least 3.0% on an annual basis. In short, the 1.3% average across the West Midlands Combined Authority Area is substantially bolstered by Solihull and Lichfield and therefore it is very ambitious to suggest this will occur across the Black Country area.
4.25 That said, growth in the Black Country needs to be faster than in previous years and the new Core Strategy has a vital role to play in supporting this, however the analysis presented above suggests that the growth targets need to be lowered to better reflect the local economic climate. It is considered unlikely that an annual increase of 1.0% or more will happen in the area in the long-term, especially with the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs capturing new job opportunities at a faster rate in recent years. Lowering the employment growth rate means the amount of employment floorspace needed would be lower. This would not reduce the demographically based housing targets for the area but it would potentially free up previously allocated employment sites for other uses such as residential. This would help the Black Country meet its future housing targets and ensure that it has enough homes for its future workforce to live in.
4.26 As identified in the supporting report and above, it is known that employment sites that had previously been identified for housing are still operational with businesses continuing to use the land and, conversely, there are sites allocated for employment that have been vacant and subsequently market, however, remain unoccupied, which could be transferred to a residential use. It is therefore recommended that the Councils ensure that updated EDNA qualitative review conclusions are taken into account and correct uses applied where appropriate.
Question 5: Do you agree with the proposed approach to the Black Country Green Belt Review? Yes/No; If not, what additional work do you think is necessary?
4.27 In respect of the Green Belt Review, on the basis of the evidence published setting out housing need and supply, it is agreed that it will be necessary to find sites outside of the existing urban area, which will require removing land from the Green Belt where it is appropriate to do so. This will provide an opportunity to identify strategic sites that can provide a significant amount of homes to contribute to meeting identified housing needs. It is considered that there are a number of locations whereby housing sites can be identified, without the purposes of the Green Belt being compromised, ensuring the function and integrity of the Green Belt will remain.
4.28 In addition, areas on the urban fringe have the potential to ensure new homes can be delivered in an established, well landscaped environment, which could be attractive to those young families and professionals that the Black Country authorities have had difficulty in retaining, often through out-migration to neighbouring Shire districts considered to represent more aspirational locations.
4.29 In terms of the process and methodology for undertaking a Green Belt Review, it is understood that the awaited Strategic Housing Needs Study (SHNS) will be accompanied by Strategic Green Belt Review across Greater Birmingham and that the Black Country authorities have been engaged in presenting potential opportunities. It is reassuring that this engagement between consultants and local planning authorities is taking place as there is a danger that logical locations fail to be identified due to a lack of understanding of environmental conditions and/ or local circumstances that are applicable to sites.
4.30 It is agreed and makes sense for the local planning authorities to conduct a Stage 2 Green Belt Assessment following the completion of the higher-level work. Any input on reviewing the draft methodology for the Stage 3 Green Belt Review would be welcomed.
Question 6: Do you agree that the key issues set out in Part 3 are the key issues that need to be taken into account through the Core Strategy Review? Yes/No; If not, what other key issues should be taken into account?
4.31 The key issues presented are considered to be relevant, however, there are a number of inconsistencies relating to matters identified above against the previous questions raised.
5. REVIEWING THE STRATEGY TO MEET NEW CHALLENGES & OPPORTUNITIES
Question 7: Do you think that the Core Strategy vision and sustainability principles remain appropriate? Yes/No; If not, what alternatives would you suggest?
5.1 In the main, the Core Strategy Vision and sustainability principles are considered to be appropriate, with exception to the principle of 'brownfield first'. It is understood that the NPPF, whilst it encourages an efficient use of land and for brown field land to be recycled, it does not suggest a sequential approach to development. There is no evidence to demonstrate that the development of greenfield land will compromise the development of brownfield land. Often the type of developers of the different land categories are different and, given the scale of the housing need, it is appropriate that the early delivery of housing is encouraged from all types of sites. In particular, the larger, potentially Green Belt, sites will have a longer lead in time due to the time it takes to plan for, determine and implement a comprehensive scheme. Indeed, a recent study entitled 'Start to Finish', prepared by NLP, supports this claim. When planning the housing trajectory for the Core Strategy, the larger sites should be planned in to come forward as soon as practically possible.
5.2 It is therefore suggested that the reference to 'putting brownfield first' is inappropriate and that it should be replaced by 'ensuring an efficient use of land to meet the identified housing needs', which encourages the recycling of land and recognises the contributions of greenfield/ Green Belt land to meeting housing delivery targets.
Question 8: Do you think that the Core Strategy spatial objectives remain appropriate? Yes/No; If not, what alternatives would you suggest and how might these changes impact on individual Core Strategy policies?
5.3 Whilst the objectives outlined generally remain sound, there is concern that one of the NPPFs main priorities is absent. This is in relation to significantly boosting the supply of housing. It is suggested that an additional objective is added in order to ensure that meeting housing needs remains a priority within the Black Country. Once a preferred option is arrived at, spatial references as to where the housing growth will be delivered could be included (for example, meeting housing needs on urban (brownfield and greenfield) land and at extensions to the urban area).
5.4 Further, given the increased employment land requirements, the second objective relating to employment land being within the best locations within the Regeneration Corridors may no longer be appropriate. Indeed, as highlighted earlier, there is concern that there is a mismatch in land allocations, and it is appropriate for the Core Strategy review to ensure all employment sites are fit for purpose. This may conclude that employment opportunities should be identified on new land outside of the Regeneration Corridors. Should this be the case, the objective would be inappropriately worded.
Question 9: Do you agree that Policies CSP1 and CSP2 should be retained and updated to reflect new evidence and growth proposals outside the Growth Network? Yes/No; If not, what changes do you think should be made to Policies CSP1 and CSP2 in response to new challenges and opportunities?
5.5 It is agreed that the policies could remain, if the development requirements and related changes are made to ensure the policies are consistent with the overall strategy. The changes relate to both the quantum of development (homes, employment and retail space), the location of development (within and beyond the existing Regeneration Corridors) and the type of development (brownfield, greenfield and on land removed from the Green Belt). It is considered that references should be made to urban extensions (on land removed from the Green Belt) in Policy CSP2 specifically, to highlight the important contribution that such sites will make to meeting the development requirements of the Plan.
Question 10: In continuing to promote growth within the Growth Network, is there a need to amend the boundaries of any of the Regeneration Corridors in the existing Core Strategy? Yes/No; If so, which boundaries and why?
5.6 No comment.
Question 11a: Do you support Strategic Option 1A? Yes/No; If yes, please explain why. If no, do you support Option 1B? Yes/No; If yes, please explain why. If you support the release of further employment land for housing, what should the characteristics of these employment areas be?
5.7 Option 1A is considered to be appropriate for accommodating the growth needs of the Black Country over the Plan period to 2036. This option would significantly boost the supply of housing land and help to meet the significant current and future identified need.
Question 11b: Are there any current employment areas that might be considered suitable for redevelopment to housing? Yes/No; Please submit specific sites through the 'call for sites' form.
5.8 As highlighted previously, the key to understanding where the most appropriate employment/ housing locations are within the Growth Network and Corridors will be determined through a qualitative assessment of allocated employment sites. It is understood an updated assessment has been undertaken and such work, complete with responses to the Call for Sites consultation, will provide the Black Country authorities with evidence to determine the urban capacity for housing, which may include transferring some employment land to housing as well as housing land to employment. This work will then outline the number of dwellings to be accommodated beyond the existing Growth Network within the Green Belt.
5.9 It is welcomed that the Issues and Options Draft recognises the need to release Green Belt in all scenarios proposed.
Question 12a: Do you support Spatial Option H1? Yes/No; What criteria should be used to select suitable sites? e.g. ability to create a defensible new green belt boundary, size, access to existing residential services.
5.10 No comment.
Question 12b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details (please submit specific sites through the 'call for sites' form).
5.11 No comment.
Question 13a: Do you support Spatial Option H2? Yes/No; What should the characteristics of Sustainable Urban Areas (SUEs) be? e.g. minimum/ maximum size, mix of uses, mix of housing types, accessibility to other areas. What criteria should be used to select suitable sites? e.g. proximity to a rail station, availability of existing infrastructure, easy access to jobs, potential to support existing settlements / services, proximity to the existing growth network, potential to support urban regeneration.
5.12 Given the scale of the housing need, there is concern that the development requirements could not be met with just one of the suggested options presented and, therefore, a combination of both options will be necessary.
5.13 To be in the best possible position to significantly boost the amount of housing and meet the development requirements in the Black Country, in accordance with the NPPF, it is advised that opportunities to both round off edges of the Green Belt and Sustainable Urban Extensions are proposed in the Preferred Options Draft Core Strategy. As highlighted within the Issues and Options Draft, there are challenges and opportunities that come with both types of development, for example from a delivery perspective, smaller sites will come forward more quickly due to the nature of these being straight forward proposals (with limited infrastructure necessary and one or few land owners) and larger sites will ultimately take longer as they are more complex (with multiple land uses, infrastructure and land owners). This fact has been evidenced by Nathaniel Lichfield and Partners (now known as Lichfields) within their report 'Start to Finish' who concluded that the average planning approval period of schemes of 2,000+ dwellings is 6.1 years and the annual average build out rate is 161 dwellings per annum. These figures demonstrate the need to have a number of sites of different sizes and in different locations removed from the Green Belt. The report also identifies, with regard to housing delivery, that 50% more homes per annum are delivered on average on large greenfield sites than large brownfield sites. This is a significant benefit of including greenfield sites within the Preferred Option and will assist to secure its delivery.
5.14 In terms of the locations for removing land from the Green Belt, this should be informed by the Strategic Growth Study and a Black Country Review of the Green Belt. The more detailed study will provide an assessment of land parcels against the purposes of the Green Belt and is likely to recommend that those that compromise the purposes the least will be shortlisted for further consideration to be removed from the Green Belt. It is advised that the next stage should be a consideration of the shortlisted sites based on their suitability (i.e. are the neighbouring uses compatible, would any previous land uses prevent the development of the site), sustainability (i.e. proximity to/ ability to provide local services/ public transport/ employment opportunities) and deliverability (i.e. whether the site is available, being promoted for development, has no barriers to coming forward etc.) credentials. Clearly each site will fair differently against such criteria and the Call for Sites submission will assist the Council to come to a decision on the preferred sites. It is advised that the Black Country authorities should be mindful of the opportunities, through infrastructure and design, that development can bring that will enhance the diversity and character of a particular location.
5.15 In terms of the characteristics of a Sustainable Urban Extension, this is likely to vary depending on the location of each site. For example, some may be more urban and others suburban in their character and would, therefore, provide a different land use offer. It is important that each are considered on a site by site basis to ensure that any subsequent allocation delivers a successful development. It is important that the developer responsible for promoting the site helps to influence what is ultimately delivered. Often what is proposed on site has been informed by housing market intelligence undertaken by sales experts at development companies and, therefore, should be taken into account. Particularly given recent experience in the down turn in the apartment market, it is important that sites are allocated for the right type and mix of housing to ensure that it will be delivered, occupied and successful.
5.16 In the more suburban locations, it is suggested that Sustainable Urban Extensions should look to provide a different offer to potentially what exists in the Strategic Centres and Regeneration Corridors, such as a mix of larger and lower density homes, which will attract those households that in the past have migrated elsewhere. Given the emphasis on delivering more high density homes in the Strategic Centres, it is important that this housing mix is offset by more larger homes in appropriate locations. Otherwise, there is a concern that the Black Country will have a disproportional amount of small homes, which will further encourage more families to migrate elsewhere and not meet the aspiration to diversify the wider HMA.
Question 13b: What infrastructure do you think would be needed for different sizes of SUEs?
5.17 The type of infrastructure needed will vary depending on the different location and size of each site and must be compliant with paragraph 122 of the CIL Regulations that requires planning obligations (which applies to most infrastructure) to be necessary to make the development acceptable in planning terms; directly related to the development; and fairly and reasonably related in scale and kind to the development. With the above in mind, however, provision for open space (both formal and informal), local centre and potentially a primary school should be considered for sites in excess of 1,000 homes.
Question 13c: Are there any potential locations that should be considered for SUEs (please submit through the 'call for sites' form) and what infrastructure would be required to support these?
5.18 No comment.
Question 13d: Do you think that the Core Strategy should set out detailed guidance for the development of SUEs (e.g. type and tenure of housing, specific infrastructure required), rather than details being determined at a local level in light of local policies? Yes/No; Any further comments?
5.19 For the reasons outlined above, relating to considering existing local circumstances and CIL Regulation requirements in respect of any charging schedule and planning obligation requirements, it is advised that detailed guidance for the development of SUEs should not be specified within the Black Country Core Strategy as each site will vary and deserves a more detailed consideration, alongside the developer, at the local level.
Question 14: Do you think there are any other deliverable and sustainable Housing Spatial Options? Yes/No; If yes, please provide details
5.20 There are no other sustainable and deliverable options that we are aware of within the Black Country administrative boundary that are capable of delivering the housing spatial options.
Question 15a: If all housing need cannot be met within the Black Country, do you support the 'export' of housing growth to neighbouring authorities within the HMA? Yes/No; What factors should be taken into account in an assessment of the opportunities in neighbouring authorities e.g. proximity to the edge of the urban area, proximity to a rail station, availability of existing infrastructure, easy access to jobs?
5.21 Even if all realistically deliverable options have been considered within the Black Country, there will remain an unmet need for housing. Therefore, it is necessary for the Black Country authorities to consider the possibility of exporting growth to neighbouring authorities within the HMA. In particular, there are options to expand existing settlements that are close to the administrative boundary (for example, in South Staffordshire) across authorities and could help deliver the necessary growth in a sustainable and deliverable manner. These opportunities should be explored first prior to exporting further growth to other authorities within the HMA where there is less of a spatial connection.
Question 15b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details.
5.22 No comment.
Question 15c: Do you think there are ways to ensure that exporting housing will meet the needs of people who would otherwise live in the Black Country? (e.g. transport improvements, provision of affordable housing, creation of employment opportunities) Yes/No; If yes, please provide details.
5.23 It is important to consider a number of factors, including migration and travel to work patterns, which have been used to identify the extent of the HMA, to determine where households relocate to when leaving the Black Country in order to understand where and why those moves are taking place. Whilst planning can attempt to influence where people relocate to, there is no mechanism to guide or restrict people moving to or from certain locations. Once knowledge of movers can be understood can the planning system can attempt to recreate those attractive characteristics (homes that are more affordable, good public transport links, employment opportunities etc.) in locations where there is capacity for the homes to be delivered. It is advised that an additional analysis of the data, where necessary, is undertaken to provide the Black Country authorities with the relevant intelligence to deliver a successful strategy for growth outside the administrative area.
Question 16: Do you support Spatial Option E1? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access) If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.24 No comment.
Question 17: Do you support Spatial Option E2? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites e.g. quick motorway access, good sustainable transport links? If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.25 No comment.
Question 18: Do you support Spatial Option E3? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access) If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.26 No comment.
Question 19a: Do you support Spatial Option E4? Yes/No; Any further comments?
5.27 No comment.
Question 19b: Should any factors be taken into account in an assessment of the opportunities? Yes/No; If yes, what should they be? (e.g. quick motorway access, strong transport links with the Black Country, good sustainable transport links with the Black Country) If you think there are any potential locations that should be considered, please provide details.
5.28 No comment.
Question 20: Do you think there are any other deliverable and sustainable Employment Land Spatial Options? Yes/No; If yes, please provide details.
5.29 As previously outlined, there is concern that some of the employment sites currently identified are potentially not fit for purpose and others that are identified to be transferred to housing remain in employment occupation. In light of this mismatch, it is welcomed that an updated qualitative assessment has been undertaken and has informed how much employment land is has be found outside the urban area.
5.30 In terms of where the employment land should be located outside the urban area, as with housing, decisions should be based on the results of the Green Belt Review and the suitability, sustainability and deliverability of sites. For employment land sites, the suitability of a site may well include good transportation links for goods and people. The Call for Sites consultation will assist in putting forward suggestions for sites.
6. DELIVERING GROWTH - INFRASTRUCTURE & VIABILITY
Question 21: Do you think that changes are required to Policy DEL1 to ensure it covers both development within the existing urban area and any within the Green Belt? Yes/No; If yes, please provide details.
6.1 Policy DEL1 is considered to be sound on the basis that it is sufficiently flexible to deal with different circumstances on different sites across the Black Country, including sites that are to be removed from the Green Belt.
Question 22: Do you have evidence of a requirement for new social infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.2 No comment.
Question 23: Do you have evidence of social infrastructure that is no longer needed and where the site could be reallocated for alternative uses? Yes/No; If yes, please provide details.
6.3 No comment.
Question 24: Do you have evidence of pressure being placed on the capacity of current social infrastructure which could be exacerbated by new housing? Yes/No; If yes, please provide details.
6.4 No comment.
Question 25: Will there be any new social infrastructure requirements necessary to serve large new housing developments? Yes/No; If yes, please explain the type and scale of any new social infrastructure required.
6.5 It is recognised that delivery of new housing developments may give rise to the need to deliver supporting infrastructure. Committed to working with the relevant authorities and service providers to determine the capacity of existing infrastructure and determine the level of mitigatory provision necessary to support an increase in the population in this location. It is however important that each potential large new housing development is given independent consideration in respect of any infrastructure obligations, recognising that pressures will be dependent on location and existing infrastructure capacity.
Question 26: Do you have any evidence of a requirement for new physical infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.6 No comment.
Question 27: Do you have evidence of pressure being placed on the capacity of current physical infrastructure which could be exacerbated by new developments? Yes/No; If yes, please provide details.
6.7 No comment.
Question 28: Do you think physical infrastructure is necessary to serve large new housing developments? Yes/No; If yes, what type and scale of physical infrastructure is necessary?
6.8 As set out above, the need for infrastructure will vary for each site. Given such different circumstances, it would be inappropriate and potentially unlawful (as it would conflict with paragraph 122 of the CIL Regulations) to incorporate a blanket policy requiring specific infrastructure on every large housing site.
Question 29: Do you think there are any other tools or interventions that could be used to ensure enough infrastructure is provided by developments? Yes/No; If yes, please provide details.
6.9 It is considered that the existing national framework (which includes the NPPF and CIL Regulations) provides a sufficient tool to ensure the relevant infrastructure is delivered. In addition, the CIL Charging Schedule allows authorities to raise funds for named infrastructure projects, which should be updated in line with any Core Strategy advanced. Therefore, it is considered that there are existing provisions to deliver infrastructure and no additional interventions through the Black Country Core Strategy Review are needed.
Question 30: Do you have any suggestions around how the strategy can be developed in order to maintain the urban regeneration focus of the Black Country while at the same time bringing forward sites in the green belt? Yes/No; If yes, please provide details.
6.10 There is no a need for any specific interventions, such as phasing, to protect the delivery of urban regeneration in the Black Country. Indeed, it is considered that development of greenfield and Green Belt sites can very much compliment urban regeneration through the provision of a more varied form of development that will help diversify the housing stock and profile of residents in the wider area, which will assist to sustain and improve the vitality of existing communities. Further, as highlighted above, given the priority to significantly boost the delivery of housing greenfield and Green Belt sites should come forward for development as soon as practically possible. Given lead in and build out rates of larger sites, the land should be encouraged to be developed as soon as possible so to ensure the homes are delivered in the Plan period and the needs are met.
Question 31: Do you think that the right scale and form of funding is available to support the delivery of the Core Strategy review? Yes/No; If no, what alternative sources of funding or delivery mechanisms should be investigated?
6.11 When delivering greenfield/ Green Belt sites, there is an opportunity to deliver infrastructure to meet the needs arising from the proposal, which may have wider benefits for the local community. In addition, it is likely that the communities created by the Sustainable Urban Extensions will potentially be more affluent and share their wealth using local shops and services within the wider Black Country, which will contribute to more successful and prosperous communities.
7. REVIEW OF EXISTING CORE STRATEGY POLICIES & PROPOSALS Housing
Question 35: Do you support the proposed approach to housing land supply? Yes/No; If no, please explain why
7.1 As identified above, it is important that a range of sites in different locations are identified to be in the best possible position of delivering the development requirements. In terms of presenting these sites in the Core Strategy, whilst it is useful to identify a housing trajectory, it is important that there is not a phasing policy as such that would prevent the delivery of housing, given the current housing crisis. As stated above, the delivery of housing on greenfield and Green Belt land will not compromise the delivery of urban regeneration as the development on the urban edge will complement and rejuvenate the environment in a different way.
7.2 In terms of the proposed level of discounting, it is considered that if the LPA adopt an approach to identify a further 20% of sites in accordance with the LPEG recommendations identified above, there would not necessarily be a need for the application of discounting in determining the overall level of supply. It is interesting to note that the level of discounting proposed by LPEG is suggested for all LPAs, not necessarily those which have experienced difficulty in delivery. It could therefore be argued that an increased buffer of 25% could be applied in order to take a cautious approach.
Question 36: Do you think that the current accessibility and density standards set out in Policy HOU2 and Table 8 should be changed? Yes/No; If yes, what standards should be applied instead, for example should the minimum net density of 35 dwellings per hectare be increased to maximise brownfield housing delivery?
7.3 It is clear that the current accessibility and density standards outlined in the adopted Core Strategy were formulated in the context of the vast majority of development taking place on brownfield sites within the defined urban area. As reiterated throughout these representations, there is now a clear need for Green Belt release as part of the Local Plan Review to meet emerging, objectively assessed housing needs. We outline in further detail below why the adopted accessibility and densities would not be applicable to Green Belt sites, however would suggest that the current standards do not allow sufficient flexibility on brownfield sites. A blanket application of prescriptive accessibility and density standards across the Black Country, be it brownfield or greenfield, does not allow sufficient flexibility which take into account site specific characteristics. The Council should allow for greater flexibility when assessing accessibility and density standards, with a more pragmatic approach which allows appropriate assessment for site-specific characteristics and also an assessment of market demand which may vary significantly across the large Black Country area.
7.4 Paragraph 47 of the NPPF outlines how local authorities should set out their own approach towards density. It is suggested that the currently adopted approach does not allow for sufficient assessment of local characteristics. It is clear that the chosen approach must be reflective of local circumstances, including the matters outlined above as well as infrastructure and services available in the locality. It is advocated that a more flexible approach to density and accessibility standards is taken as part of the emerging Local Plan Review.
Question 37a: Do you think that the existing Policy HOU2 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why
7.5 In line with the comments above, it is suggested that the Council should assess each site on a case by case basis in terms of accessibility and density standards. This approach would suggest that the numerical baseline trigger of 15 homes or more will not always be appropriate or applicable, and as advocated throughout these representations it suggested that there should be a complete reassessment on accessibility and density standards as part of the emerging Local Plan Review.
Question 38: Do you think that the current accessibility and density standards are appropriate for green belt release locations? Yes/No; If no, what standards should be applied in these locations and why?
7.6 No, it is not considered that the current standards would be applicable to Green Belt release locations. The adopted standards are overly prescriptive, and as previously discussed were written in the context of brownfield land. Green Belt release sites have a completely different type of character, therefore consideration of accessibility and density standards in relation to these sites should be reflective of local character and site characteristics. The more suburban settings of Green Belt release land lends itself to lower densities which are more appropriate to the Green Belt setting, which typically deliver more family homes. The Council must provide robust evidence to test any forthcoming accessibility and density standards in relation to Green Belt release locations, which allows for a flexible and pragmatic approach.
Question 39: Do you think separate accessibility standards are needed for particular types of housing e.g. housing for the elderly or affordable housing (as occupiers may be less mobile and more dependent on public transport)? Yes/No; If yes, please provide details.
7.7 It is clear that separate accessibility standards will apply to particular types of housing such as affordable and for the elderly population, however in line with the sentiment expressed above, any forthcoming standards should be based on robust evidence and allow for sufficient flexibility to avoid any unnecessary constraints to development coming forward.
Question 40: Do you agree that the 2017 SHMA findings should be used to set general house type targets for the Plan period? Yes/No; If no, please explain why.
7.8 A general and blanket application for house types across the Black Country should not be advanced as part of the Local Plan Review. Paragraph 50 is clear that local planning authorities should plan for a mix of housing based on current and future demographic trends and market trends. It is therefore notable that the NPPF specifically highlights 'market trends' in this context, which acknowledges that the market must inform such decisions.
7.9 Whilst the 2017 SHMA does provide an assessment of demographic and market trends, it is notable that it looks at a wider area assessment and is focused at a higher level. This assessment therefore does not draw out sub-market trends, and cover smaller areas within the vast Black Country area. Again, a blanket policy of house type targets across the Black Country area would not allow for sufficient flexibility to assess each site on a site by site basis, taking into consideration local market trends and demand. The NPPF does not state that specific policies should be set to enforce that local demand is met. As such, it is considered that this should be left for the market to decide, as opposed to applying rigid and prescriptive house size standards.
7.10 It is suggested that the evidence presented in the SHMA should be put into the Plan as an informative and general guide, but should not feed into a specific policy requirement which outlines housing mix percentages that should be applied across the Black Country. A policy containing general house type targets could present as a significant constraint to the delivery of a site where there is no local market demand for this house type, which in turn would have a negative impact on achieving the necessary housing growth targets to be delivered in the Black Country over the Plan period.
Question 41a: Do you support the introduction of a policy approach towards self and custom build housing in the Core Strategy? Yes/No; If yes, would you support:
7.11 It is not considered that there is a policy need for the Core Strategy to address self and custom build housing in the emerging Review. Paragraph 6.32 indicates that there are only nine records on self and custom build registers in the Black Country. It is evident that that there is very limited demand in the Black Country, which is unsurprising given that self and custom build housing is often more popular in rural areas. Given the limited demand it is therefore not considered necessary to take a policy approach towards self and custom build housing within the Local Plan Review.
Question 41b: A target for each authority? Yes/No; Any further comments
7.12 Given that there is evidence of little market demand, it is not considered necessary for the Core Strategy to set targets for each of the Black Country authorities. If it was considered to be necessary as the Local Plan Review progresses, any targets being set should be formulated on the basis of robust evidence such as monitoring of the registers, to provide an indication of how many self-build homes will be needed.
Question 41c: A requirement for large housing sites to provide serviced plots? Yes/No; Any further comments?
7.13 There should not be a requirement for large housing sites to provide serviced plots. This can pose an unnecessary market constraint for large housebuilders when there may be limited or no market demand for self-build plots. Self and custom build plots are often unusual and unique in character, therefore would not be best suited to be located within a large housing development with more uniform house types. If deemed necessary, self and custom build housing should be allocated specific site allocations, as discussed below.
Question 41d: Another approach altogether? Yes/No; If yes, please specify.
7.14 If it is considered necessary for the Review to address self and custom build housing, this should be addressed by the Council's identifying and allocating specific plots for these uses. Identifying site-specific plots would ensure that the most appropriate and suitable locations for self and custom-build will be allocated, via the assessment of appropriate evidence and market demand. In addition, this might be more likely to be achieved on surplus publicly owned land.
Question 42: Do you agree that the annual affordable homes target should be increased to reflect the 2017 Black Country Strategic Housing Market Assessment? Yes/No; If no, please explain why.
7.15 As a general principle, the notion of applying different affordable housing ratios to different parts of the Black Country, based on an understanding of needs and viability, is acceptable. Given that the Black Country represents a vast area, there will not be a uniform housing market, and there will be sub-market trends within this wider area. As such, a more flexible approach which assesses local housing market evidence on a case by case basis could be justified. That said, there is an inherent simplicity and attraction to a single rate figure, which is easy for the development industry to understand.
7.16 In terms of the annual affordable housing target, it is unclear how the Issues and Options document has calculated the figure of 832 homes per year. At paragraph 7.42 of the June 2017 SHMA Part Two- affordable housing document, it is stated that the total annual affordable housing need is 677 dwellings, which represents 19.8% of the annual projected household growth. This differs to paragraph 6.36 of the Issues and Options document, which states that the affordable housing target is 23.4% of total housing need or 832 homes per year. From paragraph 7.47 of the SHMA, it appears that this figure may have been calculated by adding the overall requirement of 16.6% of housing to be affordable rented and 6.7% shared ownership. Clarity is sought on how this figure has been calculated, and we reserve the right to comment further on this matter.
Question 43a: Do you think that the existing Policy HOU3 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why.
7.17 We have not undertaken detailed analysis of the findings and assumptions of the SHMA and affordable housing delivery matters, therefore would like to reserve the right to comment on this matter further. However, on face value, it appears to be a reasonable threshold and is not dissimilar to other locations.
Question 44a: Do you think that the affordable housing requirement for eligible sites in Question 43 should be kept at 25% of the total number of homes on the site? Yes /No; Any further comments?
7.18 Based on the current evidence, a blanket rate of 25% affordable housing would appear to be sound.
7.19 However, irrespective of the final rate, any amendments to the currently adopted affordable housing policy must continue to have a clause in it which stipulates that this requirement is subject to viability tests. Any revised affordable housing requirements will also need to carefully consider the implications of adopted Community Infrastructure Levy (CIL) regimes. Both Sandwell and Dudley Councils have adopted CIL Charging Schedules. These will have implications on viability, therefore if revised affordable housing targets are to progressed then these CIL tariffs will need to re-assessed and re-visited.
Question 44b: If no, should the percentage be increased to allow for the provision of affordable home ownership? Yes/No; If yes, what should the percentage be and why?
7.20 At paragraph 6.39 of the Issues and Options Paper, it is stated that options need to be explored to increase affordable housing delivery of private sites. One option would be to increase the overall affordable housing proportion, which would require developers to provide affordable home ownership products plus an appropriate proportion of other affordable tenures. This paragraph follows on from commentary relating to the Housing White Paper.
7.21 The Housing White Paper discusses Starter Homes at Chapter 4, and explains how the government intend to amend the NPPF to introduce a clear policy expectation that housing sites deliver a minimum of 10% affordable home ownership units. It is later stated that it will be for local areas to work with developers to agree an appropriate level of delivery of starter homes, alongside other affordable home ownership and rented tenures.
7.22 The policy position on Starter Homes is not yet fully clear, and has yet to be formally established through a formal amendment and update to the NPPF. Until the national policy position on Starter Homes has been made clear, it would be premature for the Core Strategy Review to suggest an uplift in the affordable housing requirement to include affordable home ownership such as Starter Homes. Any suggestion to uplift the affordable housing requirement to include Starter Homes should be reflective of the national policy position, as well as founded upon a robust evident base which dictates exactly what percentage this element should be of the overall affordable housing requirement.
Question 45: Should an increased affordable housing requirement be set for green belt release sites, to reflect the likely financial viability of these sites? Yes/No; If yes, what should this be.
7.23 The likely financial viability of Green Belt sites will vary across different areas of the Black Country, therefore any affordable housing requirements for Green Belt sites will need to be reflective of these circumstances. Any affordable housing targets for Green Belt sites should be based on robust evidence, and acknowledge that many sites may need to support and deliver other infrastructure requirements.
7.24 Ultimately, any affordable housing strategy will need to address the affordable housing need as well as the need for market housing. Bearing in mind that the SHMA confirms over 70% of homes required are for homes to be sold on the open market, any affordable housing policy must not dilute the delivery of these needs/requirements. A higher figure on Green Belt sites over and above a standard blanket figure would potentially do this.
Employment Question 49a: Is there still a need for existing Policy DEL2 in order to manage the release of poorer quality employment land for housing? Yes/No; If no, please explain why.
7.25 The Black Country is to be the subject of large levels of both employment and housing growth over the Plan period. These uses are very much inter-linked with one another, and will drive each other's need for growth. The Local Plan Review, in order to meet emerging employment and housing needs, must identify a significant number of specific sites for employment and housing uses. By planning proactively and identifying suitable sites for both employment land and housing land, this should reduce the pressures to manage the release of poorer quality employment land, which may not always be suitable for release. The Local Plan Review should also seek to undertake a further review of poorer quality employment land to make it available for other suitable uses, if it proves to no longer be viable for employment land use. This is in line with policy provisions of the NPPF, which at Paragraph 22 outlines that planning policies should avoid the long-term protection of sites allocated for employment use where there is no reasonable prospect of a site being used for that purpose.
Question 50: Do you think that the Core Strategy should continue to set a target for the total employment land stock in Policy EMP1? Yes/No; Please explain why.
7.26 The continuation of setting a target for employment land stock would be supported. Policy EMP1 should make it clear that these are not maximum figures, to encourage further flexibility for additional growth.
Retail Question 59: Have all the appropriate centres within the Black Country been identified? Yes/No; If not, please specify additional centres
7.27 No comment.
Question 61: In addition to para 4.33 of the current Core Strategy should the revised Core Strategy include criteria for the creation of new centres that might be needed as a result of any additional housing identified through the plan? Yes/No; Any further comments?
7.28 Criteria would be a useful policy tool to help assess the designation of new centres, and should be in line with previous methodologies used which set out clear thresholds.
Question 71: Should the Core Strategy set housing targets for the Town Centres?
7.29 Housing within Town Centres should be supported, in line with paragraph 23 of the NPPF which discusses the important role that residential development can play in ensuring the vitality of Town Centres. Any housing targets should be based on what sites are known to be readily available, suitable and viable for residential development. Market demand for housing in these areas will also need to be fully assessed. It is notable from the outcome of the 2017 SHMA that there is most demand for three bedroom properties (40%). The highest demand is therefore for family housing, and not for flats which are often the most popular within Town Centre locations. Any housing targets set for the Town Centre would therefore need to consider the findings of the SHMA, and be reflective of the fact that family housing is often more suitable for delivery on larger sites, including on sites which are currently located within the Green Belt.
Environment Question 99a: Do you think that national standards for housing development on water consumption should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.30 When referring to water consumption paragraph 6.1.52 of the Issues and Options document states that the Black Country does not currently lie in an area of serious water stress, therefore clear need may be difficult to demonstrate. This evidence suggests that there is limited or no need to introduce such a policy, therefore it is not considered that the Core Strategy Review should seek to introduce water consumption standards for housing development.
Question 99b: Do you think that national access standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.31 The introduction of any national access standards, with the Issues and Options document referring specifically to Lifetime Homes, again must be based on a robust evidence base which can demonstrate market demand. It is noted that Paragraph 50 of the NPPF states that planning authorities must plan for a mix of housing to meet a range of needs. In the same paragraph, it is later stated that these must be based on current and future market trends. If Lifetime Home standards are to be introduced these will therefore need to be based on robust evidence, to ensure that the standards are not overly onerous and prevent the delivery of other types of housing which have higher levels of market demand.
Question 99c: Do you think that national space standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.32 As reiterated throughout these representations, it is not considered that a blanket approach of prescriptive standards across the Black Country allows sufficient flexibility to assess local market and site considerations in an appropriate manner. Whilst it is recognised that space standards can be an important tool to ensure that high quality of homes are delivered, we agree with the sentiment expressed in the recent Housing White Paper. The Paper explains that the government are concerned that a one size fits all approach may not reflect the needs and aspirations of a wider range of households. The White Paper also states that the Government will be undertaking a review of the Nationally Described Space Standards. It is suggested that the Core Strategy Review should await the outcome of this national review of national space standards, to ensure compliance with national policy and to ensure that the most appropriate approach to space standards, if required, is taken.
Question 99d: Do you think that the standards should be different for brownfield and greenfield sites? Yes/No; If yes, please explain how and why.
7.33 As discussed above, prescriptive standards do not always allow sufficient flexibility for local market needs, so we would not advocate a blanket approach of different standards to brownfield and greenfield sites.
Open Space, Sport and Recreation Question 102a: Do you support the proposed changes relating to open space, sport and recreation? Yes/No; If no, please explain
7.34 Paragraph 6.1.60 of the Issues and Options paper outlines how adopted Policy ENV6 creates the framework for open space policies at the local level. The Issues and Options paper outlines how this is in line with national guidance, and that it is proposed to retain this policy and update some references in the supporting text to reflect changing circumstances. It is agreed that the local level remains the appropriate place to set open space policies, and that Policy ENV6 should continue to endorse this approach.

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

2. The Black Country Today - the Existing Strategy

Representation ID: 2559

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Pegasus Group

Representation Summary:

3.1 As set out within this section, the delivery of both employment and housing land has not come forward as originally envisaged in part due to the after effects of the recession. Surplus employment land which might have been available for housing has not come forward due to a strengthening economy and local firms being more robust than anticipated. In addition, the range of locations available has not in all cases met with market expectations as to where people want to live.
3.2 In terms of the employment land, it is important that sufficient land is provided for new employment and that there is not an overreliance on land that is currently in use. It is impressive that despite generally poor economic performance local businesses have performed well. Should the economy significantly improve within the Plan period in line with LEP aspirations (considered later in this response), there is concern that it may become difficult to transfer a wide range of existing employment locations to housing allocations. It is appropriate, therefore, for the Council to ensure the evidence contained within the Strategic Housing and Employment Land Availability Assessment is reviewed and updated regularly. This will enable the land supply to be responsive to arising needs and not rigidly be wedded to delivering commitments that are unlikely to be realised.
3.3 What is further emphasised by the analysis in this section is that urban regeneration cannot be delivered quickly and that there are a number of factors beyond the control of the Black Country authorities that may have implications for the delivery of the strategy. This further emphasises the need for a mix of types of sites (brownfield, brownfield compulsory purchase, greenfield and Green Belt) of different forms of development (high density, mid and low density family homes) in a variety of locations, which will maximise the opportunities to deliver a successful Local Plan.
3.4 Finally, in respect of the proposal to maintain 300 hectares of employment land that will become vacant by way of general churn over the Plan period. Whilst the principle is considered acceptable, there should be appropriate evidence to support the assumption.
3.5 Our experience is that there are employment sites that clients are looking to secure a residential allocation on that have not been identified thus far. In light of these changing circumstances, the Black Country authorities should ensure that the policy approach is flexible to allow sites in appropriate locations to be brought forward for housing throughout the Plan period and likewise, sites that have been allocated for housing but have not come forward should be removed from the supply.

