Black Country Core Strategy Issue and Option Report

Search representations

Results for Clowes Developments search

New search New search

Object

Black Country Core Strategy Issue and Option Report

Question 13a - Do you support Spatial Option H2? Yes/No; What should the characteristics of Sustainable Urban Areas (SUEs) be? e.g. minimum/ maximum size, mix of uses, mix of housing types, accessibi

Representation ID: 2215

Received: 08/09/2017

Respondent: Clowes Developments

Agent: Harris Lamb

Representation Summary:

The respondent does not support Spatial option H2. Some modest sized sustainable urban extensions or smaller sites in the greenbelt should be provided. Also consider that larger sustainable urban extensions would not be delivered during the plan period.

Comment

Black Country Core Strategy Issue and Option Report

Question 15a - If all housing need cannot be met within the Black Country, do you support the 'export' of housing growth to neighbouring authorities within the HMA? Yes/No; What factors should be tak

Representation ID: 2216

Received: 08/09/2017

Respondent: Clowes Developments

Agent: Harris Lamb

Representation Summary:

It will be necessary to release sites outside the Black Country Administrative boundary to meet the housing needs of the Black Country.
Sites should be identified in South Staffordshire, Wyre Forest and Bromsgrove Districts.
Locations should be considered that meet the following criteria:
A. Be situated immediately adjoining the Black Country administrative boundary and with the ability to achieve easy access to the existing urban area; or
B. Be located in settlements in close proximity to the Black Country.

Comment

Black Country Core Strategy Issue and Option Report

Question 15b - Do you think there are any potential locations that should be considered? Yes/No; If yes, please provide details.

Representation ID: 2217

Received: 08/09/2017

Respondent: Clowes Developments

Agent: Harris Lamb

Representation Summary:

Hagley will provide an appropriate location for sites to meet the housing needs of the Black Country. Two sites namely Western Road/ Stourbridge Road and Stoney Lane/Stakenbridge Lane/Kidderminster Road have been identified through "call for sites" process.

Comment

Black Country Core Strategy Issue and Option Report

Question 15c - Do you think there are ways to ensure that exporting housing will meet the needs of people who would otherwise live in the Black Country? (e.g. transport improvements, provision of affo

Representation ID: 2218

Received: 08/09/2017

Respondent: Clowes Developments

Agent: Harris Lamb

Representation Summary:

Yes we believe that sites can be released in the neighbouring authorities namely South Staffordshire, Wyre Forest and Bromsgrove Districts.

Comment

Black Country Core Strategy Issue and Option Report

Question 21 - Do you think that changes are required to Policy DEL1 to ensure it covers both development within the existing urban area and any within the Green Belt? Yes/No; If yes, please provide de

Representation ID: 2219

Received: 08/09/2017

Respondent: Clowes Developments

Agent: Harris Lamb

Representation Summary:

Policy DEL1 needs to be reviewed to ensure compliance with the NPPF and the PPG. Otherwise joint working with neighbouring authorities will be required to ensure adequate provision of infrastructure to support development.
The statutory undertakers should be consulted at early stages of the of the plan production to ensure the timely availability of the necessary infrastructure including highways, drainage and power.

Comment

Black Country Core Strategy Issue and Option Report

Question 25 - Will there be any new social infrastructure requirements necessary to serve large new housing developments? Yes/No; If yes, please explain the type and scale of any new social infrastruc

Representation ID: 2220

Received: 08/09/2017

Respondent: Clowes Developments

Agent: Harris Lamb

Representation Summary:

There will need to be significant improvements to the social infrastructure provision to meet the requirements of occupiers of the new developments mooted in the plan.
Doctor surgeries should be regarded as "private sector" matter.
The new infrastructure to be provided for individual schemes should be assessed on case to case basis.

Comment

Black Country Core Strategy Issue and Option Report

Question 29 - Do you think there are any other tools or interventions that could be used to ensure enough infrastructure is provided by developments? Yes/No; If yes, please provide details.

Representation ID: 2221

Received: 08/09/2017

Respondent: Clowes Developments

Agent: Harris Lamb

Representation Summary:

Viability is an important issue which needs addressing as and when the sites come forward for development.

Comment

Black Country Core Strategy Issue and Option Report

Question 30 - Do you have any suggestions around how the strategy can be developed in order to maintain the urban regeneration focus of the Black Country while at the same time bringing forward sites

Representation ID: 2222

Received: 08/09/2017

Respondent: Clowes Developments

Agent: Harris Lamb

Representation Summary:

There should be a balanced provision of brownfield and greenfield sites as there is limited capacity on brownfield sites for residential development.
Greenfield sites should be identified at an early stage of plan production to ensure adequate supply of land for housing and other uses.
A balanced housing provision should be provided which is not reliant on external funding opportunities.
The authorities should provide flexibility in terms of layout and design solutions on the sites that have constraints associated with them.

Comment

Black Country Core Strategy Issue and Option Report

Question 31 - Do you think that the right scale and form of funding is available to support the delivery of the Core Strategy review? Yes/No; If no, what alternative sources of funding or delivery mec

Representation ID: 2223

Received: 08/09/2017

Respondent: Clowes Developments

Agent: Harris Lamb

Representation Summary:

The respondents are concerned in terms of the time it takes for funding opportunities to bring forward sites for development. There is no guarantee that funding will continue for the life of the plan.
A balanced housing provision should be provided which is not reliant on external funding opportunities. More greenfield sites should be identified in the plan.

Comment

Black Country Core Strategy Issue and Option Report

Question 34a - Do you agree that the health and wellbeing impacts of large development proposals should be considered at the Preferred Spatial Option stage of the Core Strategy review through a Health

Representation ID: 2224

Received: 08/09/2017

Respondent: Clowes Developments

Agent: Harris Lamb

Representation Summary:

These matters should be considered at the planning application stage to assess health impacts of a development.