Full text:

Question 1: Do you agree that the Core Strategy review should be a partial review, retaining and stretching the existing spatial strategy and updating existing policies? Yes/No; If not, what do you think should be the scope of the review?
2.4 In response to Question 1 and whether it should be a partial review or not, whilst the existing strategy identifies the most sustainable locations for growth in the context of delivering development requirements identified by the Regional Strategy (RS), there is now a new and much bigger challenge ahead in meeting the arising needs for homes identified by the latest evidence and there is concern that the existing spatial strategy may not facilitate the delivery of these needs. The Black Country authorities, therefore, need to be mindful of this and not attempt to put "a square peg in a round hole".
2.5 It is our view that urban regeneration can be achieved whilst pursuing development on the urban edge. Indeed, the scale of housing need is so large that both must be encouraged in order to meet current and arising housing needs within the Black Country.
2.6 It is extremely important that in reviewing the Core Strategy it fully takes account of and facilitates the delivery of strategic economic plans, as recognised in paragraph 1.15. All too often these strategies are ignored and, accordingly, development plans could effectively frustrate economic growth from being realised.
2.7 In terms of the Plan period proposed in paragraph 1.17, whilst a 15-year time period from adoption is appropriate, there is concern that the preparation of plans is often delayed (due to reasons beyond the control of the LPAs) and it may be prudent to stretch the period further to prevent such an issue from occurring.
2.8 It is welcomed that the Issues and Options document recognises that it will not be possible to accommodate all future development needs within the urban area and that an examination of the potential for development land outside the existing urban area, which is effectively land within the Green Belt, will take place as part of the Core Strategy review process.
3. THE BLACK COUNTRY TODAY - THE EXISTING STRATEGY
3.1 As set out within this section, the delivery of both employment and housing land has not come forward as originally envisaged in part due to the after effects of the recession. Surplus employment land which might have been available for housing has not come forward due to a strengthening economy and local firms being more robust than anticipated. In addition, the range of locations available has not in all cases met with market expectations as to where people want to live.
3.2 In terms of the employment land, it is important that sufficient land is provided for new employment and that there is not an overreliance on land that is currently in use. It is impressive that despite generally poor economic performance local businesses have performed well. Should the economy significantly improve within the Plan period in line with LEP aspirations (considered later in this response), there is concern that it may become difficult to transfer a wide range of existing employment locations to housing allocations. It is appropriate, therefore, for the Council to ensure the evidence contained within the Strategic Housing and Employment Land Availability Assessment is reviewed and updated regularly. This will enable the land supply to be responsive to arising needs and not rigidly be wedded to delivering commitments that are unlikely to be realised.
3.3 What is further emphasised by the analysis in this section is that urban regeneration cannot be delivered quickly and that there are a number of factors beyond the control of the Black Country authorities that may have implications for the delivery of the strategy. This further emphasises the need for a mix of types of sites (brownfield, brownfield compulsory purchase, greenfield and Green Belt) of different forms of development (high density, mid and low density family homes) in a variety of locations, which will maximise the opportunities to deliver a successful Local Plan.
3.4 Finally, in respect of the proposal to maintain 300 hectares of employment land that will become vacant by way of general churn over the Plan period. Whilst the principle is considered acceptable, there should be appropriate evidence to support the assumption.
3.5 Our experience is that there are employment sites that clients are looking to secure a residential allocation on that have not been identified thus far. In light of these changing circumstances, the Black Country authorities should ensure that the policy approach is flexible to allow sites in appropriate locations to be brought forward for housing throughout the Plan period and likewise, sites that have been allocated for housing but have not come forward should be removed from the supply.
4. THE STRATEGIC CHALLENGES & OPPORTUNITIES
4.1 It is welcomed that the Black Country authorities are updating their evidence base. Indeed, the adopted Core Strategy took the development requirements from the adopted Regional Strategy (RS), which has since been revoked and is unquestionably out of date. Since the RS was published there has been a number of population and household projections published showing increasing dwelling requirements in the Black Country, which were largely ignored and, therefore, it should come as no surprise that there is a significant increase in forming households.
4.2 In terms of the list of evidence either prepared or due to be completed, it appears to be sufficiently comprehensive.
4.3 A separate review of the housing evidence based, including the Strategic Housing Market Assessment for the Black Country and South Staffordshire, is contained at Appendix A. The key conclusions arising from the report as summarised as follows:
* In determining the OAN, there are concerns with regard to the SHMA methodology and it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline.
* There is concern that the economic growth scenarios do not use the latest economic forecast data and that the methodology translating the job growth into dwelling growth is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances and also more aspirational job growth targets, such as those arising from the SEP.
* In terms of providing uplifts for market signals, a 25% uplift for South Staffs is appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, it should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack within the housing market and prevent house prices from increasing at an accelerated rate.
4.4 In addition, consideration of the Housing Background Report is also contained in the Housing Evidence Based Review Paper contained at Appendix A. The key findings from reviewing the evidence is set out below:
* Clearly a lot of work is yet to be done to determine what the housing land supply position is in the Black Country. Given that much of the existing evidence is based on the adopted Core Strategy, it is recognised that the SHLAAs across the four authorities will need to be updated, both in terms of revising the methodology and range of sites assessed, to reflect a potentially different approach to locating development.
* It is commendable that the Housing Background Report has examined existing sources of supply in an attempt to provide additional homes from sites within the urban area. There is concern, however, that by changing policies, for example, to increase the minimum density on sites has wider policy implications to take into account than simply increasing the number of homes.
* The Housing Background Report suggests a continued allowance for larger windfall sites. It is suggested that it is inappropriate to include an allowance for this source as there is no certainty that this land will come forward for development.
* Other sources, such as converting employment sites to residential sites, based on the evidence presented and feedback from the development industry, it is known that there are employment sites functioning well as employment sites but are to be converted to residential and other employment sites that are unoccupied and undesirable that are to be retained as employment sites. Clearly, there is a mismatch between employment land need and employment land supply. It is advised that the qualitative assessment of employment informs future land supply recommendations and allocations are revised where necessary.
4.5 As a result of the dwelling requirements generated by the SHMA and the land supply identified from the Housing Background Report, it is concluded that there in insufficient urban land to provide for the development requirements and that a Green Belt Review should be conducted. It is noted that scoping is underway and that the work is to be completed in mid-2018. It is hopeful that the development industry will be involved in defining the methodology of the work to ensure that it is conducted in a robust way.
4.6 Another very important piece of work to be taken into consideration will be the Greater Birmingham and Black Country HMA Strategic Growth Study. It is unclear at this stage what role the Black Country authorities will play in meeting the wider needs of Birmingham and, indeed, whether it can now contribute given that meeting the needs of the indigenous population will be a tall order. Further, there is uncertainty with regard to how far the study will go in identifying locations for growth and how this evidence will be taken forward in emerging Development Plans, particularly given that it is premature to the Green Belt Review for the wider Black Country area. It is our view that there are sites within the Green Belt that will provide sustainable locations for growth and that their removal will not compromise the purposes of the Green Belt and, accordingly it will remain purposeful and functional.
Question 2: Do you think that the key evidence set out in Table 1 is sufficient to support the key stages of the Core Strategy review? Yes/No; If not, what further evidence is required and, if there are any particular issues that should be taken into account in considering development on any particular sites or in any particular areas, please provide details
4.7 It is considered that the evidence contained within Table 1 is comprehensive, however, as suggested above and below, a number of concerns have been highlighted and it is therefore suggested that these are addressed in order to improve the soundness of the next iteration of the Core Strategy Review.
4.8 It is welcomed that an updated qualitative assessment of employment land has been undertaken in order to identify if the sites are fit for purpose, alongside the quantitative employment land study. It has been identified that a number of employment land sites that have been suggested for residential land allocations remain in occupation as functioning employment sites. These sites should be removed from the housing land supply. Conversely, there are vacant employment land sites that have been marketed over a period of time where no market interest has been forthcoming and, therefore, it is recommended that these sites should be considered for housing delivery.
4.9 It is noted that Viability Studies are identified as evidence base documents that are still to be prepared. Whilst not specifically identified, it is recommended that affordable housing viability is a key matter that needs to be addressed as part of this evidence base to ensure the level suggested by the SHMA Part 2 is deliverable. If this is not the case, the delivery of both market and affordable housing could be compromised and prevent the successful delivery of any new strategy.
Question 3: Do you agree that the housing need identified for the Black Country over the period 2014-36 in the SHMA, and the anticipated amount of supply, are appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.10 In terms of the extent of the sub market, which includes the Black Country and South Staffordshire, this is considered to be appropriate. It is recognised and welcomed that the Black Country authorities and South Staffordshire have jointly undertaken a SHMA for the sub area, which facilitates the preparation of an Issues and Options Core Strategy Review. There is concern, however, that the remaining constituent authorities within the wider Greater Birmingham Housing Market Area have not taken part and there is a danger that housing need for the whole HMA may not entirely be comprehensively captured due to the different time periods covered by the separate studies. It is advised that a SHMA, consistent with the guidance in the NPPF and Planning Practice Guidance, is prepared for the entire HMA over the same Plan period (as opposed to a housing needs study), which will properly consider all relevant factors in a consistent and comprehensive manner.
4.11 The OAN arrived at by the SHMA is generally appropriate in identifying the starting point for determining the dwelling requirement, however, it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline. There is concern that the economic growth scenarios contain potentially out of date employment forecasts and the methodology to determine appropriate dwelling requirements is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances. In addition, more aspirational job growth targets, such as those arising from the SEP, may not necessarily be appropriate for the Black Country (as discussed later in these representations).
4.12 In terms of providing an uplift for market signals, a 25% uplift for South Staffs is agreed to be appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, the application of such an uplift in South Staffordshire should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack or headroom within the housing market and prevent house prices from increasing at an accelerated rate, exacerbating issues of affordability.
4.13 Clearly, the evidence contained in the SHMA does not consider the potential to accommodate any of Birmingham City's housing needs and that this could result in increased dwelling requirements. We reserve our position in respect of this matter and await the publication of the HMA wide Strategic Housing Needs Study.
4.14 We shortly await a consultation publication from central Government in relation to providing a standardised methodology for generating dwelling requirements. This is anticipated in Autumn 2017. The Black Country authorities will need to take account of any proposed national policy changes identified through the consultation paper. We reserve our position on this matter, until the full details and implications for the Back Country are known. It is considered that, whilst a standard methodology will be helpful in identifying a baseline dwelling requirement, the consideration of long term trends and economic forecasts cannot be carried out in a mathematical calculation outside a demographic/ economic model. In light of this, the SHMA prepared for the sub-area could remain useful as evidence to inform the review of the Black Country Core Strategy.
4.15 In terms of meeting the dwelling requirements, it is understood that the 'Call for Sites' consultation will inform an updated SHLAA, which will assess sites both within and outside the urban area to determine the maximum number of dwellings that can be realistically delivered within the Black Country over the proposed Plan period. The Housing Background Report that has been published as part of the evidence base for the Issues and Options Core Strategy Review has considered assumptions contained within the SHLAA based on adopted policies and considers changes to the policies to boost the delivery of housing on existing sites. Whilst it is a commendable that the Black Country authorities are exploring all potential options to boost housing on urban land, there are wider implications of doing so and accordingly, caution is expressed in response to a number of the identified approaches proposed.
4.16 As confirmed in paragraph 3.15, it is extremely important that the Black Country authorities 'firm up' the housing supply in order to ensure that there is sufficient provision to meet the dwelling requirements. It is also considered appropriate to provide an additional buffer of housing land supply to provide a contingency when sites are delayed. As explained earlier in the Issues and Options Report, sites providing a total of 3,000 homes have not come forward as anticipated. It is considered that additional supply is required to provide flexibility and minimise any durations within the Plan period where the housing trajectory would otherwise dip.
4.17 In terms of the extent of a buffer for housing land, the Local Plan Expert Group suggested that additional land, equivalent to delivering 20% of the overall dwelling requirement, is added to the supply, which will provide a contingency of land to be used as and when necessary during the Plan period. It is suggested that this additional land will help ensure the dwelling delivery targets and housing needs are met in a timely manner, which will reduce the opportunity for households to become concealed or shared. Given the issues experienced in respect of delivery in the past, it could be argued that an increased buffer of circa 25% could be applied.
4.18 It is also appropriate to ensure that, as well as identifying the right amount of land, there is sufficient variety in the types of sites (brownfield, greenfield, Green Belt) are identified, reflecting different sizes, in a range of locations. This variety in provision will allow the best opportunity for multiple sites to come forward at the same time without market constraint and hence ensuring delivery targets are met. In addition, this approach will also provide market choice to existing and arising households looking to move into a new home in the Black Country, which will have wider social benefits (i.e. allow families to live nearby one another and provide an opportunity to diversify existing communities through providing alternative homes to the existing housing stock).
4.19 Indeed, as previously documented in the adopted Core Strategy, it is considered that the ambition to retain the young and professional population within the Black Country should be maintained and that suitable and attractive housing and complementary environments are encouraged.
4.20 Finally, it is welcomed that the Black Country authorities have agreed to test the dwelling requirement figures on an ongoing basis. It is hoped that the suggested changes/alternative scenarios suggested above are implemented in order to ensure the evidence base is robust and the resultant policies and proposals soundly based.
Question 4: Do you consider the employment land requirement identified for the Black Country up to 2036 in the EDNA is appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.21 The Core Strategy review intends to utilise the Economic Development Needs Assessment (EDNA) for the Black Country, published in May 2017, to inform future employment land requirements. The EDNA uses forecasts produced as part of the West Midlands Combined Authority Strategic Economic Plan (SEP) to calculate long-term growth, noting that the 'Super SEP Economy+ Scenario' is the preferred aspirational scenario. This scenario assumes average annual growth in employment of 1.3% across the Combined Authority and presents an ambitious view of future growth in the area, with 500,000 jobs created between 2013 and 2030.
4.22 The SEP Technical Appendix breaks down the job forecasts for the three Local Enterprise Partnerships that form the Combined Authority (Black Country; Coventry & Warwickshire; and Greater Birmingham & Solihull). Jobs growth in the Black Country LEP is forecast to be around 1.1% per annum, whilst it is forecast at 1.5% per annum in the other two LEP areas. This averages out at annual growth of approximately 1.3%. Using data from the Business Register & Employment Survey, published by the Office for National Statistics, it is possible to look at employment trends over the last five to six years (2009-15) and this analysis suggests that the growth rate used in the aspirational growth scenario may be too ambitious for the Back Country:
4.23 Between 2009 and 2015, total employment in the Black Country LEP increased from around 450,000 to approximately 453,000. This equates to average annual growth of 0.1%. Walsall (1.5% p.a.) and Sandwell (0.9% p.a.) experienced jobs growth, although Dudley (-1.1% p.a.) and Wolverhampton (-0.8%) both suffered a fall in employment.
4.24 By contrast, both the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs saw total job numbers increase by 1.3% p.a. from 2009-13. A number of districts in these LEPs saw particularly strong growth over the period, notably Solihull and Lichfield in Greater Birmingham & Solihull, where employment grew by at least 3.0% on an annual basis. In short, the 1.3% average across the West Midlands Combined Authority Area is substantially bolstered by Solihull and Lichfield and therefore it is very ambitious to suggest this will occur across the Black Country area.
4.25 That said, growth in the Black Country needs to be faster than in previous years and the new Core Strategy has a vital role to play in supporting this, however the analysis presented above suggests that the growth targets need to be lowered to better reflect the local economic climate. It is considered unlikely that an annual increase of 1.0% or more will happen in the area in the long-term, especially with the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs capturing new job opportunities at a faster rate in recent years. Lowering the employment growth rate means the amount of employment floorspace needed would be lower. This would not reduce the demographically based housing targets for the area but it would potentially free up previously allocated employment sites for other uses such as residential. This would help the Black Country meet its future housing targets and ensure that it has enough homes for its future workforce to live in.
4.26 As identified in the supporting report and above, it is known that employment sites that had previously been identified for housing are still operational with businesses continuing to use the land and, conversely, there are sites allocated for employment that have been vacant and subsequently market, however, remain unoccupied, which could be transferred to a residential use. It is therefore recommended that the Councils ensure that updated EDNA qualitative review conclusions are taken into account and correct uses applied where appropriate.
Question 5: Do you agree with the proposed approach to the Black Country Green Belt Review? Yes/No; If not, what additional work do you think is necessary?
4.27 In respect of the Green Belt Review, on the basis of the evidence published setting out housing need and supply, it is agreed that it will be necessary to find sites outside of the existing urban area, which will require removing land from the Green Belt where it is appropriate to do so. This will provide an opportunity to identify strategic sites that can provide a significant amount of homes to contribute to meeting identified housing needs. It is considered that there are a number of locations whereby housing sites can be identified, without the purposes of the Green Belt being compromised, ensuring the function and integrity of the Green Belt will remain.
4.28 In addition, areas on the urban fringe have the potential to ensure new homes can be delivered in an established, well landscaped environment, which could be attractive to those young families and professionals that the Black Country authorities have had difficulty in retaining, often through out-migration to neighbouring Shire districts considered to represent more aspirational locations.
4.29 In terms of the process and methodology for undertaking a Green Belt Review, it is understood that the awaited Strategic Housing Needs Study (SHNS) will be accompanied by Strategic Green Belt Review across Greater Birmingham and that the Black Country authorities have been engaged in presenting potential opportunities. It is reassuring that this engagement between consultants and local planning authorities is taking place as there is a danger that logical locations fail to be identified due to a lack of understanding of environmental conditions and/ or local circumstances that are applicable to sites.
4.30 It is agreed and makes sense for the local planning authorities to conduct a Stage 2 Green Belt Assessment following the completion of the higher-level work. Any input on reviewing the draft methodology for the Stage 3 Green Belt Review would be welcomed.
Question 6: Do you agree that the key issues set out in Part 3 are the key issues that need to be taken into account through the Core Strategy Review? Yes/No; If not, what other key issues should be taken into account?
4.31 The key issues presented are considered to be relevant, however, there are a number of inconsistencies relating to matters identified above against the previous questions raised.
5. REVIEWING THE STRATEGY TO MEET NEW CHALLENGES & OPPORTUNITIES
Question 7: Do you think that the Core Strategy vision and sustainability principles remain appropriate? Yes/No; If not, what alternatives would you suggest?
5.1 In the main, the Core Strategy Vision and sustainability principles are considered to be appropriate, with exception to the principle of 'brownfield first'. It is understood that the NPPF, whilst it encourages an efficient use of land and for brown field land to be recycled, it does not suggest a sequential approach to development. There is no evidence to demonstrate that the development of greenfield land will compromise the development of brownfield land. Often the type of developers of the different land categories are different and, given the scale of the housing need, it is appropriate that the early delivery of housing is encouraged from all types of sites. In particular, the larger, potentially Green Belt, sites will have a longer lead in time due to the time it takes to plan for, determine and implement a comprehensive scheme. Indeed, a recent study entitled 'Start to Finish', prepared by NLP, supports this claim. When planning the housing trajectory for the Core Strategy, the larger sites should be planned in to come forward as soon as practically possible.
5.2 It is therefore suggested that the reference to 'putting brownfield first' is inappropriate and that it should be replaced by 'ensuring an efficient use of land to meet the identified housing needs', which encourages the recycling of land and recognises the contributions of greenfield/ Green Belt land to meeting housing delivery targets.
Question 8: Do you think that the Core Strategy spatial objectives remain appropriate? Yes/No; If not, what alternatives would you suggest and how might these changes impact on individual Core Strategy policies?
5.3 Whilst the objectives outlined generally remain sound, there is concern that one of the NPPFs main priorities is absent. This is in relation to significantly boosting the supply of housing. It is suggested that an additional objective is added in order to ensure that meeting housing needs remains a priority within the Black Country. Once a preferred option is arrived at, spatial references as to where the housing growth will be delivered could be included (for example, meeting housing needs on urban (brownfield and greenfield) land and at extensions to the urban area).
5.4 Further, given the increased employment land requirements, the second objective relating to employment land being within the best locations within the Regeneration Corridors may no longer be appropriate. Indeed, as highlighted earlier, there is concern that there is a mismatch in land allocations, and it is appropriate for the Core Strategy review to ensure all employment sites are fit for purpose. This may conclude that employment opportunities should be identified on new land outside of the Regeneration Corridors. Should this be the case, the objective would be inappropriately worded.
Question 9: Do you agree that Policies CSP1 and CSP2 should be retained and updated to reflect new evidence and growth proposals outside the Growth Network? Yes/No; If not, what changes do you think should be made to Policies CSP1 and CSP2 in response to new challenges and opportunities?
5.5 It is agreed that the policies could remain, if the development requirements and related changes are made to ensure the policies are consistent with the overall strategy. The changes relate to both the quantum of development (homes, employment and retail space), the location of development (within and beyond the existing Regeneration Corridors) and the type of development (brownfield, greenfield and on land removed from the Green Belt). It is considered that references should be made to urban extensions (on land removed from the Green Belt) in Policy CSP2 specifically, to highlight the important contribution that such sites will make to meeting the development requirements of the Plan.
Question 10: In continuing to promote growth within the Growth Network, is there a need to amend the boundaries of any of the Regeneration Corridors in the existing Core Strategy? Yes/No; If so, which boundaries and why?
5.6 No comment.
Question 11a: Do you support Strategic Option 1A? Yes/No; If yes, please explain why. If no, do you support Option 1B? Yes/No; If yes, please explain why. If you support the release of further employment land for housing, what should the characteristics of these employment areas be?
5.7 Option 1A is considered to be appropriate for accommodating the growth needs of the Black Country over the Plan period to 2036. This option would significantly boost the supply of housing land and help to meet the significant current and future identified need.
Question 11b: Are there any current employment areas that might be considered suitable for redevelopment to housing? Yes/No; Please submit specific sites through the 'call for sites' form.
5.8 As highlighted previously, the key to understanding where the most appropriate employment/ housing locations are within the Growth Network and Corridors will be determined through a qualitative assessment of allocated employment sites. It is understood an updated assessment has been undertaken and such work, complete with responses to the Call for Sites consultation, will provide the Black Country authorities with evidence to determine the urban capacity for housing, which may include transferring some employment land to housing as well as housing land to employment. This work will then outline the number of dwellings to be accommodated beyond the existing Growth Network within the Green Belt.
5.9 It is welcomed that the Issues and Options Draft recognises the need to release Green Belt in all scenarios proposed.
Question 12a: Do you support Spatial Option H1? Yes/No; What criteria should be used to select suitable sites? e.g. ability to create a defensible new green belt boundary, size, access to existing residential services.
5.10 No comment.
Question 12b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details (please submit specific sites through the 'call for sites' form).
5.11 No comment.
Question 13a: Do you support Spatial Option H2? Yes/No; What should the characteristics of Sustainable Urban Areas (SUEs) be? e.g. minimum/ maximum size, mix of uses, mix of housing types, accessibility to other areas. What criteria should be used to select suitable sites? e.g. proximity to a rail station, availability of existing infrastructure, easy access to jobs, potential to support existing settlements / services, proximity to the existing growth network, potential to support urban regeneration.
5.12 Given the scale of the housing need, there is concern that the development requirements could not be met with just one of the suggested options presented and, therefore, a combination of both options will be necessary.
5.13 To be in the best possible position to significantly boost the amount of housing and meet the development requirements in the Black Country, in accordance with the NPPF, it is advised that opportunities to both round off edges of the Green Belt and Sustainable Urban Extensions are proposed in the Preferred Options Draft Core Strategy. As highlighted within the Issues and Options Draft, there are challenges and opportunities that come with both types of development, for example from a delivery perspective, smaller sites will come forward more quickly due to the nature of these being straight forward proposals (with limited infrastructure necessary and one or few land owners) and larger sites will ultimately take longer as they are more complex (with multiple land uses, infrastructure and land owners). This fact has been evidenced by Nathaniel Lichfield and Partners (now known as Lichfields) within their report 'Start to Finish' who concluded that the average planning approval period of schemes of 2,000+ dwellings is 6.1 years and the annual average build out rate is 161 dwellings per annum. These figures demonstrate the need to have a number of sites of different sizes and in different locations removed from the Green Belt. The report also identifies, with regard to housing delivery, that 50% more homes per annum are delivered on average on large greenfield sites than large brownfield sites. This is a significant benefit of including greenfield sites within the Preferred Option and will assist to secure its delivery.
5.14 In terms of the locations for removing land from the Green Belt, this should be informed by the Strategic Growth Study and a Black Country Review of the Green Belt. The more detailed study will provide an assessment of land parcels against the purposes of the Green Belt and is likely to recommend that those that compromise the purposes the least will be shortlisted for further consideration to be removed from the Green Belt. It is advised that the next stage should be a consideration of the shortlisted sites based on their suitability (i.e. are the neighbouring uses compatible, would any previous land uses prevent the development of the site), sustainability (i.e. proximity to/ ability to provide local services/ public transport/ employment opportunities) and deliverability (i.e. whether the site is available, being promoted for development, has no barriers to coming forward etc.) credentials. Clearly each site will fair differently against such criteria and the Call for Sites submission will assist the Council to come to a decision on the preferred sites. It is advised that the Black Country authorities should be mindful of the opportunities, through infrastructure and design, that development can bring that will enhance the diversity and character of a particular location.
5.15 In terms of the characteristics of a Sustainable Urban Extension, this is likely to vary depending on the location of each site. For example, some may be more urban and others suburban in their character and would, therefore, provide a different land use offer. It is important that each are considered on a site by site basis to ensure that any subsequent allocation delivers a successful development. It is important that the developer responsible for promoting the site helps to influence what is ultimately delivered. Often what is proposed on site has been informed by housing market intelligence undertaken by sales experts at development companies and, therefore, should be taken into account. Particularly given recent experience in the down turn in the apartment market, it is important that sites are allocated for the right type and mix of housing to ensure that it will be delivered, occupied and successful.
5.16 In the more suburban locations, it is suggested that Sustainable Urban Extensions should look to provide a different offer to potentially what exists in the Strategic Centres and Regeneration Corridors, such as a mix of larger and lower density homes, which will attract those households that in the past have migrated elsewhere. Given the emphasis on delivering more high density homes in the Strategic Centres, it is important that this housing mix is offset by more larger homes in appropriate locations. Otherwise, there is a concern that the Black Country will have a disproportional amount of small homes, which will further encourage more families to migrate elsewhere and not meet the aspiration to diversify the wider HMA.
Question 13b: What infrastructure do you think would be needed for different sizes of SUEs?
5.17 The type of infrastructure needed will vary depending on the different location and size of each site and must be compliant with paragraph 122 of the CIL Regulations that requires planning obligations (which applies to most infrastructure) to be necessary to make the development acceptable in planning terms; directly related to the development; and fairly and reasonably related in scale and kind to the development. With the above in mind, however, provision for open space (both formal and informal), local centre and potentially a primary school should be considered for sites in excess of 1,000 homes.
Question 13c: Are there any potential locations that should be considered for SUEs (please submit through the 'call for sites' form) and what infrastructure would be required to support these?
5.18 No comment.
Question 13d: Do you think that the Core Strategy should set out detailed guidance for the development of SUEs (e.g. type and tenure of housing, specific infrastructure required), rather than details being determined at a local level in light of local policies? Yes/No; Any further comments?
5.19 For the reasons outlined above, relating to considering existing local circumstances and CIL Regulation requirements in respect of any charging schedule and planning obligation requirements, it is advised that detailed guidance for the development of SUEs should not be specified within the Black Country Core Strategy as each site will vary and deserves a more detailed consideration, alongside the developer, at the local level.
Question 14: Do you think there are any other deliverable and sustainable Housing Spatial Options? Yes/No; If yes, please provide details
5.20 There are no other sustainable and deliverable options that we are aware of within the Black Country administrative boundary that are capable of delivering the housing spatial options.
Question 15a: If all housing need cannot be met within the Black Country, do you support the 'export' of housing growth to neighbouring authorities within the HMA? Yes/No; What factors should be taken into account in an assessment of the opportunities in neighbouring authorities e.g. proximity to the edge of the urban area, proximity to a rail station, availability of existing infrastructure, easy access to jobs?
5.21 Even if all realistically deliverable options have been considered within the Black Country, there will remain an unmet need for housing. Therefore, it is necessary for the Black Country authorities to consider the possibility of exporting growth to neighbouring authorities within the HMA. In particular, there are options to expand existing settlements that are close to the administrative boundary (for example, in South Staffordshire) across authorities and could help deliver the necessary growth in a sustainable and deliverable manner. These opportunities should be explored first prior to exporting further growth to other authorities within the HMA where there is less of a spatial connection.
Question 15b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details.
5.22 No comment.
Question 15c: Do you think there are ways to ensure that exporting housing will meet the needs of people who would otherwise live in the Black Country? (e.g. transport improvements, provision of affordable housing, creation of employment opportunities) Yes/No; If yes, please provide details.
5.23 It is important to consider a number of factors, including migration and travel to work patterns, which have been used to identify the extent of the HMA, to determine where households relocate to when leaving the Black Country in order to understand where and why those moves are taking place. Whilst planning can attempt to influence where people relocate to, there is no mechanism to guide or restrict people moving to or from certain locations. Once knowledge of movers can be understood can the planning system can attempt to recreate those attractive characteristics (homes that are more affordable, good public transport links, employment opportunities etc.) in locations where there is capacity for the homes to be delivered. It is advised that an additional analysis of the data, where necessary, is undertaken to provide the Black Country authorities with the relevant intelligence to deliver a successful strategy for growth outside the administrative area.
Question 16: Do you support Spatial Option E1? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access) If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.24 No comment.
Question 17: Do you support Spatial Option E2? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites e.g. quick motorway access, good sustainable transport links? If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.25 No comment.
Question 18: Do you support Spatial Option E3? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access) If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.26 No comment.
Question 19a: Do you support Spatial Option E4? Yes/No; Any further comments?
5.27 No comment.
Question 19b: Should any factors be taken into account in an assessment of the opportunities? Yes/No; If yes, what should they be? (e.g. quick motorway access, strong transport links with the Black Country, good sustainable transport links with the Black Country) If you think there are any potential locations that should be considered, please provide details.
5.28 No comment.
Question 20: Do you think there are any other deliverable and sustainable Employment Land Spatial Options? Yes/No; If yes, please provide details.
5.29 As previously outlined, there is concern that some of the employment sites currently identified are potentially not fit for purpose and others that are identified to be transferred to housing remain in employment occupation. In light of this mismatch, it is welcomed that an updated qualitative assessment has been undertaken and has informed how much employment land is has be found outside the urban area.
5.30 In terms of where the employment land should be located outside the urban area, as with housing, decisions should be based on the results of the Green Belt Review and the suitability, sustainability and deliverability of sites. For employment land sites, the suitability of a site may well include good transportation links for goods and people. The Call for Sites consultation will assist in putting forward suggestions for sites.
6. DELIVERING GROWTH - INFRASTRUCTURE & VIABILITY
Question 21: Do you think that changes are required to Policy DEL1 to ensure it covers both development within the existing urban area and any within the Green Belt? Yes/No; If yes, please provide details.
6.1 Policy DEL1 is considered to be sound on the basis that it is sufficiently flexible to deal with different circumstances on different sites across the Black Country, including sites that are to be removed from the Green Belt.
Question 22: Do you have evidence of a requirement for new social infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.2 No comment.
Question 23: Do you have evidence of social infrastructure that is no longer needed and where the site could be reallocated for alternative uses? Yes/No; If yes, please provide details.
6.3 No comment.
Question 24: Do you have evidence of pressure being placed on the capacity of current social infrastructure which could be exacerbated by new housing? Yes/No; If yes, please provide details.
6.4 No comment.
Question 25: Will there be any new social infrastructure requirements necessary to serve large new housing developments? Yes/No; If yes, please explain the type and scale of any new social infrastructure required.
6.5 It is recognised that delivery of new housing developments may give rise to the need to deliver supporting infrastructure. Committed to working with the relevant authorities and service providers to determine the capacity of existing infrastructure and determine the level of mitigatory provision necessary to support an increase in the population in this location. It is however important that each potential large new housing development is given independent consideration in respect of any infrastructure obligations, recognising that pressures will be dependent on location and existing infrastructure capacity.
Question 26: Do you have any evidence of a requirement for new physical infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.6 No comment.
Question 27: Do you have evidence of pressure being placed on the capacity of current physical infrastructure which could be exacerbated by new developments? Yes/No; If yes, please provide details.
6.7 No comment.
Question 28: Do you think physical infrastructure is necessary to serve large new housing developments? Yes/No; If yes, what type and scale of physical infrastructure is necessary?
6.8 As set out above, the need for infrastructure will vary for each site. Given such different circumstances, it would be inappropriate and potentially unlawful (as it would conflict with paragraph 122 of the CIL Regulations) to incorporate a blanket policy requiring specific infrastructure on every large housing site.
Question 29: Do you think there are any other tools or interventions that could be used to ensure enough infrastructure is provided by developments? Yes/No; If yes, please provide details.
6.9 It is considered that the existing national framework (which includes the NPPF and CIL Regulations) provides a sufficient tool to ensure the relevant infrastructure is delivered. In addition, the CIL Charging Schedule allows authorities to raise funds for named infrastructure projects, which should be updated in line with any Core Strategy advanced. Therefore, it is considered that there are existing provisions to deliver infrastructure and no additional interventions through the Black Country Core Strategy Review are needed.
Question 30: Do you have any suggestions around how the strategy can be developed in order to maintain the urban regeneration focus of the Black Country while at the same time bringing forward sites in the green belt? Yes/No; If yes, please provide details.
6.10 There is no a need for any specific interventions, such as phasing, to protect the delivery of urban regeneration in the Black Country. Indeed, it is considered that development of greenfield and Green Belt sites can very much compliment urban regeneration through the provision of a more varied form of development that will help diversify the housing stock and profile of residents in the wider area, which will assist to sustain and improve the vitality of existing communities. Further, as highlighted above, given the priority to significantly boost the delivery of housing greenfield and Green Belt sites should come forward for development as soon as practically possible. Given lead in and build out rates of larger sites, the land should be encouraged to be developed as soon as possible so to ensure the homes are delivered in the Plan period and the needs are met.
Question 31: Do you think that the right scale and form of funding is available to support the delivery of the Core Strategy review? Yes/No; If no, what alternative sources of funding or delivery mechanisms should be investigated?
6.11 When delivering greenfield/ Green Belt sites, there is an opportunity to deliver infrastructure to meet the needs arising from the proposal, which may have wider benefits for the local community. In addition, it is likely that the communities created by the Sustainable Urban Extensions will potentially be more affluent and share their wealth using local shops and services within the wider Black Country, which will contribute to more successful and prosperous communities.
7. REVIEW OF EXISTING CORE STRATEGY POLICIES & PROPOSALS Housing
Question 35: Do you support the proposed approach to housing land supply? Yes/No; If no, please explain why
7.1 As identified above, it is important that a range of sites in different locations are identified to be in the best possible position of delivering the development requirements. In terms of presenting these sites in the Core Strategy, whilst it is useful to identify a housing trajectory, it is important that there is not a phasing policy as such that would prevent the delivery of housing, given the current housing crisis. As stated above, the delivery of housing on greenfield and Green Belt land will not compromise the delivery of urban regeneration as the development on the urban edge will complement and rejuvenate the environment in a different way.
7.2 In terms of the proposed level of discounting, it is considered that if the LPA adopt an approach to identify a further 20% of sites in accordance with the LPEG recommendations identified above, there would not necessarily be a need for the application of discounting in determining the overall level of supply. It is interesting to note that the level of discounting proposed by LPEG is suggested for all LPAs, not necessarily those which have experienced difficulty in delivery. It could therefore be argued that an increased buffer of 25% could be applied in order to take a cautious approach.
Question 36: Do you think that the current accessibility and density standards set out in Policy HOU2 and Table 8 should be changed? Yes/No; If yes, what standards should be applied instead, for example should the minimum net density of 35 dwellings per hectare be increased to maximise brownfield housing delivery?
7.3 It is clear that the current accessibility and density standards outlined in the adopted Core Strategy were formulated in the context of the vast majority of development taking place on brownfield sites within the defined urban area. As reiterated throughout these representations, there is now a clear need for Green Belt release as part of the Local Plan Review to meet emerging, objectively assessed housing needs. We outline in further detail below why the adopted accessibility and densities would not be applicable to Green Belt sites, however would suggest that the current standards do not allow sufficient flexibility on brownfield sites. A blanket application of prescriptive accessibility and density standards across the Black Country, be it brownfield or greenfield, does not allow sufficient flexibility which take into account site specific characteristics. The Council should allow for greater flexibility when assessing accessibility and density standards, with a more pragmatic approach which allows appropriate assessment for site-specific characteristics and also an assessment of market demand which may vary significantly across the large Black Country area.
7.4 Paragraph 47 of the NPPF outlines how local authorities should set out their own approach towards density. It is suggested that the currently adopted approach does not allow for sufficient assessment of local characteristics. It is clear that the chosen approach must be reflective of local circumstances, including the matters outlined above as well as infrastructure and services available in the locality. It is advocated that a more flexible approach to density and accessibility standards is taken as part of the emerging Local Plan Review.
Question 37a: Do you think that the existing Policy HOU2 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why
7.5 In line with the comments above, it is suggested that the Council should assess each site on a case by case basis in terms of accessibility and density standards. This approach would suggest that the numerical baseline trigger of 15 homes or more will not always be appropriate or applicable, and as advocated throughout these representations it suggested that there should be a complete reassessment on accessibility and density standards as part of the emerging Local Plan Review.
Question 38: Do you think that the current accessibility and density standards are appropriate for green belt release locations? Yes/No; If no, what standards should be applied in these locations and why?
7.6 No, it is not considered that the current standards would be applicable to Green Belt release locations. The adopted standards are overly prescriptive, and as previously discussed were written in the context of brownfield land. Green Belt release sites have a completely different type of character, therefore consideration of accessibility and density standards in relation to these sites should be reflective of local character and site characteristics. The more suburban settings of Green Belt release land lends itself to lower densities which are more appropriate to the Green Belt setting, which typically deliver more family homes. The Council must provide robust evidence to test any forthcoming accessibility and density standards in relation to Green Belt release locations, which allows for a flexible and pragmatic approach.
Question 39: Do you think separate accessibility standards are needed for particular types of housing e.g. housing for the elderly or affordable housing (as occupiers may be less mobile and more dependent on public transport)? Yes/No; If yes, please provide details.
7.7 It is clear that separate accessibility standards will apply to particular types of housing such as affordable and for the elderly population, however in line with the sentiment expressed above, any forthcoming standards should be based on robust evidence and allow for sufficient flexibility to avoid any unnecessary constraints to development coming forward.
Question 40: Do you agree that the 2017 SHMA findings should be used to set general house type targets for the Plan period? Yes/No; If no, please explain why.
7.8 A general and blanket application for house types across the Black Country should not be advanced as part of the Local Plan Review. Paragraph 50 is clear that local planning authorities should plan for a mix of housing based on current and future demographic trends and market trends. It is therefore notable that the NPPF specifically highlights 'market trends' in this context, which acknowledges that the market must inform such decisions.
7.9 Whilst the 2017 SHMA does provide an assessment of demographic and market trends, it is notable that it looks at a wider area assessment and is focused at a higher level. This assessment therefore does not draw out sub-market trends, and cover smaller areas within the vast Black Country area. Again, a blanket policy of house type targets across the Black Country area would not allow for sufficient flexibility to assess each site on a site by site basis, taking into consideration local market trends and demand. The NPPF does not state that specific policies should be set to enforce that local demand is met. As such, it is considered that this should be left for the market to decide, as opposed to applying rigid and prescriptive house size standards.
7.10 It is suggested that the evidence presented in the SHMA should be put into the Plan as an informative and general guide, but should not feed into a specific policy requirement which outlines housing mix percentages that should be applied across the Black Country. A policy containing general house type targets could present as a significant constraint to the delivery of a site where there is no local market demand for this house type, which in turn would have a negative impact on achieving the necessary housing growth targets to be delivered in the Black Country over the Plan period.
Question 41a: Do you support the introduction of a policy approach towards self and custom build housing in the Core Strategy? Yes/No; If yes, would you support:
7.11 It is not considered that there is a policy need for the Core Strategy to address self and custom build housing in the emerging Review. Paragraph 6.32 indicates that there are only nine records on self and custom build registers in the Black Country. It is evident that that there is very limited demand in the Black Country, which is unsurprising given that self and custom build housing is often more popular in rural areas. Given the limited demand it is therefore not considered necessary to take a policy approach towards self and custom build housing within the Local Plan Review.
Question 41b: A target for each authority? Yes/No; Any further comments
7.12 Given that there is evidence of little market demand, it is not considered necessary for the Core Strategy to set targets for each of the Black Country authorities. If it was considered to be necessary as the Local Plan Review progresses, any targets being set should be formulated on the basis of robust evidence such as monitoring of the registers, to provide an indication of how many self-build homes will be needed.
Question 41c: A requirement for large housing sites to provide serviced plots? Yes/No; Any further comments?
7.13 There should not be a requirement for large housing sites to provide serviced plots. This can pose an unnecessary market constraint for large housebuilders when there may be limited or no market demand for self-build plots. Self and custom build plots are often unusual and unique in character, therefore would not be best suited to be located within a large housing development with more uniform house types. If deemed necessary, self and custom build housing should be allocated specific site allocations, as discussed below.
Question 41d: Another approach altogether? Yes/No; If yes, please specify.
7.14 If it is considered necessary for the Review to address self and custom build housing, this should be addressed by the Council's identifying and allocating specific plots for these uses. Identifying site-specific plots would ensure that the most appropriate and suitable locations for self and custom-build will be allocated, via the assessment of appropriate evidence and market demand. In addition, this might be more likely to be achieved on surplus publicly owned land.
Question 42: Do you agree that the annual affordable homes target should be increased to reflect the 2017 Black Country Strategic Housing Market Assessment? Yes/No; If no, please explain why.
7.15 As a general principle, the notion of applying different affordable housing ratios to different parts of the Black Country, based on an understanding of needs and viability, is acceptable. Given that the Black Country represents a vast area, there will not be a uniform housing market, and there will be sub-market trends within this wider area. As such, a more flexible approach which assesses local housing market evidence on a case by case basis could be justified. That said, there is an inherent simplicity and attraction to a single rate figure, which is easy for the development industry to understand.
7.16 In terms of the annual affordable housing target, it is unclear how the Issues and Options document has calculated the figure of 832 homes per year. At paragraph 7.42 of the June 2017 SHMA Part Two- affordable housing document, it is stated that the total annual affordable housing need is 677 dwellings, which represents 19.8% of the annual projected household growth. This differs to paragraph 6.36 of the Issues and Options document, which states that the affordable housing target is 23.4% of total housing need or 832 homes per year. From paragraph 7.47 of the SHMA, it appears that this figure may have been calculated by adding the overall requirement of 16.6% of housing to be affordable rented and 6.7% shared ownership. Clarity is sought on how this figure has been calculated, and we reserve the right to comment further on this matter.
Question 43a: Do you think that the existing Policy HOU3 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why.
7.17 We have not undertaken detailed analysis of the findings and assumptions of the SHMA and affordable housing delivery matters, therefore would like to reserve the right to comment on this matter further. However, on face value, it appears to be a reasonable threshold and is not dissimilar to other locations.
Question 44a: Do you think that the affordable housing requirement for eligible sites in Question 43 should be kept at 25% of the total number of homes on the site? Yes /No; Any further comments?
7.18 Based on the current evidence, a blanket rate of 25% affordable housing would appear to be sound.
7.19 However, irrespective of the final rate, any amendments to the currently adopted affordable housing policy must continue to have a clause in it which stipulates that this requirement is subject to viability tests. Any revised affordable housing requirements will also need to carefully consider the implications of adopted Community Infrastructure Levy (CIL) regimes. Both Sandwell and Dudley Councils have adopted CIL Charging Schedules. These will have implications on viability, therefore if revised affordable housing targets are to progressed then these CIL tariffs will need to re-assessed and re-visited.
Question 44b: If no, should the percentage be increased to allow for the provision of affordable home ownership? Yes/No; If yes, what should the percentage be and why?
7.20 At paragraph 6.39 of the Issues and Options Paper, it is stated that options need to be explored to increase affordable housing delivery of private sites. One option would be to increase the overall affordable housing proportion, which would require developers to provide affordable home ownership products plus an appropriate proportion of other affordable tenures. This paragraph follows on from commentary relating to the Housing White Paper.
7.21 The Housing White Paper discusses Starter Homes at Chapter 4, and explains how the government intend to amend the NPPF to introduce a clear policy expectation that housing sites deliver a minimum of 10% affordable home ownership units. It is later stated that it will be for local areas to work with developers to agree an appropriate level of delivery of starter homes, alongside other affordable home ownership and rented tenures.
7.22 The policy position on Starter Homes is not yet fully clear, and has yet to be formally established through a formal amendment and update to the NPPF. Until the national policy position on Starter Homes has been made clear, it would be premature for the Core Strategy Review to suggest an uplift in the affordable housing requirement to include affordable home ownership such as Starter Homes. Any suggestion to uplift the affordable housing requirement to include Starter Homes should be reflective of the national policy position, as well as founded upon a robust evident base which dictates exactly what percentage this element should be of the overall affordable housing requirement.
Question 45: Should an increased affordable housing requirement be set for green belt release sites, to reflect the likely financial viability of these sites? Yes/No; If yes, what should this be.
7.23 The likely financial viability of Green Belt sites will vary across different areas of the Black Country, therefore any affordable housing requirements for Green Belt sites will need to be reflective of these circumstances. Any affordable housing targets for Green Belt sites should be based on robust evidence, and acknowledge that many sites may need to support and deliver other infrastructure requirements.
7.24 Ultimately, any affordable housing strategy will need to address the affordable housing need as well as the need for market housing. Bearing in mind that the SHMA confirms over 70% of homes required are for homes to be sold on the open market, any affordable housing policy must not dilute the delivery of these needs/requirements. A higher figure on Green Belt sites over and above a standard blanket figure would potentially do this.
Employment Question 49a: Is there still a need for existing Policy DEL2 in order to manage the release of poorer quality employment land for housing? Yes/No; If no, please explain why.
7.25 The Black Country is to be the subject of large levels of both employment and housing growth over the Plan period. These uses are very much inter-linked with one another, and will drive each other's need for growth. The Local Plan Review, in order to meet emerging employment and housing needs, must identify a significant number of specific sites for employment and housing uses. By planning proactively and identifying suitable sites for both employment land and housing land, this should reduce the pressures to manage the release of poorer quality employment land, which may not always be suitable for release. The Local Plan Review should also seek to undertake a further review of poorer quality employment land to make it available for other suitable uses, if it proves to no longer be viable for employment land use. This is in line with policy provisions of the NPPF, which at Paragraph 22 outlines that planning policies should avoid the long-term protection of sites allocated for employment use where there is no reasonable prospect of a site being used for that purpose.
Question 50: Do you think that the Core Strategy should continue to set a target for the total employment land stock in Policy EMP1? Yes/No; Please explain why.
7.26 The continuation of setting a target for employment land stock would be supported. Policy EMP1 should make it clear that these are not maximum figures, to encourage further flexibility for additional growth.
Retail Question 59: Have all the appropriate centres within the Black Country been identified? Yes/No; If not, please specify additional centres
7.27 No comment.
Question 61: In addition to para 4.33 of the current Core Strategy should the revised Core Strategy include criteria for the creation of new centres that might be needed as a result of any additional housing identified through the plan? Yes/No; Any further comments?
7.28 Criteria would be a useful policy tool to help assess the designation of new centres, and should be in line with previous methodologies used which set out clear thresholds.
Question 71: Should the Core Strategy set housing targets for the Town Centres?
7.29 Housing within Town Centres should be supported, in line with paragraph 23 of the NPPF which discusses the important role that residential development can play in ensuring the vitality of Town Centres. Any housing targets should be based on what sites are known to be readily available, suitable and viable for residential development. Market demand for housing in these areas will also need to be fully assessed. It is notable from the outcome of the 2017 SHMA that there is most demand for three bedroom properties (40%). The highest demand is therefore for family housing, and not for flats which are often the most popular within Town Centre locations. Any housing targets set for the Town Centre would therefore need to consider the findings of the SHMA, and be reflective of the fact that family housing is often more suitable for delivery on larger sites, including on sites which are currently located within the Green Belt.
Environment Question 99a: Do you think that national standards for housing development on water consumption should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.30 When referring to water consumption paragraph 6.1.52 of the Issues and Options document states that the Black Country does not currently lie in an area of serious water stress, therefore clear need may be difficult to demonstrate. This evidence suggests that there is limited or no need to introduce such a policy, therefore it is not considered that the Core Strategy Review should seek to introduce water consumption standards for housing development.
Question 99b: Do you think that national access standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.31 The introduction of any national access standards, with the Issues and Options document referring specifically to Lifetime Homes, again must be based on a robust evidence base which can demonstrate market demand. It is noted that Paragraph 50 of the NPPF states that planning authorities must plan for a mix of housing to meet a range of needs. In the same paragraph, it is later stated that these must be based on current and future market trends. If Lifetime Home standards are to be introduced these will therefore need to be based on robust evidence, to ensure that the standards are not overly onerous and prevent the delivery of other types of housing which have higher levels of market demand.
Question 99c: Do you think that national space standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.32 As reiterated throughout these representations, it is not considered that a blanket approach of prescriptive standards across the Black Country allows sufficient flexibility to assess local market and site considerations in an appropriate manner. Whilst it is recognised that space standards can be an important tool to ensure that high quality of homes are delivered, we agree with the sentiment expressed in the recent Housing White Paper. The Paper explains that the government are concerned that a one size fits all approach may not reflect the needs and aspirations of a wider range of households. The White Paper also states that the Government will be undertaking a review of the Nationally Described Space Standards. It is suggested that the Core Strategy Review should await the outcome of this national review of national space standards, to ensure compliance with national policy and to ensure that the most appropriate approach to space standards, if required, is taken.
Question 99d: Do you think that the standards should be different for brownfield and greenfield sites? Yes/No; If yes, please explain how and why.
7.33 As discussed above, prescriptive standards do not always allow sufficient flexibility for local market needs, so we would not advocate a blanket approach of different standards to brownfield and greenfield sites.
Open Space, Sport and Recreation Question 102a: Do you support the proposed changes relating to open space, sport and recreation? Yes/No; If no, please explain
7.34 Paragraph 6.1.60 of the Issues and Options paper outlines how adopted Policy ENV6 creates the framework for open space policies at the local level. The Issues and Options paper outlines how this is in line with national guidance, and that it is proposed to retain this policy and update some references in the supporting text to reflect changing circumstances. It is agreed that the local level remains the appropriate place to set open space policies, and that Policy ENV6 should continue to endorse this approach.

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

3. The Strategic Challenges and Opportunities

Representation ID: 2560

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Pegasus Group

Representation Summary:

4.1 It is welcomed that the Black Country authorities are updating their evidence base. Indeed, the adopted Core Strategy took the development requirements from the adopted Regional Strategy (RS), which has since been revoked and is unquestionably out of date. Since the RS was published there has been a number of population and household projections published showing increasing dwelling requirements in the Black Country, which were largely ignored and, therefore, it should come as no surprise that there is a significant increase in forming households.
4.2 In terms of the list of evidence either prepared or due to be completed, it appears to be sufficiently comprehensive.
4.3 A separate review of the housing evidence based, including the Strategic Housing Market Assessment for the Black Country and South Staffordshire, is contained at Appendix A. The key conclusions arising from the report as summarised as follows:
* In determining the OAN, there are concerns with regard to the SHMA methodology and it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline.
* There is concern that the economic growth scenarios do not use the latest economic forecast data and that the methodology translating the job growth into dwelling growth is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances and also more aspirational job growth targets, such as those arising from the SEP.
* In terms of providing uplifts for market signals, a 25% uplift for South Staffs is appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, it should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack within the housing market and prevent house prices from increasing at an accelerated rate.
4.4 In addition, consideration of the Housing Background Report is also contained in the Housing Evidence Based Review Paper contained at Appendix A. The key findings from reviewing the evidence is set out below:
* Clearly a lot of work is yet to be done to determine what the housing land supply position is in the Black Country. Given that much of the existing evidence is based on the adopted Core Strategy, it is recognised that the SHLAAs across the four authorities will need to be updated, both in terms of revising the methodology and range of sites assessed, to reflect a potentially different approach to locating development.
* It is commendable that the Housing Background Report has examined existing sources of supply in an attempt to provide additional homes from sites within the urban area. There is concern, however, that by changing policies, for example, to increase the minimum density on sites has wider policy implications to take into account than simply increasing the number of homes.
* The Housing Background Report suggests a continued allowance for larger windfall sites. It is suggested that it is inappropriate to include an allowance for this source as there is no certainty that this land will come forward for development.
* Other sources, such as converting employment sites to residential sites, based on the evidence presented and feedback from the development industry, it is known that there are employment sites functioning well as employment sites but are to be converted to residential and other employment sites that are unoccupied and undesirable that are to be retained as employment sites. Clearly, there is a mismatch between employment land need and employment land supply. It is advised that the qualitative assessment of employment informs future land supply recommendations and allocations are revised where necessary.
4.5 As a result of the dwelling requirements generated by the SHMA and the land supply identified from the Housing Background Report, it is concluded that there in insufficient urban land to provide for the development requirements and that a Green Belt Review should be conducted. It is noted that scoping is underway and that the work is to be completed in mid-2018. It is hopeful that the development industry will be involved in defining the methodology of the work to ensure that it is conducted in a robust way.
4.6 Another very important piece of work to be taken into consideration will be the Greater Birmingham and Black Country HMA Strategic Growth Study. It is unclear at this stage what role the Black Country authorities will play in meeting the wider needs of Birmingham and, indeed, whether it can now contribute given that meeting the needs of the indigenous population will be a tall order. Further, there is uncertainty with regard to how far the study will go in identifying locations for growth and how this evidence will be taken forward in emerging Development Plans, particularly given that it is premature to the Green Belt Review for the wider Black Country area. It is our view that there are sites within the Green Belt that will provide sustainable locations for growth and that their removal will not compromise the purposes of the Green Belt and, accordingly it will remain purposeful and functional.

Full text:

Question 1: Do you agree that the Core Strategy review should be a partial review, retaining and stretching the existing spatial strategy and updating existing policies? Yes/No; If not, what do you think should be the scope of the review?
2.4 In response to Question 1 and whether it should be a partial review or not, whilst the existing strategy identifies the most sustainable locations for growth in the context of delivering development requirements identified by the Regional Strategy (RS), there is now a new and much bigger challenge ahead in meeting the arising needs for homes identified by the latest evidence and there is concern that the existing spatial strategy may not facilitate the delivery of these needs. The Black Country authorities, therefore, need to be mindful of this and not attempt to put "a square peg in a round hole".
2.5 It is our view that urban regeneration can be achieved whilst pursuing development on the urban edge. Indeed, the scale of housing need is so large that both must be encouraged in order to meet current and arising housing needs within the Black Country.
2.6 It is extremely important that in reviewing the Core Strategy it fully takes account of and facilitates the delivery of strategic economic plans, as recognised in paragraph 1.15. All too often these strategies are ignored and, accordingly, development plans could effectively frustrate economic growth from being realised.
2.7 In terms of the Plan period proposed in paragraph 1.17, whilst a 15-year time period from adoption is appropriate, there is concern that the preparation of plans is often delayed (due to reasons beyond the control of the LPAs) and it may be prudent to stretch the period further to prevent such an issue from occurring.
2.8 It is welcomed that the Issues and Options document recognises that it will not be possible to accommodate all future development needs within the urban area and that an examination of the potential for development land outside the existing urban area, which is effectively land within the Green Belt, will take place as part of the Core Strategy review process.
3. THE BLACK COUNTRY TODAY - THE EXISTING STRATEGY
3.1 As set out within this section, the delivery of both employment and housing land has not come forward as originally envisaged in part due to the after effects of the recession. Surplus employment land which might have been available for housing has not come forward due to a strengthening economy and local firms being more robust than anticipated. In addition, the range of locations available has not in all cases met with market expectations as to where people want to live.
3.2 In terms of the employment land, it is important that sufficient land is provided for new employment and that there is not an overreliance on land that is currently in use. It is impressive that despite generally poor economic performance local businesses have performed well. Should the economy significantly improve within the Plan period in line with LEP aspirations (considered later in this response), there is concern that it may become difficult to transfer a wide range of existing employment locations to housing allocations. It is appropriate, therefore, for the Council to ensure the evidence contained within the Strategic Housing and Employment Land Availability Assessment is reviewed and updated regularly. This will enable the land supply to be responsive to arising needs and not rigidly be wedded to delivering commitments that are unlikely to be realised.
3.3 What is further emphasised by the analysis in this section is that urban regeneration cannot be delivered quickly and that there are a number of factors beyond the control of the Black Country authorities that may have implications for the delivery of the strategy. This further emphasises the need for a mix of types of sites (brownfield, brownfield compulsory purchase, greenfield and Green Belt) of different forms of development (high density, mid and low density family homes) in a variety of locations, which will maximise the opportunities to deliver a successful Local Plan.
3.4 Finally, in respect of the proposal to maintain 300 hectares of employment land that will become vacant by way of general churn over the Plan period. Whilst the principle is considered acceptable, there should be appropriate evidence to support the assumption.
3.5 Our experience is that there are employment sites that clients are looking to secure a residential allocation on that have not been identified thus far. In light of these changing circumstances, the Black Country authorities should ensure that the policy approach is flexible to allow sites in appropriate locations to be brought forward for housing throughout the Plan period and likewise, sites that have been allocated for housing but have not come forward should be removed from the supply.
4. THE STRATEGIC CHALLENGES & OPPORTUNITIES
4.1 It is welcomed that the Black Country authorities are updating their evidence base. Indeed, the adopted Core Strategy took the development requirements from the adopted Regional Strategy (RS), which has since been revoked and is unquestionably out of date. Since the RS was published there has been a number of population and household projections published showing increasing dwelling requirements in the Black Country, which were largely ignored and, therefore, it should come as no surprise that there is a significant increase in forming households.
4.2 In terms of the list of evidence either prepared or due to be completed, it appears to be sufficiently comprehensive.
4.3 A separate review of the housing evidence based, including the Strategic Housing Market Assessment for the Black Country and South Staffordshire, is contained at Appendix A. The key conclusions arising from the report as summarised as follows:
* In determining the OAN, there are concerns with regard to the SHMA methodology and it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline.
* There is concern that the economic growth scenarios do not use the latest economic forecast data and that the methodology translating the job growth into dwelling growth is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances and also more aspirational job growth targets, such as those arising from the SEP.
* In terms of providing uplifts for market signals, a 25% uplift for South Staffs is appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, it should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack within the housing market and prevent house prices from increasing at an accelerated rate.
4.4 In addition, consideration of the Housing Background Report is also contained in the Housing Evidence Based Review Paper contained at Appendix A. The key findings from reviewing the evidence is set out below:
* Clearly a lot of work is yet to be done to determine what the housing land supply position is in the Black Country. Given that much of the existing evidence is based on the adopted Core Strategy, it is recognised that the SHLAAs across the four authorities will need to be updated, both in terms of revising the methodology and range of sites assessed, to reflect a potentially different approach to locating development.
* It is commendable that the Housing Background Report has examined existing sources of supply in an attempt to provide additional homes from sites within the urban area. There is concern, however, that by changing policies, for example, to increase the minimum density on sites has wider policy implications to take into account than simply increasing the number of homes.
* The Housing Background Report suggests a continued allowance for larger windfall sites. It is suggested that it is inappropriate to include an allowance for this source as there is no certainty that this land will come forward for development.
* Other sources, such as converting employment sites to residential sites, based on the evidence presented and feedback from the development industry, it is known that there are employment sites functioning well as employment sites but are to be converted to residential and other employment sites that are unoccupied and undesirable that are to be retained as employment sites. Clearly, there is a mismatch between employment land need and employment land supply. It is advised that the qualitative assessment of employment informs future land supply recommendations and allocations are revised where necessary.
4.5 As a result of the dwelling requirements generated by the SHMA and the land supply identified from the Housing Background Report, it is concluded that there in insufficient urban land to provide for the development requirements and that a Green Belt Review should be conducted. It is noted that scoping is underway and that the work is to be completed in mid-2018. It is hopeful that the development industry will be involved in defining the methodology of the work to ensure that it is conducted in a robust way.
4.6 Another very important piece of work to be taken into consideration will be the Greater Birmingham and Black Country HMA Strategic Growth Study. It is unclear at this stage what role the Black Country authorities will play in meeting the wider needs of Birmingham and, indeed, whether it can now contribute given that meeting the needs of the indigenous population will be a tall order. Further, there is uncertainty with regard to how far the study will go in identifying locations for growth and how this evidence will be taken forward in emerging Development Plans, particularly given that it is premature to the Green Belt Review for the wider Black Country area. It is our view that there are sites within the Green Belt that will provide sustainable locations for growth and that their removal will not compromise the purposes of the Green Belt and, accordingly it will remain purposeful and functional.
Question 2: Do you think that the key evidence set out in Table 1 is sufficient to support the key stages of the Core Strategy review? Yes/No; If not, what further evidence is required and, if there are any particular issues that should be taken into account in considering development on any particular sites or in any particular areas, please provide details
4.7 It is considered that the evidence contained within Table 1 is comprehensive, however, as suggested above and below, a number of concerns have been highlighted and it is therefore suggested that these are addressed in order to improve the soundness of the next iteration of the Core Strategy Review.
4.8 It is welcomed that an updated qualitative assessment of employment land has been undertaken in order to identify if the sites are fit for purpose, alongside the quantitative employment land study. It has been identified that a number of employment land sites that have been suggested for residential land allocations remain in occupation as functioning employment sites. These sites should be removed from the housing land supply. Conversely, there are vacant employment land sites that have been marketed over a period of time where no market interest has been forthcoming and, therefore, it is recommended that these sites should be considered for housing delivery.
4.9 It is noted that Viability Studies are identified as evidence base documents that are still to be prepared. Whilst not specifically identified, it is recommended that affordable housing viability is a key matter that needs to be addressed as part of this evidence base to ensure the level suggested by the SHMA Part 2 is deliverable. If this is not the case, the delivery of both market and affordable housing could be compromised and prevent the successful delivery of any new strategy.
Question 3: Do you agree that the housing need identified for the Black Country over the period 2014-36 in the SHMA, and the anticipated amount of supply, are appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.10 In terms of the extent of the sub market, which includes the Black Country and South Staffordshire, this is considered to be appropriate. It is recognised and welcomed that the Black Country authorities and South Staffordshire have jointly undertaken a SHMA for the sub area, which facilitates the preparation of an Issues and Options Core Strategy Review. There is concern, however, that the remaining constituent authorities within the wider Greater Birmingham Housing Market Area have not taken part and there is a danger that housing need for the whole HMA may not entirely be comprehensively captured due to the different time periods covered by the separate studies. It is advised that a SHMA, consistent with the guidance in the NPPF and Planning Practice Guidance, is prepared for the entire HMA over the same Plan period (as opposed to a housing needs study), which will properly consider all relevant factors in a consistent and comprehensive manner.
4.11 The OAN arrived at by the SHMA is generally appropriate in identifying the starting point for determining the dwelling requirement, however, it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline. There is concern that the economic growth scenarios contain potentially out of date employment forecasts and the methodology to determine appropriate dwelling requirements is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances. In addition, more aspirational job growth targets, such as those arising from the SEP, may not necessarily be appropriate for the Black Country (as discussed later in these representations).
4.12 In terms of providing an uplift for market signals, a 25% uplift for South Staffs is agreed to be appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, the application of such an uplift in South Staffordshire should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack or headroom within the housing market and prevent house prices from increasing at an accelerated rate, exacerbating issues of affordability.
4.13 Clearly, the evidence contained in the SHMA does not consider the potential to accommodate any of Birmingham City's housing needs and that this could result in increased dwelling requirements. We reserve our position in respect of this matter and await the publication of the HMA wide Strategic Housing Needs Study.
4.14 We shortly await a consultation publication from central Government in relation to providing a standardised methodology for generating dwelling requirements. This is anticipated in Autumn 2017. The Black Country authorities will need to take account of any proposed national policy changes identified through the consultation paper. We reserve our position on this matter, until the full details and implications for the Back Country are known. It is considered that, whilst a standard methodology will be helpful in identifying a baseline dwelling requirement, the consideration of long term trends and economic forecasts cannot be carried out in a mathematical calculation outside a demographic/ economic model. In light of this, the SHMA prepared for the sub-area could remain useful as evidence to inform the review of the Black Country Core Strategy.
4.15 In terms of meeting the dwelling requirements, it is understood that the 'Call for Sites' consultation will inform an updated SHLAA, which will assess sites both within and outside the urban area to determine the maximum number of dwellings that can be realistically delivered within the Black Country over the proposed Plan period. The Housing Background Report that has been published as part of the evidence base for the Issues and Options Core Strategy Review has considered assumptions contained within the SHLAA based on adopted policies and considers changes to the policies to boost the delivery of housing on existing sites. Whilst it is a commendable that the Black Country authorities are exploring all potential options to boost housing on urban land, there are wider implications of doing so and accordingly, caution is expressed in response to a number of the identified approaches proposed.
4.16 As confirmed in paragraph 3.15, it is extremely important that the Black Country authorities 'firm up' the housing supply in order to ensure that there is sufficient provision to meet the dwelling requirements. It is also considered appropriate to provide an additional buffer of housing land supply to provide a contingency when sites are delayed. As explained earlier in the Issues and Options Report, sites providing a total of 3,000 homes have not come forward as anticipated. It is considered that additional supply is required to provide flexibility and minimise any durations within the Plan period where the housing trajectory would otherwise dip.
4.17 In terms of the extent of a buffer for housing land, the Local Plan Expert Group suggested that additional land, equivalent to delivering 20% of the overall dwelling requirement, is added to the supply, which will provide a contingency of land to be used as and when necessary during the Plan period. It is suggested that this additional land will help ensure the dwelling delivery targets and housing needs are met in a timely manner, which will reduce the opportunity for households to become concealed or shared. Given the issues experienced in respect of delivery in the past, it could be argued that an increased buffer of circa 25% could be applied.
4.18 It is also appropriate to ensure that, as well as identifying the right amount of land, there is sufficient variety in the types of sites (brownfield, greenfield, Green Belt) are identified, reflecting different sizes, in a range of locations. This variety in provision will allow the best opportunity for multiple sites to come forward at the same time without market constraint and hence ensuring delivery targets are met. In addition, this approach will also provide market choice to existing and arising households looking to move into a new home in the Black Country, which will have wider social benefits (i.e. allow families to live nearby one another and provide an opportunity to diversify existing communities through providing alternative homes to the existing housing stock).
4.19 Indeed, as previously documented in the adopted Core Strategy, it is considered that the ambition to retain the young and professional population within the Black Country should be maintained and that suitable and attractive housing and complementary environments are encouraged.
4.20 Finally, it is welcomed that the Black Country authorities have agreed to test the dwelling requirement figures on an ongoing basis. It is hoped that the suggested changes/alternative scenarios suggested above are implemented in order to ensure the evidence base is robust and the resultant policies and proposals soundly based.
Question 4: Do you consider the employment land requirement identified for the Black Country up to 2036 in the EDNA is appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.21 The Core Strategy review intends to utilise the Economic Development Needs Assessment (EDNA) for the Black Country, published in May 2017, to inform future employment land requirements. The EDNA uses forecasts produced as part of the West Midlands Combined Authority Strategic Economic Plan (SEP) to calculate long-term growth, noting that the 'Super SEP Economy+ Scenario' is the preferred aspirational scenario. This scenario assumes average annual growth in employment of 1.3% across the Combined Authority and presents an ambitious view of future growth in the area, with 500,000 jobs created between 2013 and 2030.
4.22 The SEP Technical Appendix breaks down the job forecasts for the three Local Enterprise Partnerships that form the Combined Authority (Black Country; Coventry & Warwickshire; and Greater Birmingham & Solihull). Jobs growth in the Black Country LEP is forecast to be around 1.1% per annum, whilst it is forecast at 1.5% per annum in the other two LEP areas. This averages out at annual growth of approximately 1.3%. Using data from the Business Register & Employment Survey, published by the Office for National Statistics, it is possible to look at employment trends over the last five to six years (2009-15) and this analysis suggests that the growth rate used in the aspirational growth scenario may be too ambitious for the Back Country:
4.23 Between 2009 and 2015, total employment in the Black Country LEP increased from around 450,000 to approximately 453,000. This equates to average annual growth of 0.1%. Walsall (1.5% p.a.) and Sandwell (0.9% p.a.) experienced jobs growth, although Dudley (-1.1% p.a.) and Wolverhampton (-0.8%) both suffered a fall in employment.
4.24 By contrast, both the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs saw total job numbers increase by 1.3% p.a. from 2009-13. A number of districts in these LEPs saw particularly strong growth over the period, notably Solihull and Lichfield in Greater Birmingham & Solihull, where employment grew by at least 3.0% on an annual basis. In short, the 1.3% average across the West Midlands Combined Authority Area is substantially bolstered by Solihull and Lichfield and therefore it is very ambitious to suggest this will occur across the Black Country area.
4.25 That said, growth in the Black Country needs to be faster than in previous years and the new Core Strategy has a vital role to play in supporting this, however the analysis presented above suggests that the growth targets need to be lowered to better reflect the local economic climate. It is considered unlikely that an annual increase of 1.0% or more will happen in the area in the long-term, especially with the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs capturing new job opportunities at a faster rate in recent years. Lowering the employment growth rate means the amount of employment floorspace needed would be lower. This would not reduce the demographically based housing targets for the area but it would potentially free up previously allocated employment sites for other uses such as residential. This would help the Black Country meet its future housing targets and ensure that it has enough homes for its future workforce to live in.
4.26 As identified in the supporting report and above, it is known that employment sites that had previously been identified for housing are still operational with businesses continuing to use the land and, conversely, there are sites allocated for employment that have been vacant and subsequently market, however, remain unoccupied, which could be transferred to a residential use. It is therefore recommended that the Councils ensure that updated EDNA qualitative review conclusions are taken into account and correct uses applied where appropriate.
Question 5: Do you agree with the proposed approach to the Black Country Green Belt Review? Yes/No; If not, what additional work do you think is necessary?
4.27 In respect of the Green Belt Review, on the basis of the evidence published setting out housing need and supply, it is agreed that it will be necessary to find sites outside of the existing urban area, which will require removing land from the Green Belt where it is appropriate to do so. This will provide an opportunity to identify strategic sites that can provide a significant amount of homes to contribute to meeting identified housing needs. It is considered that there are a number of locations whereby housing sites can be identified, without the purposes of the Green Belt being compromised, ensuring the function and integrity of the Green Belt will remain.
4.28 In addition, areas on the urban fringe have the potential to ensure new homes can be delivered in an established, well landscaped environment, which could be attractive to those young families and professionals that the Black Country authorities have had difficulty in retaining, often through out-migration to neighbouring Shire districts considered to represent more aspirational locations.
4.29 In terms of the process and methodology for undertaking a Green Belt Review, it is understood that the awaited Strategic Housing Needs Study (SHNS) will be accompanied by Strategic Green Belt Review across Greater Birmingham and that the Black Country authorities have been engaged in presenting potential opportunities. It is reassuring that this engagement between consultants and local planning authorities is taking place as there is a danger that logical locations fail to be identified due to a lack of understanding of environmental conditions and/ or local circumstances that are applicable to sites.
4.30 It is agreed and makes sense for the local planning authorities to conduct a Stage 2 Green Belt Assessment following the completion of the higher-level work. Any input on reviewing the draft methodology for the Stage 3 Green Belt Review would be welcomed.
Question 6: Do you agree that the key issues set out in Part 3 are the key issues that need to be taken into account through the Core Strategy Review? Yes/No; If not, what other key issues should be taken into account?
4.31 The key issues presented are considered to be relevant, however, there are a number of inconsistencies relating to matters identified above against the previous questions raised.
5. REVIEWING THE STRATEGY TO MEET NEW CHALLENGES & OPPORTUNITIES
Question 7: Do you think that the Core Strategy vision and sustainability principles remain appropriate? Yes/No; If not, what alternatives would you suggest?
5.1 In the main, the Core Strategy Vision and sustainability principles are considered to be appropriate, with exception to the principle of 'brownfield first'. It is understood that the NPPF, whilst it encourages an efficient use of land and for brown field land to be recycled, it does not suggest a sequential approach to development. There is no evidence to demonstrate that the development of greenfield land will compromise the development of brownfield land. Often the type of developers of the different land categories are different and, given the scale of the housing need, it is appropriate that the early delivery of housing is encouraged from all types of sites. In particular, the larger, potentially Green Belt, sites will have a longer lead in time due to the time it takes to plan for, determine and implement a comprehensive scheme. Indeed, a recent study entitled 'Start to Finish', prepared by NLP, supports this claim. When planning the housing trajectory for the Core Strategy, the larger sites should be planned in to come forward as soon as practically possible.
5.2 It is therefore suggested that the reference to 'putting brownfield first' is inappropriate and that it should be replaced by 'ensuring an efficient use of land to meet the identified housing needs', which encourages the recycling of land and recognises the contributions of greenfield/ Green Belt land to meeting housing delivery targets.
Question 8: Do you think that the Core Strategy spatial objectives remain appropriate? Yes/No; If not, what alternatives would you suggest and how might these changes impact on individual Core Strategy policies?
5.3 Whilst the objectives outlined generally remain sound, there is concern that one of the NPPFs main priorities is absent. This is in relation to significantly boosting the supply of housing. It is suggested that an additional objective is added in order to ensure that meeting housing needs remains a priority within the Black Country. Once a preferred option is arrived at, spatial references as to where the housing growth will be delivered could be included (for example, meeting housing needs on urban (brownfield and greenfield) land and at extensions to the urban area).
5.4 Further, given the increased employment land requirements, the second objective relating to employment land being within the best locations within the Regeneration Corridors may no longer be appropriate. Indeed, as highlighted earlier, there is concern that there is a mismatch in land allocations, and it is appropriate for the Core Strategy review to ensure all employment sites are fit for purpose. This may conclude that employment opportunities should be identified on new land outside of the Regeneration Corridors. Should this be the case, the objective would be inappropriately worded.
Question 9: Do you agree that Policies CSP1 and CSP2 should be retained and updated to reflect new evidence and growth proposals outside the Growth Network? Yes/No; If not, what changes do you think should be made to Policies CSP1 and CSP2 in response to new challenges and opportunities?
5.5 It is agreed that the policies could remain, if the development requirements and related changes are made to ensure the policies are consistent with the overall strategy. The changes relate to both the quantum of development (homes, employment and retail space), the location of development (within and beyond the existing Regeneration Corridors) and the type of development (brownfield, greenfield and on land removed from the Green Belt). It is considered that references should be made to urban extensions (on land removed from the Green Belt) in Policy CSP2 specifically, to highlight the important contribution that such sites will make to meeting the development requirements of the Plan.
Question 10: In continuing to promote growth within the Growth Network, is there a need to amend the boundaries of any of the Regeneration Corridors in the existing Core Strategy? Yes/No; If so, which boundaries and why?
5.6 No comment.
Question 11a: Do you support Strategic Option 1A? Yes/No; If yes, please explain why. If no, do you support Option 1B? Yes/No; If yes, please explain why. If you support the release of further employment land for housing, what should the characteristics of these employment areas be?
5.7 Option 1A is considered to be appropriate for accommodating the growth needs of the Black Country over the Plan period to 2036. This option would significantly boost the supply of housing land and help to meet the significant current and future identified need.
Question 11b: Are there any current employment areas that might be considered suitable for redevelopment to housing? Yes/No; Please submit specific sites through the 'call for sites' form.
5.8 As highlighted previously, the key to understanding where the most appropriate employment/ housing locations are within the Growth Network and Corridors will be determined through a qualitative assessment of allocated employment sites. It is understood an updated assessment has been undertaken and such work, complete with responses to the Call for Sites consultation, will provide the Black Country authorities with evidence to determine the urban capacity for housing, which may include transferring some employment land to housing as well as housing land to employment. This work will then outline the number of dwellings to be accommodated beyond the existing Growth Network within the Green Belt.
5.9 It is welcomed that the Issues and Options Draft recognises the need to release Green Belt in all scenarios proposed.
Question 12a: Do you support Spatial Option H1? Yes/No; What criteria should be used to select suitable sites? e.g. ability to create a defensible new green belt boundary, size, access to existing residential services.
5.10 No comment.
Question 12b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details (please submit specific sites through the 'call for sites' form).
5.11 No comment.
Question 13a: Do you support Spatial Option H2? Yes/No; What should the characteristics of Sustainable Urban Areas (SUEs) be? e.g. minimum/ maximum size, mix of uses, mix of housing types, accessibility to other areas. What criteria should be used to select suitable sites? e.g. proximity to a rail station, availability of existing infrastructure, easy access to jobs, potential to support existing settlements / services, proximity to the existing growth network, potential to support urban regeneration.
5.12 Given the scale of the housing need, there is concern that the development requirements could not be met with just one of the suggested options presented and, therefore, a combination of both options will be necessary.
5.13 To be in the best possible position to significantly boost the amount of housing and meet the development requirements in the Black Country, in accordance with the NPPF, it is advised that opportunities to both round off edges of the Green Belt and Sustainable Urban Extensions are proposed in the Preferred Options Draft Core Strategy. As highlighted within the Issues and Options Draft, there are challenges and opportunities that come with both types of development, for example from a delivery perspective, smaller sites will come forward more quickly due to the nature of these being straight forward proposals (with limited infrastructure necessary and one or few land owners) and larger sites will ultimately take longer as they are more complex (with multiple land uses, infrastructure and land owners). This fact has been evidenced by Nathaniel Lichfield and Partners (now known as Lichfields) within their report 'Start to Finish' who concluded that the average planning approval period of schemes of 2,000+ dwellings is 6.1 years and the annual average build out rate is 161 dwellings per annum. These figures demonstrate the need to have a number of sites of different sizes and in different locations removed from the Green Belt. The report also identifies, with regard to housing delivery, that 50% more homes per annum are delivered on average on large greenfield sites than large brownfield sites. This is a significant benefit of including greenfield sites within the Preferred Option and will assist to secure its delivery.
5.14 In terms of the locations for removing land from the Green Belt, this should be informed by the Strategic Growth Study and a Black Country Review of the Green Belt. The more detailed study will provide an assessment of land parcels against the purposes of the Green Belt and is likely to recommend that those that compromise the purposes the least will be shortlisted for further consideration to be removed from the Green Belt. It is advised that the next stage should be a consideration of the shortlisted sites based on their suitability (i.e. are the neighbouring uses compatible, would any previous land uses prevent the development of the site), sustainability (i.e. proximity to/ ability to provide local services/ public transport/ employment opportunities) and deliverability (i.e. whether the site is available, being promoted for development, has no barriers to coming forward etc.) credentials. Clearly each site will fair differently against such criteria and the Call for Sites submission will assist the Council to come to a decision on the preferred sites. It is advised that the Black Country authorities should be mindful of the opportunities, through infrastructure and design, that development can bring that will enhance the diversity and character of a particular location.
5.15 In terms of the characteristics of a Sustainable Urban Extension, this is likely to vary depending on the location of each site. For example, some may be more urban and others suburban in their character and would, therefore, provide a different land use offer. It is important that each are considered on a site by site basis to ensure that any subsequent allocation delivers a successful development. It is important that the developer responsible for promoting the site helps to influence what is ultimately delivered. Often what is proposed on site has been informed by housing market intelligence undertaken by sales experts at development companies and, therefore, should be taken into account. Particularly given recent experience in the down turn in the apartment market, it is important that sites are allocated for the right type and mix of housing to ensure that it will be delivered, occupied and successful.
5.16 In the more suburban locations, it is suggested that Sustainable Urban Extensions should look to provide a different offer to potentially what exists in the Strategic Centres and Regeneration Corridors, such as a mix of larger and lower density homes, which will attract those households that in the past have migrated elsewhere. Given the emphasis on delivering more high density homes in the Strategic Centres, it is important that this housing mix is offset by more larger homes in appropriate locations. Otherwise, there is a concern that the Black Country will have a disproportional amount of small homes, which will further encourage more families to migrate elsewhere and not meet the aspiration to diversify the wider HMA.
Question 13b: What infrastructure do you think would be needed for different sizes of SUEs?
5.17 The type of infrastructure needed will vary depending on the different location and size of each site and must be compliant with paragraph 122 of the CIL Regulations that requires planning obligations (which applies to most infrastructure) to be necessary to make the development acceptable in planning terms; directly related to the development; and fairly and reasonably related in scale and kind to the development. With the above in mind, however, provision for open space (both formal and informal), local centre and potentially a primary school should be considered for sites in excess of 1,000 homes.
Question 13c: Are there any potential locations that should be considered for SUEs (please submit through the 'call for sites' form) and what infrastructure would be required to support these?
5.18 No comment.
Question 13d: Do you think that the Core Strategy should set out detailed guidance for the development of SUEs (e.g. type and tenure of housing, specific infrastructure required), rather than details being determined at a local level in light of local policies? Yes/No; Any further comments?
5.19 For the reasons outlined above, relating to considering existing local circumstances and CIL Regulation requirements in respect of any charging schedule and planning obligation requirements, it is advised that detailed guidance for the development of SUEs should not be specified within the Black Country Core Strategy as each site will vary and deserves a more detailed consideration, alongside the developer, at the local level.
Question 14: Do you think there are any other deliverable and sustainable Housing Spatial Options? Yes/No; If yes, please provide details
5.20 There are no other sustainable and deliverable options that we are aware of within the Black Country administrative boundary that are capable of delivering the housing spatial options.
Question 15a: If all housing need cannot be met within the Black Country, do you support the 'export' of housing growth to neighbouring authorities within the HMA? Yes/No; What factors should be taken into account in an assessment of the opportunities in neighbouring authorities e.g. proximity to the edge of the urban area, proximity to a rail station, availability of existing infrastructure, easy access to jobs?
5.21 Even if all realistically deliverable options have been considered within the Black Country, there will remain an unmet need for housing. Therefore, it is necessary for the Black Country authorities to consider the possibility of exporting growth to neighbouring authorities within the HMA. In particular, there are options to expand existing settlements that are close to the administrative boundary (for example, in South Staffordshire) across authorities and could help deliver the necessary growth in a sustainable and deliverable manner. These opportunities should be explored first prior to exporting further growth to other authorities within the HMA where there is less of a spatial connection.
Question 15b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details.
5.22 No comment.
Question 15c: Do you think there are ways to ensure that exporting housing will meet the needs of people who would otherwise live in the Black Country? (e.g. transport improvements, provision of affordable housing, creation of employment opportunities) Yes/No; If yes, please provide details.
5.23 It is important to consider a number of factors, including migration and travel to work patterns, which have been used to identify the extent of the HMA, to determine where households relocate to when leaving the Black Country in order to understand where and why those moves are taking place. Whilst planning can attempt to influence where people relocate to, there is no mechanism to guide or restrict people moving to or from certain locations. Once knowledge of movers can be understood can the planning system can attempt to recreate those attractive characteristics (homes that are more affordable, good public transport links, employment opportunities etc.) in locations where there is capacity for the homes to be delivered. It is advised that an additional analysis of the data, where necessary, is undertaken to provide the Black Country authorities with the relevant intelligence to deliver a successful strategy for growth outside the administrative area.
Question 16: Do you support Spatial Option E1? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access) If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.24 No comment.
Question 17: Do you support Spatial Option E2? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites e.g. quick motorway access, good sustainable transport links? If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.25 No comment.
Question 18: Do you support Spatial Option E3? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access) If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.26 No comment.
Question 19a: Do you support Spatial Option E4? Yes/No; Any further comments?
5.27 No comment.
Question 19b: Should any factors be taken into account in an assessment of the opportunities? Yes/No; If yes, what should they be? (e.g. quick motorway access, strong transport links with the Black Country, good sustainable transport links with the Black Country) If you think there are any potential locations that should be considered, please provide details.
5.28 No comment.
Question 20: Do you think there are any other deliverable and sustainable Employment Land Spatial Options? Yes/No; If yes, please provide details.
5.29 As previously outlined, there is concern that some of the employment sites currently identified are potentially not fit for purpose and others that are identified to be transferred to housing remain in employment occupation. In light of this mismatch, it is welcomed that an updated qualitative assessment has been undertaken and has informed how much employment land is has be found outside the urban area.
5.30 In terms of where the employment land should be located outside the urban area, as with housing, decisions should be based on the results of the Green Belt Review and the suitability, sustainability and deliverability of sites. For employment land sites, the suitability of a site may well include good transportation links for goods and people. The Call for Sites consultation will assist in putting forward suggestions for sites.
6. DELIVERING GROWTH - INFRASTRUCTURE & VIABILITY
Question 21: Do you think that changes are required to Policy DEL1 to ensure it covers both development within the existing urban area and any within the Green Belt? Yes/No; If yes, please provide details.
6.1 Policy DEL1 is considered to be sound on the basis that it is sufficiently flexible to deal with different circumstances on different sites across the Black Country, including sites that are to be removed from the Green Belt.
Question 22: Do you have evidence of a requirement for new social infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.2 No comment.
Question 23: Do you have evidence of social infrastructure that is no longer needed and where the site could be reallocated for alternative uses? Yes/No; If yes, please provide details.
6.3 No comment.
Question 24: Do you have evidence of pressure being placed on the capacity of current social infrastructure which could be exacerbated by new housing? Yes/No; If yes, please provide details.
6.4 No comment.
Question 25: Will there be any new social infrastructure requirements necessary to serve large new housing developments? Yes/No; If yes, please explain the type and scale of any new social infrastructure required.
6.5 It is recognised that delivery of new housing developments may give rise to the need to deliver supporting infrastructure. Committed to working with the relevant authorities and service providers to determine the capacity of existing infrastructure and determine the level of mitigatory provision necessary to support an increase in the population in this location. It is however important that each potential large new housing development is given independent consideration in respect of any infrastructure obligations, recognising that pressures will be dependent on location and existing infrastructure capacity.
Question 26: Do you have any evidence of a requirement for new physical infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.6 No comment.
Question 27: Do you have evidence of pressure being placed on the capacity of current physical infrastructure which could be exacerbated by new developments? Yes/No; If yes, please provide details.
6.7 No comment.
Question 28: Do you think physical infrastructure is necessary to serve large new housing developments? Yes/No; If yes, what type and scale of physical infrastructure is necessary?
6.8 As set out above, the need for infrastructure will vary for each site. Given such different circumstances, it would be inappropriate and potentially unlawful (as it would conflict with paragraph 122 of the CIL Regulations) to incorporate a blanket policy requiring specific infrastructure on every large housing site.
Question 29: Do you think there are any other tools or interventions that could be used to ensure enough infrastructure is provided by developments? Yes/No; If yes, please provide details.
6.9 It is considered that the existing national framework (which includes the NPPF and CIL Regulations) provides a sufficient tool to ensure the relevant infrastructure is delivered. In addition, the CIL Charging Schedule allows authorities to raise funds for named infrastructure projects, which should be updated in line with any Core Strategy advanced. Therefore, it is considered that there are existing provisions to deliver infrastructure and no additional interventions through the Black Country Core Strategy Review are needed.
Question 30: Do you have any suggestions around how the strategy can be developed in order to maintain the urban regeneration focus of the Black Country while at the same time bringing forward sites in the green belt? Yes/No; If yes, please provide details.
6.10 There is no a need for any specific interventions, such as phasing, to protect the delivery of urban regeneration in the Black Country. Indeed, it is considered that development of greenfield and Green Belt sites can very much compliment urban regeneration through the provision of a more varied form of development that will help diversify the housing stock and profile of residents in the wider area, which will assist to sustain and improve the vitality of existing communities. Further, as highlighted above, given the priority to significantly boost the delivery of housing greenfield and Green Belt sites should come forward for development as soon as practically possible. Given lead in and build out rates of larger sites, the land should be encouraged to be developed as soon as possible so to ensure the homes are delivered in the Plan period and the needs are met.
Question 31: Do you think that the right scale and form of funding is available to support the delivery of the Core Strategy review? Yes/No; If no, what alternative sources of funding or delivery mechanisms should be investigated?
6.11 When delivering greenfield/ Green Belt sites, there is an opportunity to deliver infrastructure to meet the needs arising from the proposal, which may have wider benefits for the local community. In addition, it is likely that the communities created by the Sustainable Urban Extensions will potentially be more affluent and share their wealth using local shops and services within the wider Black Country, which will contribute to more successful and prosperous communities.
7. REVIEW OF EXISTING CORE STRATEGY POLICIES & PROPOSALS Housing
Question 35: Do you support the proposed approach to housing land supply? Yes/No; If no, please explain why
7.1 As identified above, it is important that a range of sites in different locations are identified to be in the best possible position of delivering the development requirements. In terms of presenting these sites in the Core Strategy, whilst it is useful to identify a housing trajectory, it is important that there is not a phasing policy as such that would prevent the delivery of housing, given the current housing crisis. As stated above, the delivery of housing on greenfield and Green Belt land will not compromise the delivery of urban regeneration as the development on the urban edge will complement and rejuvenate the environment in a different way.
7.2 In terms of the proposed level of discounting, it is considered that if the LPA adopt an approach to identify a further 20% of sites in accordance with the LPEG recommendations identified above, there would not necessarily be a need for the application of discounting in determining the overall level of supply. It is interesting to note that the level of discounting proposed by LPEG is suggested for all LPAs, not necessarily those which have experienced difficulty in delivery. It could therefore be argued that an increased buffer of 25% could be applied in order to take a cautious approach.
Question 36: Do you think that the current accessibility and density standards set out in Policy HOU2 and Table 8 should be changed? Yes/No; If yes, what standards should be applied instead, for example should the minimum net density of 35 dwellings per hectare be increased to maximise brownfield housing delivery?
7.3 It is clear that the current accessibility and density standards outlined in the adopted Core Strategy were formulated in the context of the vast majority of development taking place on brownfield sites within the defined urban area. As reiterated throughout these representations, there is now a clear need for Green Belt release as part of the Local Plan Review to meet emerging, objectively assessed housing needs. We outline in further detail below why the adopted accessibility and densities would not be applicable to Green Belt sites, however would suggest that the current standards do not allow sufficient flexibility on brownfield sites. A blanket application of prescriptive accessibility and density standards across the Black Country, be it brownfield or greenfield, does not allow sufficient flexibility which take into account site specific characteristics. The Council should allow for greater flexibility when assessing accessibility and density standards, with a more pragmatic approach which allows appropriate assessment for site-specific characteristics and also an assessment of market demand which may vary significantly across the large Black Country area.
7.4 Paragraph 47 of the NPPF outlines how local authorities should set out their own approach towards density. It is suggested that the currently adopted approach does not allow for sufficient assessment of local characteristics. It is clear that the chosen approach must be reflective of local circumstances, including the matters outlined above as well as infrastructure and services available in the locality. It is advocated that a more flexible approach to density and accessibility standards is taken as part of the emerging Local Plan Review.
Question 37a: Do you think that the existing Policy HOU2 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why
7.5 In line with the comments above, it is suggested that the Council should assess each site on a case by case basis in terms of accessibility and density standards. This approach would suggest that the numerical baseline trigger of 15 homes or more will not always be appropriate or applicable, and as advocated throughout these representations it suggested that there should be a complete reassessment on accessibility and density standards as part of the emerging Local Plan Review.
Question 38: Do you think that the current accessibility and density standards are appropriate for green belt release locations? Yes/No; If no, what standards should be applied in these locations and why?
7.6 No, it is not considered that the current standards would be applicable to Green Belt release locations. The adopted standards are overly prescriptive, and as previously discussed were written in the context of brownfield land. Green Belt release sites have a completely different type of character, therefore consideration of accessibility and density standards in relation to these sites should be reflective of local character and site characteristics. The more suburban settings of Green Belt release land lends itself to lower densities which are more appropriate to the Green Belt setting, which typically deliver more family homes. The Council must provide robust evidence to test any forthcoming accessibility and density standards in relation to Green Belt release locations, which allows for a flexible and pragmatic approach.
Question 39: Do you think separate accessibility standards are needed for particular types of housing e.g. housing for the elderly or affordable housing (as occupiers may be less mobile and more dependent on public transport)? Yes/No; If yes, please provide details.
7.7 It is clear that separate accessibility standards will apply to particular types of housing such as affordable and for the elderly population, however in line with the sentiment expressed above, any forthcoming standards should be based on robust evidence and allow for sufficient flexibility to avoid any unnecessary constraints to development coming forward.
Question 40: Do you agree that the 2017 SHMA findings should be used to set general house type targets for the Plan period? Yes/No; If no, please explain why.
7.8 A general and blanket application for house types across the Black Country should not be advanced as part of the Local Plan Review. Paragraph 50 is clear that local planning authorities should plan for a mix of housing based on current and future demographic trends and market trends. It is therefore notable that the NPPF specifically highlights 'market trends' in this context, which acknowledges that the market must inform such decisions.
7.9 Whilst the 2017 SHMA does provide an assessment of demographic and market trends, it is notable that it looks at a wider area assessment and is focused at a higher level. This assessment therefore does not draw out sub-market trends, and cover smaller areas within the vast Black Country area. Again, a blanket policy of house type targets across the Black Country area would not allow for sufficient flexibility to assess each site on a site by site basis, taking into consideration local market trends and demand. The NPPF does not state that specific policies should be set to enforce that local demand is met. As such, it is considered that this should be left for the market to decide, as opposed to applying rigid and prescriptive house size standards.
7.10 It is suggested that the evidence presented in the SHMA should be put into the Plan as an informative and general guide, but should not feed into a specific policy requirement which outlines housing mix percentages that should be applied across the Black Country. A policy containing general house type targets could present as a significant constraint to the delivery of a site where there is no local market demand for this house type, which in turn would have a negative impact on achieving the necessary housing growth targets to be delivered in the Black Country over the Plan period.
Question 41a: Do you support the introduction of a policy approach towards self and custom build housing in the Core Strategy? Yes/No; If yes, would you support:
7.11 It is not considered that there is a policy need for the Core Strategy to address self and custom build housing in the emerging Review. Paragraph 6.32 indicates that there are only nine records on self and custom build registers in the Black Country. It is evident that that there is very limited demand in the Black Country, which is unsurprising given that self and custom build housing is often more popular in rural areas. Given the limited demand it is therefore not considered necessary to take a policy approach towards self and custom build housing within the Local Plan Review.
Question 41b: A target for each authority? Yes/No; Any further comments
7.12 Given that there is evidence of little market demand, it is not considered necessary for the Core Strategy to set targets for each of the Black Country authorities. If it was considered to be necessary as the Local Plan Review progresses, any targets being set should be formulated on the basis of robust evidence such as monitoring of the registers, to provide an indication of how many self-build homes will be needed.
Question 41c: A requirement for large housing sites to provide serviced plots? Yes/No; Any further comments?
7.13 There should not be a requirement for large housing sites to provide serviced plots. This can pose an unnecessary market constraint for large housebuilders when there may be limited or no market demand for self-build plots. Self and custom build plots are often unusual and unique in character, therefore would not be best suited to be located within a large housing development with more uniform house types. If deemed necessary, self and custom build housing should be allocated specific site allocations, as discussed below.
Question 41d: Another approach altogether? Yes/No; If yes, please specify.
7.14 If it is considered necessary for the Review to address self and custom build housing, this should be addressed by the Council's identifying and allocating specific plots for these uses. Identifying site-specific plots would ensure that the most appropriate and suitable locations for self and custom-build will be allocated, via the assessment of appropriate evidence and market demand. In addition, this might be more likely to be achieved on surplus publicly owned land.
Question 42: Do you agree that the annual affordable homes target should be increased to reflect the 2017 Black Country Strategic Housing Market Assessment? Yes/No; If no, please explain why.
7.15 As a general principle, the notion of applying different affordable housing ratios to different parts of the Black Country, based on an understanding of needs and viability, is acceptable. Given that the Black Country represents a vast area, there will not be a uniform housing market, and there will be sub-market trends within this wider area. As such, a more flexible approach which assesses local housing market evidence on a case by case basis could be justified. That said, there is an inherent simplicity and attraction to a single rate figure, which is easy for the development industry to understand.
7.16 In terms of the annual affordable housing target, it is unclear how the Issues and Options document has calculated the figure of 832 homes per year. At paragraph 7.42 of the June 2017 SHMA Part Two- affordable housing document, it is stated that the total annual affordable housing need is 677 dwellings, which represents 19.8% of the annual projected household growth. This differs to paragraph 6.36 of the Issues and Options document, which states that the affordable housing target is 23.4% of total housing need or 832 homes per year. From paragraph 7.47 of the SHMA, it appears that this figure may have been calculated by adding the overall requirement of 16.6% of housing to be affordable rented and 6.7% shared ownership. Clarity is sought on how this figure has been calculated, and we reserve the right to comment further on this matter.
Question 43a: Do you think that the existing Policy HOU3 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why.
7.17 We have not undertaken detailed analysis of the findings and assumptions of the SHMA and affordable housing delivery matters, therefore would like to reserve the right to comment on this matter further. However, on face value, it appears to be a reasonable threshold and is not dissimilar to other locations.
Question 44a: Do you think that the affordable housing requirement for eligible sites in Question 43 should be kept at 25% of the total number of homes on the site? Yes /No; Any further comments?
7.18 Based on the current evidence, a blanket rate of 25% affordable housing would appear to be sound.
7.19 However, irrespective of the final rate, any amendments to the currently adopted affordable housing policy must continue to have a clause in it which stipulates that this requirement is subject to viability tests. Any revised affordable housing requirements will also need to carefully consider the implications of adopted Community Infrastructure Levy (CIL) regimes. Both Sandwell and Dudley Councils have adopted CIL Charging Schedules. These will have implications on viability, therefore if revised affordable housing targets are to progressed then these CIL tariffs will need to re-assessed and re-visited.
Question 44b: If no, should the percentage be increased to allow for the provision of affordable home ownership? Yes/No; If yes, what should the percentage be and why?
7.20 At paragraph 6.39 of the Issues and Options Paper, it is stated that options need to be explored to increase affordable housing delivery of private sites. One option would be to increase the overall affordable housing proportion, which would require developers to provide affordable home ownership products plus an appropriate proportion of other affordable tenures. This paragraph follows on from commentary relating to the Housing White Paper.
7.21 The Housing White Paper discusses Starter Homes at Chapter 4, and explains how the government intend to amend the NPPF to introduce a clear policy expectation that housing sites deliver a minimum of 10% affordable home ownership units. It is later stated that it will be for local areas to work with developers to agree an appropriate level of delivery of starter homes, alongside other affordable home ownership and rented tenures.
7.22 The policy position on Starter Homes is not yet fully clear, and has yet to be formally established through a formal amendment and update to the NPPF. Until the national policy position on Starter Homes has been made clear, it would be premature for the Core Strategy Review to suggest an uplift in the affordable housing requirement to include affordable home ownership such as Starter Homes. Any suggestion to uplift the affordable housing requirement to include Starter Homes should be reflective of the national policy position, as well as founded upon a robust evident base which dictates exactly what percentage this element should be of the overall affordable housing requirement.
Question 45: Should an increased affordable housing requirement be set for green belt release sites, to reflect the likely financial viability of these sites? Yes/No; If yes, what should this be.
7.23 The likely financial viability of Green Belt sites will vary across different areas of the Black Country, therefore any affordable housing requirements for Green Belt sites will need to be reflective of these circumstances. Any affordable housing targets for Green Belt sites should be based on robust evidence, and acknowledge that many sites may need to support and deliver other infrastructure requirements.
7.24 Ultimately, any affordable housing strategy will need to address the affordable housing need as well as the need for market housing. Bearing in mind that the SHMA confirms over 70% of homes required are for homes to be sold on the open market, any affordable housing policy must not dilute the delivery of these needs/requirements. A higher figure on Green Belt sites over and above a standard blanket figure would potentially do this.
Employment Question 49a: Is there still a need for existing Policy DEL2 in order to manage the release of poorer quality employment land for housing? Yes/No; If no, please explain why.
7.25 The Black Country is to be the subject of large levels of both employment and housing growth over the Plan period. These uses are very much inter-linked with one another, and will drive each other's need for growth. The Local Plan Review, in order to meet emerging employment and housing needs, must identify a significant number of specific sites for employment and housing uses. By planning proactively and identifying suitable sites for both employment land and housing land, this should reduce the pressures to manage the release of poorer quality employment land, which may not always be suitable for release. The Local Plan Review should also seek to undertake a further review of poorer quality employment land to make it available for other suitable uses, if it proves to no longer be viable for employment land use. This is in line with policy provisions of the NPPF, which at Paragraph 22 outlines that planning policies should avoid the long-term protection of sites allocated for employment use where there is no reasonable prospect of a site being used for that purpose.
Question 50: Do you think that the Core Strategy should continue to set a target for the total employment land stock in Policy EMP1? Yes/No; Please explain why.
7.26 The continuation of setting a target for employment land stock would be supported. Policy EMP1 should make it clear that these are not maximum figures, to encourage further flexibility for additional growth.
Retail Question 59: Have all the appropriate centres within the Black Country been identified? Yes/No; If not, please specify additional centres
7.27 No comment.
Question 61: In addition to para 4.33 of the current Core Strategy should the revised Core Strategy include criteria for the creation of new centres that might be needed as a result of any additional housing identified through the plan? Yes/No; Any further comments?
7.28 Criteria would be a useful policy tool to help assess the designation of new centres, and should be in line with previous methodologies used which set out clear thresholds.
Question 71: Should the Core Strategy set housing targets for the Town Centres?
7.29 Housing within Town Centres should be supported, in line with paragraph 23 of the NPPF which discusses the important role that residential development can play in ensuring the vitality of Town Centres. Any housing targets should be based on what sites are known to be readily available, suitable and viable for residential development. Market demand for housing in these areas will also need to be fully assessed. It is notable from the outcome of the 2017 SHMA that there is most demand for three bedroom properties (40%). The highest demand is therefore for family housing, and not for flats which are often the most popular within Town Centre locations. Any housing targets set for the Town Centre would therefore need to consider the findings of the SHMA, and be reflective of the fact that family housing is often more suitable for delivery on larger sites, including on sites which are currently located within the Green Belt.
Environment Question 99a: Do you think that national standards for housing development on water consumption should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.30 When referring to water consumption paragraph 6.1.52 of the Issues and Options document states that the Black Country does not currently lie in an area of serious water stress, therefore clear need may be difficult to demonstrate. This evidence suggests that there is limited or no need to introduce such a policy, therefore it is not considered that the Core Strategy Review should seek to introduce water consumption standards for housing development.
Question 99b: Do you think that national access standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.31 The introduction of any national access standards, with the Issues and Options document referring specifically to Lifetime Homes, again must be based on a robust evidence base which can demonstrate market demand. It is noted that Paragraph 50 of the NPPF states that planning authorities must plan for a mix of housing to meet a range of needs. In the same paragraph, it is later stated that these must be based on current and future market trends. If Lifetime Home standards are to be introduced these will therefore need to be based on robust evidence, to ensure that the standards are not overly onerous and prevent the delivery of other types of housing which have higher levels of market demand.
Question 99c: Do you think that national space standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.32 As reiterated throughout these representations, it is not considered that a blanket approach of prescriptive standards across the Black Country allows sufficient flexibility to assess local market and site considerations in an appropriate manner. Whilst it is recognised that space standards can be an important tool to ensure that high quality of homes are delivered, we agree with the sentiment expressed in the recent Housing White Paper. The Paper explains that the government are concerned that a one size fits all approach may not reflect the needs and aspirations of a wider range of households. The White Paper also states that the Government will be undertaking a review of the Nationally Described Space Standards. It is suggested that the Core Strategy Review should await the outcome of this national review of national space standards, to ensure compliance with national policy and to ensure that the most appropriate approach to space standards, if required, is taken.
Question 99d: Do you think that the standards should be different for brownfield and greenfield sites? Yes/No; If yes, please explain how and why.
7.33 As discussed above, prescriptive standards do not always allow sufficient flexibility for local market needs, so we would not advocate a blanket approach of different standards to brownfield and greenfield sites.
Open Space, Sport and Recreation Question 102a: Do you support the proposed changes relating to open space, sport and recreation? Yes/No; If no, please explain
7.34 Paragraph 6.1.60 of the Issues and Options paper outlines how adopted Policy ENV6 creates the framework for open space policies at the local level. The Issues and Options paper outlines how this is in line with national guidance, and that it is proposed to retain this policy and update some references in the supporting text to reflect changing circumstances. It is agreed that the local level remains the appropriate place to set open space policies, and that Policy ENV6 should continue to endorse this approach.

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

Question 2 - Do you think that the key evidence set out in Table 1 is sufficient to support the key stages of the Core Strategy review? Yes/No; If not, what further evidence is required and, if there

Representation ID: 2561

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Pegasus Group

Representation Summary:

4.7 It is considered that the evidence contained within Table 1 is comprehensive, however, as suggested above and below, a number of concerns have been highlighted and it is therefore suggested that these are addressed in order to improve the soundness of the next iteration of the Core Strategy Review.
4.8 It is welcomed that an updated qualitative assessment of employment land has been undertaken in order to identify if the sites are fit for purpose, alongside the quantitative employment land study. It has been identified that a number of employment land sites that have been suggested for residential land allocations remain in occupation as functioning employment sites. These sites should be removed from the housing land supply. Conversely, there are vacant employment land sites that have been marketed over a period of time where no market interest has been forthcoming and, therefore, it is recommended that these sites should be considered for housing delivery.
4.9 It is noted that Viability Studies are identified as evidence base documents that are still to be prepared. Whilst not specifically identified, it is recommended that affordable housing viability is a key matter that needs to be addressed as part of this evidence base to ensure the level suggested by the SHMA Part 2 is deliverable. If this is not the case, the delivery of both market and affordable housing could be compromised and prevent the successful delivery of any new strategy.

Full text:

Question 1: Do you agree that the Core Strategy review should be a partial review, retaining and stretching the existing spatial strategy and updating existing policies? Yes/No; If not, what do you think should be the scope of the review?
2.4 In response to Question 1 and whether it should be a partial review or not, whilst the existing strategy identifies the most sustainable locations for growth in the context of delivering development requirements identified by the Regional Strategy (RS), there is now a new and much bigger challenge ahead in meeting the arising needs for homes identified by the latest evidence and there is concern that the existing spatial strategy may not facilitate the delivery of these needs. The Black Country authorities, therefore, need to be mindful of this and not attempt to put "a square peg in a round hole".
2.5 It is our view that urban regeneration can be achieved whilst pursuing development on the urban edge. Indeed, the scale of housing need is so large that both must be encouraged in order to meet current and arising housing needs within the Black Country.
2.6 It is extremely important that in reviewing the Core Strategy it fully takes account of and facilitates the delivery of strategic economic plans, as recognised in paragraph 1.15. All too often these strategies are ignored and, accordingly, development plans could effectively frustrate economic growth from being realised.
2.7 In terms of the Plan period proposed in paragraph 1.17, whilst a 15-year time period from adoption is appropriate, there is concern that the preparation of plans is often delayed (due to reasons beyond the control of the LPAs) and it may be prudent to stretch the period further to prevent such an issue from occurring.
2.8 It is welcomed that the Issues and Options document recognises that it will not be possible to accommodate all future development needs within the urban area and that an examination of the potential for development land outside the existing urban area, which is effectively land within the Green Belt, will take place as part of the Core Strategy review process.
3. THE BLACK COUNTRY TODAY - THE EXISTING STRATEGY
3.1 As set out within this section, the delivery of both employment and housing land has not come forward as originally envisaged in part due to the after effects of the recession. Surplus employment land which might have been available for housing has not come forward due to a strengthening economy and local firms being more robust than anticipated. In addition, the range of locations available has not in all cases met with market expectations as to where people want to live.
3.2 In terms of the employment land, it is important that sufficient land is provided for new employment and that there is not an overreliance on land that is currently in use. It is impressive that despite generally poor economic performance local businesses have performed well. Should the economy significantly improve within the Plan period in line with LEP aspirations (considered later in this response), there is concern that it may become difficult to transfer a wide range of existing employment locations to housing allocations. It is appropriate, therefore, for the Council to ensure the evidence contained within the Strategic Housing and Employment Land Availability Assessment is reviewed and updated regularly. This will enable the land supply to be responsive to arising needs and not rigidly be wedded to delivering commitments that are unlikely to be realised.
3.3 What is further emphasised by the analysis in this section is that urban regeneration cannot be delivered quickly and that there are a number of factors beyond the control of the Black Country authorities that may have implications for the delivery of the strategy. This further emphasises the need for a mix of types of sites (brownfield, brownfield compulsory purchase, greenfield and Green Belt) of different forms of development (high density, mid and low density family homes) in a variety of locations, which will maximise the opportunities to deliver a successful Local Plan.
3.4 Finally, in respect of the proposal to maintain 300 hectares of employment land that will become vacant by way of general churn over the Plan period. Whilst the principle is considered acceptable, there should be appropriate evidence to support the assumption.
3.5 Our experience is that there are employment sites that clients are looking to secure a residential allocation on that have not been identified thus far. In light of these changing circumstances, the Black Country authorities should ensure that the policy approach is flexible to allow sites in appropriate locations to be brought forward for housing throughout the Plan period and likewise, sites that have been allocated for housing but have not come forward should be removed from the supply.
4. THE STRATEGIC CHALLENGES & OPPORTUNITIES
4.1 It is welcomed that the Black Country authorities are updating their evidence base. Indeed, the adopted Core Strategy took the development requirements from the adopted Regional Strategy (RS), which has since been revoked and is unquestionably out of date. Since the RS was published there has been a number of population and household projections published showing increasing dwelling requirements in the Black Country, which were largely ignored and, therefore, it should come as no surprise that there is a significant increase in forming households.
4.2 In terms of the list of evidence either prepared or due to be completed, it appears to be sufficiently comprehensive.
4.3 A separate review of the housing evidence based, including the Strategic Housing Market Assessment for the Black Country and South Staffordshire, is contained at Appendix A. The key conclusions arising from the report as summarised as follows:
* In determining the OAN, there are concerns with regard to the SHMA methodology and it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline.
* There is concern that the economic growth scenarios do not use the latest economic forecast data and that the methodology translating the job growth into dwelling growth is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances and also more aspirational job growth targets, such as those arising from the SEP.
* In terms of providing uplifts for market signals, a 25% uplift for South Staffs is appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, it should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack within the housing market and prevent house prices from increasing at an accelerated rate.
4.4 In addition, consideration of the Housing Background Report is also contained in the Housing Evidence Based Review Paper contained at Appendix A. The key findings from reviewing the evidence is set out below:
* Clearly a lot of work is yet to be done to determine what the housing land supply position is in the Black Country. Given that much of the existing evidence is based on the adopted Core Strategy, it is recognised that the SHLAAs across the four authorities will need to be updated, both in terms of revising the methodology and range of sites assessed, to reflect a potentially different approach to locating development.
* It is commendable that the Housing Background Report has examined existing sources of supply in an attempt to provide additional homes from sites within the urban area. There is concern, however, that by changing policies, for example, to increase the minimum density on sites has wider policy implications to take into account than simply increasing the number of homes.
* The Housing Background Report suggests a continued allowance for larger windfall sites. It is suggested that it is inappropriate to include an allowance for this source as there is no certainty that this land will come forward for development.
* Other sources, such as converting employment sites to residential sites, based on the evidence presented and feedback from the development industry, it is known that there are employment sites functioning well as employment sites but are to be converted to residential and other employment sites that are unoccupied and undesirable that are to be retained as employment sites. Clearly, there is a mismatch between employment land need and employment land supply. It is advised that the qualitative assessment of employment informs future land supply recommendations and allocations are revised where necessary.
4.5 As a result of the dwelling requirements generated by the SHMA and the land supply identified from the Housing Background Report, it is concluded that there in insufficient urban land to provide for the development requirements and that a Green Belt Review should be conducted. It is noted that scoping is underway and that the work is to be completed in mid-2018. It is hopeful that the development industry will be involved in defining the methodology of the work to ensure that it is conducted in a robust way.
4.6 Another very important piece of work to be taken into consideration will be the Greater Birmingham and Black Country HMA Strategic Growth Study. It is unclear at this stage what role the Black Country authorities will play in meeting the wider needs of Birmingham and, indeed, whether it can now contribute given that meeting the needs of the indigenous population will be a tall order. Further, there is uncertainty with regard to how far the study will go in identifying locations for growth and how this evidence will be taken forward in emerging Development Plans, particularly given that it is premature to the Green Belt Review for the wider Black Country area. It is our view that there are sites within the Green Belt that will provide sustainable locations for growth and that their removal will not compromise the purposes of the Green Belt and, accordingly it will remain purposeful and functional.
Question 2: Do you think that the key evidence set out in Table 1 is sufficient to support the key stages of the Core Strategy review? Yes/No; If not, what further evidence is required and, if there are any particular issues that should be taken into account in considering development on any particular sites or in any particular areas, please provide details
4.7 It is considered that the evidence contained within Table 1 is comprehensive, however, as suggested above and below, a number of concerns have been highlighted and it is therefore suggested that these are addressed in order to improve the soundness of the next iteration of the Core Strategy Review.
4.8 It is welcomed that an updated qualitative assessment of employment land has been undertaken in order to identify if the sites are fit for purpose, alongside the quantitative employment land study. It has been identified that a number of employment land sites that have been suggested for residential land allocations remain in occupation as functioning employment sites. These sites should be removed from the housing land supply. Conversely, there are vacant employment land sites that have been marketed over a period of time where no market interest has been forthcoming and, therefore, it is recommended that these sites should be considered for housing delivery.
4.9 It is noted that Viability Studies are identified as evidence base documents that are still to be prepared. Whilst not specifically identified, it is recommended that affordable housing viability is a key matter that needs to be addressed as part of this evidence base to ensure the level suggested by the SHMA Part 2 is deliverable. If this is not the case, the delivery of both market and affordable housing could be compromised and prevent the successful delivery of any new strategy.
Question 3: Do you agree that the housing need identified for the Black Country over the period 2014-36 in the SHMA, and the anticipated amount of supply, are appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.10 In terms of the extent of the sub market, which includes the Black Country and South Staffordshire, this is considered to be appropriate. It is recognised and welcomed that the Black Country authorities and South Staffordshire have jointly undertaken a SHMA for the sub area, which facilitates the preparation of an Issues and Options Core Strategy Review. There is concern, however, that the remaining constituent authorities within the wider Greater Birmingham Housing Market Area have not taken part and there is a danger that housing need for the whole HMA may not entirely be comprehensively captured due to the different time periods covered by the separate studies. It is advised that a SHMA, consistent with the guidance in the NPPF and Planning Practice Guidance, is prepared for the entire HMA over the same Plan period (as opposed to a housing needs study), which will properly consider all relevant factors in a consistent and comprehensive manner.
4.11 The OAN arrived at by the SHMA is generally appropriate in identifying the starting point for determining the dwelling requirement, however, it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline. There is concern that the economic growth scenarios contain potentially out of date employment forecasts and the methodology to determine appropriate dwelling requirements is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances. In addition, more aspirational job growth targets, such as those arising from the SEP, may not necessarily be appropriate for the Black Country (as discussed later in these representations).
4.12 In terms of providing an uplift for market signals, a 25% uplift for South Staffs is agreed to be appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, the application of such an uplift in South Staffordshire should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack or headroom within the housing market and prevent house prices from increasing at an accelerated rate, exacerbating issues of affordability.
4.13 Clearly, the evidence contained in the SHMA does not consider the potential to accommodate any of Birmingham City's housing needs and that this could result in increased dwelling requirements. We reserve our position in respect of this matter and await the publication of the HMA wide Strategic Housing Needs Study.
4.14 We shortly await a consultation publication from central Government in relation to providing a standardised methodology for generating dwelling requirements. This is anticipated in Autumn 2017. The Black Country authorities will need to take account of any proposed national policy changes identified through the consultation paper. We reserve our position on this matter, until the full details and implications for the Back Country are known. It is considered that, whilst a standard methodology will be helpful in identifying a baseline dwelling requirement, the consideration of long term trends and economic forecasts cannot be carried out in a mathematical calculation outside a demographic/ economic model. In light of this, the SHMA prepared for the sub-area could remain useful as evidence to inform the review of the Black Country Core Strategy.
4.15 In terms of meeting the dwelling requirements, it is understood that the 'Call for Sites' consultation will inform an updated SHLAA, which will assess sites both within and outside the urban area to determine the maximum number of dwellings that can be realistically delivered within the Black Country over the proposed Plan period. The Housing Background Report that has been published as part of the evidence base for the Issues and Options Core Strategy Review has considered assumptions contained within the SHLAA based on adopted policies and considers changes to the policies to boost the delivery of housing on existing sites. Whilst it is a commendable that the Black Country authorities are exploring all potential options to boost housing on urban land, there are wider implications of doing so and accordingly, caution is expressed in response to a number of the identified approaches proposed.
4.16 As confirmed in paragraph 3.15, it is extremely important that the Black Country authorities 'firm up' the housing supply in order to ensure that there is sufficient provision to meet the dwelling requirements. It is also considered appropriate to provide an additional buffer of housing land supply to provide a contingency when sites are delayed. As explained earlier in the Issues and Options Report, sites providing a total of 3,000 homes have not come forward as anticipated. It is considered that additional supply is required to provide flexibility and minimise any durations within the Plan period where the housing trajectory would otherwise dip.
4.17 In terms of the extent of a buffer for housing land, the Local Plan Expert Group suggested that additional land, equivalent to delivering 20% of the overall dwelling requirement, is added to the supply, which will provide a contingency of land to be used as and when necessary during the Plan period. It is suggested that this additional land will help ensure the dwelling delivery targets and housing needs are met in a timely manner, which will reduce the opportunity for households to become concealed or shared. Given the issues experienced in respect of delivery in the past, it could be argued that an increased buffer of circa 25% could be applied.
4.18 It is also appropriate to ensure that, as well as identifying the right amount of land, there is sufficient variety in the types of sites (brownfield, greenfield, Green Belt) are identified, reflecting different sizes, in a range of locations. This variety in provision will allow the best opportunity for multiple sites to come forward at the same time without market constraint and hence ensuring delivery targets are met. In addition, this approach will also provide market choice to existing and arising households looking to move into a new home in the Black Country, which will have wider social benefits (i.e. allow families to live nearby one another and provide an opportunity to diversify existing communities through providing alternative homes to the existing housing stock).
4.19 Indeed, as previously documented in the adopted Core Strategy, it is considered that the ambition to retain the young and professional population within the Black Country should be maintained and that suitable and attractive housing and complementary environments are encouraged.
4.20 Finally, it is welcomed that the Black Country authorities have agreed to test the dwelling requirement figures on an ongoing basis. It is hoped that the suggested changes/alternative scenarios suggested above are implemented in order to ensure the evidence base is robust and the resultant policies and proposals soundly based.
Question 4: Do you consider the employment land requirement identified for the Black Country up to 2036 in the EDNA is appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.21 The Core Strategy review intends to utilise the Economic Development Needs Assessment (EDNA) for the Black Country, published in May 2017, to inform future employment land requirements. The EDNA uses forecasts produced as part of the West Midlands Combined Authority Strategic Economic Plan (SEP) to calculate long-term growth, noting that the 'Super SEP Economy+ Scenario' is the preferred aspirational scenario. This scenario assumes average annual growth in employment of 1.3% across the Combined Authority and presents an ambitious view of future growth in the area, with 500,000 jobs created between 2013 and 2030.
4.22 The SEP Technical Appendix breaks down the job forecasts for the three Local Enterprise Partnerships that form the Combined Authority (Black Country; Coventry & Warwickshire; and Greater Birmingham & Solihull). Jobs growth in the Black Country LEP is forecast to be around 1.1% per annum, whilst it is forecast at 1.5% per annum in the other two LEP areas. This averages out at annual growth of approximately 1.3%. Using data from the Business Register & Employment Survey, published by the Office for National Statistics, it is possible to look at employment trends over the last five to six years (2009-15) and this analysis suggests that the growth rate used in the aspirational growth scenario may be too ambitious for the Back Country:
4.23 Between 2009 and 2015, total employment in the Black Country LEP increased from around 450,000 to approximately 453,000. This equates to average annual growth of 0.1%. Walsall (1.5% p.a.) and Sandwell (0.9% p.a.) experienced jobs growth, although Dudley (-1.1% p.a.) and Wolverhampton (-0.8%) both suffered a fall in employment.
4.24 By contrast, both the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs saw total job numbers increase by 1.3% p.a. from 2009-13. A number of districts in these LEPs saw particularly strong growth over the period, notably Solihull and Lichfield in Greater Birmingham & Solihull, where employment grew by at least 3.0% on an annual basis. In short, the 1.3% average across the West Midlands Combined Authority Area is substantially bolstered by Solihull and Lichfield and therefore it is very ambitious to suggest this will occur across the Black Country area.
4.25 That said, growth in the Black Country needs to be faster than in previous years and the new Core Strategy has a vital role to play in supporting this, however the analysis presented above suggests that the growth targets need to be lowered to better reflect the local economic climate. It is considered unlikely that an annual increase of 1.0% or more will happen in the area in the long-term, especially with the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs capturing new job opportunities at a faster rate in recent years. Lowering the employment growth rate means the amount of employment floorspace needed would be lower. This would not reduce the demographically based housing targets for the area but it would potentially free up previously allocated employment sites for other uses such as residential. This would help the Black Country meet its future housing targets and ensure that it has enough homes for its future workforce to live in.
4.26 As identified in the supporting report and above, it is known that employment sites that had previously been identified for housing are still operational with businesses continuing to use the land and, conversely, there are sites allocated for employment that have been vacant and subsequently market, however, remain unoccupied, which could be transferred to a residential use. It is therefore recommended that the Councils ensure that updated EDNA qualitative review conclusions are taken into account and correct uses applied where appropriate.
Question 5: Do you agree with the proposed approach to the Black Country Green Belt Review? Yes/No; If not, what additional work do you think is necessary?
4.27 In respect of the Green Belt Review, on the basis of the evidence published setting out housing need and supply, it is agreed that it will be necessary to find sites outside of the existing urban area, which will require removing land from the Green Belt where it is appropriate to do so. This will provide an opportunity to identify strategic sites that can provide a significant amount of homes to contribute to meeting identified housing needs. It is considered that there are a number of locations whereby housing sites can be identified, without the purposes of the Green Belt being compromised, ensuring the function and integrity of the Green Belt will remain.
4.28 In addition, areas on the urban fringe have the potential to ensure new homes can be delivered in an established, well landscaped environment, which could be attractive to those young families and professionals that the Black Country authorities have had difficulty in retaining, often through out-migration to neighbouring Shire districts considered to represent more aspirational locations.
4.29 In terms of the process and methodology for undertaking a Green Belt Review, it is understood that the awaited Strategic Housing Needs Study (SHNS) will be accompanied by Strategic Green Belt Review across Greater Birmingham and that the Black Country authorities have been engaged in presenting potential opportunities. It is reassuring that this engagement between consultants and local planning authorities is taking place as there is a danger that logical locations fail to be identified due to a lack of understanding of environmental conditions and/ or local circumstances that are applicable to sites.
4.30 It is agreed and makes sense for the local planning authorities to conduct a Stage 2 Green Belt Assessment following the completion of the higher-level work. Any input on reviewing the draft methodology for the Stage 3 Green Belt Review would be welcomed.
Question 6: Do you agree that the key issues set out in Part 3 are the key issues that need to be taken into account through the Core Strategy Review? Yes/No; If not, what other key issues should be taken into account?
4.31 The key issues presented are considered to be relevant, however, there are a number of inconsistencies relating to matters identified above against the previous questions raised.
5. REVIEWING THE STRATEGY TO MEET NEW CHALLENGES & OPPORTUNITIES
Question 7: Do you think that the Core Strategy vision and sustainability principles remain appropriate? Yes/No; If not, what alternatives would you suggest?
5.1 In the main, the Core Strategy Vision and sustainability principles are considered to be appropriate, with exception to the principle of 'brownfield first'. It is understood that the NPPF, whilst it encourages an efficient use of land and for brown field land to be recycled, it does not suggest a sequential approach to development. There is no evidence to demonstrate that the development of greenfield land will compromise the development of brownfield land. Often the type of developers of the different land categories are different and, given the scale of the housing need, it is appropriate that the early delivery of housing is encouraged from all types of sites. In particular, the larger, potentially Green Belt, sites will have a longer lead in time due to the time it takes to plan for, determine and implement a comprehensive scheme. Indeed, a recent study entitled 'Start to Finish', prepared by NLP, supports this claim. When planning the housing trajectory for the Core Strategy, the larger sites should be planned in to come forward as soon as practically possible.
5.2 It is therefore suggested that the reference to 'putting brownfield first' is inappropriate and that it should be replaced by 'ensuring an efficient use of land to meet the identified housing needs', which encourages the recycling of land and recognises the contributions of greenfield/ Green Belt land to meeting housing delivery targets.
Question 8: Do you think that the Core Strategy spatial objectives remain appropriate? Yes/No; If not, what alternatives would you suggest and how might these changes impact on individual Core Strategy policies?
5.3 Whilst the objectives outlined generally remain sound, there is concern that one of the NPPFs main priorities is absent. This is in relation to significantly boosting the supply of housing. It is suggested that an additional objective is added in order to ensure that meeting housing needs remains a priority within the Black Country. Once a preferred option is arrived at, spatial references as to where the housing growth will be delivered could be included (for example, meeting housing needs on urban (brownfield and greenfield) land and at extensions to the urban area).
5.4 Further, given the increased employment land requirements, the second objective relating to employment land being within the best locations within the Regeneration Corridors may no longer be appropriate. Indeed, as highlighted earlier, there is concern that there is a mismatch in land allocations, and it is appropriate for the Core Strategy review to ensure all employment sites are fit for purpose. This may conclude that employment opportunities should be identified on new land outside of the Regeneration Corridors. Should this be the case, the objective would be inappropriately worded.
Question 9: Do you agree that Policies CSP1 and CSP2 should be retained and updated to reflect new evidence and growth proposals outside the Growth Network? Yes/No; If not, what changes do you think should be made to Policies CSP1 and CSP2 in response to new challenges and opportunities?
5.5 It is agreed that the policies could remain, if the development requirements and related changes are made to ensure the policies are consistent with the overall strategy. The changes relate to both the quantum of development (homes, employment and retail space), the location of development (within and beyond the existing Regeneration Corridors) and the type of development (brownfield, greenfield and on land removed from the Green Belt). It is considered that references should be made to urban extensions (on land removed from the Green Belt) in Policy CSP2 specifically, to highlight the important contribution that such sites will make to meeting the development requirements of the Plan.
Question 10: In continuing to promote growth within the Growth Network, is there a need to amend the boundaries of any of the Regeneration Corridors in the existing Core Strategy? Yes/No; If so, which boundaries and why?
5.6 No comment.
Question 11a: Do you support Strategic Option 1A? Yes/No; If yes, please explain why. If no, do you support Option 1B? Yes/No; If yes, please explain why. If you support the release of further employment land for housing, what should the characteristics of these employment areas be?
5.7 Option 1A is considered to be appropriate for accommodating the growth needs of the Black Country over the Plan period to 2036. This option would significantly boost the supply of housing land and help to meet the significant current and future identified need.
Question 11b: Are there any current employment areas that might be considered suitable for redevelopment to housing? Yes/No; Please submit specific sites through the 'call for sites' form.
5.8 As highlighted previously, the key to understanding where the most appropriate employment/ housing locations are within the Growth Network and Corridors will be determined through a qualitative assessment of allocated employment sites. It is understood an updated assessment has been undertaken and such work, complete with responses to the Call for Sites consultation, will provide the Black Country authorities with evidence to determine the urban capacity for housing, which may include transferring some employment land to housing as well as housing land to employment. This work will then outline the number of dwellings to be accommodated beyond the existing Growth Network within the Green Belt.
5.9 It is welcomed that the Issues and Options Draft recognises the need to release Green Belt in all scenarios proposed.
Question 12a: Do you support Spatial Option H1? Yes/No; What criteria should be used to select suitable sites? e.g. ability to create a defensible new green belt boundary, size, access to existing residential services.
5.10 No comment.
Question 12b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details (please submit specific sites through the 'call for sites' form).
5.11 No comment.
Question 13a: Do you support Spatial Option H2? Yes/No; What should the characteristics of Sustainable Urban Areas (SUEs) be? e.g. minimum/ maximum size, mix of uses, mix of housing types, accessibility to other areas. What criteria should be used to select suitable sites? e.g. proximity to a rail station, availability of existing infrastructure, easy access to jobs, potential to support existing settlements / services, proximity to the existing growth network, potential to support urban regeneration.
5.12 Given the scale of the housing need, there is concern that the development requirements could not be met with just one of the suggested options presented and, therefore, a combination of both options will be necessary.
5.13 To be in the best possible position to significantly boost the amount of housing and meet the development requirements in the Black Country, in accordance with the NPPF, it is advised that opportunities to both round off edges of the Green Belt and Sustainable Urban Extensions are proposed in the Preferred Options Draft Core Strategy. As highlighted within the Issues and Options Draft, there are challenges and opportunities that come with both types of development, for example from a delivery perspective, smaller sites will come forward more quickly due to the nature of these being straight forward proposals (with limited infrastructure necessary and one or few land owners) and larger sites will ultimately take longer as they are more complex (with multiple land uses, infrastructure and land owners). This fact has been evidenced by Nathaniel Lichfield and Partners (now known as Lichfields) within their report 'Start to Finish' who concluded that the average planning approval period of schemes of 2,000+ dwellings is 6.1 years and the annual average build out rate is 161 dwellings per annum. These figures demonstrate the need to have a number of sites of different sizes and in different locations removed from the Green Belt. The report also identifies, with regard to housing delivery, that 50% more homes per annum are delivered on average on large greenfield sites than large brownfield sites. This is a significant benefit of including greenfield sites within the Preferred Option and will assist to secure its delivery.
5.14 In terms of the locations for removing land from the Green Belt, this should be informed by the Strategic Growth Study and a Black Country Review of the Green Belt. The more detailed study will provide an assessment of land parcels against the purposes of the Green Belt and is likely to recommend that those that compromise the purposes the least will be shortlisted for further consideration to be removed from the Green Belt. It is advised that the next stage should be a consideration of the shortlisted sites based on their suitability (i.e. are the neighbouring uses compatible, would any previous land uses prevent the development of the site), sustainability (i.e. proximity to/ ability to provide local services/ public transport/ employment opportunities) and deliverability (i.e. whether the site is available, being promoted for development, has no barriers to coming forward etc.) credentials. Clearly each site will fair differently against such criteria and the Call for Sites submission will assist the Council to come to a decision on the preferred sites. It is advised that the Black Country authorities should be mindful of the opportunities, through infrastructure and design, that development can bring that will enhance the diversity and character of a particular location.
5.15 In terms of the characteristics of a Sustainable Urban Extension, this is likely to vary depending on the location of each site. For example, some may be more urban and others suburban in their character and would, therefore, provide a different land use offer. It is important that each are considered on a site by site basis to ensure that any subsequent allocation delivers a successful development. It is important that the developer responsible for promoting the site helps to influence what is ultimately delivered. Often what is proposed on site has been informed by housing market intelligence undertaken by sales experts at development companies and, therefore, should be taken into account. Particularly given recent experience in the down turn in the apartment market, it is important that sites are allocated for the right type and mix of housing to ensure that it will be delivered, occupied and successful.
5.16 In the more suburban locations, it is suggested that Sustainable Urban Extensions should look to provide a different offer to potentially what exists in the Strategic Centres and Regeneration Corridors, such as a mix of larger and lower density homes, which will attract those households that in the past have migrated elsewhere. Given the emphasis on delivering more high density homes in the Strategic Centres, it is important that this housing mix is offset by more larger homes in appropriate locations. Otherwise, there is a concern that the Black Country will have a disproportional amount of small homes, which will further encourage more families to migrate elsewhere and not meet the aspiration to diversify the wider HMA.
Question 13b: What infrastructure do you think would be needed for different sizes of SUEs?
5.17 The type of infrastructure needed will vary depending on the different location and size of each site and must be compliant with paragraph 122 of the CIL Regulations that requires planning obligations (which applies to most infrastructure) to be necessary to make the development acceptable in planning terms; directly related to the development; and fairly and reasonably related in scale and kind to the development. With the above in mind, however, provision for open space (both formal and informal), local centre and potentially a primary school should be considered for sites in excess of 1,000 homes.
Question 13c: Are there any potential locations that should be considered for SUEs (please submit through the 'call for sites' form) and what infrastructure would be required to support these?
5.18 No comment.
Question 13d: Do you think that the Core Strategy should set out detailed guidance for the development of SUEs (e.g. type and tenure of housing, specific infrastructure required), rather than details being determined at a local level in light of local policies? Yes/No; Any further comments?
5.19 For the reasons outlined above, relating to considering existing local circumstances and CIL Regulation requirements in respect of any charging schedule and planning obligation requirements, it is advised that detailed guidance for the development of SUEs should not be specified within the Black Country Core Strategy as each site will vary and deserves a more detailed consideration, alongside the developer, at the local level.
Question 14: Do you think there are any other deliverable and sustainable Housing Spatial Options? Yes/No; If yes, please provide details
5.20 There are no other sustainable and deliverable options that we are aware of within the Black Country administrative boundary that are capable of delivering the housing spatial options.
Question 15a: If all housing need cannot be met within the Black Country, do you support the 'export' of housing growth to neighbouring authorities within the HMA? Yes/No; What factors should be taken into account in an assessment of the opportunities in neighbouring authorities e.g. proximity to the edge of the urban area, proximity to a rail station, availability of existing infrastructure, easy access to jobs?
5.21 Even if all realistically deliverable options have been considered within the Black Country, there will remain an unmet need for housing. Therefore, it is necessary for the Black Country authorities to consider the possibility of exporting growth to neighbouring authorities within the HMA. In particular, there are options to expand existing settlements that are close to the administrative boundary (for example, in South Staffordshire) across authorities and could help deliver the necessary growth in a sustainable and deliverable manner. These opportunities should be explored first prior to exporting further growth to other authorities within the HMA where there is less of a spatial connection.
Question 15b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details.
5.22 No comment.
Question 15c: Do you think there are ways to ensure that exporting housing will meet the needs of people who would otherwise live in the Black Country? (e.g. transport improvements, provision of affordable housing, creation of employment opportunities) Yes/No; If yes, please provide details.
5.23 It is important to consider a number of factors, including migration and travel to work patterns, which have been used to identify the extent of the HMA, to determine where households relocate to when leaving the Black Country in order to understand where and why those moves are taking place. Whilst planning can attempt to influence where people relocate to, there is no mechanism to guide or restrict people moving to or from certain locations. Once knowledge of movers can be understood can the planning system can attempt to recreate those attractive characteristics (homes that are more affordable, good public transport links, employment opportunities etc.) in locations where there is capacity for the homes to be delivered. It is advised that an additional analysis of the data, where necessary, is undertaken to provide the Black Country authorities with the relevant intelligence to deliver a successful strategy for growth outside the administrative area.
Question 16: Do you support Spatial Option E1? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access) If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.24 No comment.
Question 17: Do you support Spatial Option E2? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites e.g. quick motorway access, good sustainable transport links? If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.25 No comment.
Question 18: Do you support Spatial Option E3? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access) If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.26 No comment.
Question 19a: Do you support Spatial Option E4? Yes/No; Any further comments?
5.27 No comment.
Question 19b: Should any factors be taken into account in an assessment of the opportunities? Yes/No; If yes, what should they be? (e.g. quick motorway access, strong transport links with the Black Country, good sustainable transport links with the Black Country) If you think there are any potential locations that should be considered, please provide details.
5.28 No comment.
Question 20: Do you think there are any other deliverable and sustainable Employment Land Spatial Options? Yes/No; If yes, please provide details.
5.29 As previously outlined, there is concern that some of the employment sites currently identified are potentially not fit for purpose and others that are identified to be transferred to housing remain in employment occupation. In light of this mismatch, it is welcomed that an updated qualitative assessment has been undertaken and has informed how much employment land is has be found outside the urban area.
5.30 In terms of where the employment land should be located outside the urban area, as with housing, decisions should be based on the results of the Green Belt Review and the suitability, sustainability and deliverability of sites. For employment land sites, the suitability of a site may well include good transportation links for goods and people. The Call for Sites consultation will assist in putting forward suggestions for sites.
6. DELIVERING GROWTH - INFRASTRUCTURE & VIABILITY
Question 21: Do you think that changes are required to Policy DEL1 to ensure it covers both development within the existing urban area and any within the Green Belt? Yes/No; If yes, please provide details.
6.1 Policy DEL1 is considered to be sound on the basis that it is sufficiently flexible to deal with different circumstances on different sites across the Black Country, including sites that are to be removed from the Green Belt.
Question 22: Do you have evidence of a requirement for new social infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.2 No comment.
Question 23: Do you have evidence of social infrastructure that is no longer needed and where the site could be reallocated for alternative uses? Yes/No; If yes, please provide details.
6.3 No comment.
Question 24: Do you have evidence of pressure being placed on the capacity of current social infrastructure which could be exacerbated by new housing? Yes/No; If yes, please provide details.
6.4 No comment.
Question 25: Will there be any new social infrastructure requirements necessary to serve large new housing developments? Yes/No; If yes, please explain the type and scale of any new social infrastructure required.
6.5 It is recognised that delivery of new housing developments may give rise to the need to deliver supporting infrastructure. Committed to working with the relevant authorities and service providers to determine the capacity of existing infrastructure and determine the level of mitigatory provision necessary to support an increase in the population in this location. It is however important that each potential large new housing development is given independent consideration in respect of any infrastructure obligations, recognising that pressures will be dependent on location and existing infrastructure capacity.
Question 26: Do you have any evidence of a requirement for new physical infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.6 No comment.
Question 27: Do you have evidence of pressure being placed on the capacity of current physical infrastructure which could be exacerbated by new developments? Yes/No; If yes, please provide details.
6.7 No comment.
Question 28: Do you think physical infrastructure is necessary to serve large new housing developments? Yes/No; If yes, what type and scale of physical infrastructure is necessary?
6.8 As set out above, the need for infrastructure will vary for each site. Given such different circumstances, it would be inappropriate and potentially unlawful (as it would conflict with paragraph 122 of the CIL Regulations) to incorporate a blanket policy requiring specific infrastructure on every large housing site.
Question 29: Do you think there are any other tools or interventions that could be used to ensure enough infrastructure is provided by developments? Yes/No; If yes, please provide details.
6.9 It is considered that the existing national framework (which includes the NPPF and CIL Regulations) provides a sufficient tool to ensure the relevant infrastructure is delivered. In addition, the CIL Charging Schedule allows authorities to raise funds for named infrastructure projects, which should be updated in line with any Core Strategy advanced. Therefore, it is considered that there are existing provisions to deliver infrastructure and no additional interventions through the Black Country Core Strategy Review are needed.
Question 30: Do you have any suggestions around how the strategy can be developed in order to maintain the urban regeneration focus of the Black Country while at the same time bringing forward sites in the green belt? Yes/No; If yes, please provide details.
6.10 There is no a need for any specific interventions, such as phasing, to protect the delivery of urban regeneration in the Black Country. Indeed, it is considered that development of greenfield and Green Belt sites can very much compliment urban regeneration through the provision of a more varied form of development that will help diversify the housing stock and profile of residents in the wider area, which will assist to sustain and improve the vitality of existing communities. Further, as highlighted above, given the priority to significantly boost the delivery of housing greenfield and Green Belt sites should come forward for development as soon as practically possible. Given lead in and build out rates of larger sites, the land should be encouraged to be developed as soon as possible so to ensure the homes are delivered in the Plan period and the needs are met.
Question 31: Do you think that the right scale and form of funding is available to support the delivery of the Core Strategy review? Yes/No; If no, what alternative sources of funding or delivery mechanisms should be investigated?
6.11 When delivering greenfield/ Green Belt sites, there is an opportunity to deliver infrastructure to meet the needs arising from the proposal, which may have wider benefits for the local community. In addition, it is likely that the communities created by the Sustainable Urban Extensions will potentially be more affluent and share their wealth using local shops and services within the wider Black Country, which will contribute to more successful and prosperous communities.
7. REVIEW OF EXISTING CORE STRATEGY POLICIES & PROPOSALS Housing
Question 35: Do you support the proposed approach to housing land supply? Yes/No; If no, please explain why
7.1 As identified above, it is important that a range of sites in different locations are identified to be in the best possible position of delivering the development requirements. In terms of presenting these sites in the Core Strategy, whilst it is useful to identify a housing trajectory, it is important that there is not a phasing policy as such that would prevent the delivery of housing, given the current housing crisis. As stated above, the delivery of housing on greenfield and Green Belt land will not compromise the delivery of urban regeneration as the development on the urban edge will complement and rejuvenate the environment in a different way.
7.2 In terms of the proposed level of discounting, it is considered that if the LPA adopt an approach to identify a further 20% of sites in accordance with the LPEG recommendations identified above, there would not necessarily be a need for the application of discounting in determining the overall level of supply. It is interesting to note that the level of discounting proposed by LPEG is suggested for all LPAs, not necessarily those which have experienced difficulty in delivery. It could therefore be argued that an increased buffer of 25% could be applied in order to take a cautious approach.
Question 36: Do you think that the current accessibility and density standards set out in Policy HOU2 and Table 8 should be changed? Yes/No; If yes, what standards should be applied instead, for example should the minimum net density of 35 dwellings per hectare be increased to maximise brownfield housing delivery?
7.3 It is clear that the current accessibility and density standards outlined in the adopted Core Strategy were formulated in the context of the vast majority of development taking place on brownfield sites within the defined urban area. As reiterated throughout these representations, there is now a clear need for Green Belt release as part of the Local Plan Review to meet emerging, objectively assessed housing needs. We outline in further detail below why the adopted accessibility and densities would not be applicable to Green Belt sites, however would suggest that the current standards do not allow sufficient flexibility on brownfield sites. A blanket application of prescriptive accessibility and density standards across the Black Country, be it brownfield or greenfield, does not allow sufficient flexibility which take into account site specific characteristics. The Council should allow for greater flexibility when assessing accessibility and density standards, with a more pragmatic approach which allows appropriate assessment for site-specific characteristics and also an assessment of market demand which may vary significantly across the large Black Country area.
7.4 Paragraph 47 of the NPPF outlines how local authorities should set out their own approach towards density. It is suggested that the currently adopted approach does not allow for sufficient assessment of local characteristics. It is clear that the chosen approach must be reflective of local circumstances, including the matters outlined above as well as infrastructure and services available in the locality. It is advocated that a more flexible approach to density and accessibility standards is taken as part of the emerging Local Plan Review.
Question 37a: Do you think that the existing Policy HOU2 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why
7.5 In line with the comments above, it is suggested that the Council should assess each site on a case by case basis in terms of accessibility and density standards. This approach would suggest that the numerical baseline trigger of 15 homes or more will not always be appropriate or applicable, and as advocated throughout these representations it suggested that there should be a complete reassessment on accessibility and density standards as part of the emerging Local Plan Review.
Question 38: Do you think that the current accessibility and density standards are appropriate for green belt release locations? Yes/No; If no, what standards should be applied in these locations and why?
7.6 No, it is not considered that the current standards would be applicable to Green Belt release locations. The adopted standards are overly prescriptive, and as previously discussed were written in the context of brownfield land. Green Belt release sites have a completely different type of character, therefore consideration of accessibility and density standards in relation to these sites should be reflective of local character and site characteristics. The more suburban settings of Green Belt release land lends itself to lower densities which are more appropriate to the Green Belt setting, which typically deliver more family homes. The Council must provide robust evidence to test any forthcoming accessibility and density standards in relation to Green Belt release locations, which allows for a flexible and pragmatic approach.
Question 39: Do you think separate accessibility standards are needed for particular types of housing e.g. housing for the elderly or affordable housing (as occupiers may be less mobile and more dependent on public transport)? Yes/No; If yes, please provide details.
7.7 It is clear that separate accessibility standards will apply to particular types of housing such as affordable and for the elderly population, however in line with the sentiment expressed above, any forthcoming standards should be based on robust evidence and allow for sufficient flexibility to avoid any unnecessary constraints to development coming forward.
Question 40: Do you agree that the 2017 SHMA findings should be used to set general house type targets for the Plan period? Yes/No; If no, please explain why.
7.8 A general and blanket application for house types across the Black Country should not be advanced as part of the Local Plan Review. Paragraph 50 is clear that local planning authorities should plan for a mix of housing based on current and future demographic trends and market trends. It is therefore notable that the NPPF specifically highlights 'market trends' in this context, which acknowledges that the market must inform such decisions.
7.9 Whilst the 2017 SHMA does provide an assessment of demographic and market trends, it is notable that it looks at a wider area assessment and is focused at a higher level. This assessment therefore does not draw out sub-market trends, and cover smaller areas within the vast Black Country area. Again, a blanket policy of house type targets across the Black Country area would not allow for sufficient flexibility to assess each site on a site by site basis, taking into consideration local market trends and demand. The NPPF does not state that specific policies should be set to enforce that local demand is met. As such, it is considered that this should be left for the market to decide, as opposed to applying rigid and prescriptive house size standards.
7.10 It is suggested that the evidence presented in the SHMA should be put into the Plan as an informative and general guide, but should not feed into a specific policy requirement which outlines housing mix percentages that should be applied across the Black Country. A policy containing general house type targets could present as a significant constraint to the delivery of a site where there is no local market demand for this house type, which in turn would have a negative impact on achieving the necessary housing growth targets to be delivered in the Black Country over the Plan period.
Question 41a: Do you support the introduction of a policy approach towards self and custom build housing in the Core Strategy? Yes/No; If yes, would you support:
7.11 It is not considered that there is a policy need for the Core Strategy to address self and custom build housing in the emerging Review. Paragraph 6.32 indicates that there are only nine records on self and custom build registers in the Black Country. It is evident that that there is very limited demand in the Black Country, which is unsurprising given that self and custom build housing is often more popular in rural areas. Given the limited demand it is therefore not considered necessary to take a policy approach towards self and custom build housing within the Local Plan Review.
Question 41b: A target for each authority? Yes/No; Any further comments
7.12 Given that there is evidence of little market demand, it is not considered necessary for the Core Strategy to set targets for each of the Black Country authorities. If it was considered to be necessary as the Local Plan Review progresses, any targets being set should be formulated on the basis of robust evidence such as monitoring of the registers, to provide an indication of how many self-build homes will be needed.
Question 41c: A requirement for large housing sites to provide serviced plots? Yes/No; Any further comments?
7.13 There should not be a requirement for large housing sites to provide serviced plots. This can pose an unnecessary market constraint for large housebuilders when there may be limited or no market demand for self-build plots. Self and custom build plots are often unusual and unique in character, therefore would not be best suited to be located within a large housing development with more uniform house types. If deemed necessary, self and custom build housing should be allocated specific site allocations, as discussed below.
Question 41d: Another approach altogether? Yes/No; If yes, please specify.
7.14 If it is considered necessary for the Review to address self and custom build housing, this should be addressed by the Council's identifying and allocating specific plots for these uses. Identifying site-specific plots would ensure that the most appropriate and suitable locations for self and custom-build will be allocated, via the assessment of appropriate evidence and market demand. In addition, this might be more likely to be achieved on surplus publicly owned land.
Question 42: Do you agree that the annual affordable homes target should be increased to reflect the 2017 Black Country Strategic Housing Market Assessment? Yes/No; If no, please explain why.
7.15 As a general principle, the notion of applying different affordable housing ratios to different parts of the Black Country, based on an understanding of needs and viability, is acceptable. Given that the Black Country represents a vast area, there will not be a uniform housing market, and there will be sub-market trends within this wider area. As such, a more flexible approach which assesses local housing market evidence on a case by case basis could be justified. That said, there is an inherent simplicity and attraction to a single rate figure, which is easy for the development industry to understand.
7.16 In terms of the annual affordable housing target, it is unclear how the Issues and Options document has calculated the figure of 832 homes per year. At paragraph 7.42 of the June 2017 SHMA Part Two- affordable housing document, it is stated that the total annual affordable housing need is 677 dwellings, which represents 19.8% of the annual projected household growth. This differs to paragraph 6.36 of the Issues and Options document, which states that the affordable housing target is 23.4% of total housing need or 832 homes per year. From paragraph 7.47 of the SHMA, it appears that this figure may have been calculated by adding the overall requirement of 16.6% of housing to be affordable rented and 6.7% shared ownership. Clarity is sought on how this figure has been calculated, and we reserve the right to comment further on this matter.
Question 43a: Do you think that the existing Policy HOU3 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why.
7.17 We have not undertaken detailed analysis of the findings and assumptions of the SHMA and affordable housing delivery matters, therefore would like to reserve the right to comment on this matter further. However, on face value, it appears to be a reasonable threshold and is not dissimilar to other locations.
Question 44a: Do you think that the affordable housing requirement for eligible sites in Question 43 should be kept at 25% of the total number of homes on the site? Yes /No; Any further comments?
7.18 Based on the current evidence, a blanket rate of 25% affordable housing would appear to be sound.
7.19 However, irrespective of the final rate, any amendments to the currently adopted affordable housing policy must continue to have a clause in it which stipulates that this requirement is subject to viability tests. Any revised affordable housing requirements will also need to carefully consider the implications of adopted Community Infrastructure Levy (CIL) regimes. Both Sandwell and Dudley Councils have adopted CIL Charging Schedules. These will have implications on viability, therefore if revised affordable housing targets are to progressed then these CIL tariffs will need to re-assessed and re-visited.
Question 44b: If no, should the percentage be increased to allow for the provision of affordable home ownership? Yes/No; If yes, what should the percentage be and why?
7.20 At paragraph 6.39 of the Issues and Options Paper, it is stated that options need to be explored to increase affordable housing delivery of private sites. One option would be to increase the overall affordable housing proportion, which would require developers to provide affordable home ownership products plus an appropriate proportion of other affordable tenures. This paragraph follows on from commentary relating to the Housing White Paper.
7.21 The Housing White Paper discusses Starter Homes at Chapter 4, and explains how the government intend to amend the NPPF to introduce a clear policy expectation that housing sites deliver a minimum of 10% affordable home ownership units. It is later stated that it will be for local areas to work with developers to agree an appropriate level of delivery of starter homes, alongside other affordable home ownership and rented tenures.
7.22 The policy position on Starter Homes is not yet fully clear, and has yet to be formally established through a formal amendment and update to the NPPF. Until the national policy position on Starter Homes has been made clear, it would be premature for the Core Strategy Review to suggest an uplift in the affordable housing requirement to include affordable home ownership such as Starter Homes. Any suggestion to uplift the affordable housing requirement to include Starter Homes should be reflective of the national policy position, as well as founded upon a robust evident base which dictates exactly what percentage this element should be of the overall affordable housing requirement.
Question 45: Should an increased affordable housing requirement be set for green belt release sites, to reflect the likely financial viability of these sites? Yes/No; If yes, what should this be.
7.23 The likely financial viability of Green Belt sites will vary across different areas of the Black Country, therefore any affordable housing requirements for Green Belt sites will need to be reflective of these circumstances. Any affordable housing targets for Green Belt sites should be based on robust evidence, and acknowledge that many sites may need to support and deliver other infrastructure requirements.
7.24 Ultimately, any affordable housing strategy will need to address the affordable housing need as well as the need for market housing. Bearing in mind that the SHMA confirms over 70% of homes required are for homes to be sold on the open market, any affordable housing policy must not dilute the delivery of these needs/requirements. A higher figure on Green Belt sites over and above a standard blanket figure would potentially do this.
Employment Question 49a: Is there still a need for existing Policy DEL2 in order to manage the release of poorer quality employment land for housing? Yes/No; If no, please explain why.
7.25 The Black Country is to be the subject of large levels of both employment and housing growth over the Plan period. These uses are very much inter-linked with one another, and will drive each other's need for growth. The Local Plan Review, in order to meet emerging employment and housing needs, must identify a significant number of specific sites for employment and housing uses. By planning proactively and identifying suitable sites for both employment land and housing land, this should reduce the pressures to manage the release of poorer quality employment land, which may not always be suitable for release. The Local Plan Review should also seek to undertake a further review of poorer quality employment land to make it available for other suitable uses, if it proves to no longer be viable for employment land use. This is in line with policy provisions of the NPPF, which at Paragraph 22 outlines that planning policies should avoid the long-term protection of sites allocated for employment use where there is no reasonable prospect of a site being used for that purpose.
Question 50: Do you think that the Core Strategy should continue to set a target for the total employment land stock in Policy EMP1? Yes/No; Please explain why.
7.26 The continuation of setting a target for employment land stock would be supported. Policy EMP1 should make it clear that these are not maximum figures, to encourage further flexibility for additional growth.
Retail Question 59: Have all the appropriate centres within the Black Country been identified? Yes/No; If not, please specify additional centres
7.27 No comment.
Question 61: In addition to para 4.33 of the current Core Strategy should the revised Core Strategy include criteria for the creation of new centres that might be needed as a result of any additional housing identified through the plan? Yes/No; Any further comments?
7.28 Criteria would be a useful policy tool to help assess the designation of new centres, and should be in line with previous methodologies used which set out clear thresholds.
Question 71: Should the Core Strategy set housing targets for the Town Centres?
7.29 Housing within Town Centres should be supported, in line with paragraph 23 of the NPPF which discusses the important role that residential development can play in ensuring the vitality of Town Centres. Any housing targets should be based on what sites are known to be readily available, suitable and viable for residential development. Market demand for housing in these areas will also need to be fully assessed. It is notable from the outcome of the 2017 SHMA that there is most demand for three bedroom properties (40%). The highest demand is therefore for family housing, and not for flats which are often the most popular within Town Centre locations. Any housing targets set for the Town Centre would therefore need to consider the findings of the SHMA, and be reflective of the fact that family housing is often more suitable for delivery on larger sites, including on sites which are currently located within the Green Belt.
Environment Question 99a: Do you think that national standards for housing development on water consumption should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.30 When referring to water consumption paragraph 6.1.52 of the Issues and Options document states that the Black Country does not currently lie in an area of serious water stress, therefore clear need may be difficult to demonstrate. This evidence suggests that there is limited or no need to introduce such a policy, therefore it is not considered that the Core Strategy Review should seek to introduce water consumption standards for housing development.
Question 99b: Do you think that national access standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.31 The introduction of any national access standards, with the Issues and Options document referring specifically to Lifetime Homes, again must be based on a robust evidence base which can demonstrate market demand. It is noted that Paragraph 50 of the NPPF states that planning authorities must plan for a mix of housing to meet a range of needs. In the same paragraph, it is later stated that these must be based on current and future market trends. If Lifetime Home standards are to be introduced these will therefore need to be based on robust evidence, to ensure that the standards are not overly onerous and prevent the delivery of other types of housing which have higher levels of market demand.
Question 99c: Do you think that national space standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.32 As reiterated throughout these representations, it is not considered that a blanket approach of prescriptive standards across the Black Country allows sufficient flexibility to assess local market and site considerations in an appropriate manner. Whilst it is recognised that space standards can be an important tool to ensure that high quality of homes are delivered, we agree with the sentiment expressed in the recent Housing White Paper. The Paper explains that the government are concerned that a one size fits all approach may not reflect the needs and aspirations of a wider range of households. The White Paper also states that the Government will be undertaking a review of the Nationally Described Space Standards. It is suggested that the Core Strategy Review should await the outcome of this national review of national space standards, to ensure compliance with national policy and to ensure that the most appropriate approach to space standards, if required, is taken.
Question 99d: Do you think that the standards should be different for brownfield and greenfield sites? Yes/No; If yes, please explain how and why.
7.33 As discussed above, prescriptive standards do not always allow sufficient flexibility for local market needs, so we would not advocate a blanket approach of different standards to brownfield and greenfield sites.
Open Space, Sport and Recreation Question 102a: Do you support the proposed changes relating to open space, sport and recreation? Yes/No; If no, please explain
7.34 Paragraph 6.1.60 of the Issues and Options paper outlines how adopted Policy ENV6 creates the framework for open space policies at the local level. The Issues and Options paper outlines how this is in line with national guidance, and that it is proposed to retain this policy and update some references in the supporting text to reflect changing circumstances. It is agreed that the local level remains the appropriate place to set open space policies, and that Policy ENV6 should continue to endorse this approach.

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

Question 3 - Do you agree that the housing need identified for the Black Country over the period 2014-36 in the SHMA, and the anticipated amount of supply, are appropriate and in line with national gu

Representation ID: 2562

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Pegasus Group

Representation Summary:

4.10 In terms of the extent of the sub market, which includes the Black Country and South Staffordshire, this is considered to be appropriate. It is recognised and welcomed that the Black Country authorities and South Staffordshire have jointly undertaken a SHMA for the sub area, which facilitates the preparation of an Issues and Options Core Strategy Review. There is concern, however, that the remaining constituent authorities within the wider Greater Birmingham Housing Market Area have not taken part and there is a danger that housing need for the whole HMA may not entirely be comprehensively captured due to the different time periods covered by the separate studies. It is advised that a SHMA, consistent with the guidance in the NPPF and Planning Practice Guidance, is prepared for the entire HMA over the same Plan period (as opposed to a housing needs study), which will properly consider all relevant factors in a consistent and comprehensive manner.
4.11 The OAN arrived at by the SHMA is generally appropriate in identifying the starting point for determining the dwelling requirement, however, it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline. There is concern that the economic growth scenarios contain potentially out of date employment forecasts and the methodology to determine appropriate dwelling requirements is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances. In addition, more aspirational job growth targets, such as those arising from the SEP, may not necessarily be appropriate for the Black Country (as discussed later in these representations).
4.12 In terms of providing an uplift for market signals, a 25% uplift for South Staffs is agreed to be appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, the application of such an uplift in South Staffordshire should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack or headroom within the housing market and prevent house prices from increasing at an accelerated rate, exacerbating issues of affordability.
4.13 Clearly, the evidence contained in the SHMA does not consider the potential to accommodate any of Birmingham City's housing needs and that this could result in increased dwelling requirements. We reserve our position in respect of this matter and await the publication of the HMA wide Strategic Housing Needs Study.
4.14 We shortly await a consultation publication from central Government in relation to providing a standardised methodology for generating dwelling requirements. This is anticipated in Autumn 2017. The Black Country authorities will need to take account of any proposed national policy changes identified through the consultation paper. We reserve our position on this matter, until the full details and implications for the Back Country are known. It is considered that, whilst a standard methodology will be helpful in identifying a baseline dwelling requirement, the consideration of long term trends and economic forecasts cannot be carried out in a mathematical calculation outside a demographic/ economic model. In light of this, the SHMA prepared for the sub-area could remain useful as evidence to inform the review of the Black Country Core Strategy.
4.15 In terms of meeting the dwelling requirements, it is understood that the 'Call for Sites' consultation will inform an updated SHLAA, which will assess sites both within and outside the urban area to determine the maximum number of dwellings that can be realistically delivered within the Black Country over the proposed Plan period. The Housing Background Report that has been published as part of the evidence base for the Issues and Options Core Strategy Review has considered assumptions contained within the SHLAA based on adopted policies and considers changes to the policies to boost the delivery of housing on existing sites. Whilst it is a commendable that the Black Country authorities are exploring all potential options to boost housing on urban land, there are wider implications of doing so and accordingly, caution is expressed in response to a number of the identified approaches proposed.
4.16 As confirmed in paragraph 3.15, it is extremely important that the Black Country authorities 'firm up' the housing supply in order to ensure that there is sufficient provision to meet the dwelling requirements. It is also considered appropriate to provide an additional buffer of housing land supply to provide a contingency when sites are delayed. As explained earlier in the Issues and Options Report, sites providing a total of 3,000 homes have not come forward as anticipated. It is considered that additional supply is required to provide flexibility and minimise any durations within the Plan period where the housing trajectory would otherwise dip.
4.17 In terms of the extent of a buffer for housing land, the Local Plan Expert Group suggested that additional land, equivalent to delivering 20% of the overall dwelling requirement, is added to the supply, which will provide a contingency of land to be used as and when necessary during the Plan period. It is suggested that this additional land will help ensure the dwelling delivery targets and housing needs are met in a timely manner, which will reduce the opportunity for households to become concealed or shared. Given the issues experienced in respect of delivery in the past, it could be argued that an increased buffer of circa 25% could be applied.
4.18 It is also appropriate to ensure that, as well as identifying the right amount of land, there is sufficient variety in the types of sites (brownfield, greenfield, Green Belt) are identified, reflecting different sizes, in a range of locations. This variety in provision will allow the best opportunity for multiple sites to come forward at the same time without market constraint and hence ensuring delivery targets are met. In addition, this approach will also provide market choice to existing and arising households looking to move into a new home in the Black Country, which will have wider social benefits (i.e. allow families to live nearby one another and provide an opportunity to diversify existing communities through providing alternative homes to the existing housing stock).
4.19 Indeed, as previously documented in the adopted Core Strategy, it is considered that the ambition to retain the young and professional population within the Black Country should be maintained and that suitable and attractive housing and complementary environments are encouraged.
4.20 Finally, it is welcomed that the Black Country authorities have agreed to test the dwelling requirement figures on an ongoing basis. It is hoped that the suggested changes/alternative scenarios suggested above are implemented in order to ensure the evidence base is robust and the resultant policies and proposals soundly based.

Full text:

Question 1: Do you agree that the Core Strategy review should be a partial review, retaining and stretching the existing spatial strategy and updating existing policies? Yes/No; If not, what do you think should be the scope of the review?
2.4 In response to Question 1 and whether it should be a partial review or not, whilst the existing strategy identifies the most sustainable locations for growth in the context of delivering development requirements identified by the Regional Strategy (RS), there is now a new and much bigger challenge ahead in meeting the arising needs for homes identified by the latest evidence and there is concern that the existing spatial strategy may not facilitate the delivery of these needs. The Black Country authorities, therefore, need to be mindful of this and not attempt to put "a square peg in a round hole".
2.5 It is our view that urban regeneration can be achieved whilst pursuing development on the urban edge. Indeed, the scale of housing need is so large that both must be encouraged in order to meet current and arising housing needs within the Black Country.
2.6 It is extremely important that in reviewing the Core Strategy it fully takes account of and facilitates the delivery of strategic economic plans, as recognised in paragraph 1.15. All too often these strategies are ignored and, accordingly, development plans could effectively frustrate economic growth from being realised.
2.7 In terms of the Plan period proposed in paragraph 1.17, whilst a 15-year time period from adoption is appropriate, there is concern that the preparation of plans is often delayed (due to reasons beyond the control of the LPAs) and it may be prudent to stretch the period further to prevent such an issue from occurring.
2.8 It is welcomed that the Issues and Options document recognises that it will not be possible to accommodate all future development needs within the urban area and that an examination of the potential for development land outside the existing urban area, which is effectively land within the Green Belt, will take place as part of the Core Strategy review process.
3. THE BLACK COUNTRY TODAY - THE EXISTING STRATEGY
3.1 As set out within this section, the delivery of both employment and housing land has not come forward as originally envisaged in part due to the after effects of the recession. Surplus employment land which might have been available for housing has not come forward due to a strengthening economy and local firms being more robust than anticipated. In addition, the range of locations available has not in all cases met with market expectations as to where people want to live.
3.2 In terms of the employment land, it is important that sufficient land is provided for new employment and that there is not an overreliance on land that is currently in use. It is impressive that despite generally poor economic performance local businesses have performed well. Should the economy significantly improve within the Plan period in line with LEP aspirations (considered later in this response), there is concern that it may become difficult to transfer a wide range of existing employment locations to housing allocations. It is appropriate, therefore, for the Council to ensure the evidence contained within the Strategic Housing and Employment Land Availability Assessment is reviewed and updated regularly. This will enable the land supply to be responsive to arising needs and not rigidly be wedded to delivering commitments that are unlikely to be realised.
3.3 What is further emphasised by the analysis in this section is that urban regeneration cannot be delivered quickly and that there are a number of factors beyond the control of the Black Country authorities that may have implications for the delivery of the strategy. This further emphasises the need for a mix of types of sites (brownfield, brownfield compulsory purchase, greenfield and Green Belt) of different forms of development (high density, mid and low density family homes) in a variety of locations, which will maximise the opportunities to deliver a successful Local Plan.
3.4 Finally, in respect of the proposal to maintain 300 hectares of employment land that will become vacant by way of general churn over the Plan period. Whilst the principle is considered acceptable, there should be appropriate evidence to support the assumption.
3.5 Our experience is that there are employment sites that clients are looking to secure a residential allocation on that have not been identified thus far. In light of these changing circumstances, the Black Country authorities should ensure that the policy approach is flexible to allow sites in appropriate locations to be brought forward for housing throughout the Plan period and likewise, sites that have been allocated for housing but have not come forward should be removed from the supply.
4. THE STRATEGIC CHALLENGES & OPPORTUNITIES
4.1 It is welcomed that the Black Country authorities are updating their evidence base. Indeed, the adopted Core Strategy took the development requirements from the adopted Regional Strategy (RS), which has since been revoked and is unquestionably out of date. Since the RS was published there has been a number of population and household projections published showing increasing dwelling requirements in the Black Country, which were largely ignored and, therefore, it should come as no surprise that there is a significant increase in forming households.
4.2 In terms of the list of evidence either prepared or due to be completed, it appears to be sufficiently comprehensive.
4.3 A separate review of the housing evidence based, including the Strategic Housing Market Assessment for the Black Country and South Staffordshire, is contained at Appendix A. The key conclusions arising from the report as summarised as follows:
* In determining the OAN, there are concerns with regard to the SHMA methodology and it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline.
* There is concern that the economic growth scenarios do not use the latest economic forecast data and that the methodology translating the job growth into dwelling growth is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances and also more aspirational job growth targets, such as those arising from the SEP.
* In terms of providing uplifts for market signals, a 25% uplift for South Staffs is appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, it should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack within the housing market and prevent house prices from increasing at an accelerated rate.
4.4 In addition, consideration of the Housing Background Report is also contained in the Housing Evidence Based Review Paper contained at Appendix A. The key findings from reviewing the evidence is set out below:
* Clearly a lot of work is yet to be done to determine what the housing land supply position is in the Black Country. Given that much of the existing evidence is based on the adopted Core Strategy, it is recognised that the SHLAAs across the four authorities will need to be updated, both in terms of revising the methodology and range of sites assessed, to reflect a potentially different approach to locating development.
* It is commendable that the Housing Background Report has examined existing sources of supply in an attempt to provide additional homes from sites within the urban area. There is concern, however, that by changing policies, for example, to increase the minimum density on sites has wider policy implications to take into account than simply increasing the number of homes.
* The Housing Background Report suggests a continued allowance for larger windfall sites. It is suggested that it is inappropriate to include an allowance for this source as there is no certainty that this land will come forward for development.
* Other sources, such as converting employment sites to residential sites, based on the evidence presented and feedback from the development industry, it is known that there are employment sites functioning well as employment sites but are to be converted to residential and other employment sites that are unoccupied and undesirable that are to be retained as employment sites. Clearly, there is a mismatch between employment land need and employment land supply. It is advised that the qualitative assessment of employment informs future land supply recommendations and allocations are revised where necessary.
4.5 As a result of the dwelling requirements generated by the SHMA and the land supply identified from the Housing Background Report, it is concluded that there in insufficient urban land to provide for the development requirements and that a Green Belt Review should be conducted. It is noted that scoping is underway and that the work is to be completed in mid-2018. It is hopeful that the development industry will be involved in defining the methodology of the work to ensure that it is conducted in a robust way.
4.6 Another very important piece of work to be taken into consideration will be the Greater Birmingham and Black Country HMA Strategic Growth Study. It is unclear at this stage what role the Black Country authorities will play in meeting the wider needs of Birmingham and, indeed, whether it can now contribute given that meeting the needs of the indigenous population will be a tall order. Further, there is uncertainty with regard to how far the study will go in identifying locations for growth and how this evidence will be taken forward in emerging Development Plans, particularly given that it is premature to the Green Belt Review for the wider Black Country area. It is our view that there are sites within the Green Belt that will provide sustainable locations for growth and that their removal will not compromise the purposes of the Green Belt and, accordingly it will remain purposeful and functional.
Question 2: Do you think that the key evidence set out in Table 1 is sufficient to support the key stages of the Core Strategy review? Yes/No; If not, what further evidence is required and, if there are any particular issues that should be taken into account in considering development on any particular sites or in any particular areas, please provide details
4.7 It is considered that the evidence contained within Table 1 is comprehensive, however, as suggested above and below, a number of concerns have been highlighted and it is therefore suggested that these are addressed in order to improve the soundness of the next iteration of the Core Strategy Review.
4.8 It is welcomed that an updated qualitative assessment of employment land has been undertaken in order to identify if the sites are fit for purpose, alongside the quantitative employment land study. It has been identified that a number of employment land sites that have been suggested for residential land allocations remain in occupation as functioning employment sites. These sites should be removed from the housing land supply. Conversely, there are vacant employment land sites that have been marketed over a period of time where no market interest has been forthcoming and, therefore, it is recommended that these sites should be considered for housing delivery.
4.9 It is noted that Viability Studies are identified as evidence base documents that are still to be prepared. Whilst not specifically identified, it is recommended that affordable housing viability is a key matter that needs to be addressed as part of this evidence base to ensure the level suggested by the SHMA Part 2 is deliverable. If this is not the case, the delivery of both market and affordable housing could be compromised and prevent the successful delivery of any new strategy.
Question 3: Do you agree that the housing need identified for the Black Country over the period 2014-36 in the SHMA, and the anticipated amount of supply, are appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.10 In terms of the extent of the sub market, which includes the Black Country and South Staffordshire, this is considered to be appropriate. It is recognised and welcomed that the Black Country authorities and South Staffordshire have jointly undertaken a SHMA for the sub area, which facilitates the preparation of an Issues and Options Core Strategy Review. There is concern, however, that the remaining constituent authorities within the wider Greater Birmingham Housing Market Area have not taken part and there is a danger that housing need for the whole HMA may not entirely be comprehensively captured due to the different time periods covered by the separate studies. It is advised that a SHMA, consistent with the guidance in the NPPF and Planning Practice Guidance, is prepared for the entire HMA over the same Plan period (as opposed to a housing needs study), which will properly consider all relevant factors in a consistent and comprehensive manner.
4.11 The OAN arrived at by the SHMA is generally appropriate in identifying the starting point for determining the dwelling requirement, however, it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline. There is concern that the economic growth scenarios contain potentially out of date employment forecasts and the methodology to determine appropriate dwelling requirements is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances. In addition, more aspirational job growth targets, such as those arising from the SEP, may not necessarily be appropriate for the Black Country (as discussed later in these representations).
4.12 In terms of providing an uplift for market signals, a 25% uplift for South Staffs is agreed to be appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, the application of such an uplift in South Staffordshire should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack or headroom within the housing market and prevent house prices from increasing at an accelerated rate, exacerbating issues of affordability.
4.13 Clearly, the evidence contained in the SHMA does not consider the potential to accommodate any of Birmingham City's housing needs and that this could result in increased dwelling requirements. We reserve our position in respect of this matter and await the publication of the HMA wide Strategic Housing Needs Study.
4.14 We shortly await a consultation publication from central Government in relation to providing a standardised methodology for generating dwelling requirements. This is anticipated in Autumn 2017. The Black Country authorities will need to take account of any proposed national policy changes identified through the consultation paper. We reserve our position on this matter, until the full details and implications for the Back Country are known. It is considered that, whilst a standard methodology will be helpful in identifying a baseline dwelling requirement, the consideration of long term trends and economic forecasts cannot be carried out in a mathematical calculation outside a demographic/ economic model. In light of this, the SHMA prepared for the sub-area could remain useful as evidence to inform the review of the Black Country Core Strategy.
4.15 In terms of meeting the dwelling requirements, it is understood that the 'Call for Sites' consultation will inform an updated SHLAA, which will assess sites both within and outside the urban area to determine the maximum number of dwellings that can be realistically delivered within the Black Country over the proposed Plan period. The Housing Background Report that has been published as part of the evidence base for the Issues and Options Core Strategy Review has considered assumptions contained within the SHLAA based on adopted policies and considers changes to the policies to boost the delivery of housing on existing sites. Whilst it is a commendable that the Black Country authorities are exploring all potential options to boost housing on urban land, there are wider implications of doing so and accordingly, caution is expressed in response to a number of the identified approaches proposed.
4.16 As confirmed in paragraph 3.15, it is extremely important that the Black Country authorities 'firm up' the housing supply in order to ensure that there is sufficient provision to meet the dwelling requirements. It is also considered appropriate to provide an additional buffer of housing land supply to provide a contingency when sites are delayed. As explained earlier in the Issues and Options Report, sites providing a total of 3,000 homes have not come forward as anticipated. It is considered that additional supply is required to provide flexibility and minimise any durations within the Plan period where the housing trajectory would otherwise dip.
4.17 In terms of the extent of a buffer for housing land, the Local Plan Expert Group suggested that additional land, equivalent to delivering 20% of the overall dwelling requirement, is added to the supply, which will provide a contingency of land to be used as and when necessary during the Plan period. It is suggested that this additional land will help ensure the dwelling delivery targets and housing needs are met in a timely manner, which will reduce the opportunity for households to become concealed or shared. Given the issues experienced in respect of delivery in the past, it could be argued that an increased buffer of circa 25% could be applied.
4.18 It is also appropriate to ensure that, as well as identifying the right amount of land, there is sufficient variety in the types of sites (brownfield, greenfield, Green Belt) are identified, reflecting different sizes, in a range of locations. This variety in provision will allow the best opportunity for multiple sites to come forward at the same time without market constraint and hence ensuring delivery targets are met. In addition, this approach will also provide market choice to existing and arising households looking to move into a new home in the Black Country, which will have wider social benefits (i.e. allow families to live nearby one another and provide an opportunity to diversify existing communities through providing alternative homes to the existing housing stock).
4.19 Indeed, as previously documented in the adopted Core Strategy, it is considered that the ambition to retain the young and professional population within the Black Country should be maintained and that suitable and attractive housing and complementary environments are encouraged.
4.20 Finally, it is welcomed that the Black Country authorities have agreed to test the dwelling requirement figures on an ongoing basis. It is hoped that the suggested changes/alternative scenarios suggested above are implemented in order to ensure the evidence base is robust and the resultant policies and proposals soundly based.
Question 4: Do you consider the employment land requirement identified for the Black Country up to 2036 in the EDNA is appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.21 The Core Strategy review intends to utilise the Economic Development Needs Assessment (EDNA) for the Black Country, published in May 2017, to inform future employment land requirements. The EDNA uses forecasts produced as part of the West Midlands Combined Authority Strategic Economic Plan (SEP) to calculate long-term growth, noting that the 'Super SEP Economy+ Scenario' is the preferred aspirational scenario. This scenario assumes average annual growth in employment of 1.3% across the Combined Authority and presents an ambitious view of future growth in the area, with 500,000 jobs created between 2013 and 2030.
4.22 The SEP Technical Appendix breaks down the job forecasts for the three Local Enterprise Partnerships that form the Combined Authority (Black Country; Coventry & Warwickshire; and Greater Birmingham & Solihull). Jobs growth in the Black Country LEP is forecast to be around 1.1% per annum, whilst it is forecast at 1.5% per annum in the other two LEP areas. This averages out at annual growth of approximately 1.3%. Using data from the Business Register & Employment Survey, published by the Office for National Statistics, it is possible to look at employment trends over the last five to six years (2009-15) and this analysis suggests that the growth rate used in the aspirational growth scenario may be too ambitious for the Back Country:
4.23 Between 2009 and 2015, total employment in the Black Country LEP increased from around 450,000 to approximately 453,000. This equates to average annual growth of 0.1%. Walsall (1.5% p.a.) and Sandwell (0.9% p.a.) experienced jobs growth, although Dudley (-1.1% p.a.) and Wolverhampton (-0.8%) both suffered a fall in employment.
4.24 By contrast, both the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs saw total job numbers increase by 1.3% p.a. from 2009-13. A number of districts in these LEPs saw particularly strong growth over the period, notably Solihull and Lichfield in Greater Birmingham & Solihull, where employment grew by at least 3.0% on an annual basis. In short, the 1.3% average across the West Midlands Combined Authority Area is substantially bolstered by Solihull and Lichfield and therefore it is very ambitious to suggest this will occur across the Black Country area.
4.25 That said, growth in the Black Country needs to be faster than in previous years and the new Core Strategy has a vital role to play in supporting this, however the analysis presented above suggests that the growth targets need to be lowered to better reflect the local economic climate. It is considered unlikely that an annual increase of 1.0% or more will happen in the area in the long-term, especially with the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs capturing new job opportunities at a faster rate in recent years. Lowering the employment growth rate means the amount of employment floorspace needed would be lower. This would not reduce the demographically based housing targets for the area but it would potentially free up previously allocated employment sites for other uses such as residential. This would help the Black Country meet its future housing targets and ensure that it has enough homes for its future workforce to live in.
4.26 As identified in the supporting report and above, it is known that employment sites that had previously been identified for housing are still operational with businesses continuing to use the land and, conversely, there are sites allocated for employment that have been vacant and subsequently market, however, remain unoccupied, which could be transferred to a residential use. It is therefore recommended that the Councils ensure that updated EDNA qualitative review conclusions are taken into account and correct uses applied where appropriate.
Question 5: Do you agree with the proposed approach to the Black Country Green Belt Review? Yes/No; If not, what additional work do you think is necessary?
4.27 In respect of the Green Belt Review, on the basis of the evidence published setting out housing need and supply, it is agreed that it will be necessary to find sites outside of the existing urban area, which will require removing land from the Green Belt where it is appropriate to do so. This will provide an opportunity to identify strategic sites that can provide a significant amount of homes to contribute to meeting identified housing needs. It is considered that there are a number of locations whereby housing sites can be identified, without the purposes of the Green Belt being compromised, ensuring the function and integrity of the Green Belt will remain.
4.28 In addition, areas on the urban fringe have the potential to ensure new homes can be delivered in an established, well landscaped environment, which could be attractive to those young families and professionals that the Black Country authorities have had difficulty in retaining, often through out-migration to neighbouring Shire districts considered to represent more aspirational locations.
4.29 In terms of the process and methodology for undertaking a Green Belt Review, it is understood that the awaited Strategic Housing Needs Study (SHNS) will be accompanied by Strategic Green Belt Review across Greater Birmingham and that the Black Country authorities have been engaged in presenting potential opportunities. It is reassuring that this engagement between consultants and local planning authorities is taking place as there is a danger that logical locations fail to be identified due to a lack of understanding of environmental conditions and/ or local circumstances that are applicable to sites.
4.30 It is agreed and makes sense for the local planning authorities to conduct a Stage 2 Green Belt Assessment following the completion of the higher-level work. Any input on reviewing the draft methodology for the Stage 3 Green Belt Review would be welcomed.
Question 6: Do you agree that the key issues set out in Part 3 are the key issues that need to be taken into account through the Core Strategy Review? Yes/No; If not, what other key issues should be taken into account?
4.31 The key issues presented are considered to be relevant, however, there are a number of inconsistencies relating to matters identified above against the previous questions raised.
5. REVIEWING THE STRATEGY TO MEET NEW CHALLENGES & OPPORTUNITIES
Question 7: Do you think that the Core Strategy vision and sustainability principles remain appropriate? Yes/No; If not, what alternatives would you suggest?
5.1 In the main, the Core Strategy Vision and sustainability principles are considered to be appropriate, with exception to the principle of 'brownfield first'. It is understood that the NPPF, whilst it encourages an efficient use of land and for brown field land to be recycled, it does not suggest a sequential approach to development. There is no evidence to demonstrate that the development of greenfield land will compromise the development of brownfield land. Often the type of developers of the different land categories are different and, given the scale of the housing need, it is appropriate that the early delivery of housing is encouraged from all types of sites. In particular, the larger, potentially Green Belt, sites will have a longer lead in time due to the time it takes to plan for, determine and implement a comprehensive scheme. Indeed, a recent study entitled 'Start to Finish', prepared by NLP, supports this claim. When planning the housing trajectory for the Core Strategy, the larger sites should be planned in to come forward as soon as practically possible.
5.2 It is therefore suggested that the reference to 'putting brownfield first' is inappropriate and that it should be replaced by 'ensuring an efficient use of land to meet the identified housing needs', which encourages the recycling of land and recognises the contributions of greenfield/ Green Belt land to meeting housing delivery targets.
Question 8: Do you think that the Core Strategy spatial objectives remain appropriate? Yes/No; If not, what alternatives would you suggest and how might these changes impact on individual Core Strategy policies?
5.3 Whilst the objectives outlined generally remain sound, there is concern that one of the NPPFs main priorities is absent. This is in relation to significantly boosting the supply of housing. It is suggested that an additional objective is added in order to ensure that meeting housing needs remains a priority within the Black Country. Once a preferred option is arrived at, spatial references as to where the housing growth will be delivered could be included (for example, meeting housing needs on urban (brownfield and greenfield) land and at extensions to the urban area).
5.4 Further, given the increased employment land requirements, the second objective relating to employment land being within the best locations within the Regeneration Corridors may no longer be appropriate. Indeed, as highlighted earlier, there is concern that there is a mismatch in land allocations, and it is appropriate for the Core Strategy review to ensure all employment sites are fit for purpose. This may conclude that employment opportunities should be identified on new land outside of the Regeneration Corridors. Should this be the case, the objective would be inappropriately worded.
Question 9: Do you agree that Policies CSP1 and CSP2 should be retained and updated to reflect new evidence and growth proposals outside the Growth Network? Yes/No; If not, what changes do you think should be made to Policies CSP1 and CSP2 in response to new challenges and opportunities?
5.5 It is agreed that the policies could remain, if the development requirements and related changes are made to ensure the policies are consistent with the overall strategy. The changes relate to both the quantum of development (homes, employment and retail space), the location of development (within and beyond the existing Regeneration Corridors) and the type of development (brownfield, greenfield and on land removed from the Green Belt). It is considered that references should be made to urban extensions (on land removed from the Green Belt) in Policy CSP2 specifically, to highlight the important contribution that such sites will make to meeting the development requirements of the Plan.
Question 10: In continuing to promote growth within the Growth Network, is there a need to amend the boundaries of any of the Regeneration Corridors in the existing Core Strategy? Yes/No; If so, which boundaries and why?
5.6 No comment.
Question 11a: Do you support Strategic Option 1A? Yes/No; If yes, please explain why. If no, do you support Option 1B? Yes/No; If yes, please explain why. If you support the release of further employment land for housing, what should the characteristics of these employment areas be?
5.7 Option 1A is considered to be appropriate for accommodating the growth needs of the Black Country over the Plan period to 2036. This option would significantly boost the supply of housing land and help to meet the significant current and future identified need.
Question 11b: Are there any current employment areas that might be considered suitable for redevelopment to housing? Yes/No; Please submit specific sites through the 'call for sites' form.
5.8 As highlighted previously, the key to understanding where the most appropriate employment/ housing locations are within the Growth Network and Corridors will be determined through a qualitative assessment of allocated employment sites. It is understood an updated assessment has been undertaken and such work, complete with responses to the Call for Sites consultation, will provide the Black Country authorities with evidence to determine the urban capacity for housing, which may include transferring some employment land to housing as well as housing land to employment. This work will then outline the number of dwellings to be accommodated beyond the existing Growth Network within the Green Belt.
5.9 It is welcomed that the Issues and Options Draft recognises the need to release Green Belt in all scenarios proposed.
Question 12a: Do you support Spatial Option H1? Yes/No; What criteria should be used to select suitable sites? e.g. ability to create a defensible new green belt boundary, size, access to existing residential services.
5.10 No comment.
Question 12b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details (please submit specific sites through the 'call for sites' form).
5.11 No comment.
Question 13a: Do you support Spatial Option H2? Yes/No; What should the characteristics of Sustainable Urban Areas (SUEs) be? e.g. minimum/ maximum size, mix of uses, mix of housing types, accessibility to other areas. What criteria should be used to select suitable sites? e.g. proximity to a rail station, availability of existing infrastructure, easy access to jobs, potential to support existing settlements / services, proximity to the existing growth network, potential to support urban regeneration.
5.12 Given the scale of the housing need, there is concern that the development requirements could not be met with just one of the suggested options presented and, therefore, a combination of both options will be necessary.
5.13 To be in the best possible position to significantly boost the amount of housing and meet the development requirements in the Black Country, in accordance with the NPPF, it is advised that opportunities to both round off edges of the Green Belt and Sustainable Urban Extensions are proposed in the Preferred Options Draft Core Strategy. As highlighted within the Issues and Options Draft, there are challenges and opportunities that come with both types of development, for example from a delivery perspective, smaller sites will come forward more quickly due to the nature of these being straight forward proposals (with limited infrastructure necessary and one or few land owners) and larger sites will ultimately take longer as they are more complex (with multiple land uses, infrastructure and land owners). This fact has been evidenced by Nathaniel Lichfield and Partners (now known as Lichfields) within their report 'Start to Finish' who concluded that the average planning approval period of schemes of 2,000+ dwellings is 6.1 years and the annual average build out rate is 161 dwellings per annum. These figures demonstrate the need to have a number of sites of different sizes and in different locations removed from the Green Belt. The report also identifies, with regard to housing delivery, that 50% more homes per annum are delivered on average on large greenfield sites than large brownfield sites. This is a significant benefit of including greenfield sites within the Preferred Option and will assist to secure its delivery.
5.14 In terms of the locations for removing land from the Green Belt, this should be informed by the Strategic Growth Study and a Black Country Review of the Green Belt. The more detailed study will provide an assessment of land parcels against the purposes of the Green Belt and is likely to recommend that those that compromise the purposes the least will be shortlisted for further consideration to be removed from the Green Belt. It is advised that the next stage should be a consideration of the shortlisted sites based on their suitability (i.e. are the neighbouring uses compatible, would any previous land uses prevent the development of the site), sustainability (i.e. proximity to/ ability to provide local services/ public transport/ employment opportunities) and deliverability (i.e. whether the site is available, being promoted for development, has no barriers to coming forward etc.) credentials. Clearly each site will fair differently against such criteria and the Call for Sites submission will assist the Council to come to a decision on the preferred sites. It is advised that the Black Country authorities should be mindful of the opportunities, through infrastructure and design, that development can bring that will enhance the diversity and character of a particular location.
5.15 In terms of the characteristics of a Sustainable Urban Extension, this is likely to vary depending on the location of each site. For example, some may be more urban and others suburban in their character and would, therefore, provide a different land use offer. It is important that each are considered on a site by site basis to ensure that any subsequent allocation delivers a successful development. It is important that the developer responsible for promoting the site helps to influence what is ultimately delivered. Often what is proposed on site has been informed by housing market intelligence undertaken by sales experts at development companies and, therefore, should be taken into account. Particularly given recent experience in the down turn in the apartment market, it is important that sites are allocated for the right type and mix of housing to ensure that it will be delivered, occupied and successful.
5.16 In the more suburban locations, it is suggested that Sustainable Urban Extensions should look to provide a different offer to potentially what exists in the Strategic Centres and Regeneration Corridors, such as a mix of larger and lower density homes, which will attract those households that in the past have migrated elsewhere. Given the emphasis on delivering more high density homes in the Strategic Centres, it is important that this housing mix is offset by more larger homes in appropriate locations. Otherwise, there is a concern that the Black Country will have a disproportional amount of small homes, which will further encourage more families to migrate elsewhere and not meet the aspiration to diversify the wider HMA.
Question 13b: What infrastructure do you think would be needed for different sizes of SUEs?
5.17 The type of infrastructure needed will vary depending on the different location and size of each site and must be compliant with paragraph 122 of the CIL Regulations that requires planning obligations (which applies to most infrastructure) to be necessary to make the development acceptable in planning terms; directly related to the development; and fairly and reasonably related in scale and kind to the development. With the above in mind, however, provision for open space (both formal and informal), local centre and potentially a primary school should be considered for sites in excess of 1,000 homes.
Question 13c: Are there any potential locations that should be considered for SUEs (please submit through the 'call for sites' form) and what infrastructure would be required to support these?
5.18 No comment.
Question 13d: Do you think that the Core Strategy should set out detailed guidance for the development of SUEs (e.g. type and tenure of housing, specific infrastructure required), rather than details being determined at a local level in light of local policies? Yes/No; Any further comments?
5.19 For the reasons outlined above, relating to considering existing local circumstances and CIL Regulation requirements in respect of any charging schedule and planning obligation requirements, it is advised that detailed guidance for the development of SUEs should not be specified within the Black Country Core Strategy as each site will vary and deserves a more detailed consideration, alongside the developer, at the local level.
Question 14: Do you think there are any other deliverable and sustainable Housing Spatial Options? Yes/No; If yes, please provide details
5.20 There are no other sustainable and deliverable options that we are aware of within the Black Country administrative boundary that are capable of delivering the housing spatial options.
Question 15a: If all housing need cannot be met within the Black Country, do you support the 'export' of housing growth to neighbouring authorities within the HMA? Yes/No; What factors should be taken into account in an assessment of the opportunities in neighbouring authorities e.g. proximity to the edge of the urban area, proximity to a rail station, availability of existing infrastructure, easy access to jobs?
5.21 Even if all realistically deliverable options have been considered within the Black Country, there will remain an unmet need for housing. Therefore, it is necessary for the Black Country authorities to consider the possibility of exporting growth to neighbouring authorities within the HMA. In particular, there are options to expand existing settlements that are close to the administrative boundary (for example, in South Staffordshire) across authorities and could help deliver the necessary growth in a sustainable and deliverable manner. These opportunities should be explored first prior to exporting further growth to other authorities within the HMA where there is less of a spatial connection.
Question 15b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details.
5.22 No comment.
Question 15c: Do you think there are ways to ensure that exporting housing will meet the needs of people who would otherwise live in the Black Country? (e.g. transport improvements, provision of affordable housing, creation of employment opportunities) Yes/No; If yes, please provide details.
5.23 It is important to consider a number of factors, including migration and travel to work patterns, which have been used to identify the extent of the HMA, to determine where households relocate to when leaving the Black Country in order to understand where and why those moves are taking place. Whilst planning can attempt to influence where people relocate to, there is no mechanism to guide or restrict people moving to or from certain locations. Once knowledge of movers can be understood can the planning system can attempt to recreate those attractive characteristics (homes that are more affordable, good public transport links, employment opportunities etc.) in locations where there is capacity for the homes to be delivered. It is advised that an additional analysis of the data, where necessary, is undertaken to provide the Black Country authorities with the relevant intelligence to deliver a successful strategy for growth outside the administrative area.
Question 16: Do you support Spatial Option E1? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access) If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.24 No comment.
Question 17: Do you support Spatial Option E2? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites e.g. quick motorway access, good sustainable transport links? If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.25 No comment.
Question 18: Do you support Spatial Option E3? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access) If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.26 No comment.
Question 19a: Do you support Spatial Option E4? Yes/No; Any further comments?
5.27 No comment.
Question 19b: Should any factors be taken into account in an assessment of the opportunities? Yes/No; If yes, what should they be? (e.g. quick motorway access, strong transport links with the Black Country, good sustainable transport links with the Black Country) If you think there are any potential locations that should be considered, please provide details.
5.28 No comment.
Question 20: Do you think there are any other deliverable and sustainable Employment Land Spatial Options? Yes/No; If yes, please provide details.
5.29 As previously outlined, there is concern that some of the employment sites currently identified are potentially not fit for purpose and others that are identified to be transferred to housing remain in employment occupation. In light of this mismatch, it is welcomed that an updated qualitative assessment has been undertaken and has informed how much employment land is has be found outside the urban area.
5.30 In terms of where the employment land should be located outside the urban area, as with housing, decisions should be based on the results of the Green Belt Review and the suitability, sustainability and deliverability of sites. For employment land sites, the suitability of a site may well include good transportation links for goods and people. The Call for Sites consultation will assist in putting forward suggestions for sites.
6. DELIVERING GROWTH - INFRASTRUCTURE & VIABILITY
Question 21: Do you think that changes are required to Policy DEL1 to ensure it covers both development within the existing urban area and any within the Green Belt? Yes/No; If yes, please provide details.
6.1 Policy DEL1 is considered to be sound on the basis that it is sufficiently flexible to deal with different circumstances on different sites across the Black Country, including sites that are to be removed from the Green Belt.
Question 22: Do you have evidence of a requirement for new social infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.2 No comment.
Question 23: Do you have evidence of social infrastructure that is no longer needed and where the site could be reallocated for alternative uses? Yes/No; If yes, please provide details.
6.3 No comment.
Question 24: Do you have evidence of pressure being placed on the capacity of current social infrastructure which could be exacerbated by new housing? Yes/No; If yes, please provide details.
6.4 No comment.
Question 25: Will there be any new social infrastructure requirements necessary to serve large new housing developments? Yes/No; If yes, please explain the type and scale of any new social infrastructure required.
6.5 It is recognised that delivery of new housing developments may give rise to the need to deliver supporting infrastructure. Committed to working with the relevant authorities and service providers to determine the capacity of existing infrastructure and determine the level of mitigatory provision necessary to support an increase in the population in this location. It is however important that each potential large new housing development is given independent consideration in respect of any infrastructure obligations, recognising that pressures will be dependent on location and existing infrastructure capacity.
Question 26: Do you have any evidence of a requirement for new physical infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.6 No comment.
Question 27: Do you have evidence of pressure being placed on the capacity of current physical infrastructure which could be exacerbated by new developments? Yes/No; If yes, please provide details.
6.7 No comment.
Question 28: Do you think physical infrastructure is necessary to serve large new housing developments? Yes/No; If yes, what type and scale of physical infrastructure is necessary?
6.8 As set out above, the need for infrastructure will vary for each site. Given such different circumstances, it would be inappropriate and potentially unlawful (as it would conflict with paragraph 122 of the CIL Regulations) to incorporate a blanket policy requiring specific infrastructure on every large housing site.
Question 29: Do you think there are any other tools or interventions that could be used to ensure enough infrastructure is provided by developments? Yes/No; If yes, please provide details.
6.9 It is considered that the existing national framework (which includes the NPPF and CIL Regulations) provides a sufficient tool to ensure the relevant infrastructure is delivered. In addition, the CIL Charging Schedule allows authorities to raise funds for named infrastructure projects, which should be updated in line with any Core Strategy advanced. Therefore, it is considered that there are existing provisions to deliver infrastructure and no additional interventions through the Black Country Core Strategy Review are needed.
Question 30: Do you have any suggestions around how the strategy can be developed in order to maintain the urban regeneration focus of the Black Country while at the same time bringing forward sites in the green belt? Yes/No; If yes, please provide details.
6.10 There is no a need for any specific interventions, such as phasing, to protect the delivery of urban regeneration in the Black Country. Indeed, it is considered that development of greenfield and Green Belt sites can very much compliment urban regeneration through the provision of a more varied form of development that will help diversify the housing stock and profile of residents in the wider area, which will assist to sustain and improve the vitality of existing communities. Further, as highlighted above, given the priority to significantly boost the delivery of housing greenfield and Green Belt sites should come forward for development as soon as practically possible. Given lead in and build out rates of larger sites, the land should be encouraged to be developed as soon as possible so to ensure the homes are delivered in the Plan period and the needs are met.
Question 31: Do you think that the right scale and form of funding is available to support the delivery of the Core Strategy review? Yes/No; If no, what alternative sources of funding or delivery mechanisms should be investigated?
6.11 When delivering greenfield/ Green Belt sites, there is an opportunity to deliver infrastructure to meet the needs arising from the proposal, which may have wider benefits for the local community. In addition, it is likely that the communities created by the Sustainable Urban Extensions will potentially be more affluent and share their wealth using local shops and services within the wider Black Country, which will contribute to more successful and prosperous communities.
7. REVIEW OF EXISTING CORE STRATEGY POLICIES & PROPOSALS Housing
Question 35: Do you support the proposed approach to housing land supply? Yes/No; If no, please explain why
7.1 As identified above, it is important that a range of sites in different locations are identified to be in the best possible position of delivering the development requirements. In terms of presenting these sites in the Core Strategy, whilst it is useful to identify a housing trajectory, it is important that there is not a phasing policy as such that would prevent the delivery of housing, given the current housing crisis. As stated above, the delivery of housing on greenfield and Green Belt land will not compromise the delivery of urban regeneration as the development on the urban edge will complement and rejuvenate the environment in a different way.
7.2 In terms of the proposed level of discounting, it is considered that if the LPA adopt an approach to identify a further 20% of sites in accordance with the LPEG recommendations identified above, there would not necessarily be a need for the application of discounting in determining the overall level of supply. It is interesting to note that the level of discounting proposed by LPEG is suggested for all LPAs, not necessarily those which have experienced difficulty in delivery. It could therefore be argued that an increased buffer of 25% could be applied in order to take a cautious approach.
Question 36: Do you think that the current accessibility and density standards set out in Policy HOU2 and Table 8 should be changed? Yes/No; If yes, what standards should be applied instead, for example should the minimum net density of 35 dwellings per hectare be increased to maximise brownfield housing delivery?
7.3 It is clear that the current accessibility and density standards outlined in the adopted Core Strategy were formulated in the context of the vast majority of development taking place on brownfield sites within the defined urban area. As reiterated throughout these representations, there is now a clear need for Green Belt release as part of the Local Plan Review to meet emerging, objectively assessed housing needs. We outline in further detail below why the adopted accessibility and densities would not be applicable to Green Belt sites, however would suggest that the current standards do not allow sufficient flexibility on brownfield sites. A blanket application of prescriptive accessibility and density standards across the Black Country, be it brownfield or greenfield, does not allow sufficient flexibility which take into account site specific characteristics. The Council should allow for greater flexibility when assessing accessibility and density standards, with a more pragmatic approach which allows appropriate assessment for site-specific characteristics and also an assessment of market demand which may vary significantly across the large Black Country area.
7.4 Paragraph 47 of the NPPF outlines how local authorities should set out their own approach towards density. It is suggested that the currently adopted approach does not allow for sufficient assessment of local characteristics. It is clear that the chosen approach must be reflective of local circumstances, including the matters outlined above as well as infrastructure and services available in the locality. It is advocated that a more flexible approach to density and accessibility standards is taken as part of the emerging Local Plan Review.
Question 37a: Do you think that the existing Policy HOU2 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why
7.5 In line with the comments above, it is suggested that the Council should assess each site on a case by case basis in terms of accessibility and density standards. This approach would suggest that the numerical baseline trigger of 15 homes or more will not always be appropriate or applicable, and as advocated throughout these representations it suggested that there should be a complete reassessment on accessibility and density standards as part of the emerging Local Plan Review.
Question 38: Do you think that the current accessibility and density standards are appropriate for green belt release locations? Yes/No; If no, what standards should be applied in these locations and why?
7.6 No, it is not considered that the current standards would be applicable to Green Belt release locations. The adopted standards are overly prescriptive, and as previously discussed were written in the context of brownfield land. Green Belt release sites have a completely different type of character, therefore consideration of accessibility and density standards in relation to these sites should be reflective of local character and site characteristics. The more suburban settings of Green Belt release land lends itself to lower densities which are more appropriate to the Green Belt setting, which typically deliver more family homes. The Council must provide robust evidence to test any forthcoming accessibility and density standards in relation to Green Belt release locations, which allows for a flexible and pragmatic approach.
Question 39: Do you think separate accessibility standards are needed for particular types of housing e.g. housing for the elderly or affordable housing (as occupiers may be less mobile and more dependent on public transport)? Yes/No; If yes, please provide details.
7.7 It is clear that separate accessibility standards will apply to particular types of housing such as affordable and for the elderly population, however in line with the sentiment expressed above, any forthcoming standards should be based on robust evidence and allow for sufficient flexibility to avoid any unnecessary constraints to development coming forward.
Question 40: Do you agree that the 2017 SHMA findings should be used to set general house type targets for the Plan period? Yes/No; If no, please explain why.
7.8 A general and blanket application for house types across the Black Country should not be advanced as part of the Local Plan Review. Paragraph 50 is clear that local planning authorities should plan for a mix of housing based on current and future demographic trends and market trends. It is therefore notable that the NPPF specifically highlights 'market trends' in this context, which acknowledges that the market must inform such decisions.
7.9 Whilst the 2017 SHMA does provide an assessment of demographic and market trends, it is notable that it looks at a wider area assessment and is focused at a higher level. This assessment therefore does not draw out sub-market trends, and cover smaller areas within the vast Black Country area. Again, a blanket policy of house type targets across the Black Country area would not allow for sufficient flexibility to assess each site on a site by site basis, taking into consideration local market trends and demand. The NPPF does not state that specific policies should be set to enforce that local demand is met. As such, it is considered that this should be left for the market to decide, as opposed to applying rigid and prescriptive house size standards.
7.10 It is suggested that the evidence presented in the SHMA should be put into the Plan as an informative and general guide, but should not feed into a specific policy requirement which outlines housing mix percentages that should be applied across the Black Country. A policy containing general house type targets could present as a significant constraint to the delivery of a site where there is no local market demand for this house type, which in turn would have a negative impact on achieving the necessary housing growth targets to be delivered in the Black Country over the Plan period.
Question 41a: Do you support the introduction of a policy approach towards self and custom build housing in the Core Strategy? Yes/No; If yes, would you support:
7.11 It is not considered that there is a policy need for the Core Strategy to address self and custom build housing in the emerging Review. Paragraph 6.32 indicates that there are only nine records on self and custom build registers in the Black Country. It is evident that that there is very limited demand in the Black Country, which is unsurprising given that self and custom build housing is often more popular in rural areas. Given the limited demand it is therefore not considered necessary to take a policy approach towards self and custom build housing within the Local Plan Review.
Question 41b: A target for each authority? Yes/No; Any further comments
7.12 Given that there is evidence of little market demand, it is not considered necessary for the Core Strategy to set targets for each of the Black Country authorities. If it was considered to be necessary as the Local Plan Review progresses, any targets being set should be formulated on the basis of robust evidence such as monitoring of the registers, to provide an indication of how many self-build homes will be needed.
Question 41c: A requirement for large housing sites to provide serviced plots? Yes/No; Any further comments?
7.13 There should not be a requirement for large housing sites to provide serviced plots. This can pose an unnecessary market constraint for large housebuilders when there may be limited or no market demand for self-build plots. Self and custom build plots are often unusual and unique in character, therefore would not be best suited to be located within a large housing development with more uniform house types. If deemed necessary, self and custom build housing should be allocated specific site allocations, as discussed below.
Question 41d: Another approach altogether? Yes/No; If yes, please specify.
7.14 If it is considered necessary for the Review to address self and custom build housing, this should be addressed by the Council's identifying and allocating specific plots for these uses. Identifying site-specific plots would ensure that the most appropriate and suitable locations for self and custom-build will be allocated, via the assessment of appropriate evidence and market demand. In addition, this might be more likely to be achieved on surplus publicly owned land.
Question 42: Do you agree that the annual affordable homes target should be increased to reflect the 2017 Black Country Strategic Housing Market Assessment? Yes/No; If no, please explain why.
7.15 As a general principle, the notion of applying different affordable housing ratios to different parts of the Black Country, based on an understanding of needs and viability, is acceptable. Given that the Black Country represents a vast area, there will not be a uniform housing market, and there will be sub-market trends within this wider area. As such, a more flexible approach which assesses local housing market evidence on a case by case basis could be justified. That said, there is an inherent simplicity and attraction to a single rate figure, which is easy for the development industry to understand.
7.16 In terms of the annual affordable housing target, it is unclear how the Issues and Options document has calculated the figure of 832 homes per year. At paragraph 7.42 of the June 2017 SHMA Part Two- affordable housing document, it is stated that the total annual affordable housing need is 677 dwellings, which represents 19.8% of the annual projected household growth. This differs to paragraph 6.36 of the Issues and Options document, which states that the affordable housing target is 23.4% of total housing need or 832 homes per year. From paragraph 7.47 of the SHMA, it appears that this figure may have been calculated by adding the overall requirement of 16.6% of housing to be affordable rented and 6.7% shared ownership. Clarity is sought on how this figure has been calculated, and we reserve the right to comment further on this matter.
Question 43a: Do you think that the existing Policy HOU3 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why.
7.17 We have not undertaken detailed analysis of the findings and assumptions of the SHMA and affordable housing delivery matters, therefore would like to reserve the right to comment on this matter further. However, on face value, it appears to be a reasonable threshold and is not dissimilar to other locations.
Question 44a: Do you think that the affordable housing requirement for eligible sites in Question 43 should be kept at 25% of the total number of homes on the site? Yes /No; Any further comments?
7.18 Based on the current evidence, a blanket rate of 25% affordable housing would appear to be sound.
7.19 However, irrespective of the final rate, any amendments to the currently adopted affordable housing policy must continue to have a clause in it which stipulates that this requirement is subject to viability tests. Any revised affordable housing requirements will also need to carefully consider the implications of adopted Community Infrastructure Levy (CIL) regimes. Both Sandwell and Dudley Councils have adopted CIL Charging Schedules. These will have implications on viability, therefore if revised affordable housing targets are to progressed then these CIL tariffs will need to re-assessed and re-visited.
Question 44b: If no, should the percentage be increased to allow for the provision of affordable home ownership? Yes/No; If yes, what should the percentage be and why?
7.20 At paragraph 6.39 of the Issues and Options Paper, it is stated that options need to be explored to increase affordable housing delivery of private sites. One option would be to increase the overall affordable housing proportion, which would require developers to provide affordable home ownership products plus an appropriate proportion of other affordable tenures. This paragraph follows on from commentary relating to the Housing White Paper.
7.21 The Housing White Paper discusses Starter Homes at Chapter 4, and explains how the government intend to amend the NPPF to introduce a clear policy expectation that housing sites deliver a minimum of 10% affordable home ownership units. It is later stated that it will be for local areas to work with developers to agree an appropriate level of delivery of starter homes, alongside other affordable home ownership and rented tenures.
7.22 The policy position on Starter Homes is not yet fully clear, and has yet to be formally established through a formal amendment and update to the NPPF. Until the national policy position on Starter Homes has been made clear, it would be premature for the Core Strategy Review to suggest an uplift in the affordable housing requirement to include affordable home ownership such as Starter Homes. Any suggestion to uplift the affordable housing requirement to include Starter Homes should be reflective of the national policy position, as well as founded upon a robust evident base which dictates exactly what percentage this element should be of the overall affordable housing requirement.
Question 45: Should an increased affordable housing requirement be set for green belt release sites, to reflect the likely financial viability of these sites? Yes/No; If yes, what should this be.
7.23 The likely financial viability of Green Belt sites will vary across different areas of the Black Country, therefore any affordable housing requirements for Green Belt sites will need to be reflective of these circumstances. Any affordable housing targets for Green Belt sites should be based on robust evidence, and acknowledge that many sites may need to support and deliver other infrastructure requirements.
7.24 Ultimately, any affordable housing strategy will need to address the affordable housing need as well as the need for market housing. Bearing in mind that the SHMA confirms over 70% of homes required are for homes to be sold on the open market, any affordable housing policy must not dilute the delivery of these needs/requirements. A higher figure on Green Belt sites over and above a standard blanket figure would potentially do this.
Employment Question 49a: Is there still a need for existing Policy DEL2 in order to manage the release of poorer quality employment land for housing? Yes/No; If no, please explain why.
7.25 The Black Country is to be the subject of large levels of both employment and housing growth over the Plan period. These uses are very much inter-linked with one another, and will drive each other's need for growth. The Local Plan Review, in order to meet emerging employment and housing needs, must identify a significant number of specific sites for employment and housing uses. By planning proactively and identifying suitable sites for both employment land and housing land, this should reduce the pressures to manage the release of poorer quality employment land, which may not always be suitable for release. The Local Plan Review should also seek to undertake a further review of poorer quality employment land to make it available for other suitable uses, if it proves to no longer be viable for employment land use. This is in line with policy provisions of the NPPF, which at Paragraph 22 outlines that planning policies should avoid the long-term protection of sites allocated for employment use where there is no reasonable prospect of a site being used for that purpose.
Question 50: Do you think that the Core Strategy should continue to set a target for the total employment land stock in Policy EMP1? Yes/No; Please explain why.
7.26 The continuation of setting a target for employment land stock would be supported. Policy EMP1 should make it clear that these are not maximum figures, to encourage further flexibility for additional growth.
Retail Question 59: Have all the appropriate centres within the Black Country been identified? Yes/No; If not, please specify additional centres
7.27 No comment.
Question 61: In addition to para 4.33 of the current Core Strategy should the revised Core Strategy include criteria for the creation of new centres that might be needed as a result of any additional housing identified through the plan? Yes/No; Any further comments?
7.28 Criteria would be a useful policy tool to help assess the designation of new centres, and should be in line with previous methodologies used which set out clear thresholds.
Question 71: Should the Core Strategy set housing targets for the Town Centres?
7.29 Housing within Town Centres should be supported, in line with paragraph 23 of the NPPF which discusses the important role that residential development can play in ensuring the vitality of Town Centres. Any housing targets should be based on what sites are known to be readily available, suitable and viable for residential development. Market demand for housing in these areas will also need to be fully assessed. It is notable from the outcome of the 2017 SHMA that there is most demand for three bedroom properties (40%). The highest demand is therefore for family housing, and not for flats which are often the most popular within Town Centre locations. Any housing targets set for the Town Centre would therefore need to consider the findings of the SHMA, and be reflective of the fact that family housing is often more suitable for delivery on larger sites, including on sites which are currently located within the Green Belt.
Environment Question 99a: Do you think that national standards for housing development on water consumption should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.30 When referring to water consumption paragraph 6.1.52 of the Issues and Options document states that the Black Country does not currently lie in an area of serious water stress, therefore clear need may be difficult to demonstrate. This evidence suggests that there is limited or no need to introduce such a policy, therefore it is not considered that the Core Strategy Review should seek to introduce water consumption standards for housing development.
Question 99b: Do you think that national access standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.31 The introduction of any national access standards, with the Issues and Options document referring specifically to Lifetime Homes, again must be based on a robust evidence base which can demonstrate market demand. It is noted that Paragraph 50 of the NPPF states that planning authorities must plan for a mix of housing to meet a range of needs. In the same paragraph, it is later stated that these must be based on current and future market trends. If Lifetime Home standards are to be introduced these will therefore need to be based on robust evidence, to ensure that the standards are not overly onerous and prevent the delivery of other types of housing which have higher levels of market demand.
Question 99c: Do you think that national space standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.32 As reiterated throughout these representations, it is not considered that a blanket approach of prescriptive standards across the Black Country allows sufficient flexibility to assess local market and site considerations in an appropriate manner. Whilst it is recognised that space standards can be an important tool to ensure that high quality of homes are delivered, we agree with the sentiment expressed in the recent Housing White Paper. The Paper explains that the government are concerned that a one size fits all approach may not reflect the needs and aspirations of a wider range of households. The White Paper also states that the Government will be undertaking a review of the Nationally Described Space Standards. It is suggested that the Core Strategy Review should await the outcome of this national review of national space standards, to ensure compliance with national policy and to ensure that the most appropriate approach to space standards, if required, is taken.
Question 99d: Do you think that the standards should be different for brownfield and greenfield sites? Yes/No; If yes, please explain how and why.
7.33 As discussed above, prescriptive standards do not always allow sufficient flexibility for local market needs, so we would not advocate a blanket approach of different standards to brownfield and greenfield sites.
Open Space, Sport and Recreation Question 102a: Do you support the proposed changes relating to open space, sport and recreation? Yes/No; If no, please explain
7.34 Paragraph 6.1.60 of the Issues and Options paper outlines how adopted Policy ENV6 creates the framework for open space policies at the local level. The Issues and Options paper outlines how this is in line with national guidance, and that it is proposed to retain this policy and update some references in the supporting text to reflect changing circumstances. It is agreed that the local level remains the appropriate place to set open space policies, and that Policy ENV6 should continue to endorse this approach.

Attachments:

Comment

Black Country Core Strategy Issue and Option Report

Question 4 - Do you consider the employment land requirement identified for the Black Country up to 2036 in the EDNA is appropriate and in line with national guidance? Yes/No; If not, please explain w

Representation ID: 2563

Received: 08/09/2017

Respondent: Bloor Homes

Agent: Pegasus Group

Representation Summary:

4.21 The Core Strategy review intends to utilise the Economic Development Needs Assessment (EDNA) for the Black Country, published in May 2017, to inform future employment land requirements. The EDNA uses forecasts produced as part of the West Midlands Combined Authority Strategic Economic Plan (SEP) to calculate long-term growth, noting that the 'Super SEP Economy+ Scenario' is the preferred aspirational scenario. This scenario assumes average annual growth in employment of 1.3% across the Combined Authority and presents an ambitious view of future growth in the area, with 500,000 jobs created between 2013 and 2030.
4.22 The SEP Technical Appendix breaks down the job forecasts for the three Local Enterprise Partnerships that form the Combined Authority (Black Country; Coventry & Warwickshire; and Greater Birmingham & Solihull). Jobs growth in the Black Country LEP is forecast to be around 1.1% per annum, whilst it is forecast at 1.5% per annum in the other two LEP areas. This averages out at annual growth of approximately 1.3%. Using data from the Business Register & Employment Survey, published by the Office for National Statistics, it is possible to look at employment trends over the last five to six years (2009-15) and this analysis suggests that the growth rate used in the aspirational growth scenario may be too ambitious for the Back Country:
4.23 Between 2009 and 2015, total employment in the Black Country LEP increased from around 450,000 to approximately 453,000. This equates to average annual growth of 0.1%. Walsall (1.5% p.a.) and Sandwell (0.9% p.a.) experienced jobs growth, although Dudley (-1.1% p.a.) and Wolverhampton (-0.8%) both suffered a fall in employment.
4.24 By contrast, both the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs saw total job numbers increase by 1.3% p.a. from 2009-13. A number of districts in these LEPs saw particularly strong growth over the period, notably Solihull and Lichfield in Greater Birmingham & Solihull, where employment grew by at least 3.0% on an annual basis. In short, the 1.3% average across the West Midlands Combined Authority Area is substantially bolstered by Solihull and Lichfield and therefore it is very ambitious to suggest this will occur across the Black Country area.
4.25 That said, growth in the Black Country needs to be faster than in previous years and the new Core Strategy has a vital role to play in supporting this, however the analysis presented above suggests that the growth targets need to be lowered to better reflect the local economic climate. It is considered unlikely that an annual increase of 1.0% or more will happen in the area in the long-term, especially with the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs capturing new job opportunities at a faster rate in recent years. Lowering the employment growth rate means the amount of employment floorspace needed would be lower. This would not reduce the demographically based housing targets for the area but it would potentially free up previously allocated employment sites for other uses such as residential. This would help the Black Country meet its future housing targets and ensure that it has enough homes for its future workforce to live in.
4.26 As identified in the supporting report and above, it is known that employment sites that had previously been identified for housing are still operational with businesses continuing to use the land and, conversely, there are sites allocated for employment that have been vacant and subsequently market, however, remain unoccupied, which could be transferred to a residential use. It is therefore recommended that the Councils ensure that updated EDNA qualitative review conclusions are taken into account and correct uses applied where appropriate.

Full text:

Question 1: Do you agree that the Core Strategy review should be a partial review, retaining and stretching the existing spatial strategy and updating existing policies? Yes/No; If not, what do you think should be the scope of the review?
2.4 In response to Question 1 and whether it should be a partial review or not, whilst the existing strategy identifies the most sustainable locations for growth in the context of delivering development requirements identified by the Regional Strategy (RS), there is now a new and much bigger challenge ahead in meeting the arising needs for homes identified by the latest evidence and there is concern that the existing spatial strategy may not facilitate the delivery of these needs. The Black Country authorities, therefore, need to be mindful of this and not attempt to put "a square peg in a round hole".
2.5 It is our view that urban regeneration can be achieved whilst pursuing development on the urban edge. Indeed, the scale of housing need is so large that both must be encouraged in order to meet current and arising housing needs within the Black Country.
2.6 It is extremely important that in reviewing the Core Strategy it fully takes account of and facilitates the delivery of strategic economic plans, as recognised in paragraph 1.15. All too often these strategies are ignored and, accordingly, development plans could effectively frustrate economic growth from being realised.
2.7 In terms of the Plan period proposed in paragraph 1.17, whilst a 15-year time period from adoption is appropriate, there is concern that the preparation of plans is often delayed (due to reasons beyond the control of the LPAs) and it may be prudent to stretch the period further to prevent such an issue from occurring.
2.8 It is welcomed that the Issues and Options document recognises that it will not be possible to accommodate all future development needs within the urban area and that an examination of the potential for development land outside the existing urban area, which is effectively land within the Green Belt, will take place as part of the Core Strategy review process.
3. THE BLACK COUNTRY TODAY - THE EXISTING STRATEGY
3.1 As set out within this section, the delivery of both employment and housing land has not come forward as originally envisaged in part due to the after effects of the recession. Surplus employment land which might have been available for housing has not come forward due to a strengthening economy and local firms being more robust than anticipated. In addition, the range of locations available has not in all cases met with market expectations as to where people want to live.
3.2 In terms of the employment land, it is important that sufficient land is provided for new employment and that there is not an overreliance on land that is currently in use. It is impressive that despite generally poor economic performance local businesses have performed well. Should the economy significantly improve within the Plan period in line with LEP aspirations (considered later in this response), there is concern that it may become difficult to transfer a wide range of existing employment locations to housing allocations. It is appropriate, therefore, for the Council to ensure the evidence contained within the Strategic Housing and Employment Land Availability Assessment is reviewed and updated regularly. This will enable the land supply to be responsive to arising needs and not rigidly be wedded to delivering commitments that are unlikely to be realised.
3.3 What is further emphasised by the analysis in this section is that urban regeneration cannot be delivered quickly and that there are a number of factors beyond the control of the Black Country authorities that may have implications for the delivery of the strategy. This further emphasises the need for a mix of types of sites (brownfield, brownfield compulsory purchase, greenfield and Green Belt) of different forms of development (high density, mid and low density family homes) in a variety of locations, which will maximise the opportunities to deliver a successful Local Plan.
3.4 Finally, in respect of the proposal to maintain 300 hectares of employment land that will become vacant by way of general churn over the Plan period. Whilst the principle is considered acceptable, there should be appropriate evidence to support the assumption.
3.5 Our experience is that there are employment sites that clients are looking to secure a residential allocation on that have not been identified thus far. In light of these changing circumstances, the Black Country authorities should ensure that the policy approach is flexible to allow sites in appropriate locations to be brought forward for housing throughout the Plan period and likewise, sites that have been allocated for housing but have not come forward should be removed from the supply.
4. THE STRATEGIC CHALLENGES & OPPORTUNITIES
4.1 It is welcomed that the Black Country authorities are updating their evidence base. Indeed, the adopted Core Strategy took the development requirements from the adopted Regional Strategy (RS), which has since been revoked and is unquestionably out of date. Since the RS was published there has been a number of population and household projections published showing increasing dwelling requirements in the Black Country, which were largely ignored and, therefore, it should come as no surprise that there is a significant increase in forming households.
4.2 In terms of the list of evidence either prepared or due to be completed, it appears to be sufficiently comprehensive.
4.3 A separate review of the housing evidence based, including the Strategic Housing Market Assessment for the Black Country and South Staffordshire, is contained at Appendix A. The key conclusions arising from the report as summarised as follows:
* In determining the OAN, there are concerns with regard to the SHMA methodology and it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline.
* There is concern that the economic growth scenarios do not use the latest economic forecast data and that the methodology translating the job growth into dwelling growth is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances and also more aspirational job growth targets, such as those arising from the SEP.
* In terms of providing uplifts for market signals, a 25% uplift for South Staffs is appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, it should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack within the housing market and prevent house prices from increasing at an accelerated rate.
4.4 In addition, consideration of the Housing Background Report is also contained in the Housing Evidence Based Review Paper contained at Appendix A. The key findings from reviewing the evidence is set out below:
* Clearly a lot of work is yet to be done to determine what the housing land supply position is in the Black Country. Given that much of the existing evidence is based on the adopted Core Strategy, it is recognised that the SHLAAs across the four authorities will need to be updated, both in terms of revising the methodology and range of sites assessed, to reflect a potentially different approach to locating development.
* It is commendable that the Housing Background Report has examined existing sources of supply in an attempt to provide additional homes from sites within the urban area. There is concern, however, that by changing policies, for example, to increase the minimum density on sites has wider policy implications to take into account than simply increasing the number of homes.
* The Housing Background Report suggests a continued allowance for larger windfall sites. It is suggested that it is inappropriate to include an allowance for this source as there is no certainty that this land will come forward for development.
* Other sources, such as converting employment sites to residential sites, based on the evidence presented and feedback from the development industry, it is known that there are employment sites functioning well as employment sites but are to be converted to residential and other employment sites that are unoccupied and undesirable that are to be retained as employment sites. Clearly, there is a mismatch between employment land need and employment land supply. It is advised that the qualitative assessment of employment informs future land supply recommendations and allocations are revised where necessary.
4.5 As a result of the dwelling requirements generated by the SHMA and the land supply identified from the Housing Background Report, it is concluded that there in insufficient urban land to provide for the development requirements and that a Green Belt Review should be conducted. It is noted that scoping is underway and that the work is to be completed in mid-2018. It is hopeful that the development industry will be involved in defining the methodology of the work to ensure that it is conducted in a robust way.
4.6 Another very important piece of work to be taken into consideration will be the Greater Birmingham and Black Country HMA Strategic Growth Study. It is unclear at this stage what role the Black Country authorities will play in meeting the wider needs of Birmingham and, indeed, whether it can now contribute given that meeting the needs of the indigenous population will be a tall order. Further, there is uncertainty with regard to how far the study will go in identifying locations for growth and how this evidence will be taken forward in emerging Development Plans, particularly given that it is premature to the Green Belt Review for the wider Black Country area. It is our view that there are sites within the Green Belt that will provide sustainable locations for growth and that their removal will not compromise the purposes of the Green Belt and, accordingly it will remain purposeful and functional.
Question 2: Do you think that the key evidence set out in Table 1 is sufficient to support the key stages of the Core Strategy review? Yes/No; If not, what further evidence is required and, if there are any particular issues that should be taken into account in considering development on any particular sites or in any particular areas, please provide details
4.7 It is considered that the evidence contained within Table 1 is comprehensive, however, as suggested above and below, a number of concerns have been highlighted and it is therefore suggested that these are addressed in order to improve the soundness of the next iteration of the Core Strategy Review.
4.8 It is welcomed that an updated qualitative assessment of employment land has been undertaken in order to identify if the sites are fit for purpose, alongside the quantitative employment land study. It has been identified that a number of employment land sites that have been suggested for residential land allocations remain in occupation as functioning employment sites. These sites should be removed from the housing land supply. Conversely, there are vacant employment land sites that have been marketed over a period of time where no market interest has been forthcoming and, therefore, it is recommended that these sites should be considered for housing delivery.
4.9 It is noted that Viability Studies are identified as evidence base documents that are still to be prepared. Whilst not specifically identified, it is recommended that affordable housing viability is a key matter that needs to be addressed as part of this evidence base to ensure the level suggested by the SHMA Part 2 is deliverable. If this is not the case, the delivery of both market and affordable housing could be compromised and prevent the successful delivery of any new strategy.
Question 3: Do you agree that the housing need identified for the Black Country over the period 2014-36 in the SHMA, and the anticipated amount of supply, are appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.10 In terms of the extent of the sub market, which includes the Black Country and South Staffordshire, this is considered to be appropriate. It is recognised and welcomed that the Black Country authorities and South Staffordshire have jointly undertaken a SHMA for the sub area, which facilitates the preparation of an Issues and Options Core Strategy Review. There is concern, however, that the remaining constituent authorities within the wider Greater Birmingham Housing Market Area have not taken part and there is a danger that housing need for the whole HMA may not entirely be comprehensively captured due to the different time periods covered by the separate studies. It is advised that a SHMA, consistent with the guidance in the NPPF and Planning Practice Guidance, is prepared for the entire HMA over the same Plan period (as opposed to a housing needs study), which will properly consider all relevant factors in a consistent and comprehensive manner.
4.11 The OAN arrived at by the SHMA is generally appropriate in identifying the starting point for determining the dwelling requirement, however, it is suggested a further scenario should be tested to consider long term growth which includes balanced periods of economic prosperity and decline. There is concern that the economic growth scenarios contain potentially out of date employment forecasts and the methodology to determine appropriate dwelling requirements is not sufficiently robust to accurately determine the impact of forecasts based on existing circumstances. In addition, more aspirational job growth targets, such as those arising from the SEP, may not necessarily be appropriate for the Black Country (as discussed later in these representations).
4.12 In terms of providing an uplift for market signals, a 25% uplift for South Staffs is agreed to be appropriate. It is advised that dwelling requirements for the Black Country should not be reduced as a result of this and, accordingly, the application of such an uplift in South Staffordshire should not count towards meeting any unmet needs outside of the HMA as the main function is to provide slack or headroom within the housing market and prevent house prices from increasing at an accelerated rate, exacerbating issues of affordability.
4.13 Clearly, the evidence contained in the SHMA does not consider the potential to accommodate any of Birmingham City's housing needs and that this could result in increased dwelling requirements. We reserve our position in respect of this matter and await the publication of the HMA wide Strategic Housing Needs Study.
4.14 We shortly await a consultation publication from central Government in relation to providing a standardised methodology for generating dwelling requirements. This is anticipated in Autumn 2017. The Black Country authorities will need to take account of any proposed national policy changes identified through the consultation paper. We reserve our position on this matter, until the full details and implications for the Back Country are known. It is considered that, whilst a standard methodology will be helpful in identifying a baseline dwelling requirement, the consideration of long term trends and economic forecasts cannot be carried out in a mathematical calculation outside a demographic/ economic model. In light of this, the SHMA prepared for the sub-area could remain useful as evidence to inform the review of the Black Country Core Strategy.
4.15 In terms of meeting the dwelling requirements, it is understood that the 'Call for Sites' consultation will inform an updated SHLAA, which will assess sites both within and outside the urban area to determine the maximum number of dwellings that can be realistically delivered within the Black Country over the proposed Plan period. The Housing Background Report that has been published as part of the evidence base for the Issues and Options Core Strategy Review has considered assumptions contained within the SHLAA based on adopted policies and considers changes to the policies to boost the delivery of housing on existing sites. Whilst it is a commendable that the Black Country authorities are exploring all potential options to boost housing on urban land, there are wider implications of doing so and accordingly, caution is expressed in response to a number of the identified approaches proposed.
4.16 As confirmed in paragraph 3.15, it is extremely important that the Black Country authorities 'firm up' the housing supply in order to ensure that there is sufficient provision to meet the dwelling requirements. It is also considered appropriate to provide an additional buffer of housing land supply to provide a contingency when sites are delayed. As explained earlier in the Issues and Options Report, sites providing a total of 3,000 homes have not come forward as anticipated. It is considered that additional supply is required to provide flexibility and minimise any durations within the Plan period where the housing trajectory would otherwise dip.
4.17 In terms of the extent of a buffer for housing land, the Local Plan Expert Group suggested that additional land, equivalent to delivering 20% of the overall dwelling requirement, is added to the supply, which will provide a contingency of land to be used as and when necessary during the Plan period. It is suggested that this additional land will help ensure the dwelling delivery targets and housing needs are met in a timely manner, which will reduce the opportunity for households to become concealed or shared. Given the issues experienced in respect of delivery in the past, it could be argued that an increased buffer of circa 25% could be applied.
4.18 It is also appropriate to ensure that, as well as identifying the right amount of land, there is sufficient variety in the types of sites (brownfield, greenfield, Green Belt) are identified, reflecting different sizes, in a range of locations. This variety in provision will allow the best opportunity for multiple sites to come forward at the same time without market constraint and hence ensuring delivery targets are met. In addition, this approach will also provide market choice to existing and arising households looking to move into a new home in the Black Country, which will have wider social benefits (i.e. allow families to live nearby one another and provide an opportunity to diversify existing communities through providing alternative homes to the existing housing stock).
4.19 Indeed, as previously documented in the adopted Core Strategy, it is considered that the ambition to retain the young and professional population within the Black Country should be maintained and that suitable and attractive housing and complementary environments are encouraged.
4.20 Finally, it is welcomed that the Black Country authorities have agreed to test the dwelling requirement figures on an ongoing basis. It is hoped that the suggested changes/alternative scenarios suggested above are implemented in order to ensure the evidence base is robust and the resultant policies and proposals soundly based.
Question 4: Do you consider the employment land requirement identified for the Black Country up to 2036 in the EDNA is appropriate and in line with national guidance? Yes/No; If not, please explain why they are not appropriate and in line with national guidance.
4.21 The Core Strategy review intends to utilise the Economic Development Needs Assessment (EDNA) for the Black Country, published in May 2017, to inform future employment land requirements. The EDNA uses forecasts produced as part of the West Midlands Combined Authority Strategic Economic Plan (SEP) to calculate long-term growth, noting that the 'Super SEP Economy+ Scenario' is the preferred aspirational scenario. This scenario assumes average annual growth in employment of 1.3% across the Combined Authority and presents an ambitious view of future growth in the area, with 500,000 jobs created between 2013 and 2030.
4.22 The SEP Technical Appendix breaks down the job forecasts for the three Local Enterprise Partnerships that form the Combined Authority (Black Country; Coventry & Warwickshire; and Greater Birmingham & Solihull). Jobs growth in the Black Country LEP is forecast to be around 1.1% per annum, whilst it is forecast at 1.5% per annum in the other two LEP areas. This averages out at annual growth of approximately 1.3%. Using data from the Business Register & Employment Survey, published by the Office for National Statistics, it is possible to look at employment trends over the last five to six years (2009-15) and this analysis suggests that the growth rate used in the aspirational growth scenario may be too ambitious for the Back Country:
4.23 Between 2009 and 2015, total employment in the Black Country LEP increased from around 450,000 to approximately 453,000. This equates to average annual growth of 0.1%. Walsall (1.5% p.a.) and Sandwell (0.9% p.a.) experienced jobs growth, although Dudley (-1.1% p.a.) and Wolverhampton (-0.8%) both suffered a fall in employment.
4.24 By contrast, both the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs saw total job numbers increase by 1.3% p.a. from 2009-13. A number of districts in these LEPs saw particularly strong growth over the period, notably Solihull and Lichfield in Greater Birmingham & Solihull, where employment grew by at least 3.0% on an annual basis. In short, the 1.3% average across the West Midlands Combined Authority Area is substantially bolstered by Solihull and Lichfield and therefore it is very ambitious to suggest this will occur across the Black Country area.
4.25 That said, growth in the Black Country needs to be faster than in previous years and the new Core Strategy has a vital role to play in supporting this, however the analysis presented above suggests that the growth targets need to be lowered to better reflect the local economic climate. It is considered unlikely that an annual increase of 1.0% or more will happen in the area in the long-term, especially with the Coventry & Warwickshire and Greater Birmingham & Solihull LEPs capturing new job opportunities at a faster rate in recent years. Lowering the employment growth rate means the amount of employment floorspace needed would be lower. This would not reduce the demographically based housing targets for the area but it would potentially free up previously allocated employment sites for other uses such as residential. This would help the Black Country meet its future housing targets and ensure that it has enough homes for its future workforce to live in.
4.26 As identified in the supporting report and above, it is known that employment sites that had previously been identified for housing are still operational with businesses continuing to use the land and, conversely, there are sites allocated for employment that have been vacant and subsequently market, however, remain unoccupied, which could be transferred to a residential use. It is therefore recommended that the Councils ensure that updated EDNA qualitative review conclusions are taken into account and correct uses applied where appropriate.
Question 5: Do you agree with the proposed approach to the Black Country Green Belt Review? Yes/No; If not, what additional work do you think is necessary?
4.27 In respect of the Green Belt Review, on the basis of the evidence published setting out housing need and supply, it is agreed that it will be necessary to find sites outside of the existing urban area, which will require removing land from the Green Belt where it is appropriate to do so. This will provide an opportunity to identify strategic sites that can provide a significant amount of homes to contribute to meeting identified housing needs. It is considered that there are a number of locations whereby housing sites can be identified, without the purposes of the Green Belt being compromised, ensuring the function and integrity of the Green Belt will remain.
4.28 In addition, areas on the urban fringe have the potential to ensure new homes can be delivered in an established, well landscaped environment, which could be attractive to those young families and professionals that the Black Country authorities have had difficulty in retaining, often through out-migration to neighbouring Shire districts considered to represent more aspirational locations.
4.29 In terms of the process and methodology for undertaking a Green Belt Review, it is understood that the awaited Strategic Housing Needs Study (SHNS) will be accompanied by Strategic Green Belt Review across Greater Birmingham and that the Black Country authorities have been engaged in presenting potential opportunities. It is reassuring that this engagement between consultants and local planning authorities is taking place as there is a danger that logical locations fail to be identified due to a lack of understanding of environmental conditions and/ or local circumstances that are applicable to sites.
4.30 It is agreed and makes sense for the local planning authorities to conduct a Stage 2 Green Belt Assessment following the completion of the higher-level work. Any input on reviewing the draft methodology for the Stage 3 Green Belt Review would be welcomed.
Question 6: Do you agree that the key issues set out in Part 3 are the key issues that need to be taken into account through the Core Strategy Review? Yes/No; If not, what other key issues should be taken into account?
4.31 The key issues presented are considered to be relevant, however, there are a number of inconsistencies relating to matters identified above against the previous questions raised.
5. REVIEWING THE STRATEGY TO MEET NEW CHALLENGES & OPPORTUNITIES
Question 7: Do you think that the Core Strategy vision and sustainability principles remain appropriate? Yes/No; If not, what alternatives would you suggest?
5.1 In the main, the Core Strategy Vision and sustainability principles are considered to be appropriate, with exception to the principle of 'brownfield first'. It is understood that the NPPF, whilst it encourages an efficient use of land and for brown field land to be recycled, it does not suggest a sequential approach to development. There is no evidence to demonstrate that the development of greenfield land will compromise the development of brownfield land. Often the type of developers of the different land categories are different and, given the scale of the housing need, it is appropriate that the early delivery of housing is encouraged from all types of sites. In particular, the larger, potentially Green Belt, sites will have a longer lead in time due to the time it takes to plan for, determine and implement a comprehensive scheme. Indeed, a recent study entitled 'Start to Finish', prepared by NLP, supports this claim. When planning the housing trajectory for the Core Strategy, the larger sites should be planned in to come forward as soon as practically possible.
5.2 It is therefore suggested that the reference to 'putting brownfield first' is inappropriate and that it should be replaced by 'ensuring an efficient use of land to meet the identified housing needs', which encourages the recycling of land and recognises the contributions of greenfield/ Green Belt land to meeting housing delivery targets.
Question 8: Do you think that the Core Strategy spatial objectives remain appropriate? Yes/No; If not, what alternatives would you suggest and how might these changes impact on individual Core Strategy policies?
5.3 Whilst the objectives outlined generally remain sound, there is concern that one of the NPPFs main priorities is absent. This is in relation to significantly boosting the supply of housing. It is suggested that an additional objective is added in order to ensure that meeting housing needs remains a priority within the Black Country. Once a preferred option is arrived at, spatial references as to where the housing growth will be delivered could be included (for example, meeting housing needs on urban (brownfield and greenfield) land and at extensions to the urban area).
5.4 Further, given the increased employment land requirements, the second objective relating to employment land being within the best locations within the Regeneration Corridors may no longer be appropriate. Indeed, as highlighted earlier, there is concern that there is a mismatch in land allocations, and it is appropriate for the Core Strategy review to ensure all employment sites are fit for purpose. This may conclude that employment opportunities should be identified on new land outside of the Regeneration Corridors. Should this be the case, the objective would be inappropriately worded.
Question 9: Do you agree that Policies CSP1 and CSP2 should be retained and updated to reflect new evidence and growth proposals outside the Growth Network? Yes/No; If not, what changes do you think should be made to Policies CSP1 and CSP2 in response to new challenges and opportunities?
5.5 It is agreed that the policies could remain, if the development requirements and related changes are made to ensure the policies are consistent with the overall strategy. The changes relate to both the quantum of development (homes, employment and retail space), the location of development (within and beyond the existing Regeneration Corridors) and the type of development (brownfield, greenfield and on land removed from the Green Belt). It is considered that references should be made to urban extensions (on land removed from the Green Belt) in Policy CSP2 specifically, to highlight the important contribution that such sites will make to meeting the development requirements of the Plan.
Question 10: In continuing to promote growth within the Growth Network, is there a need to amend the boundaries of any of the Regeneration Corridors in the existing Core Strategy? Yes/No; If so, which boundaries and why?
5.6 No comment.
Question 11a: Do you support Strategic Option 1A? Yes/No; If yes, please explain why. If no, do you support Option 1B? Yes/No; If yes, please explain why. If you support the release of further employment land for housing, what should the characteristics of these employment areas be?
5.7 Option 1A is considered to be appropriate for accommodating the growth needs of the Black Country over the Plan period to 2036. This option would significantly boost the supply of housing land and help to meet the significant current and future identified need.
Question 11b: Are there any current employment areas that might be considered suitable for redevelopment to housing? Yes/No; Please submit specific sites through the 'call for sites' form.
5.8 As highlighted previously, the key to understanding where the most appropriate employment/ housing locations are within the Growth Network and Corridors will be determined through a qualitative assessment of allocated employment sites. It is understood an updated assessment has been undertaken and such work, complete with responses to the Call for Sites consultation, will provide the Black Country authorities with evidence to determine the urban capacity for housing, which may include transferring some employment land to housing as well as housing land to employment. This work will then outline the number of dwellings to be accommodated beyond the existing Growth Network within the Green Belt.
5.9 It is welcomed that the Issues and Options Draft recognises the need to release Green Belt in all scenarios proposed.
Question 12a: Do you support Spatial Option H1? Yes/No; What criteria should be used to select suitable sites? e.g. ability to create a defensible new green belt boundary, size, access to existing residential services.
5.10 No comment.
Question 12b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details (please submit specific sites through the 'call for sites' form).
5.11 No comment.
Question 13a: Do you support Spatial Option H2? Yes/No; What should the characteristics of Sustainable Urban Areas (SUEs) be? e.g. minimum/ maximum size, mix of uses, mix of housing types, accessibility to other areas. What criteria should be used to select suitable sites? e.g. proximity to a rail station, availability of existing infrastructure, easy access to jobs, potential to support existing settlements / services, proximity to the existing growth network, potential to support urban regeneration.
5.12 Given the scale of the housing need, there is concern that the development requirements could not be met with just one of the suggested options presented and, therefore, a combination of both options will be necessary.
5.13 To be in the best possible position to significantly boost the amount of housing and meet the development requirements in the Black Country, in accordance with the NPPF, it is advised that opportunities to both round off edges of the Green Belt and Sustainable Urban Extensions are proposed in the Preferred Options Draft Core Strategy. As highlighted within the Issues and Options Draft, there are challenges and opportunities that come with both types of development, for example from a delivery perspective, smaller sites will come forward more quickly due to the nature of these being straight forward proposals (with limited infrastructure necessary and one or few land owners) and larger sites will ultimately take longer as they are more complex (with multiple land uses, infrastructure and land owners). This fact has been evidenced by Nathaniel Lichfield and Partners (now known as Lichfields) within their report 'Start to Finish' who concluded that the average planning approval period of schemes of 2,000+ dwellings is 6.1 years and the annual average build out rate is 161 dwellings per annum. These figures demonstrate the need to have a number of sites of different sizes and in different locations removed from the Green Belt. The report also identifies, with regard to housing delivery, that 50% more homes per annum are delivered on average on large greenfield sites than large brownfield sites. This is a significant benefit of including greenfield sites within the Preferred Option and will assist to secure its delivery.
5.14 In terms of the locations for removing land from the Green Belt, this should be informed by the Strategic Growth Study and a Black Country Review of the Green Belt. The more detailed study will provide an assessment of land parcels against the purposes of the Green Belt and is likely to recommend that those that compromise the purposes the least will be shortlisted for further consideration to be removed from the Green Belt. It is advised that the next stage should be a consideration of the shortlisted sites based on their suitability (i.e. are the neighbouring uses compatible, would any previous land uses prevent the development of the site), sustainability (i.e. proximity to/ ability to provide local services/ public transport/ employment opportunities) and deliverability (i.e. whether the site is available, being promoted for development, has no barriers to coming forward etc.) credentials. Clearly each site will fair differently against such criteria and the Call for Sites submission will assist the Council to come to a decision on the preferred sites. It is advised that the Black Country authorities should be mindful of the opportunities, through infrastructure and design, that development can bring that will enhance the diversity and character of a particular location.
5.15 In terms of the characteristics of a Sustainable Urban Extension, this is likely to vary depending on the location of each site. For example, some may be more urban and others suburban in their character and would, therefore, provide a different land use offer. It is important that each are considered on a site by site basis to ensure that any subsequent allocation delivers a successful development. It is important that the developer responsible for promoting the site helps to influence what is ultimately delivered. Often what is proposed on site has been informed by housing market intelligence undertaken by sales experts at development companies and, therefore, should be taken into account. Particularly given recent experience in the down turn in the apartment market, it is important that sites are allocated for the right type and mix of housing to ensure that it will be delivered, occupied and successful.
5.16 In the more suburban locations, it is suggested that Sustainable Urban Extensions should look to provide a different offer to potentially what exists in the Strategic Centres and Regeneration Corridors, such as a mix of larger and lower density homes, which will attract those households that in the past have migrated elsewhere. Given the emphasis on delivering more high density homes in the Strategic Centres, it is important that this housing mix is offset by more larger homes in appropriate locations. Otherwise, there is a concern that the Black Country will have a disproportional amount of small homes, which will further encourage more families to migrate elsewhere and not meet the aspiration to diversify the wider HMA.
Question 13b: What infrastructure do you think would be needed for different sizes of SUEs?
5.17 The type of infrastructure needed will vary depending on the different location and size of each site and must be compliant with paragraph 122 of the CIL Regulations that requires planning obligations (which applies to most infrastructure) to be necessary to make the development acceptable in planning terms; directly related to the development; and fairly and reasonably related in scale and kind to the development. With the above in mind, however, provision for open space (both formal and informal), local centre and potentially a primary school should be considered for sites in excess of 1,000 homes.
Question 13c: Are there any potential locations that should be considered for SUEs (please submit through the 'call for sites' form) and what infrastructure would be required to support these?
5.18 No comment.
Question 13d: Do you think that the Core Strategy should set out detailed guidance for the development of SUEs (e.g. type and tenure of housing, specific infrastructure required), rather than details being determined at a local level in light of local policies? Yes/No; Any further comments?
5.19 For the reasons outlined above, relating to considering existing local circumstances and CIL Regulation requirements in respect of any charging schedule and planning obligation requirements, it is advised that detailed guidance for the development of SUEs should not be specified within the Black Country Core Strategy as each site will vary and deserves a more detailed consideration, alongside the developer, at the local level.
Question 14: Do you think there are any other deliverable and sustainable Housing Spatial Options? Yes/No; If yes, please provide details
5.20 There are no other sustainable and deliverable options that we are aware of within the Black Country administrative boundary that are capable of delivering the housing spatial options.
Question 15a: If all housing need cannot be met within the Black Country, do you support the 'export' of housing growth to neighbouring authorities within the HMA? Yes/No; What factors should be taken into account in an assessment of the opportunities in neighbouring authorities e.g. proximity to the edge of the urban area, proximity to a rail station, availability of existing infrastructure, easy access to jobs?
5.21 Even if all realistically deliverable options have been considered within the Black Country, there will remain an unmet need for housing. Therefore, it is necessary for the Black Country authorities to consider the possibility of exporting growth to neighbouring authorities within the HMA. In particular, there are options to expand existing settlements that are close to the administrative boundary (for example, in South Staffordshire) across authorities and could help deliver the necessary growth in a sustainable and deliverable manner. These opportunities should be explored first prior to exporting further growth to other authorities within the HMA where there is less of a spatial connection.
Question 15b: Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details.
5.22 No comment.
Question 15c: Do you think there are ways to ensure that exporting housing will meet the needs of people who would otherwise live in the Black Country? (e.g. transport improvements, provision of affordable housing, creation of employment opportunities) Yes/No; If yes, please provide details.
5.23 It is important to consider a number of factors, including migration and travel to work patterns, which have been used to identify the extent of the HMA, to determine where households relocate to when leaving the Black Country in order to understand where and why those moves are taking place. Whilst planning can attempt to influence where people relocate to, there is no mechanism to guide or restrict people moving to or from certain locations. Once knowledge of movers can be understood can the planning system can attempt to recreate those attractive characteristics (homes that are more affordable, good public transport links, employment opportunities etc.) in locations where there is capacity for the homes to be delivered. It is advised that an additional analysis of the data, where necessary, is undertaken to provide the Black Country authorities with the relevant intelligence to deliver a successful strategy for growth outside the administrative area.
Question 16: Do you support Spatial Option E1? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access) If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.24 No comment.
Question 17: Do you support Spatial Option E2? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites e.g. quick motorway access, good sustainable transport links? If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.25 No comment.
Question 18: Do you support Spatial Option E3? Yes/No; What type of sites are needed to meet the needs of industry and what criteria should be used to select sites? (e.g. quick motorway access) If you think that are any potential locations that should be considered please provide details (please submit specific sites through the 'call for sites' form).
5.26 No comment.
Question 19a: Do you support Spatial Option E4? Yes/No; Any further comments?
5.27 No comment.
Question 19b: Should any factors be taken into account in an assessment of the opportunities? Yes/No; If yes, what should they be? (e.g. quick motorway access, strong transport links with the Black Country, good sustainable transport links with the Black Country) If you think there are any potential locations that should be considered, please provide details.
5.28 No comment.
Question 20: Do you think there are any other deliverable and sustainable Employment Land Spatial Options? Yes/No; If yes, please provide details.
5.29 As previously outlined, there is concern that some of the employment sites currently identified are potentially not fit for purpose and others that are identified to be transferred to housing remain in employment occupation. In light of this mismatch, it is welcomed that an updated qualitative assessment has been undertaken and has informed how much employment land is has be found outside the urban area.
5.30 In terms of where the employment land should be located outside the urban area, as with housing, decisions should be based on the results of the Green Belt Review and the suitability, sustainability and deliverability of sites. For employment land sites, the suitability of a site may well include good transportation links for goods and people. The Call for Sites consultation will assist in putting forward suggestions for sites.
6. DELIVERING GROWTH - INFRASTRUCTURE & VIABILITY
Question 21: Do you think that changes are required to Policy DEL1 to ensure it covers both development within the existing urban area and any within the Green Belt? Yes/No; If yes, please provide details.
6.1 Policy DEL1 is considered to be sound on the basis that it is sufficiently flexible to deal with different circumstances on different sites across the Black Country, including sites that are to be removed from the Green Belt.
Question 22: Do you have evidence of a requirement for new social infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.2 No comment.
Question 23: Do you have evidence of social infrastructure that is no longer needed and where the site could be reallocated for alternative uses? Yes/No; If yes, please provide details.
6.3 No comment.
Question 24: Do you have evidence of pressure being placed on the capacity of current social infrastructure which could be exacerbated by new housing? Yes/No; If yes, please provide details.
6.4 No comment.
Question 25: Will there be any new social infrastructure requirements necessary to serve large new housing developments? Yes/No; If yes, please explain the type and scale of any new social infrastructure required.
6.5 It is recognised that delivery of new housing developments may give rise to the need to deliver supporting infrastructure. Committed to working with the relevant authorities and service providers to determine the capacity of existing infrastructure and determine the level of mitigatory provision necessary to support an increase in the population in this location. It is however important that each potential large new housing development is given independent consideration in respect of any infrastructure obligations, recognising that pressures will be dependent on location and existing infrastructure capacity.
Question 26: Do you have any evidence of a requirement for new physical infrastructure to serve existing needs? Yes/No; If yes, please provide details of the type of facility and where it should be located.
6.6 No comment.
Question 27: Do you have evidence of pressure being placed on the capacity of current physical infrastructure which could be exacerbated by new developments? Yes/No; If yes, please provide details.
6.7 No comment.
Question 28: Do you think physical infrastructure is necessary to serve large new housing developments? Yes/No; If yes, what type and scale of physical infrastructure is necessary?
6.8 As set out above, the need for infrastructure will vary for each site. Given such different circumstances, it would be inappropriate and potentially unlawful (as it would conflict with paragraph 122 of the CIL Regulations) to incorporate a blanket policy requiring specific infrastructure on every large housing site.
Question 29: Do you think there are any other tools or interventions that could be used to ensure enough infrastructure is provided by developments? Yes/No; If yes, please provide details.
6.9 It is considered that the existing national framework (which includes the NPPF and CIL Regulations) provides a sufficient tool to ensure the relevant infrastructure is delivered. In addition, the CIL Charging Schedule allows authorities to raise funds for named infrastructure projects, which should be updated in line with any Core Strategy advanced. Therefore, it is considered that there are existing provisions to deliver infrastructure and no additional interventions through the Black Country Core Strategy Review are needed.
Question 30: Do you have any suggestions around how the strategy can be developed in order to maintain the urban regeneration focus of the Black Country while at the same time bringing forward sites in the green belt? Yes/No; If yes, please provide details.
6.10 There is no a need for any specific interventions, such as phasing, to protect the delivery of urban regeneration in the Black Country. Indeed, it is considered that development of greenfield and Green Belt sites can very much compliment urban regeneration through the provision of a more varied form of development that will help diversify the housing stock and profile of residents in the wider area, which will assist to sustain and improve the vitality of existing communities. Further, as highlighted above, given the priority to significantly boost the delivery of housing greenfield and Green Belt sites should come forward for development as soon as practically possible. Given lead in and build out rates of larger sites, the land should be encouraged to be developed as soon as possible so to ensure the homes are delivered in the Plan period and the needs are met.
Question 31: Do you think that the right scale and form of funding is available to support the delivery of the Core Strategy review? Yes/No; If no, what alternative sources of funding or delivery mechanisms should be investigated?
6.11 When delivering greenfield/ Green Belt sites, there is an opportunity to deliver infrastructure to meet the needs arising from the proposal, which may have wider benefits for the local community. In addition, it is likely that the communities created by the Sustainable Urban Extensions will potentially be more affluent and share their wealth using local shops and services within the wider Black Country, which will contribute to more successful and prosperous communities.
7. REVIEW OF EXISTING CORE STRATEGY POLICIES & PROPOSALS Housing
Question 35: Do you support the proposed approach to housing land supply? Yes/No; If no, please explain why
7.1 As identified above, it is important that a range of sites in different locations are identified to be in the best possible position of delivering the development requirements. In terms of presenting these sites in the Core Strategy, whilst it is useful to identify a housing trajectory, it is important that there is not a phasing policy as such that would prevent the delivery of housing, given the current housing crisis. As stated above, the delivery of housing on greenfield and Green Belt land will not compromise the delivery of urban regeneration as the development on the urban edge will complement and rejuvenate the environment in a different way.
7.2 In terms of the proposed level of discounting, it is considered that if the LPA adopt an approach to identify a further 20% of sites in accordance with the LPEG recommendations identified above, there would not necessarily be a need for the application of discounting in determining the overall level of supply. It is interesting to note that the level of discounting proposed by LPEG is suggested for all LPAs, not necessarily those which have experienced difficulty in delivery. It could therefore be argued that an increased buffer of 25% could be applied in order to take a cautious approach.
Question 36: Do you think that the current accessibility and density standards set out in Policy HOU2 and Table 8 should be changed? Yes/No; If yes, what standards should be applied instead, for example should the minimum net density of 35 dwellings per hectare be increased to maximise brownfield housing delivery?
7.3 It is clear that the current accessibility and density standards outlined in the adopted Core Strategy were formulated in the context of the vast majority of development taking place on brownfield sites within the defined urban area. As reiterated throughout these representations, there is now a clear need for Green Belt release as part of the Local Plan Review to meet emerging, objectively assessed housing needs. We outline in further detail below why the adopted accessibility and densities would not be applicable to Green Belt sites, however would suggest that the current standards do not allow sufficient flexibility on brownfield sites. A blanket application of prescriptive accessibility and density standards across the Black Country, be it brownfield or greenfield, does not allow sufficient flexibility which take into account site specific characteristics. The Council should allow for greater flexibility when assessing accessibility and density standards, with a more pragmatic approach which allows appropriate assessment for site-specific characteristics and also an assessment of market demand which may vary significantly across the large Black Country area.
7.4 Paragraph 47 of the NPPF outlines how local authorities should set out their own approach towards density. It is suggested that the currently adopted approach does not allow for sufficient assessment of local characteristics. It is clear that the chosen approach must be reflective of local circumstances, including the matters outlined above as well as infrastructure and services available in the locality. It is advocated that a more flexible approach to density and accessibility standards is taken as part of the emerging Local Plan Review.
Question 37a: Do you think that the existing Policy HOU2 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why
7.5 In line with the comments above, it is suggested that the Council should assess each site on a case by case basis in terms of accessibility and density standards. This approach would suggest that the numerical baseline trigger of 15 homes or more will not always be appropriate or applicable, and as advocated throughout these representations it suggested that there should be a complete reassessment on accessibility and density standards as part of the emerging Local Plan Review.
Question 38: Do you think that the current accessibility and density standards are appropriate for green belt release locations? Yes/No; If no, what standards should be applied in these locations and why?
7.6 No, it is not considered that the current standards would be applicable to Green Belt release locations. The adopted standards are overly prescriptive, and as previously discussed were written in the context of brownfield land. Green Belt release sites have a completely different type of character, therefore consideration of accessibility and density standards in relation to these sites should be reflective of local character and site characteristics. The more suburban settings of Green Belt release land lends itself to lower densities which are more appropriate to the Green Belt setting, which typically deliver more family homes. The Council must provide robust evidence to test any forthcoming accessibility and density standards in relation to Green Belt release locations, which allows for a flexible and pragmatic approach.
Question 39: Do you think separate accessibility standards are needed for particular types of housing e.g. housing for the elderly or affordable housing (as occupiers may be less mobile and more dependent on public transport)? Yes/No; If yes, please provide details.
7.7 It is clear that separate accessibility standards will apply to particular types of housing such as affordable and for the elderly population, however in line with the sentiment expressed above, any forthcoming standards should be based on robust evidence and allow for sufficient flexibility to avoid any unnecessary constraints to development coming forward.
Question 40: Do you agree that the 2017 SHMA findings should be used to set general house type targets for the Plan period? Yes/No; If no, please explain why.
7.8 A general and blanket application for house types across the Black Country should not be advanced as part of the Local Plan Review. Paragraph 50 is clear that local planning authorities should plan for a mix of housing based on current and future demographic trends and market trends. It is therefore notable that the NPPF specifically highlights 'market trends' in this context, which acknowledges that the market must inform such decisions.
7.9 Whilst the 2017 SHMA does provide an assessment of demographic and market trends, it is notable that it looks at a wider area assessment and is focused at a higher level. This assessment therefore does not draw out sub-market trends, and cover smaller areas within the vast Black Country area. Again, a blanket policy of house type targets across the Black Country area would not allow for sufficient flexibility to assess each site on a site by site basis, taking into consideration local market trends and demand. The NPPF does not state that specific policies should be set to enforce that local demand is met. As such, it is considered that this should be left for the market to decide, as opposed to applying rigid and prescriptive house size standards.
7.10 It is suggested that the evidence presented in the SHMA should be put into the Plan as an informative and general guide, but should not feed into a specific policy requirement which outlines housing mix percentages that should be applied across the Black Country. A policy containing general house type targets could present as a significant constraint to the delivery of a site where there is no local market demand for this house type, which in turn would have a negative impact on achieving the necessary housing growth targets to be delivered in the Black Country over the Plan period.
Question 41a: Do you support the introduction of a policy approach towards self and custom build housing in the Core Strategy? Yes/No; If yes, would you support:
7.11 It is not considered that there is a policy need for the Core Strategy to address self and custom build housing in the emerging Review. Paragraph 6.32 indicates that there are only nine records on self and custom build registers in the Black Country. It is evident that that there is very limited demand in the Black Country, which is unsurprising given that self and custom build housing is often more popular in rural areas. Given the limited demand it is therefore not considered necessary to take a policy approach towards self and custom build housing within the Local Plan Review.
Question 41b: A target for each authority? Yes/No; Any further comments
7.12 Given that there is evidence of little market demand, it is not considered necessary for the Core Strategy to set targets for each of the Black Country authorities. If it was considered to be necessary as the Local Plan Review progresses, any targets being set should be formulated on the basis of robust evidence such as monitoring of the registers, to provide an indication of how many self-build homes will be needed.
Question 41c: A requirement for large housing sites to provide serviced plots? Yes/No; Any further comments?
7.13 There should not be a requirement for large housing sites to provide serviced plots. This can pose an unnecessary market constraint for large housebuilders when there may be limited or no market demand for self-build plots. Self and custom build plots are often unusual and unique in character, therefore would not be best suited to be located within a large housing development with more uniform house types. If deemed necessary, self and custom build housing should be allocated specific site allocations, as discussed below.
Question 41d: Another approach altogether? Yes/No; If yes, please specify.
7.14 If it is considered necessary for the Review to address self and custom build housing, this should be addressed by the Council's identifying and allocating specific plots for these uses. Identifying site-specific plots would ensure that the most appropriate and suitable locations for self and custom-build will be allocated, via the assessment of appropriate evidence and market demand. In addition, this might be more likely to be achieved on surplus publicly owned land.
Question 42: Do you agree that the annual affordable homes target should be increased to reflect the 2017 Black Country Strategic Housing Market Assessment? Yes/No; If no, please explain why.
7.15 As a general principle, the notion of applying different affordable housing ratios to different parts of the Black Country, based on an understanding of needs and viability, is acceptable. Given that the Black Country represents a vast area, there will not be a uniform housing market, and there will be sub-market trends within this wider area. As such, a more flexible approach which assesses local housing market evidence on a case by case basis could be justified. That said, there is an inherent simplicity and attraction to a single rate figure, which is easy for the development industry to understand.
7.16 In terms of the annual affordable housing target, it is unclear how the Issues and Options document has calculated the figure of 832 homes per year. At paragraph 7.42 of the June 2017 SHMA Part Two- affordable housing document, it is stated that the total annual affordable housing need is 677 dwellings, which represents 19.8% of the annual projected household growth. This differs to paragraph 6.36 of the Issues and Options document, which states that the affordable housing target is 23.4% of total housing need or 832 homes per year. From paragraph 7.47 of the SHMA, it appears that this figure may have been calculated by adding the overall requirement of 16.6% of housing to be affordable rented and 6.7% shared ownership. Clarity is sought on how this figure has been calculated, and we reserve the right to comment further on this matter.
Question 43a: Do you think that the existing Policy HOU3 site size threshold should be kept at 15 homes or more? Yes/No; If no, please explain why.
7.17 We have not undertaken detailed analysis of the findings and assumptions of the SHMA and affordable housing delivery matters, therefore would like to reserve the right to comment on this matter further. However, on face value, it appears to be a reasonable threshold and is not dissimilar to other locations.
Question 44a: Do you think that the affordable housing requirement for eligible sites in Question 43 should be kept at 25% of the total number of homes on the site? Yes /No; Any further comments?
7.18 Based on the current evidence, a blanket rate of 25% affordable housing would appear to be sound.
7.19 However, irrespective of the final rate, any amendments to the currently adopted affordable housing policy must continue to have a clause in it which stipulates that this requirement is subject to viability tests. Any revised affordable housing requirements will also need to carefully consider the implications of adopted Community Infrastructure Levy (CIL) regimes. Both Sandwell and Dudley Councils have adopted CIL Charging Schedules. These will have implications on viability, therefore if revised affordable housing targets are to progressed then these CIL tariffs will need to re-assessed and re-visited.
Question 44b: If no, should the percentage be increased to allow for the provision of affordable home ownership? Yes/No; If yes, what should the percentage be and why?
7.20 At paragraph 6.39 of the Issues and Options Paper, it is stated that options need to be explored to increase affordable housing delivery of private sites. One option would be to increase the overall affordable housing proportion, which would require developers to provide affordable home ownership products plus an appropriate proportion of other affordable tenures. This paragraph follows on from commentary relating to the Housing White Paper.
7.21 The Housing White Paper discusses Starter Homes at Chapter 4, and explains how the government intend to amend the NPPF to introduce a clear policy expectation that housing sites deliver a minimum of 10% affordable home ownership units. It is later stated that it will be for local areas to work with developers to agree an appropriate level of delivery of starter homes, alongside other affordable home ownership and rented tenures.
7.22 The policy position on Starter Homes is not yet fully clear, and has yet to be formally established through a formal amendment and update to the NPPF. Until the national policy position on Starter Homes has been made clear, it would be premature for the Core Strategy Review to suggest an uplift in the affordable housing requirement to include affordable home ownership such as Starter Homes. Any suggestion to uplift the affordable housing requirement to include Starter Homes should be reflective of the national policy position, as well as founded upon a robust evident base which dictates exactly what percentage this element should be of the overall affordable housing requirement.
Question 45: Should an increased affordable housing requirement be set for green belt release sites, to reflect the likely financial viability of these sites? Yes/No; If yes, what should this be.
7.23 The likely financial viability of Green Belt sites will vary across different areas of the Black Country, therefore any affordable housing requirements for Green Belt sites will need to be reflective of these circumstances. Any affordable housing targets for Green Belt sites should be based on robust evidence, and acknowledge that many sites may need to support and deliver other infrastructure requirements.
7.24 Ultimately, any affordable housing strategy will need to address the affordable housing need as well as the need for market housing. Bearing in mind that the SHMA confirms over 70% of homes required are for homes to be sold on the open market, any affordable housing policy must not dilute the delivery of these needs/requirements. A higher figure on Green Belt sites over and above a standard blanket figure would potentially do this.
Employment Question 49a: Is there still a need for existing Policy DEL2 in order to manage the release of poorer quality employment land for housing? Yes/No; If no, please explain why.
7.25 The Black Country is to be the subject of large levels of both employment and housing growth over the Plan period. These uses are very much inter-linked with one another, and will drive each other's need for growth. The Local Plan Review, in order to meet emerging employment and housing needs, must identify a significant number of specific sites for employment and housing uses. By planning proactively and identifying suitable sites for both employment land and housing land, this should reduce the pressures to manage the release of poorer quality employment land, which may not always be suitable for release. The Local Plan Review should also seek to undertake a further review of poorer quality employment land to make it available for other suitable uses, if it proves to no longer be viable for employment land use. This is in line with policy provisions of the NPPF, which at Paragraph 22 outlines that planning policies should avoid the long-term protection of sites allocated for employment use where there is no reasonable prospect of a site being used for that purpose.
Question 50: Do you think that the Core Strategy should continue to set a target for the total employment land stock in Policy EMP1? Yes/No; Please explain why.
7.26 The continuation of setting a target for employment land stock would be supported. Policy EMP1 should make it clear that these are not maximum figures, to encourage further flexibility for additional growth.
Retail Question 59: Have all the appropriate centres within the Black Country been identified? Yes/No; If not, please specify additional centres
7.27 No comment.
Question 61: In addition to para 4.33 of the current Core Strategy should the revised Core Strategy include criteria for the creation of new centres that might be needed as a result of any additional housing identified through the plan? Yes/No; Any further comments?
7.28 Criteria would be a useful policy tool to help assess the designation of new centres, and should be in line with previous methodologies used which set out clear thresholds.
Question 71: Should the Core Strategy set housing targets for the Town Centres?
7.29 Housing within Town Centres should be supported, in line with paragraph 23 of the NPPF which discusses the important role that residential development can play in ensuring the vitality of Town Centres. Any housing targets should be based on what sites are known to be readily available, suitable and viable for residential development. Market demand for housing in these areas will also need to be fully assessed. It is notable from the outcome of the 2017 SHMA that there is most demand for three bedroom properties (40%). The highest demand is therefore for family housing, and not for flats which are often the most popular within Town Centre locations. Any housing targets set for the Town Centre would therefore need to consider the findings of the SHMA, and be reflective of the fact that family housing is often more suitable for delivery on larger sites, including on sites which are currently located within the Green Belt.
Environment Question 99a: Do you think that national standards for housing development on water consumption should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.30 When referring to water consumption paragraph 6.1.52 of the Issues and Options document states that the Black Country does not currently lie in an area of serious water stress, therefore clear need may be difficult to demonstrate. This evidence suggests that there is limited or no need to introduce such a policy, therefore it is not considered that the Core Strategy Review should seek to introduce water consumption standards for housing development.
Question 99b: Do you think that national access standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.31 The introduction of any national access standards, with the Issues and Options document referring specifically to Lifetime Homes, again must be based on a robust evidence base which can demonstrate market demand. It is noted that Paragraph 50 of the NPPF states that planning authorities must plan for a mix of housing to meet a range of needs. In the same paragraph, it is later stated that these must be based on current and future market trends. If Lifetime Home standards are to be introduced these will therefore need to be based on robust evidence, to ensure that the standards are not overly onerous and prevent the delivery of other types of housing which have higher levels of market demand.
Question 99c: Do you think that national space standards for housing development should be introduced in the Black Country? Yes/No; If yes, please specify what level and percentage would be appropriate and why.
7.32 As reiterated throughout these representations, it is not considered that a blanket approach of prescriptive standards across the Black Country allows sufficient flexibility to assess local market and site considerations in an appropriate manner. Whilst it is recognised that space standards can be an important tool to ensure that high quality of homes are delivered, we agree with the sentiment expressed in the recent Housing White Paper. The Paper explains that the government are concerned that a one size fits all approach may not reflect the needs and aspirations of a wider range of households. The White Paper also states that the Government will be undertaking a review of the Nationally Described Space Standards. It is suggested that the Core Strategy Review should await the outcome of this national review of national space standards, to ensure compliance with national policy and to ensure that the most appropriate approach to space standards, if required, is taken.
Question 99d: Do you think that the standards should be different for brownfield and greenfield sites? Yes/No; If yes, please explain how and why.
7.33 As discussed above, prescriptive standards do not always allow sufficient flexibility for local market needs, so we would not advocate a blanket approach of different standards to brownfield and greenfield sites.
Open Space, Sport and Recreation Question 102a: Do you support the proposed changes relating to open space, sport and recreation? Yes/No; If no, please explain
7.34 Paragraph 6.1.60 of the Issues and Options paper outlines how adopted Policy ENV6 creates the framework for open space policies at the local level. The Issues and Options paper outlines how this is in line with national guidance, and that it is proposed to retain this policy and update some references in the supporting text to reflect changing circumstances. It is agreed that the local level remains the appropriate place to set open space policies, and that Policy ENV6 should continue to endorse this approach.

Attachments:

Need help completing this? Click here for our simple user guide.